Construction Documents Summary: Camp Hartell CSMS Compressor Replacement
This file consists of architectural and engineering drawings for the Connecticut Military Department's compressor replacement project at Camp Hartell, located at 542 North Street, Windsor Locks, Connecticut 06096. The project, identified as ITB 25MIL23702, involves the removal of two existing air compressors and replacement with one 75-horsepower building air compressor (COMP-1), two 20-horsepower breathing air compressors (COMP-2 and COMP-3) mounted on a factory-provided skid, and all associated mechanical, electrical, and specialty systems. The drawings, dated March 6, 2026, include site logistics planning, mechanical demolition and installation plans for ductwork and piping systems, electrical floor plans and single-line diagrams, and detailed specifications for hangers, supports, housekeeping pads, and control systems. The contractor is responsible for providing a temporary 75-horsepower compressor and storage tank to serve the building during the construction phase and must coordinate all work with multiple trades including mechanical, electrical, and plumbing contractors. The facility will remain occupied and operational during construction, requiring careful scheduling of any service interruptions with the facility owner.
The construction documents establish comprehensive requirements for equipment installation, including seismic restraint calculations, vibration isolation, condensate management, and control system integration with the existing building automation system. All removed materials must be disposed of through licensed carting services, with hazardous materials handled by EPA-approved disposal services and proper documentation maintained. The contractor is required to submit shop drawings for review prior to construction, develop coordination drawings with all affected trades, and provide as-built drawings and maintenance manuals upon project completion. Electrical work requires connection to the existing 480/277-volt, three-phase main service, with power distribution through panelboard RP2B1 for control systems. The project follows Connecticut Building Code requirements and SMACNA standards for ductwork construction, with all work coordinated to maintain continuity of existing facility operations and services not affected by the renovation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK -
COMPRESSOR ROOM
APPROX. LOCATION OF
TEMP COMPRESSOR
TOWER AVE.
SL001
SCALE: NONE
SITE LOGISTICS PLAN
N
SL001
SITE LOGISTICS PLAN
JF
JF
NTS
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
1. THE EXISTING FACILITY WILL BE OCCUPIED AND IN OPERATION DURING THE PERFORMANCE OF
THE WORK.
2. WHEN NECESSARY TO TEMPORARILY DISCONNECT ANY EXISTING PIPING OR DUCTWORK WHICH
MAY CAUSE DISRUPTION TO OCCUPIED FACILITIES, CONFER WITH THE OWNER, AND SCHEDULE
A MUTUALLY AGREEABLE PERIOD OF INTERRUPTION.
3. WHERE REPLACEMENT, RELOCATION OR MODIFICATION OF EXISTING EQUIPMENT IS INDICATED, PROVIDE AND MAINTAIN ALL TEMPORARY SERVICES, CONNECTIONS, CONTROLS, AND ANY
OTHER MATERIALS AND APPURTENANCES REQUIRED TO MAINTAIN SERVICES TO OCCUPIED
AREAS.
4. NO WORK SHALL BE LEFT INCOMPLETE, NOR ANY HAZARDOUS SITUATION CREATED, WHICH
WILL AFFECT THE LIFE OR SAFETY OF THE PUBLIC AND/OR BUILDING OCCUPANTS. AT NO TIME SHALL THE WORK INTERFERE WITH OR CUT OFF ANY OF THE EXISTING SERVICES WITHOUT THE
OWNER'S PRIOR WRITTEN PERMISSION.
5. THE OWNER RESERVES THE RIGHT TO OPERATE ALL EXISTING MECHANICAL EQUIPMENT UNTIL
THE NEW SYSTEMS COME ON LINE.
6. IT IS REQUIRED THAT THE WORK INDICATED AND/OR SPECIFIED SHALL BE CARRIED OUT WITH A
MINIMUM OF INTERFERENCE TO THE ESTABLISHED OPERATIONS OF THE BUILDING.
