Construction Documents Summary: Camp Hartell CSMS Compressor Replacement

This file consists of architectural and engineering drawings for the Connecticut Military Department's compressor replacement project at Camp Hartell, located at 542 North Street, Windsor Locks, Connecticut 06096. The project, identified as ITB 25MIL23702, involves the removal of two existing air compressors and replacement with one 75-horsepower building air compressor (COMP-1), two 20-horsepower breathing air compressors (COMP-2 and COMP-3) mounted on a factory-provided skid, and all associated mechanical, electrical, and specialty systems. The drawings, dated March 6, 2026, include site logistics planning, mechanical demolition and installation plans for ductwork and piping systems, electrical floor plans and single-line diagrams, and detailed specifications for hangers, supports, housekeeping pads, and control systems. The contractor is responsible for providing a temporary 75-horsepower compressor and storage tank to serve the building during the construction phase and must coordinate all work with multiple trades including mechanical, electrical, and plumbing contractors. The facility will remain occupied and operational during construction, requiring careful scheduling of any service interruptions with the facility owner.

The construction documents establish comprehensive requirements for equipment installation, including seismic restraint calculations, vibration isolation, condensate management, and control system integration with the existing building automation system. All removed materials must be disposed of through licensed carting services, with hazardous materials handled by EPA-approved disposal services and proper documentation maintained. The contractor is required to submit shop drawings for review prior to construction, develop coordination drawings with all affected trades, and provide as-built drawings and maintenance manuals upon project completion. Electrical work requires connection to the existing 480/277-volt, three-phase main service, with power distribution through panelboard RP2B1 for control systems. The project follows Connecticut Building Code requirements and SMACNA standards for ductwork construction, with all work coordinated to maintain continuity of existing facility operations and services not affected by the renovation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA OF WORK -

COMPRESSOR ROOM

APPROX. LOCATION OF

TEMP COMPRESSOR

TOWER AVE.

SL001

SCALE: NONE

SITE LOGISTICS PLAN

N

SL001

SITE LOGISTICS PLAN

JF

JF

NTS

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

1. THE EXISTING FACILITY WILL BE OCCUPIED AND IN OPERATION DURING THE PERFORMANCE OF

THE WORK.

2. WHEN NECESSARY TO TEMPORARILY DISCONNECT ANY EXISTING PIPING OR DUCTWORK WHICH

MAY CAUSE DISRUPTION TO OCCUPIED FACILITIES, CONFER WITH THE OWNER, AND SCHEDULE

A MUTUALLY AGREEABLE PERIOD OF INTERRUPTION.

3. WHERE REPLACEMENT, RELOCATION OR MODIFICATION OF EXISTING EQUIPMENT IS INDICATED, PROVIDE AND MAINTAIN ALL TEMPORARY SERVICES, CONNECTIONS, CONTROLS, AND ANY

OTHER MATERIALS AND APPURTENANCES REQUIRED TO MAINTAIN SERVICES TO OCCUPIED

AREAS.

4. NO WORK SHALL BE LEFT INCOMPLETE, NOR ANY HAZARDOUS SITUATION CREATED, WHICH

WILL AFFECT THE LIFE OR SAFETY OF THE PUBLIC AND/OR BUILDING OCCUPANTS. AT NO TIME SHALL THE WORK INTERFERE WITH OR CUT OFF ANY OF THE EXISTING SERVICES WITHOUT THE

OWNER'S PRIOR WRITTEN PERMISSION.

5. THE OWNER RESERVES THE RIGHT TO OPERATE ALL EXISTING MECHANICAL EQUIPMENT UNTIL

THE NEW SYSTEMS COME ON LINE.

6. IT IS REQUIRED THAT THE WORK INDICATED AND/OR SPECIFIED SHALL BE CARRIED OUT WITH A

MINIMUM OF INTERFERENCE TO THE ESTABLISHED OPERATIONS OF THE BUILDING.

7. REMOVED MATERIALS SHALL BE DISPOSED OF USING LICENSED CARTING SERVICE.

8. HAZARDOUS MATERIALS - SHALL BE DISPOSED OF BY AN EPA APPROVED, LICENSED DISPOSAL SERVICE. CONTRACTOR SHALL OBTAIN AND HAVE ON FILE, AFFIDAVIT, AND RECEIPTS STATING

HOW AND WHERE THE WASTE WAS DISPOSED OF OR CONVERTED.

9. IT IS THE INTENTION OF THESE DEMO DRAWINGS TO INDICATE GENERAL SYSTEMS AND

MATERIALS TO BE REMOVED. CONTRACTOR SHALL REMOVE ALL OBSOLETE PIPING, DUCTWORK,

EQUIPMENT, CONTROLS, ETC, INDICATED OR NOT.

10. DUCTWORK, EQUIPMENT AND TERMINAL DEVICES HAVE BEEN TAKEN FROM FIELD OBSERVATION

AND ARE TO BE USED FOR REFERENCE AND SHALL NOT BE CONSTRUED TO BE ACTUAL FIELD

CONDITIONS. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SYSTEMS PRIOR TO

COMMENCEMENT OF DEMOLITION WORK.

11. ALL EQUIPMENT TO BE REMOVED SHALL BE DISPOSED OF PER OR STORED PER DIRECTION OF

OWNER. ANY ITEM NOT RETAINED BY OWNER SHALL BE REMOVED FROM SITE AND DISCARDED

IN AN APPROVED MANNER.

12. IT IS THE INTENTION OF THESE SPECIFICATION TO REMOVE ALL MATERIALS ABANDONED BY THE SCOPE OF THIS CONSTRUCTION PROJECT. NO OBSOLETE MATERIALS (I.E. HANGERS, SUPPORTS, INSULATION, DUCTWORK, ETC.) SHALL REMAIN.

13. DISCONNECT AND REMOVE ALL DUCTWORK AND ASSOCIATED SUPPLY, RETURN OR EXHAUST

GRILLES INCLUDING BUT NOT LIMITED TO ALL HANGERS, SUPPORTS, VOLUME DAMPERS AND

FLEXIBLE DUCTWORK.

14. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO ANY EXPOSED OR UNCAPPED NEW

OR EXISTING DUCTWORK TO REMAIN TO MINIMIZE DUST CONTAMINATION IN ANY AND ALL OF

THE AIR SYSTEMS. THIS SHALL INCLUDE BUT IS NOT LIMITED TO TEMPORARY FILTERS, CAPS, ENCLOSURES, ETC.

MECHANICAL DEMOLITION NOTES MECHANICAL DRAWING LIST

COVER SHEET - MECHANICALM001

DEMOLITION FLOOR PLAN PIPING - MECHANICAL

MD100

MD101

DEMOLITION FLOOR PLAN DUCTWORK - MECHANICAL

DRAWING DESCRIPTIONDRAWING

NUMBER

GENERAL

1. WHEN A CONFLICT BETWEEN THE DRAWINGS, NOTES AND/OR SPECIFICATIONS OCCUR, THE MORE STRINGENT, AND/OR LARGER QUANTITY AND/OR MORE EXPENSIVE SHALL APPLY. THE REQUIREMENTS LISTED WITHIN NOTES OR SPECIFICATIONS SHALL BE REQUIRED, PROVIDED AND INSTALLED WHETHER

SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT.

2. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO PROVIDE FOR FINISHED WORK, TESTED AND READY FOR OPERATION.

3. ITEMS AND SERVICES NOT SHOWN ON DRAWINGS OR SPECIFICATIONS BUT REQUIRED TO RENDER THE WORK COMPLETE AND READY FOR OPERATION, SHALL BE PROVIDED WITHOUT ADDITIONAL COST.

4. WORK OF THIS SECTION SHALL BE GOVERNED BY THE CONTRACT DOCUMENTS. PROVIDE MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO FURNISH, DELIVER AND INSTALL ALL WORK AS SPECIFIED AND AS REQUIRED BY JOB CONDITIONS. WHERE A CONFLICT EXISTS BETWEEN THESE NOTES, THE DRAWINGS AND THE SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL APPLY.

5. DRAWINGS ARE DIAGRAMMATIC AND INDICATE A GENERAL ARRANGEMENT OF WORK AND ARE NOT TO BE CONSIDERED SUB-CONTRACTOR DOCUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND ALL SUBCONTRACTORS TO INCLUDE THE PROVISIONS AND INSTALLATION OF ALL NECESSARY WORK AND MATERIALS FOR COMPLETE, OPERATIONAL AND CODE COMPLIANT SYSTEMS. GENERAL DESIGN

CONCEPTS INDICATED MUST BE FOLLOWED OR BETTERED. THE BID SHALL INCLUDE OFFSETS,

ADDITIONAL PIPING, VALVES AND EQUIPMENT AND COMPONENTS AS REQUIRED TO MEET

CONSTRUCTION CONDITIONS FOR PROPER OPERATION. DO NOT SCALE DRAWINGS.

6. PERFORM THE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT GENERAL

CONDITIONS AND WITH THE PROVISIONS OF ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND

LAWS.

7. WORK SHALL INCLUDE ALL INCIDENTALS, LABOR, MATERIAL, EQUIPMENT, APPLIANCES, SERVICES, HOISTING, SCAFFOLDING, SUPPORTS, TOOLS, CONSUMABLE ITEMS, FEES, LICENSES, AND

ADMINISTRATIVE TASKS REQUIRED TO COMPLETE AND MAKE OPERABLE WORK SHOWN ON THE

DRAWINGS, SPECIFIED HEREIN AND AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.