7. REMOVED MATERIALS SHALL BE DISPOSED OF USING LICENSED CARTING SERVICE.
8. HAZARDOUS MATERIALS - SHALL BE DISPOSED OF BY AN EPA APPROVED, LICENSED DISPOSAL SERVICE. CONTRACTOR SHALL OBTAIN AND HAVE ON FILE, AFFIDAVIT, AND RECEIPTS STATING
HOW AND WHERE THE WASTE WAS DISPOSED OF OR CONVERTED.
9. IT IS THE INTENTION OF THESE DEMO DRAWINGS TO INDICATE GENERAL SYSTEMS AND
MATERIALS TO BE REMOVED. CONTRACTOR SHALL REMOVE ALL OBSOLETE PIPING, DUCTWORK,
EQUIPMENT, CONTROLS, ETC, INDICATED OR NOT.
10. DUCTWORK, EQUIPMENT AND TERMINAL DEVICES HAVE BEEN TAKEN FROM FIELD OBSERVATION
AND ARE TO BE USED FOR REFERENCE AND SHALL NOT BE CONSTRUED TO BE ACTUAL FIELD
CONDITIONS. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SYSTEMS PRIOR TO
COMMENCEMENT OF DEMOLITION WORK.
11. ALL EQUIPMENT TO BE REMOVED SHALL BE DISPOSED OF PER OR STORED PER DIRECTION OF
OWNER. ANY ITEM NOT RETAINED BY OWNER SHALL BE REMOVED FROM SITE AND DISCARDED
IN AN APPROVED MANNER.
12. IT IS THE INTENTION OF THESE SPECIFICATION TO REMOVE ALL MATERIALS ABANDONED BY THE SCOPE OF THIS CONSTRUCTION PROJECT. NO OBSOLETE MATERIALS (I.E. HANGERS, SUPPORTS, INSULATION, DUCTWORK, ETC.) SHALL REMAIN.
13. DISCONNECT AND REMOVE ALL DUCTWORK AND ASSOCIATED SUPPLY, RETURN OR EXHAUST
GRILLES INCLUDING BUT NOT LIMITED TO ALL HANGERS, SUPPORTS, VOLUME DAMPERS AND
FLEXIBLE DUCTWORK.
14. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO ANY EXPOSED OR UNCAPPED NEW
OR EXISTING DUCTWORK TO REMAIN TO MINIMIZE DUST CONTAMINATION IN ANY AND ALL OF
THE AIR SYSTEMS. THIS SHALL INCLUDE BUT IS NOT LIMITED TO TEMPORARY FILTERS, CAPS, ENCLOSURES, ETC.
MECHANICAL DEMOLITION NOTES MECHANICAL DRAWING LIST
COVER SHEET - MECHANICALM001
DEMOLITION FLOOR PLAN PIPING - MECHANICAL
MD100
MD101
DEMOLITION FLOOR PLAN DUCTWORK - MECHANICAL
DRAWING DESCRIPTIONDRAWING
NUMBER
GENERAL
1. WHEN A CONFLICT BETWEEN THE DRAWINGS, NOTES AND/OR SPECIFICATIONS OCCUR, THE MORE STRINGENT, AND/OR LARGER QUANTITY AND/OR MORE EXPENSIVE SHALL APPLY. THE REQUIREMENTS LISTED WITHIN NOTES OR SPECIFICATIONS SHALL BE REQUIRED, PROVIDED AND INSTALLED WHETHER
SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT.
2. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO PROVIDE FOR FINISHED WORK, TESTED AND READY FOR OPERATION.
3. ITEMS AND SERVICES NOT SHOWN ON DRAWINGS OR SPECIFICATIONS BUT REQUIRED TO RENDER THE WORK COMPLETE AND READY FOR OPERATION, SHALL BE PROVIDED WITHOUT ADDITIONAL COST.
4. WORK OF THIS SECTION SHALL BE GOVERNED BY THE CONTRACT DOCUMENTS. PROVIDE MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO FURNISH, DELIVER AND INSTALL ALL WORK AS SPECIFIED AND AS REQUIRED BY JOB CONDITIONS. WHERE A CONFLICT EXISTS BETWEEN THESE NOTES, THE DRAWINGS AND THE SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL APPLY.
5. DRAWINGS ARE DIAGRAMMATIC AND INDICATE A GENERAL ARRANGEMENT OF WORK AND ARE NOT TO BE CONSIDERED SUB-CONTRACTOR DOCUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND ALL SUBCONTRACTORS TO INCLUDE THE PROVISIONS AND INSTALLATION OF ALL NECESSARY WORK AND MATERIALS FOR COMPLETE, OPERATIONAL AND CODE COMPLIANT SYSTEMS. GENERAL DESIGN
CONCEPTS INDICATED MUST BE FOLLOWED OR BETTERED. THE BID SHALL INCLUDE OFFSETS,
ADDITIONAL PIPING, VALVES AND EQUIPMENT AND COMPONENTS AS REQUIRED TO MEET
CONSTRUCTION CONDITIONS FOR PROPER OPERATION. DO NOT SCALE DRAWINGS.
6. PERFORM THE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT GENERAL
CONDITIONS AND WITH THE PROVISIONS OF ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND
LAWS.
7. WORK SHALL INCLUDE ALL INCIDENTALS, LABOR, MATERIAL, EQUIPMENT, APPLIANCES, SERVICES, HOISTING, SCAFFOLDING, SUPPORTS, TOOLS, CONSUMABLE ITEMS, FEES, LICENSES, AND
ADMINISTRATIVE TASKS REQUIRED TO COMPLETE AND MAKE OPERABLE WORK SHOWN ON THE
DRAWINGS, SPECIFIED HEREIN AND AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.
8. STORE MATERIALS INSIDE AND PROTECTED FROM DEBRIS, WEATHER AND MOISTURE.
9. THIS CONTRACTOR SHALL PROVIDE AND INSTALL ALL POWER AND CONTROL WIRING REQUIRED FOR EQUIPMENT OPERATION NOT SPECIFICALLY PROVIDED BY OTHERS BUT REQUIRED FOR A COMPLETE
AND OPERATIONAL SYSTEM. THIS CONTRACTOR SHALL PROVIDE MOTOR STARTERS. COORDINATE
REQUIREMENTS WITH DIVISION 26.
10. COORDINATE ALL WORK AND EQUIPMENT WITH WORK OF OTHER TRADES.
11. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF EXACT CONDITIONS TO BE VERIFIED IN THE FIELD. CONTRACTOR SHALL VISIT THE SITE TO VERIFY THE CONSTRUCTION CONDITIONS BEFORE
SUBMITTING BID.
12. REFER TO SPECIFICATION SECTION 230000 FOR ADDITIONAL PENETRATION SEALING REQUIREMENTS.
PENETRATIONS TO COMPLY WITH ASTM E84 & E814 AND APPROVED UL 1479 AND SPECIFIC UL
ASSEMBLIES AS REQUIRED TO SUIT PENETRATION CONDITIONS.
13. TEMPERATURE CONTROL CONTRACTOR (TCC) IS RESPONSIBLE FOR ALL CONTROL WIRING 120 VOLT AND LESS. SHARED TRANSFORMERS ARE NOT ALLOWED. RUN POWER PER DIVISION 26 REQUIREMENTS.
14. TCC SHALL EXTEND ALL POWER FOR DAMPER ACTUATORS, VALVE ACTUATORS AND OTHER CONTROL DEVICES FROM LOCAL ELECTRICAL PANEL. DIVISION 26 TO SUPPLY POWER TO TCPS. REFER TO
ELECTRICAL DRAWINGS FOR PANEL LOCATIONS.