8. STORE MATERIALS INSIDE AND PROTECTED FROM DEBRIS, WEATHER AND MOISTURE.

9. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL POWER AND CONTROL WIRING REQUIRED FOR EQUIPMENT OPERATION NOT SPECIFICALLY PROVIDED BY OTHERS BUT REQUIRED FOR A COMPLETE

AND OPERATIONAL SYSTEM. THIS CONTRACTOR SHALL PROVIDE MOTOR STARTERS. COORDINATE

REQUIREMENTS WITH DIVISION 26.

10. COORDINATE ALL WORK AND EQUIPMENT WITH WORK OF OTHER TRADES.

11. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF EXACT CONDITIONS TO BE VERIFIED IN THE FIELD. CONTRACTOR SHALL VISIT THE SITE TO VERIFY THE CONSTRUCTION CONDITIONS BEFORE

SUBMITTING BID.

12. REFER TO SPECIFICATION SECTION 230000 FOR ADDITIONAL PENETRATION SEALING REQUIREMENTS.

PENETRATIONS TO COMPLY WITH ASTM E84 & E814 AND APPROVED UL 1479 AND SPECIFIC UL

ASSEMBLIES AS REQUIRED TO SUIT PENETRATION CONDITIONS.

13. TEMPERATURE CONTROL CONTRACTOR (TCC) IS RESPONSIBLE FOR ALL CONTROL WIRING 120 VOLT AND LESS. SHARED TRANSFORMERS ARE NOT ALLOWED. RUN POWER PER DIVISION 26 REQUIREMENTS.

14. TCC SHALL EXTEND ALL POWER FOR DAMPER ACTUATORS, VALVE ACTUATORS AND OTHER CONTROL DEVICES FROM LOCAL ELECTRICAL PANEL. DIVISION 26 TO SUPPLY POWER TO TCPS. REFER TO

ELECTRICAL DRAWINGS FOR PANEL LOCATIONS.

15. THE DRAWINGS AND SPECIFICATIONS ARE DIVIDED INTO SECTIONS TO MEET THE NEEDS OF THE THE ENGINEERS AND THE DESIGN CONSULTANTS. THEY ARE NOT PREPARED AS INSTRUCTIONS TO THE

CONTRACTOR FOR HOW TO BUY OUT OR SUBCONTRACT THE WORK. THE CONTRACTOR IS

RESPONSIBLE FOR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS, REGARDLESS OF

WHERE IT IS SHOWN. FOR EXAMPLE, ELECTRICAL WORK IS SHOWN ON M-SERIES DRAWINGS AS WELL AS E-SERIES DRAWINGS. TO AVOID OMITTING ANY COMPONENT OF THE PROJECT, REFER TO ALL THE

CONTRACT DOCUMENTS IN THEIR ENTIRETY.

16. VERIFY EXACT LOCATION OF CONNECTION POINTS (NEW TO EXISTING) IN FIELD PRIOR TO

CONSTRUCTION.

17. RELOCATE EXISTING DUCTWORK AND/OR PIPE WORK IN EXISTING SPACES TO ACCOMMODATE ALL

RENOVATIONS AND ADDITIONS.

18. PATCH ALL WALLS, FLOORS, CEILINGS, AND ROOFS TO MATCH EXISTING IN ALL CASES WHERE EXISTING

WALLS, FLOORS, CEILINGS, AND ROOFS REMAIN AND HVAC DEMOLITION IS INDICATED.

ALTERATION WORK AND DEMOLITION

1. ALL EQUIPMENT, DUCTWORK, PIPING, CONTROL DEVICES, ETC. TO BE REMOVED, SHALL BE DISPOSED

OF, TURNED OVER TO THE OWNER, OR SALVAGED AS DIRECTED BY THE OWNER. EQUIPMENT,

DUCTWORK, PIPING, CONTROL DEVICES, ETC. SHALL NOT BE REMOVED FROM THE PREMISES WITHOUT

THE OWNER'S APPROVAL.

2. UPON COMPLETION OF REMOVALS AND MODIFICATIONS, ALL DUCTWORK AND PIPING TO REMAIN SHALL BE PROPERLY VALVED, CAPPED AND/OR BY PASSED SUCH THAT UPON COMPLETION OF WORK ALL

SYSTEMS TO REMAIN, REMAIN OPERATIONAL.

3. NO DEAD ENDS SHALL BE LEFT ON ANY DUCTWORK OR PIPING SYSTEM UPON COMPLETION OF WORK.

4. EXISTING DUCTWORK AND PIPING SYSTEMS NOT TO BE REUSED, AND NOT SPECIFICALLY NOTED FOR

REMOVAL SHALL BE COMPLETELY REMOVED.

5. ALL SYSTEMS SHALL BE LEFT IN WORKING ORDER TO THE SATISFACTION OF THE OWNER UPON

COMPLETION OF ALL NEW WORK.

6. ALL EXISTING UNNECESSARY DUCTWORK AND PIPING NOT RELATED TO NEW WORK SHALL BE

COMPLETELY REMOVED.

7. RE-ROUTE ALL EXISTING DUCTWORK, PIPING AND SYSTEMS WHERE NECESSARY TO AVOID NEW

EQUIPMENT, STRUCTURAL, OR MASONRY AS REQUIRED BY THE PROPOSED ALTERATIONS.

SHOP DRAWINGS

1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO BE REVIEWED BY THE ENGINEER PRIOR TO

CONSTRUCTION. SHOP DRAWINGS SHALL BE SUBMITTED FOR DUCTWORK LAYOUT, PIPING LAYOUT, SHEET METAL SHOP STANDARDS AND ALL EQUIPMENT FURNISHED.

2. ELECTRONIC DRAWING FILES SHALL BE GENERATED BY THE CONTRACTOR. DRAWINGS SHALL BE SUBMITTED IN BOTH HARD COPY AND ELECTRONIC VERSION (AUTOCAD VERSION AS REQUIRED BY THE

OWNER) OR AUTOCAD VERSION 2018 IF NOT SPECIFIED.

3. PRIOR TO THE SUBMISSION AND REVIEW OF SHEET METAL SHOP DRAWINGS, THE CONTRACTOR SHALL SUBMIT FOR REVIEW SHEET METAL SHOP STANDARDS. ANY SHEET METAL SHOP DRAWINGS SUBMITTED

PRIOR TO THE SUBMISSION OF THE SHOP STANDARDS SHALL BE RETURNED "NOT REVIEWED".

COORDINATION DRAWINGS

1. ELECTRONIC DRAWING FILES SHALL BE GENERATED BY THE CONTRACTOR. IF REQUESTED,

ELECTRONIC FILES OF THE MECHANICAL FLOOR PLANS, SECTIONS AND ELEVATIONS ONLY WILL BE MADE AVAILABLE. ELECTRONIC FILES WILL BE RELEASED ONLY UPON RECEIPT OF THE SIGNED AGREEMENT FOR TRANSFER OF ELECTRONIC FILE DATA, AGREEMENT FOR TRANSFER OF BUILDING

INFORMATION MODEL AND ALL FEES INDICATED THEREIN.

2. DEVELOP AND SUBMIT COORDINATION DRAWINGS AS OUTLINED.

A. SHEET METAL AND PLUMBING/PIPING SHOP DRAWINGS THAT HAVE BEEN COORDINATED WITH

ARCHITECTURAL AND STRUCTURAL PLANS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

DRAWINGS MUST BE RETURNED FROM ENGINEER EITHER "REVIEWED" OR "FURNISH AS CORRECTED"

PRIOR TO BEING USED AS BASIS FOR COORDINATION DRAWINGS.

B. AFTER SHEET METAL AND PIPING DRAWINGS HAVE BEEN REVISED PER ENGINEERS COMMENTS, REPRODUCIBLE COPIES SHALL BE SENT TO THE TRADES IN THE FOLLOWING SEQUENCE FOR THE

INCLUSION OF THEIR WORK:

-MECHANICAL SHEET METAL

-PIPING

-ELECTRICAL WORK

3. AFTER ALL TRADES HAVE INCLUDED THEIR WORK ON THE COORDINATION DRAWING AND NOTED

CONFLICTS, ALL TRADES SHALL MEET TO RESOLVE CONFLICTS AND AGREE TO ACCEPTABLE

SOLUTIONS. EACH TRADE SHALL SIGN COORDINATION DRAWINGS. ITEMS NOT SHOWN ON

COORDINATION DRAWING IS RESPONSIBILITY OF OMITTING CONTRACTOR AND CONTRACTOR IS

SUBJECT TO ADDITIONAL COSTS INCURRED BY OTHER TRADES.

4. THE ENGINEER IS NOT PART OF THE COORDINATION DRAWING PROCESS. THE ENGINEER WILL PROVIDE ASSISTANCE FOR NOTED CONFLICTS ONLY. COORDINATION DRAWINGS ARE NOT TO BE CONSIDERED PIPING OR DUCT SHOP DRAWINGS. THE CONTRACTOR IS REQUIRED TO SUBMIT INDIVIDUAL PIPING AND DUCTWORK SHOP DRAWINGS FOR REVIEW BY THE ENGINEER. PIPING AND DUCTWORK SHOP DRAWINGS

SHALL FOLLOW THE DESIGN INTENT OF THE CONTRACT DOCUMENTS.

5. SUBMIT FINAL SIGNED COORDINATION DRAWING TO ENGINEER FOR REVIEW. ENGINEER WILL REVIEW COORDINATION DRAWINGS FOR GENERAL ARRANGEMENT AND FOR NOTED CONFLICTS ONLY. SPECIFIC INSTALLATION REQUIREMENTS WILL BE REVIEWED ONLY IN INDIVIDUAL TRADE SHOP DRAWINGS.