15. THE DRAWINGS AND SPECIFICATIONS ARE DIVIDED INTO SECTIONS TO MEET THE NEEDS OF THE THE ENGINEERS AND THE DESIGN CONSULTANTS. THEY ARE NOT PREPARED AS INSTRUCTIONS TO THE
CONTRACTOR FOR HOW TO BUY OUT OR SUBCONTRACT THE WORK. THE CONTRACTOR IS
RESPONSIBLE FOR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS, REGARDLESS OF
WHERE IT IS SHOWN. FOR EXAMPLE, ELECTRICAL WORK IS SHOWN ON M-SERIES DRAWINGS AS WELL AS E-SERIES DRAWINGS. TO AVOID OMITTING ANY COMPONENT OF THE PROJECT, REFER TO ALL THE
CONTRACT DOCUMENTS IN THEIR ENTIRETY.
16. VERIFY EXACT LOCATION OF CONNECTION POINTS (NEW TO EXISTING) IN FIELD PRIOR TO
CONSTRUCTION.
17. RELOCATE EXISTING DUCTWORK AND/OR PIPE WORK IN EXISTING SPACES TO ACCOMMODATE ALL
RENOVATIONS AND ADDITIONS.
18. PATCH ALL WALLS, FLOORS, CEILINGS, AND ROOFS TO MATCH EXISTING IN ALL CASES WHERE EXISTING
WALLS, FLOORS, CEILINGS, AND ROOFS REMAIN AND HVAC DEMOLITION IS INDICATED.
ALTERATION WORK AND DEMOLITION
1. ALL EQUIPMENT, DUCTWORK, PIPING, CONTROL DEVICES, ETC. TO BE REMOVED, SHALL BE DISPOSED
OF, TURNED OVER TO THE OWNER, OR SALVAGED AS DIRECTED BY THE OWNER. EQUIPMENT,
DUCTWORK, PIPING, CONTROL DEVICES, ETC. SHALL NOT BE REMOVED FROM THE PREMISES WITHOUT
THE OWNER'S APPROVAL.
2. UPON COMPLETION OF REMOVALS AND MODIFICATIONS, ALL DUCTWORK AND PIPING TO REMAIN SHALL BE PROPERLY VALVED, CAPPED AND/OR BY PASSED SUCH THAT UPON COMPLETION OF WORK ALL
SYSTEMS TO REMAIN, REMAIN OPERATIONAL.
3. NO DEAD ENDS SHALL BE LEFT ON ANY DUCTWORK OR PIPING SYSTEM UPON COMPLETION OF WORK.
4. EXISTING DUCTWORK AND PIPING SYSTEMS NOT TO BE REUSED, AND NOT SPECIFICALLY NOTED FOR
REMOVAL SHALL BE COMPLETELY REMOVED.
5. ALL SYSTEMS SHALL BE LEFT IN WORKING ORDER TO THE SATISFACTION OF THE OWNER UPON
COMPLETION OF ALL NEW WORK.
6. ALL EXISTING UNNECESSARY DUCTWORK AND PIPING NOT RELATED TO NEW WORK SHALL BE
COMPLETELY REMOVED.
7. RE-ROUTE ALL EXISTING DUCTWORK, PIPING AND SYSTEMS WHERE NECESSARY TO AVOID NEW
EQUIPMENT, STRUCTURAL, OR MASONRY AS REQUIRED BY THE PROPOSED ALTERATIONS.
SHOP DRAWINGS
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO BE REVIEWED BY THE ENGINEER PRIOR TO
CONSTRUCTION. SHOP DRAWINGS SHALL BE SUBMITTED FOR DUCTWORK LAYOUT, PIPING LAYOUT, SHEET METAL SHOP STANDARDS AND ALL EQUIPMENT FURNISHED.
2. ELECTRONIC DRAWING FILES SHALL BE GENERATED BY THE CONTRACTOR. DRAWINGS SHALL BE SUBMITTED IN BOTH HARD COPY AND ELECTRONIC VERSION (AUTOCAD VERSION AS REQUIRED BY THE
OWNER) OR AUTOCAD VERSION 2018 IF NOT SPECIFIED.
3. PRIOR TO THE SUBMISSION AND REVIEW OF SHEET METAL SHOP DRAWINGS, THE CONTRACTOR SHALL SUBMIT FOR REVIEW SHEET METAL SHOP STANDARDS. ANY SHEET METAL SHOP DRAWINGS SUBMITTED
PRIOR TO THE SUBMISSION OF THE SHOP STANDARDS SHALL BE RETURNED "NOT REVIEWED".