6. ANY WORK FABRICATED OR INSTALLED PRIOR TO SIGN OFF BY ALL TRADES WHICH IS DEEMED TO BE IN CONFLICT WITH COORDINATION DRAWINGS SHALL BE REMOVED AND RE-INSTALLED IN CONFORMANCE

WITH COORDINATION DRAWINGS.

7. EACH CONTRACTOR (MENTIONED ABOVE) IS RESPONSIBLE FOR THE COORDINATION OF THEIR

SUB-CONTRACTORS.

8. THE OVERALL COORDINATION OF THE COORDINATION PROCESS IS THE RESPONSIBILITY OF THE CONTRACTOR. THE ENGINEER IS NOT RESPONSIBLE FOR THE COORDINATION PROCESS. THE ENGINEER

WILL RESPOND TO QUESTIONS THAT ARISE FROM THE COORDINATION PROCESS. DRAWINGS

SUBMITTED WILL BE REVIEWED FOR CLEARLY IDENTIFIED CONFLICTS ONLY. SOLUTIONS TO CONFLICTS

WILL NOT BEAR ADDITIONAL COST.

AS BUILT DRAWINGS

1. PROVIDE A COMPLETE SET OF AS-BUILT DRAWINGS REFLECTING AS INSTALLED CONDITIONS. AS-BUILT DRAWINGS SHALL INDICATE ALL INSTALLED CONDITIONS OF SYSTEMS WITHIN THIS DISCIPLINE.

DRAWINGS SHALL BE OF SIMILAR SCALE AS THE CONSTRUCTION DOCUMENTS AND INCLUDE DETAILS AS NECESSARY TO CLEARLY REFLECT THE INSTALLED CONDITION. DRAWINGS SHALL BE BOUND IN A COMPLETE AND CONSECUTIVE SET. SUPPLEMENTAL SKETCHES AND LOOSE PAPERWORK WILL NOT BE ACCEPTABLE AND WILL BE RETURNED FOR REVISION. THE CONTRACTOR SHALL COMPLY WITH THE ENGINEERS COMMENTS TO PRODUCE A CLEAR AND CONCISE SET OF DRAWINGS. DRAWINGS SHALL BE SUBMITTED IN BOTH HARD COPY AND ELECTRONIC VERSION (AUTO-CAD VERSION AS REQUIRED BY THE OWNER) OR AUTOCAD VERSION 2018 IF NOT SPECIFIED. NUMBER OF COPIES OF EACH AS REQUESTED

BY THE OWNER.

2. PROVIDE "AS-BUILT DRAWINGS" INDICATING IN A NEAT AND ACCURATE MANNER A COMPLETE RECORD OF ALL REVISIONS OF THE ORIGINAL DESIGN OF THE WORK. INDICATE THE FOLLOWING INSTALLED

CONDITIONS:

· INCLUDE ALL CHANGES AND AN ACCURATE RECORD IN AUTOCAD DRAWING OR APPROPRIATE

SHOP DRAWINGS, OF ALL DEVIATIONS, BETWEEN THE WORK SHOWN AND WORK INSTALLED.

· MAINS AND BRANCHES OF PIPING SYSTEMS, WITH VALVES AND CONTROL DEVICES LOCATED AND

NUMBERED, CONCEALED UNIONS LOCATED, AND WITH ITEMS REQUIRING MAINTENANCE LOCATED

(I.E., TRAPS, STRAINERS, EXPANSION COMPENSATORS, TANKS, ETC.). VALVE LOCATION DIAGRAMS, COMPLETE WITH VALVE TAG CHART.

· EQUIPMENT LOCATIONS (EXPOSED AND CONCEALED), DIMENSIONED FROM PROMINENT BUILDING

LINES.

· APPROVED SUBSTITUTIONS, CONTRACT MODIFICATIONS, AND ACTUAL EQUIPMENT AND MATERIALS

INSTALLED.

· CONTRACT MODIFICATIONS, ACTUAL EQUIPMENT AND MATERIALS INSTALLED.

3. SUBMIT FOR REVIEW BOUND SETS OF THE REQUIRED DRAWINGS, MANUALS AND OPERATING

INSTRUCTIONS.

4. SUBMIT A COMPLETE MAINTENANCE MANUAL OF ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT.

HOUSEKEEPING PADS

1. PROVIDE CONCRETE HOUSEKEEPING PADS FOR FLOOR-MOUNTED EQUIPMENT. COORDINATE EXACT LOCATIONS, DIMENSIONS, PIPING LOCATIONS, AND ANCHOR BOLT REQUIREMENTS. PROVIDE CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR MOUNTED EQUIPMENT. PADS SHALL BE CONSTRUCTED OF 3,000 PSI CONCRETE. PADS SHALL BE 4 INCHES HIGH (OR THE MINIMUM HEIGHT TO ACCOMMODATE THE CONDENSATE TRAP HEIGHT), AND MINIMUM 4 INCHES WIDER THAN THE EQUIPMENT IN ALL DIRECTIONS.

2. COORDINATE FLOOR DRAIN LOCATIONS WITH RESPECT TO EQUIPMENT HOUSEKEEPING PADS. PLACE DRAINS SUCH THAT EDGE OF THE FLOOR GRATE EXTENDS NO CLOSER THAN 2 INCHES FROM THE SIDE

OF THE PAD. FLOOR DRAINS TO BE COORDINATED WITH PLUMBING CONTRACTOR.

HANGERS AND SUPPORT

1. SEISMIC RESTRAINT: PROVIDE SEISMIC RESTRAINT AND EXPANSION OF ALL MECHANICAL EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH STATE AND FEDERAL BUILDING CODE REQUIREMENTS. SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE

STATE OF THE PROJECT INDICATING ALL NECESSARY COMPONENT CUTS, PLAN LOCATIONS AND

CALCULATIONS FOR A COMPLETE SYSTEM.

2. PROVIDE ALL NECESSARY STRUCTURAL MEMBERS INCLUDING ADDITIONAL STRUCTURAL SUPPORT TO SUPPORT PIPING AND EQUIPMENT. HANGERS AND SUPPORTS SHALL BE OF AN APPROVED DESIGN NECESSARY TO SUPPORT DUCTWORK, PIPING, EQUIPMENT AND TO KEEP IN PROPER ALIGNMENT AND PREVENT TRANSMISSION OF INJURIOUS THRUSTS AND VIBRATIONS. IN ALL CASES WHERE HANGERS, BRACKETS, ETC., ARE SUPPORTED FROM CONCRETE CONSTRUCTION, DO NOT WEAKEN CONCRETE OR

PENETRATE WATERPROOFING. ALL HANGERS AND SUPPORTS SHALL BE CAPABLE OF SCREW

ADJUSTMENT AFTER EQUIPMENT AND PIPING IS ERECTED. HANGERS SUPPORTING PIPING EXPANDING INTO LOOPS, BENDS AND OFFSETS SHALL BE SECURED TO THE BUILDING STRUCTURE IN SUCH A MANNER THAT HORIZONTAL ADJUSTMENT PERPENDICULAR TO THE RUN OF PIPING SUPPORTED MAY BE MADE TO ACCOMMODATE DISPLACEMENT DUE TO EXPANSION. ALL SUCH HANGERS SHALL BE FINALLY ADJUSTED BOTH IN THE VERTICAL AND HORIZONTAL DIRECTION, AS REQUIRED. HANGERS IN CONTACT WITH COPPER OR BRASS PIPE SHALL BE DIELECTRIC, COMPATIBLE WITH COPPER AND BRASS ALLOY OR

PROVIDED WITH FELT SLEEVE.

3. PROVIDE ADDITIONAL SUPPORT FOR DUCTWORK PIPING AND EQUIPMENT WHEN DECK IS NOT CAPABLE

OF SUPPORT.

4. BEAM CLAMPS - HANGERS SUPPORTED FROM STEEL SHALL BE CENTER LOADING BEAM CLAMPS FOR HANGERS SUPPORTING PIPING 2-1/2 INCHES AND LARGER. FOR PIPING 2 INCHES AND SMALLER, I BEAM CLAMPS, WITH RETAINING STRAPS, SHALL BE FORGED STEEL. "C" CLAMPS ARE NOT TO BE USED.

5. PROVIDE AND INSTALL EXPANSION COMPENSATION FOR ALL PIPING. SUBMIT PLANS, CALCULATIONS

AND EQUIPMENT DATA.

GENERAL MECHANICAL NOTES

T

H

24x12

12"Ø

XXX

GENERAL MECHANICAL SYMBOLS

CA

BA

* ALL SYMBOLS MAY NOT BE USED IN THESE DOCUMENTS.