COORDINATION DRAWINGS
1. ELECTRONIC DRAWING FILES SHALL BE GENERATED BY THE CONTRACTOR. IF REQUESTED,
ELECTRONIC FILES OF THE MECHANICAL FLOOR PLANS, SECTIONS AND ELEVATIONS ONLY WILL BE MADE AVAILABLE. ELECTRONIC FILES WILL BE RELEASED ONLY UPON RECEIPT OF THE SIGNED AGREEMENT FOR TRANSFER OF ELECTRONIC FILE DATA, AGREEMENT FOR TRANSFER OF BUILDING
INFORMATION MODEL AND ALL FEES INDICATED THEREIN.
2. DEVELOP AND SUBMIT COORDINATION DRAWINGS AS OUTLINED.
A. SHEET METAL AND PLUMBING/PIPING SHOP DRAWINGS THAT HAVE BEEN COORDINATED WITH
ARCHITECTURAL AND STRUCTURAL PLANS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
DRAWINGS MUST BE RETURNED FROM ENGINEER EITHER "REVIEWED" OR "FURNISH AS CORRECTED"
PRIOR TO BEING USED AS BASIS FOR COORDINATION DRAWINGS.
B. AFTER SHEET METAL AND PIPING DRAWINGS HAVE BEEN REVISED PER ENGINEERS COMMENTS, REPRODUCIBLE COPIES SHALL BE SENT TO THE TRADES IN THE FOLLOWING SEQUENCE FOR THE
INCLUSION OF THEIR WORK:
-MECHANICAL SHEET METAL
-PIPING
-ELECTRICAL WORK
3. AFTER ALL TRADES HAVE INCLUDED THEIR WORK ON THE COORDINATION DRAWING AND NOTED
CONFLICTS, ALL TRADES SHALL MEET TO RESOLVE CONFLICTS AND AGREE TO ACCEPTABLE
SOLUTIONS. EACH TRADE SHALL SIGN COORDINATION DRAWINGS. ITEMS NOT SHOWN ON
COORDINATION DRAWING IS RESPONSIBILITY OF OMITTING CONTRACTOR AND CONTRACTOR IS
SUBJECT TO ADDITIONAL COSTS INCURRED BY OTHER TRADES.
4. THE ENGINEER IS NOT PART OF THE COORDINATION DRAWING PROCESS. THE ENGINEER WILL PROVIDE ASSISTANCE FOR NOTED CONFLICTS ONLY. COORDINATION DRAWINGS ARE NOT TO BE CONSIDERED PIPING OR DUCT SHOP DRAWINGS. THE CONTRACTOR IS REQUIRED TO SUBMIT INDIVIDUAL PIPING AND DUCTWORK SHOP DRAWINGS FOR REVIEW BY THE ENGINEER. PIPING AND DUCTWORK SHOP DRAWINGS
SHALL FOLLOW THE DESIGN INTENT OF THE CONTRACT DOCUMENTS.
5. SUBMIT FINAL SIGNED COORDINATION DRAWING TO ENGINEER FOR REVIEW. ENGINEER WILL REVIEW COORDINATION DRAWINGS FOR GENERAL ARRANGEMENT AND FOR NOTED CONFLICTS ONLY. SPECIFIC INSTALLATION REQUIREMENTS WILL BE REVIEWED ONLY IN INDIVIDUAL TRADE SHOP DRAWINGS.
6. ANY WORK FABRICATED OR INSTALLED PRIOR TO SIGN OFF BY ALL TRADES WHICH IS DEEMED TO BE IN CONFLICT WITH COORDINATION DRAWINGS SHALL BE REMOVED AND RE-INSTALLED IN CONFORMANCE
WITH COORDINATION DRAWINGS.