XXXXXXXX

POINT OF DEMOLITION / DISCONNECT

POINT OF CONNECTION

UNDERLINED TEXT DENOTES EQUIPMENT

REFER TO SCHEDULES

BACK DRAFT DAMPER

MOTORIZED DAMPERTHERMOSTAT

RELATIVE HUMIDITY SENSOR OR HUMIDISTAT

VANE EXTRACTOR

DUCT TAKE-OFF

MITERED ELBOW WITH TURNING VANES

EXHAUST / RETURN AIR FLOW

SUPPLY AIR FLOW

FLEXIBLE DUCT CONNECTION

ROUND DUCT DIAMETER SIZE

ACCESS DOOR IN DUCT

SUPPLY DUCT UP / DOWN

RETURN AIR DUCT UP / DOWN

EXHAUST AIR DUCT UP / DOWN

DOUBLE LINE DUCTWORK WITH INDICATION

OF INSIDE DIMENSIONS

HIDDEN DUCTWORK

EXISTING DUCTWORK TO BE REMOVED

EXISTING DUCTWORK TO REMAIN

X X X X X X

X X X X X X

MD MD

BD

COMPRESSED AIR PIPING

BREATHING AIR PIPING

HIDDEN PIPING

EXISTING PIPING / EQUIPMENT TO REMAIN

EXISTING PIPING / EQUIPMENT TO BE REMOVED

DIRECTION OF FLOW IN PIPE

PIPE ELBOW UP / DOWN

PIPE TOP CONNECTION

PIPE BOTTOM CONNECTION

CAPPED PIPING

PIPING CONTINUATION

PIPE UNION

FLEXIBLE PIPE CONNECTOR

BALL VALVE

BUTTERFLY VALVE

PRESSURE GAUGE WITH BALL VALVE

PIPE REDUCER OR INCREASER

BALL DRAIN VALVE WITH HOSE COUPLING AND CAP

CHECK VALVE

BD

M101 NEW FLOOR PLAN - MECHANICAL

FLOW AND CONTROL - MECHANICALM002

M200 SCHEDULES & DETAILS - MECHANICAL

M201 DETAILS - MECHANICAL

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

M001

COVER SHEET -

MECHANICAL

KR

KR

NTS

VSF

CS

R

VFD

MS

P

SD

ES

SP

HL

FS

H

AQ

MECHANICAL CONTROLS SYMBOL LIST

DPT

DI

AI

AO

DO

T

A

M

T

H

F

VS

SH

OC

TCP

TCU

CO

NO2

L

ALARM

DDC ANALOG INPUT POINT

DDC ANALOG OUTPUT POINT

AIR QUALITY SENSOR

EMERGENCY POWER OFF SWITCH

CARBON MONOXIDE SENSOR

CURRENT SENSOR

DDC DIGITAL INPUT POINT

DDC DIGITAL OUTPUT POINT

DIFFERENTIAL PRESSURE TRANSMITTER

END SWITCH

FLOW MEASURING STATION

FREEZE STAT

ROOM HUMIDISTAT / HUMIDITY SENSOR

HUMIDITY SENSOR

HIGH LIMIT HUMIDISTAT

ELECTRONIC LIQUID LEVEL SENSOR

DAMPER/VALVE MOTOR

MOTOR STARTER

NITROGEN DIOXIDE SENSOR

OCCUPANCY SENSOR

PRESSURE SENSOR

REFRIGERANT SENSOR

SMOKE DETECTOR; FURNISHED AND WIRED BY

DIVISION 26 CONTRACTOR AND MOUNTED BY

DIVISION 23 CONTRACTOR

COOLING TOWER SUMP HEATER

STATIC PRESSURE SENSOR

TEMPERATURE CONTROL PANEL

TERMINAL CONTROL UNIT

ROOM TEMPERATURE SENSOR / THERMOSTAT

TEMPERATURE SENSOR

VARIABLE FREQUENCY CONTROLLER

VARIABLE SPEED FAN SWITCH

MAGNAHELIC PRESSURE GAUGE

HUMIDIFIER

COIL

OPPOSED BLADE DAMPER

PUMP / FAN

CO2 CARBON DIOXIDE SENSOR

PG PROPANE GAS SENSOR

DISCONNECT SWITCH

BTU BTU METER

EPO

G GAS SENSOR

ALL SYMBOLS MAY NOT BE USED IN THESE DOCUMENTS.

*REFER TO VARIABLE FREQUENCY CONTROLLER CONTROL DIAGRAM FOR REQUIRED CONTROL

POINTS FOR ALL VFD & VS SYMBOLS INDICATED.

**REFER TO SPACE THERMOSTAT CONTROL DIAGRAM FOR REQUIRED CONTROL POINTS FOR

ALL SPACE THERMOSTAT SYMBOLS INDICATED.

M002

SCALE: NONE

COMPRESSED AIR SYSTEM FLOW DIAGRAM

COMP-1

EXISTING STORAGE

RECEIVER TANK

NEW WET TANK

EXISTING STORAGE

RECEIVER TANK

NEW DRY TANK

AD-1

~ EXISTING 3" CA

TO SHOPS

AF-1 AF-2 AF-3

3/4" VALVED AND CAPPED.

FULL SIZES VALVED

BYPASS AROUND EACH

DEVICE. TYPICAL.

F.C.

1/2" CD TUBING TO OIL/WATER

SEPARATOR. TYPICAL.

OWS-1

OIL/WATER SEPARATOR.

EXTEND ALL EQUIPMENT

AND DEVICE DRAINS AND

EXISTING TANK DRAINS

TO INLET CONNECTIONS.

EXTEND 3/4" DRAIN LINE

TO FLOOR DRAIN.

M002

SCALE: NONE

BREATHING AIR SYSTEM FLOW DIAGRAM

COMP-2 COMP-3

F.C. F.C.

BREATHING AIR RECEIVER,

DRYERS, ETC. ON

FACTORY-PROVIDED SKID

2"

2" 2"

2" 2"

3" 2"

2" 2"

2"

3"

3/4

3/4

3/4"

3/4"

1- 1/2

3/4" VALVED AND

CAPPED. TYPICAL

FOR 2.

~ EXISTING 1-1/2" BA

TO SHOPS

1/2" CD TUBING TO NEARBY

FLOOR DRAIN. TYPICAL.

M002

SCALE: NONE

COMPRESSOR VENTILATION FLOW AND CONTROL

COMP-1

M

M

CONNECT COMPRESSOR EXHAUST

DUCT TO EXISTING 38" x 38" MAIN.

BYPASS AIR

DAMPER

COMPRESSOR

CONTROLLER

BACNET

CONNECTION

M

OA

EXISTING OUTSIDE

AIR DAMPER

TS

SPACE TEMP

SENSOR

AI

AO

AO AO

2" CA

2"

CAPPED

EXTERIORMER

N.C.

INSTALL TEMP LINE AND

BYPASS UP TO VALVE FOR

TEMP COMPRESSOR

ENABLING WORK.

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

M002

FLOW AND CONTROL -

MECHANICAL

EF

P.6

Q.1

5.8 7.4

PAINT BOOTH MECH.

PAINT KIT.

X X

X X

X X

X X

X X

XXXXXXXXXXX

X

X X

X X

X X

X X

X X X X X X X X X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXX

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXX

72x60

12x12

X X X X X X X X X X

X X

XXXXXXXXXX

X X

X X

X

X X X X X X X X X X

X X

X X

X X

XXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X X X X X X X X X X

X X

X

XX

X X

X

XXXXXXXXXX

X X X X X X X X X X

X X

X

XX

X X

X

XXXXXXXXXXXXXXXX

XXXXXXXXXX

X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X

XXXXXXXXXX

X X X X X X X X X X

XX

XXXXXXXXXXXXXXXX

X X X X X X X X X X X X X X X X

X X X X X X X X X X

X

XXXXXXXXXX

X X

X X

X X X X X X X X X X

X X

X X

X X

XXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X X X X X X X X X X

X X

X

XX

X X

X

XXXXXXXXXX

X X X X X X X X X X

X X

X

XX

X X

X

XXXXXXXXXXXXXXXX

XXXXXXXXXX

X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X

XXXXXXXXXX

X X X X X X X X X X

XX

XXXXXXXXXXXXXXXX

X X X X X X X X X X X X X X X X x1

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X

XXXXXX

X X

X X

X

X X X X X X

EXISTING

EUH-3

EXISTING AIR

COMP-1

EXISTING AIR

COMP-2

EXISTING OIL/

WATER SEPARATOR EXISTING BREATHING

AIR SYSTEM

EXISTING

EF-31

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

MD

X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X

EXISTING

RECEIVER

EXISTING

RECEIVER

EXISTING BMS PANEL

EXISTING EF-31 CONTROLS

EXISTING

ETP-2

XXXXXXXX

X X

X X

X X

X

XXXXXXXX

X X

X X

X X

X

XXXXXXXXXXX

X X

X X

X X

X X

X

XXXXXXXXX

X X

X X

X X

X X

X

X X X X X X X X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X

EXHAUST DUCT SERVING AIR COMPRESSOR

TO BE REMOVED COMPLETE UP TO PLENUM.

PATCH AT MAIN. TYPICAL FOR 2.

EXISTING OUTSIDE AIR PLENUM

AND LOUVER TO REMAIN.

EXISTING EXHAUST AIR

PLENUM AND LOUVER

TO REMAIN.

EXISTING HOUSEKEEPING PAD TO BE

REMOVED COMPLETE. TYPICAL.

X X

XXX

X

X XMDX

X

XXX

X

X XMD

X X

XXX

X

X XMDX

X

XXX

X

X XMD

X X

X X

X X

X X

T

T

EXISTING

EUH-4

X

XXXX

X

X X X X

X

XXXX

X

X X X X

EXISTING AIR COMP-1 SWITCH

TO BE REMOVED.

EXISTING AIR COMP-2 SWITCH

TO BE REMOVED.

P.6

Q.1

5.8 7.4

TEMPORARY 75 HP COMPRESSOR

AND STORAGE TANK

72x60

EXISTING

EF-31

MD

EXISTING OUTSIDE AIR

PLENUM AND LOUVER.

EXISTING EXHAUST AIR

PLENUM AND LOUVER.

12x12

EXISTING

EUH-3

EXISTING BMS PANEL

EXISTING EF-31 CONTROLS

EXISTING

ETP-2

T

T

EXISTING

EUH-4

DR-1WR-1

x1

COMP-1

AD-1

OWS-1

BREATHING AIR

RECEIVER, DRYERS, ETC.