7. EACH CONTRACTOR (MENTIONED ABOVE) IS RESPONSIBLE FOR THE COORDINATION OF THEIR
SUB-CONTRACTORS.
8. THE OVERALL COORDINATION OF THE COORDINATION PROCESS IS THE RESPONSIBILITY OF THE CONTRACTOR. THE ENGINEER IS NOT RESPONSIBLE FOR THE COORDINATION PROCESS. THE ENGINEER
WILL RESPOND TO QUESTIONS THAT ARISE FROM THE COORDINATION PROCESS. DRAWINGS
SUBMITTED WILL BE REVIEWED FOR CLEARLY IDENTIFIED CONFLICTS ONLY. SOLUTIONS TO CONFLICTS
WILL NOT BEAR ADDITIONAL COST.
AS BUILT DRAWINGS
1. PROVIDE A COMPLETE SET OF AS-BUILT DRAWINGS REFLECTING AS INSTALLED CONDITIONS. AS-BUILT DRAWINGS SHALL INDICATE ALL INSTALLED CONDITIONS OF SYSTEMS WITHIN THIS DISCIPLINE.
DRAWINGS SHALL BE OF SIMILAR SCALE AS THE CONSTRUCTION DOCUMENTS AND INCLUDE DETAILS AS NECESSARY TO CLEARLY REFLECT THE INSTALLED CONDITION. DRAWINGS SHALL BE BOUND IN A COMPLETE AND CONSECUTIVE SET. SUPPLEMENTAL SKETCHES AND LOOSE PAPERWORK WILL NOT BE ACCEPTABLE AND WILL BE RETURNED FOR REVISION. THE CONTRACTOR SHALL COMPLY WITH THE ENGINEERS COMMENTS TO PRODUCE A CLEAR AND CONCISE SET OF DRAWINGS. DRAWINGS SHALL BE SUBMITTED IN BOTH HARD COPY AND ELECTRONIC VERSION (AUTO-CAD VERSION AS REQUIRED BY THE OWNER) OR AUTOCAD VERSION 2018 IF NOT SPECIFIED. NUMBER OF COPIES OF EACH AS REQUESTED
BY THE OWNER.
2. PROVIDE "AS-BUILT DRAWINGS" INDICATING IN A NEAT AND ACCURATE MANNER A COMPLETE RECORD OF ALL REVISIONS OF THE ORIGINAL DESIGN OF THE WORK. INDICATE THE FOLLOWING INSTALLED
CONDITIONS:
· INCLUDE ALL CHANGES AND AN ACCURATE RECORD IN AUTOCAD DRAWING OR APPROPRIATE
SHOP DRAWINGS, OF ALL DEVIATIONS, BETWEEN THE WORK SHOWN AND WORK INSTALLED.
· MAINS AND BRANCHES OF PIPING SYSTEMS, WITH VALVES AND CONTROL DEVICES LOCATED AND
NUMBERED, CONCEALED UNIONS LOCATED, AND WITH ITEMS REQUIRING MAINTENANCE LOCATED
(I.E., TRAPS, STRAINERS, EXPANSION COMPENSATORS, TANKS, ETC.). VALVE LOCATION DIAGRAMS, COMPLETE WITH VALVE TAG CHART.
· EQUIPMENT LOCATIONS (EXPOSED AND CONCEALED), DIMENSIONED FROM PROMINENT BUILDING
LINES.
· APPROVED SUBSTITUTIONS, CONTRACT MODIFICATIONS, AND ACTUAL EQUIPMENT AND MATERIALS
INSTALLED.
· CONTRACT MODIFICATIONS, ACTUAL EQUIPMENT AND MATERIALS INSTALLED.
3. SUBMIT FOR REVIEW BOUND SETS OF THE REQUIRED DRAWINGS, MANUALS AND OPERATING
INSTRUCTIONS.