MOUNTED ON

FACTORY-PROVIDED SKIDCOMP-3

COMP-2

38x38

MD

38x38

CONNECT NEW EXHAUST DUCT

SERVING COMP-1 TO EXISTING

38x38 MAIN.

x2

TS

NEW TEMP SENSOR TIED

TO COMP-1 EXHAUST.

OPEN-ENDED DUCT WITH

WIRE MESH SCREEN. TYPICAL.

MD

MD100

SCALE: 1/2"=1'-0"

DEMOLITION PLAN - DUCTWORK

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

MD100

DEMOLITION FLOOR PLAN

DUCTWORK - MECHANICAL

EF

JF

1/2" = 1'-0"

MD100

SCALE: 1/2"=1'-0"

NEW PLAN - DUCTWORK

5.8 7.4 8.4

PAINT BOOTH MECH.

PAINT KIT.

X X

X X

X X

X X

X X

X X X X X X X X

X X

X X

X X

X X

XXXXXXXXX

X X X X X X X

X X

X X

X X

X X

XXXXXXXXX

X X

X X

X X

X X

X X

X X X X X

X X

X X

X X

XXXXXXX

X

X X

X X

X

X X

X X X X X X

X X

X X

X

XXXXXX

X

EXISTING

EUH-3

EXISTING AIR

COMP-1

EXISTING AIR

COMP-2

EXISTING

BREATHING

AIR SYSTEM

EXISTING

EUH-4

T

T

X

XXXX

X

X X X X

EXISTING

RECEIVER

EXISTING

RECEIVER

X

XXXX

X

X X X X

EXISTING AIR COMP-2 SWITCH

TO BE REMOVED.

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

XXXXXXXXXXXXXXXXXXXXXXX

X X X X X X X X X X X X X X X X X X X X X X X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

XX

X

X X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

XX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

EXISTING

TRAP

PRIMER

ETP-2

X X

XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

XXX

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

XXXXXXXXXX X X X X X X X X

X

XX

X

XXXXXXXX X X X X X X

X X

X X

X X X

X X

X

X XXXXXXXX X X X X X X X X X XXXXXXXXXXXX X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

3" CA DOWN TO EXISTING

RECEIVER TO REMAIN.

3" CA TO SHOPS

1-1/2" BA TO SYSTEM.

2" CA TOP

2" CA BOTTOM

2" CA FROM AIR COMPRESSOR

TO RECEIVER. TYPICAL FOR 2.

OIL REMOVAL FILTER TO BE

REMOVED. TYPICAL FOR 2.

XXXXXXXXXXX X X X X X X X X X

X X

XX

X

X

X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX X X X X X X X X

X X

X X

X X X

X X

X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X

XXXX X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

CUT BACK COMPRESSED

AIR TO VERTICAL HEADER.

EXISTING AIR COMPRESSOR TO BE REMOVED

COMPLETE ALONG WITH ALL ASSOCIATED

CONTROLS, CONDENSATE, COMPRESSED AIR

PIPING, ETC. TYPICAL FOR 2.

DEMO EXISTING CONDENSATE

DRAIN LINE SERVING COMP-1

AND COMP-2.

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

DEMOLISH BREATHING AIR

FILTER AND ENTIRE SYSTEM

AND PIPING AS INDICATED

EXISTING HOUSEKEEPING PAD TO

BE REMOVED COMPLETE. TYPICAL.

EXISTING BMS PANEL

EXISTING EF-31 STARTER

EXISTING OIL/WATER SEPARATOR TO

BE REMOVED COMPLETE ALONG WITH

ASSOCIATED PIPING, CONTROLS,

HOUSEKEEPING PAD, ETC.

EXISTING AIR COMP-1 SWITCH

TO BE REMOVED.

EXISTING FLOOR DRAIN. TYPICAL.

EXISTING DRAIN PUMP SERVING

RECEIVER TANK TO REMAIN.

TYPICAL FOR 2.

CUT BACK EXISTING RECEIVER TANK

DRAIN PIPING TO ELBOW FOR FUTURE

CONNECTION. TYPICAL FOR 2.

CUT BACK COMPRESSED AIR TO

EXISTING VALVE IN VERTICAL.

1-1/2" CA

1-1/2" BA

CUT BACK 3" CA FROM

EXISTING VALVE IN

VERTICAL TO TEE

MD101

SCALE: 1/2"=1'-0"

DEMOLITION PLAN - PIPING

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

MD101

DEMOLITION FLOOR PLAN

PIPING - MECHANICAL

EF

JF

1/2" = 1'-0"

5.8 7.4 8.4

PAINT BOOTH MECH.

PAINT KIT.

EXISTING

EUH-3

EXISTING

EUH-4

T

T

EXISTING

TRAP

PRIMER

ETP-2

EXIST 3" CA FROM

RECEIVER TANK TO MAIN.

3" CA TO SHOPS1-1/2" BA TO SYSTEM.

TEMPORARY 2" CA TO CONNECT TO EXISTING

SYSTEM. CONNECT TO EXISTING VALVE.

2" TEMPORARY COMPRESSED AIR

CONNECTION - PROVIDE CAP FOR

PERMANENT INSTALLATION.

ISOLATION VALVE IN

VERTICAL.

EXISTING HOUSEKEEPING

PAD. TYPICAL.

BMS PANEL

EXISTING EF-31 STARTER

LINETYPE DENOTES NEW

HOUSEKEEPING PAD. TYPICAL.

LINETYPE DENOTES EQUIPMENT

CLEARANCE. TYPICAL.

EXISTING FLOOR DRAIN. TYPICAL.

TEMPORARY 75 HP COMPRESSOR

AND STORAGE TANK

WR-1

EXISTING DRAIN PUMP SERVING

RECEIVER TANK TO REMAIN.

TYPICAL FOR 2.

DR-1

AD-1COMP-1

COMP-2

COMP-3

BREATHING AIR

RECEIVER, DRYERS, ETC.

MOUNTED ON FACTORY-PROVIDED SKID

RUN CONDENSATE FROM OIL/WATER

SEPARATOR TO NEARBY FLOOR DRAIN.

AF-1

AF-2

AF-3

OWS-1

NEW CONDENSATE TUBING CONNECTING TO

EXISTING PIPING SERVING RECEIVER TANK.

RUN TO OWS-1. TYPICAL FOR 2.

CONDENSATE TUBING TO RUN TO OWS-1.

LAYOUT IS DIAGRAMATIC. TYPICAL.

CONNECT 2" CA TO

EXISTING 3" VALVE.

2" CA DOWN TO EXISTING

VALVE. TYPICAL FOR 2.

1" BA FROM COMPRESSORS TO

INLET AT SKID.

1-1/2" BA FROM OUTLET AT SKID

TO CONNECT TO EXISTING.

RUN CONDENSATE TO NEARBY

FLOOR DRAIN. TYPICAL FOR 2.

RUN CONDENSATE TO NEARBY

FLOOR DRAIN.

BREATHING AIR COMPRESSOR

SIMILAR TO POWEREX LSE-2005.

TYPICAL FOR 2.

EXHAUST DUCT SERVING COMP-1 TO BE

CONNECTED TO EXISTING PLENUM.

PROVIDE ISOLATION VALVE

AND CHECK VALVE AT

EACH COMPRESSOR.

1" BA

1-1/2" BA

2" CA

2" CA

2" CA

2" BYPASS

PROVIDE A TEMPORARY 75 HP AIR

COMPRESSOR TO SERVE THE

BUILDING DURING THE

CONSTRUCTION PHASE. INCLUDE

ALL PIPING AND ELECTRICAL

CONNECTIONS AND ALL LOGISTICAL

COSTS.

M101A

SCALE: 1/2"=1'-0"

OPTION A - ONE COMPRESSOR

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

M101

FLOOR PLAN PIPING -

MECHANICAL

EF

JF

SUPPLY RETURN EXHAUST

G90 GALVANIZED

STEEL

TYPICAL

(UNLESS OTHERWISE SPECIFIED)

1. DUCT CONSTRUCTION SHALL MEET SMACNA METAL & FLEXIBLE 2005 3RD EDITION STANDARDS.

VIBRATION-CONTROL

REMARKS:

1. REFER TO SPECIFICATION SECTION 230548 - "VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT" FOR A DESCRIPTION OF EACH VIBRATION CONTROL DEVICE.

FPC - FLEXIBLE PIPE CONNECTIONS

HN - NEOPRENE HANGER

NP - NEOPRENE PAD

* IN ADDITION TO ANY INTERNAL VIBRATION ISOLATION.

MOTORIZED EQUPMENT, FLOOR MOUNTED

PIPING WITHIN 50FT OF CONNECTION TO ANY PIECE OF

EQUIPMENT WITH A MOTOR

DUCTWORK IN MECHANICAL ROOMS OR WITHIN 50FT

OF CONNECTED VIBRATION-ISOLATED EQUIPMENT

PIPE TO COMPRESSOR CONNECTION

BASE ISOLATOR*

FPC

HN

HN

NP4" HOUSEKEEPING PAD

0.25"

1.2"

0.2"

DEFLECTION

FLOOR MOUNTED EQUIPMENT (ALL) -

EQUIPMENT

NOTES:

1. PRESSURE CLASS SHALL BE DEFINED PER SMACNA DUCT CONSTRUCTION

STANDARDS, LATEST EDITION.

2. DUCTWORK, JOINTS, SEALING, AND FITTINGS SHALL BE CONSTRUCTED IN

ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS, LATEST EDITION.