4. SUBMIT A COMPLETE MAINTENANCE MANUAL OF ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT.
HOUSEKEEPING PADS
1. PROVIDE CONCRETE HOUSEKEEPING PADS FOR FLOOR-MOUNTED EQUIPMENT. COORDINATE EXACT LOCATIONS, DIMENSIONS, PIPING LOCATIONS, AND ANCHOR BOLT REQUIREMENTS. PROVIDE CONCRETE HOUSEKEEPING PADS UNDER ALL FLOOR MOUNTED EQUIPMENT. PADS SHALL BE CONSTRUCTED OF 3,000 PSI CONCRETE. PADS SHALL BE 4 INCHES HIGH (OR THE MINIMUM HEIGHT TO ACCOMMODATE THE CONDENSATE TRAP HEIGHT), AND MINIMUM 4 INCHES WIDER THAN THE EQUIPMENT IN ALL DIRECTIONS.
2. COORDINATE FLOOR DRAIN LOCATIONS WITH RESPECT TO EQUIPMENT HOUSEKEEPING PADS. PLACE DRAINS SUCH THAT EDGE OF THE FLOOR GRATE EXTENDS NO CLOSER THAN 2 INCHES FROM THE SIDE
OF THE PAD. FLOOR DRAINS TO BE COORDINATED WITH PLUMBING CONTRACTOR.
HANGERS AND SUPPORT
1. SEISMIC RESTRAINT: PROVIDE SEISMIC RESTRAINT AND EXPANSION OF ALL MECHANICAL EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH STATE AND FEDERAL BUILDING CODE REQUIREMENTS. SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE
STATE OF THE PROJECT INDICATING ALL NECESSARY COMPONENT CUTS, PLAN LOCATIONS AND
CALCULATIONS FOR A COMPLETE SYSTEM.
2. PROVIDE ALL NECESSARY STRUCTURAL MEMBERS INCLUDING ADDITIONAL STRUCTURAL SUPPORT TO SUPPORT PIPING AND EQUIPMENT. HANGERS AND SUPPORTS SHALL BE OF AN APPROVED DESIGN NECESSARY TO SUPPORT DUCTWORK, PIPING, EQUIPMENT AND TO KEEP IN PROPER ALIGNMENT AND PREVENT TRANSMISSION OF INJURIOUS THRUSTS AND VIBRATIONS. IN ALL CASES WHERE HANGERS, BRACKETS, ETC., ARE SUPPORTED FROM CONCRETE CONSTRUCTION, DO NOT WEAKEN CONCRETE OR
PENETRATE WATERPROOFING. ALL HANGERS AND SUPPORTS SHALL BE CAPABLE OF SCREW
ADJUSTMENT AFTER EQUIPMENT AND PIPING IS ERECTED. HANGERS SUPPORTING PIPING EXPANDING INTO LOOPS, BENDS AND OFFSETS SHALL BE SECURED TO THE BUILDING STRUCTURE IN SUCH A MANNER THAT HORIZONTAL ADJUSTMENT PERPENDICULAR TO THE RUN OF PIPING SUPPORTED MAY BE MADE TO ACCOMMODATE DISPLACEMENT DUE TO EXPANSION. ALL SUCH HANGERS SHALL BE FINALLY ADJUSTED BOTH IN THE VERTICAL AND HORIZONTAL DIRECTION, AS REQUIRED. HANGERS IN CONTACT WITH COPPER OR BRASS PIPE SHALL BE DIELECTRIC, COMPATIBLE WITH COPPER AND BRASS ALLOY OR
PROVIDED WITH FELT SLEEVE.
3. PROVIDE ADDITIONAL SUPPORT FOR DUCTWORK PIPING AND EQUIPMENT WHEN DECK IS NOT CAPABLE
OF SUPPORT.
4. BEAM CLAMPS - HANGERS SUPPORTED FROM STEEL SHALL BE CENTER LOADING BEAM CLAMPS FOR HANGERS SUPPORTING PIPING 2-1/2 INCHES AND LARGER. FOR PIPING 2 INCHES AND SMALLER, I BEAM CLAMPS, WITH RETAINING STRAPS, SHALL BE FORGED STEEL. "C" CLAMPS ARE NOT TO BE USED.
5. PROVIDE