DUCT PRESSURE CLASS

APPLICATION PRESSURE CLASS

GENERAL EXHAUST DUCTWORK 2" W.G.

G90 GALVANIZED

STEEL

G90 GALVANIZED

STEEL

APPLICATION

HVAC DUCT/PLENUM MATERIAL

- 470AF-1 MIKROPOR

GON-US-470MP

ITEM MAKE/MODEL ELEMENT

TYPE MAX. CFM REMARKS

COMPRESSED AIR FILTERS

SYSTEM PIPE SIZE CONSTRUCTION PIPING FITTINGS FLANGES

PIPING/TUBING MATERIAL, JOINTS & FITTINGS

UNIONS

2 1/2" AND SMALLER

3" AND LARGER(CA ONLY)

COMPRESSED AIR AND

BREATHING AIR

SOLDER JOINT CONSTRUCTION WITH

THREADED ADAPTERS AS REQUIRED. 95-5

TIN/ANTIMONY SOLDER.

BUTT WELDED CONSTRUCTION WITH FLANGED

CONNECTIONS TO VALVES AND EQUIPMENT

AS REQUIRED.

COPPER, TYPE L, HARD DRAWN, ANSI H23.1,

ASTM B88.

BLACK STEEL, SCHEDULE 40,

SEAMLESS, ASTM A53, GRADE B.

CAST BRONZE OR WROUGHT

COPPER, SOLDER ENDS,

ANSI B16.9 OR ANSI B16.22.

STEEL, CLASS 150, BUTT WELD

ENDS, ANSI B16.9, ASTM A234.

BRONZE SOLDER ENDS, GROUND JOINTS,

ANSI B16.19 OR ANSI B16.22.

STEEL, CLASS 150, WELD TYPE,

ANSI B16.5, ASTM 181, GRADE 1.

STEEL, CLASS 150, WELD TYPE, ANSI

B16.5, ASTM A234, GRADE WPA.

CAST BRONZE, CLASS 150, SOLDER

TYPE, ANSI B16.24.

2" AND SMALLER

2 1/2" AND LARGER

CONDENSATE DRAINS

SOLDER JOINT CONSTRUCTION WITH

THREADED ADAPTERS AS REQUIRED. 95-5

TIN/ANTIMONY SOLDER.

COPPER, TYPE L, HARD DRAWN, ANSI H23.1,

ASTM B88.

CAST BRONZE OR WROUGHT

COPPER, SOLDER ENDS,

ANSI B16.9 OR ANSI B16.22.

BRONZE SOLDER ENDS, GROUND JOINTS,

ANSI B16.19 OR ANSI B16.22.

COPPER, TYPE L, HARD DRAWN, ANSI H23.1,

ASTM B88.

CAST BRONZE OR WROUGHT

COPPER, SOLDER ENDS,

ANSI B16.9 OR ANSI B16.22.

BRONZE SOLDER ENDS, GROUND JOINTS,

ANSI B16.19 OR ANSI B16.22.

USE UNIONS

USE UNIONS

SOLDER JOINT CONSTRUCTION WITH

THREADED ADAPTERS AS REQUIRED. 95-5

TIN/ANTIMONY SOLDER.

MAX. PRESSURE

(PSI)

2"

CONNECTION SIZE

(NPT)

PARTICULATE 470AF-2 MIKROPOR

GON-US-470MX 2902"

COALESCING 470AF-3 MIKROPOR

GON-US-470MY 2902"

NOTES:

1. VFD DRIVEN COMPRESSOR

SULLAIR

SN5509V

UNIT

NO

COMP-1

CFM PSIG

AIR COMPRESSOR

HP VOLTS

ELECTRICAL

PH RPM MAKE/MODEL REMARKS

341 125 75 460 3 1780

SOUND

LEVEL

72 dBA

OWS-1 COMPRESSED AIR 7 IONIC EXCHANGE

RESIN

CLEAN RESOURCES

1DC 350

NOTES:

1. PROVIDE ALL DRAIN LINES AND FITTINGS FROM EQUIPMENT DRAINS. INSTALL PER MANUFACTURER'S INSTRUCTION.

UNIT

NO

SYSTEM

SERVED GALLONS MATERIAL

OIL/WATER SEPARATOR

MAKE/MODEL REMARKS

PRE FILTERING

GENERAL PURPOSE

OIL REMOVAL

SULLAIR

SRD400

UNIT

NO

AD-1

CFM

AIR DRYER

KW VOLT / Ø / HZ

ELECTRICAL MAKE/MODEL REMARKS

400 2.27 460 / 3 / 60 -

INLET

PRESSURE

125 PSIG

INLET

TEMP

100°F

PRESSURE

DROP

1.48 PSID

OUTLET

D.P.

45°F MAX

EVAPORATOR

TYPE

REFRIGERANT TO AIR

CONDENSING

UNIT

AIR-COOLED

MOISTURE

SEPARATOR

CENTRIFUGAL TYPE

4" HOUSEKEEPING PAD

NOTES:

1. FILTERS TO HAVE 2" HOUSINGS.

2. PROVIDE ZERO LOSS DRAINS AND DRAIN LINES TO OIL/WATER SEPARATOR.

3. SECURE TO WALL WHERE PRACTICAL WITH WALL BRACKET.

4. INSTALL BYPASS LINE WITH AMPLE CLEARANCE FOR SERVICING.

0.6

INITIAL PRESSURE

LOSS (PSI)

1.1

PARTICLE REMOVAL

(MICRON)

0.01

MAX. OIL CARRYOVER

AT 70°F (PPM)

0.5

0.01

176°F

MAX. TEMP.

176°F

176°F

PRESSURE LOSS FOR

ELEMENT CHANGE (PSI)

NOTES:

1. COMP-2 IS LEAD COMPRESSOR. COMP-3 IS STANDBY.

2. PROVIDE DUAL DESSICANT DRYERS, REGULATORS, ALARMS AND FILTRATION STATIONS

ON FACTORY SKID AND ALL INTERCONNECTING PIPING AND WIRING. REFER TO SPECIFICATIONS.

POWEREX

LSE2005

UNIT

NO

COMP-2 /

COMP-3

HP SCFM @

100 PSIG

BREATHING AIR COMPRESSOR

VOLTS SYSTEM F.L.A.

ELECTRICAL MAKE/MODEL REMARKS

20 45.6 460 28

SOUND

LEVEL

58 dBA

TANK SIZE

(GAL.)

BTU/HR

38,180

ROTARY SCREW

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

M200

SCHEDULES & DETAILS -

MECHANICAL

EF

W W

M201

NOT TO SCALE

DUCT CONSTRUCTION DETAIL

DOUBLE

WALL VANES

ONLY ACCEPTABLE WHERE SPACE

DOES NOT PERMIT THE USE OF

RADIUS ELBOWS

AIR FLOW

SUPPLY TAP

AIR FLOW

TAKE-OFF TO EXPOSED

SIDEWALL REGISTER

ACOUSTICALLY

LINED DUCT

DIMENSION DENOTES

CLEAR OPENING

12X8

RADIUS ELBOW

W

W

AIR FLOW

RETURN TAP

AIR FLOW

W

SUPPLY SPLIT

20° MAX

TRANSITION

SQUARE ELBOW

DUCT TAP TO EXPOSED

SIDEWALL REGISTER ONLY

BRANCH

DUCT

VOLUME EXTRACTOR

WITH MANUAL

ADJUSTING LEVER.

R = W OR 12" MAX

R=W R=W

R = W OR 12" MAX BRANCH

DUCT

NOTES:

1. SPECIFICATIONS EXCEED SMACNA STANDARDS

IN SOME INSTANCES.

2. SMACNA SHALL BE CONSIDERED THE MINIMUM

STANDARD UNLESS OTHERWISE NOTED ON

THE DRAWINGS, DETAILS OR IN THE

SPECIFICATIONS.

C-CLAMP WITH

RETAINING CLIP

25" TO 30"

31" TO 42"

43" TO 60"

61" TO 84"

85" AND UP

1 1/2" X 1 1/2" X 1/8"

1 1/2" X 1 1/2" X 1/8"

1 1/2" X 1 1/2" X 1/8"

2" X 2" X 1/4"

2" X 2" X 1/4"

3/8"

3/8"

1/2"

1/2"

1/2"

8'-0" O.C.

6'-0" O.C.

6'-0" O.C.

4'-0" O.C.

4'-0" O.C.

4 SQ. FT.

10 SQ. FT.

10 SQ. FT.

* REDUCE SPACING TO NEXT SMALLER INTERVAL IF DUCT AREA EXCEEDS MAXIMUM

DUCT WIDTH

SUPPORT ANGLE OR EQUIV.

CHANNEL ROD DIA. MAXIMUM SPACING MAXIMUM AREA *

WEDGE EXPANSION ANCHOR

NUT & WASHER

METAL STRAP

SHEET METAL SCREWS EVERY 6"

O.C. FOR FULL HEIGHT OF DUCT.

PROVIDE MINIMUM OF TWO ON

DUCTS SMALLER THAN 6"

2" MINIMUM SUPPORT ANGLE

INSULATION OR LINING.

PROVIDE 1'-0" LONG

SECTION OF RIGID

INSULATION AT EVERY

HANGER UNLESS LINING

IS USED. TYPICAL

DAMPER BLADE

SIDE

BEAM CLAMP

LOCKNUT

TYPICAL

THREADED ROD

THREADED ROD

TYPICAL

1" WIDE METAL STRAP

PRE-POUR

CONCRETE

INSERT

BEAM CLAMP

24" OR SMALLER 25" OR WIDER

M201

NOT TO SCALE

DUCT SUPPORT DETAIL

NOTES:

1. CONCRETE PAD LENGTH, WIDTH AND LOCATION TO BE DETERMINED BY THE MECHANICAL CONTRACTOR BASED ON THE SUBMITTED

EQUIPMENT.

MINIMUM 3000 PSI REINFORCED

CONCRETE FORMED PAD

45° CHAMFER

#4 BARS EACH WAY, PROVIDE HOOK, 90-DEG, AT

ENDS. TYPICAL

1" CLEAR ALL AROUND

M201

NOT TO SCALE

HOUSEKEEPING PAD DETAIL

EXISTING FINISHED FLOOR #4 DOWEL ANCHOR EMBEDDED 4' AND LOCATED

18" O.C. AROUND PERIMETER. FASTEN DOWEL TO

CONCRETE WITH POWERS PE1000 ADHESIVE

ANCHORING SYSTEM OR APPROVED EQUAL

CHIP OR ROUGH UP EXISTING FLOOR SLAB

WITHIN HOUSEKEEPING PAD FORM WORK

AND APPLY LATEX BONDING AGENT ON

ROUGHED UP CONC. ONLY

1"

4"

12" MIN.

2" MINIMUM

1/2"Ø THREADED DOWEL, 12"O.C. ALL AROUND PERIMETER

MIN. 6" TO EDGE OF EQUIPMENT FRAME AROUND

PERIMETER

2 1/2" AND LARGER

FLUIDS LESS THAN 100°F

2" AND SMALLER

FLUIDS GREATER THAN 100°F

2 1/2" AND LARGER2" AND SMALLER

FLUIDS 150°F-250°F 50' FROM ANCHOR

FLUIDS GREATER THAN 250°F 30' FROM ANCHOR

2" AND SMALLER 2 1/2" AND LARGER

UP TO 1 1/4"

UP TO 1 1/4"

1 1/2" & 2"

2 1/2" & 3"

4" & 5"

8", 10", 12"

14" & 16"

18"

20" & 24" 1 1/4" DIA.

1 1/8" DIA.

1" DIA.

7/8" DIA.

3/4" DIA.

5/8" DIA.

1/2" DIA.

3/8" DIA.

3/8" DIA.

3/8" DIA. 8' STEEL

6' COPPER & BRASS

10'

PIPE SIZE ROD SIZE MAX. SPACING

HANGER SCHEDULE

10'

10'

10'

10'

10'

10'

10'

DOUBLE NUTS

AND WASHERS

ROD

HANGER

PIPE

INSULATION

RIGID INSULATION

SHIELD SADDLE

INSULATION INSERT

6"

M201

NOT TO SCALE

PIPE HANGER DETAIL

ATTACHMENT METHOD

NOT PERMITTED

FRICTION CLAMPS

BEAM CLAMP WITH RETAINING

STRAP. MINIMUM RETURN STRAP

SHALL BE 1"

ATTACHMENT METHOD ONLY

ACCEPTABLE FOR PIPING < 2"

PRE-POUR CONCRETE INSERTS WEDGE EXPANSIONMETAL DECK HANGER BOLTS

BEAM CLAMPS

SUPPLEMENTAL STEEL

WELDING PROCEDURE TO BE

SUBMITTED FOR REVIEW

END ATTACHMENTS TO

BE SAME AS LARGEST

HANGER ROD

INTERMEDIATE ATTACHMENTS ONE

SIZE LARGER THAN LARGEST

HANGER ROD

SQUARE STEEL WASHER PLATE. TYPICAL.

BACK TO BACK STRUCTURAL SHAPES

W/SPACERS WELDED AT 24 INTERVALS

TWO HANGER RODS MAXIMUM BETWEEN

STRUCTURAL ATTACHMENT

M201

NOT TO SCALE

PIPE HANGER ATTACHMENT DETAIL

25MIL23702

CSMS Compressor Replacement, Camp Hartell

MARCH 6, 2026

542 North Street, Windsor Locks, CT 06096

No. Description Date

North

CONTRACTOR RESPONSIBLE TO LOCATE

ALL

EXISTING UTILITIES IN PROJECT AREA.

CONTRACTOR TO CONTACT:

- CALL BEFORE YOU DIG @ 811

GENERAL:

Architect/Engineer

REVISION

STATE OF CONNECTICUT

MILITARY DEPARTMENT

Facilities Management

Office

360 Broad Street Hartford, CT

06105

860.493.2725 Fax 860.524.4937

Drawing NUMBER

TRACKING NUMBER

Date

Drawing Title

Project

Drawn by:

App'd by:

Scale:

File as:

102 Madison Avenue, 10th Floor New York, NY 10016

212.695.2422 F 212.695.2423

www.kohlerronan.com E-mail krce@kohlerronan.com

93 Lake Avenue, 3rd Floor Danbury, CT 06810

203.778.1017 F 203.778.1018

TRUE NORTH PROJECT NORTH

KEY PLAN

1 2 3

4 5

Construction Documents 3/6/26

M201

DETAILS - MECHANICAL

EF

KR

NTS

AutoCAD SHX Text

AutoCAD SHX Text

X/#

DUPLEX CONVENIENCE RECEPTACLE - 18" AFF U.O.N.

# MOTOR, # = HORSEPOWER

ELECTRICAL SYMBOLS

SURFACE MOUNTED PANELBOARD AND CLEARANCE

BRANCH CIRCUIT HOMERUN (X = PANELBOARD, # = CIRCUIT NO.)

WALL MOUNTED JUNCTION BOX

J CEILING MOUNTED JUNCTION BOX

CONDUCTOR

J

NON-FUSED DISCONNECT SWITCH, # = SWITCH SIZE

EXISTING CONDUCTOR TO REMAIN

EXISTING CONDUCTOR, EQUIPMENT, OR DEVICE TO BE DISCONNECTED AND REMOVEDXXXXXX

DISCONNECT SWITCH FURNISHED BY DIVISION 22/23, INSTALLED BY CONTRACTOR

A AMPERES

AFF ABOVE FINISHED FLOOR

C CONDUIT

C/B CIRCUIT BREAKER

CKT CIRCUIT

E.C. ELECTRICAL CONTRACTOR

ER EXISTING RELOCATED

ETBR EXISTING TO BE RELOCATED

ETR EXISTING TO REMAIN

FBO FURNISHED BY OTHERS

G GROUND

GFP GROUND FAULT PROTECTION

JB JUNCTION BOX

MCB MAIN CIRCUIT BREAKER

MLO MAIN LUG ONLY

MTD MOUNTED

PNL PANEL

SPD SURGE PROTECTION DEVICE

TW/SH TWISTED SHIELD

U.O.N. UNLESS OTHERWISE NOTED

V VOLTS

VA VOLT-AMPERES

WP WEATHER PROOF

ELECTRICAL ABBREVIATIONS

E001 COVER SHEET - ELECTRICAL

E100 FLOOR PLAN - SECTOR 1 - ELECTRICAL

E101 FLOOR PLAN - SECTOR 2 - ELECTRICAL

E102 FLOOR PLAN - SECTOR 4 - ELECTRICAL

E400 SINGLE LINE DIAGRAM AND PANEL SCHEDULE - ELECTRICAL

DRAWING

NUMBER

ELECTRICAL DRAWING LIST

DRAWING DESCRIPTIONGENERAL

1. WHEN A CONFLICT BETWEEN THE DRAWINGS, NOTES AND/OR SPECIFICATIONS OCCUR, THE MORE

STRINGENT, AND/OR LARGER QUANTITY AND/OR MORE EXPENSIVE SHALL APPLY. THE

REQUIREMENTS LISTED WITHIN NOTES OR SPECIFICATIONS SHALL BE REQUIRED, PROVIDED AND

INSTALLED WHETHER SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT.

2. THE DRAWINGS AND SPECIFICATIONS ARE DIVIDED INTO SECTIONS TO MEET THE NEEDS OF THE

ARCHITECT, THE ENGINEERS, AND THE DESIGN CONSULTANTS. THEY ARE NOT PREPARED AS

INSTRUCTIONS TO THE CONTRACTOR FOR HOW TO BUY OUT OR SUBCONTRACT THE WORK. THE

CONTRACTOR IS RESPONSIBLE FOR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS,

REGARDLESS OF WHERE IT IS SHOWN. FOR EXAMPLE, ELECTRICAL WORK IS SHOWN ON FP-SERIES DRAWINGS AS WELL AS ON M-SERIES DRAWINGS AND E-SERIES DRAWINGS. TO AVOID OMITTING ANY

COMPONENT OF THE PROJECT, REFER TO ALL THE CONTRACT DOCUMENTS IN THEIR ENTIRETY.

WIRING & RACEWAY:

1. THE DRAWINGS SHOW THE GENERAL LAYOUT AND TYPICAL DETAILS. PROVIDE COMPLETE SYSTEMS.

DRAWINGS ARE BASED ON THE SPECIFIED EQUIPMENT. RACEWAY LAYOUTS, BOXES, AND WIRING OF

THE SYSTEMS ARE SUBJECT TO APPROVED SHOP DRAWINGS.

2. ENSURE THAT ITEMS TO BE FURNISHED FIT THE SPACE AVAILABLE. MAKE NECESSARY FIELD MEASUREMENTS TO ASCERTAIN SPACE REQUIREMENTS, INCLUDING THOSE FOR CONNECTIONS, AND PROVIDE SUCH SIZES AND SHAPES OF EQUIPMENT THAT FINAL INSTALLATION SHALL SATISFY THE

INTENT OF THE DRAWINGS AND SPECIFICATIONS.

3. LOCATIONS OF OUTLETS, SWITCHES, APPLIANCES, ETC. AS SHOWN ON ELECTRICAL PLANS ARE

APPROXIMATE; COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS AND DETAILS, AND

WITH JOB CONDITIONS. INSTALL SWITCHES WITH "OFF" POSITION DOWN. INSTALL RECEPTACLES

WITH GROUNDING POLE IN THE UP POSITION FOR VERTICAL MOUNTING AND AT LEFT FOR

HORIZONTAL MOUNTING.

4. LOCATE AND INSTALL ELECTRICAL EQUIPMENT, JUNCTION AND PULL BOXES, PANELBOARDS, SWITCHES, CONTROLS, AND OTHER APPARATUS REQUIRING MAINTENANCE, INSPECTION, AND

OPERATION SO AS TO BE READILY ACCESSIBLE.

RACEWAY INSTALLATION:

1. IN ALL ARCHITECTURALLY FINISHED SPACES, CONDUITS AND CABLES SHALL BE RUN CONCEALED IN HUNG OR FURRED CEILINGS, SLABS, MASONRY, AND PARTITIONS UNLESS OTHERWISE INDICATED.

SAW CUTTING AND FINISHED PATCHING SHALL BE REQUIRED IN EXISTING SLABS AND MASONRY

WALLS. IN UNFINISHED SPACES, RACEWAYS MAY BE RUN EXPOSED.

2. UNLESS OTHERWISE INDICATED, EXACT ROUTING OF RACEWAYS SHALL BE DETERMINED BY THE

CONTRACTOR TO SUIT PROJECT REQUIREMENTS AND FIELD CONDITIONS.

3. PROVIDE SEPARATE RACEWAYS, JUNCTION BOXES, PULL BOXES AND WIREWAYS FOR ALL

EMERGENCY SYSTEM WIRING.

WIRING INSTALLATION:

1. DO NOT USE WIRE SMALLER THAN NO. 12 AWG FOR ANY POWER OR LIGHTING CIRCUIT. USE LARGER

SIZES WHERE INDICATED, AS REQUIRED BY CODES, AND AS FOLLOWS:

30 AMPERE CIRCUIT: NO. 10

40 AMPERE CIRCUIT: NO. 8

50 AMPERE CIRCUIT: NO. 6

60 AMPERE CIRCUIT: NO. 4

A. MINIMUM HOMERUN AND BRANCH CIRCUIT WIRING SIZES AND MAXIMUM HOMERUN CONDUIT FILL FOR

120 VOLT, 20 AMPERE CIRCUITS SHALL BE AS FOLLOWS:

CIRCUIT HOME RUN CONDUIT SIZE

LENGTH WIRE SIZE WIRE SIZE (8 WIRES/CONDUIT)

0' TO 50' #12 #12 3/4"

51' TO 100' #12 #10 3/4"

101' TO 200' #10 #8 1"

GREATER THAN 200' - REQUEST DIRECTION FROM ENGINEER.

NOTE: PROVIDE DERATING PER CODE WHEN INSTALLING MORE THAN 3 CURRENT CARRYING

CONDUCTORS IN CONDUIT.

B. HOME RUNS AND BRANCH CIRCUIT WIRING FOR 277 VOLT, 20 AMPERE CIRCUITS SHALL BE AS

FOLLOWS:

CIRCUIT HOME RUN CONDUIT SIZE

LENGTH WIRE SIZE WIRE SIZE (8 WIRES/CONDUIT)

0' TO 100' #12 #12 3/4"

100' TO 200' #12 #10 3/4"

GREATER THAN 200' - REQUEST DIRECTION FROM ENGINEER.

NOTE: PROVIDE DERATING PER CODE WHEN INSTALLING MORE THAN 3 CURRENT CARRYING

CONDUCTORS IN CONDUIT.

2. DO NOT USE WIRE SMALLER THAN NO. 14 AWG FOR CONTROL CIRCUITS UNLESS OTHERWISE

RECOMMENDED BY THE EQUIPMENT OR SYSTEM MANUFACTURER ON WIRING SHOP DRAWINGS, AND

SO APPROVED BY THE ENGINEER.

3. WHERE GREATER THAN THREE (3) CURRENT-CARRYING CONDUCTORS ARE INSTALLED IN ANY ONE

CONDUIT OR CABLE, CONDUCTORS MUST BE DERATED AND SIZES INCREASED, IF NEEDED, TO

ACCOMMODATE CONDUCTOR DERATING AS REQUIRED BY NEC ARTICLE 310.

4. CONDUCTORS SHALL BE COMPLETELY INSTALLED AND CONNECTED. PROVIDE ALL TERMINALS, LUGS, AND CONNECTORS TO SUIT THE APPLICATION, AND IN COMPLIANCE WITH EQUIPMENT

MANUFACTURERS' RECOMMENDATIONS.

5. UNDER NO CIRCUMSTANCES SHALL ANY SWITCH OR CIRCUIT BREAKER BREAK A NEUTRAL

CONDUCTOR.

6. THE CIRCUIT NUMBERS INDICATED ON THE DRAWINGS ARE INTENDED AS A GUIDE FOR PROPER CONNECTION OF CIRCUITS AT PANELBOARDS; HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO ENSURE THAT THE FINAL CIRCUITING WORK FULFILLS THE FOLLOWING

CONDITIONS:

A. LOADS ON PANELBOARD BUSSES SHALL BE PHASE-BALANCED AS EVENLY AS POSSIBLE.

7. PROVIDE SEPARATE NEUTRALS FOR EACH CIRCUIT. WHERE MULTIPLE CIRCUITS ARE INSTALLED IN THE SAME RACEWAY OR ENCLOSURE, IDENTIFY NEUTRALS WITH CORRESPONDING BRANCH CIRCUIT

PHASE CONDUCTOR NUMBERS.

GROUNDING INSTALLATION:

1. EQUIPMENT GROUNDING

A. INSTALL AN INSULATED GROUND CONDUCTOR, RUN IN THE RACEWAY WITH THE PHASE

CONDUCTORS, FOR EACH FEEDER SERVING: PANELBOARDS, MOTORS, EQUIPMENT AND APPLIANCES

UNLESS OTHERWISE NOTED.

B. INCLUDE AN INSULATED GROUND CONDUCTOR IN ALL CONDUIT RUNS CONTAINING SECTIONS OF

FLEXIBLE CONDUIT UNLESS OTHERWISE NOTED.

C. INCLUDE AN INSULATED GROUND CONDUCTOR IN ALL BRANCH CIRCUIT RACEWAYS OR CABLES

UNLESS OTHERWISE NOTED.

SHORT CIRCUIT, COORDINATION, AND ARC FLASH STUDIES

1. CONTRACTOR SHALL PROVIDE A SHORT CIRCUIT, ARC FLASH, AND COORDINATION STUDY (REFER TO SPECIFICATIONS). TO ACCURATELY PERFORM THE STUDIES, STUDIES SHALL INCLUDE, BUT ARE NOT LIMITED TO, THE EXISTING UTILITY TRANSFORMER, EXISTING GENERATOR, EXISTING SWITCHBOARDS, EXISTING PANELBOARDS, EXISTING CONDUIT AND WIRE, AND EXISTING MOTOR LOADS WHERE

INDICATED ON SINGLE LINE / RISER DIAGRAM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING EQUIPMENT MANUFACTURERS, THE UTILITY COMPANY, AND OWNER FOR INFORMATION

ON EXISTING EQUIPMENT REQUIRED BY THE STUDIES.

OTHER TRADES EQUIPMENT WIRING:

1. UNLESS OTHERWISE INDICATED OR SPECIFIED HEREIN, ALL MOTORS, MOTOR STARTERS, MOTOR

CONTROLLERS, VARIABLE SPEED/FREQUENCY DRIVES, AND ASSOCIATED CONTROL DEVICES ARE

FURNISHED UNDER OTHER DIVISIONS AND INSTALLED UNDER THIS DIVISION. COORDINATE

INSTALLATION AND LOCATIONS WITH OTHER DIVISION CONTRACTORS.

2. POWER WIRING FROM THE INDICATED SOURCE TO THE STARTER/CONTROLLER/DRIVE UNIT, AND FROM THE STARTER/CONTROLLER/DRIVE UNIT TO THE MOTOR, INCLUDING ANY LOCAL DISCONNECT SWITCHES PROVIDED AND/OR INSTALLED BY THIS DIVISION, AND ALL ASSOCIATED LUGS, TERMINALS, AND CONNECTIONS, IS THE WORK OF THIS DIVISION.

3. CONTROL CIRCUIT WIRING IS GENERALLY FURNISHED AND INSTALLED UNDER OTHER DIVISIONS, EXCEPT THAT ANY SUCH WIRING SHOWN ON ELECTRICAL DRAWINGS IS WORK OF THIS DIVISION.

4. COOPERATE AND COORDINATE WITH THE OTHER TRADES IN THE INSTALLATION, CONNECTION, AND

TESTING OF MECHANICAL EQUIPMENT. PERFORM WORK OF THIS SECTION IN ACCORDANCE WITH

EQUIPMENT MANUFACTURERS' INSTRUCTIONS.

COORDINATION DRAWINGS:

1. DEVELOP AND SUBMIT COORDINATION DRAWINGS AS OUTLINED.

A. SHEET METAL AND PLUMBING SHOP DRAWINGS THAT HAVE BEEN COORDINATED WITH OTHER

DRAWINGS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW. DRAWINGS MUST BE RETURNED FROM ENGINEER EITHER "REVIEWED" OR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .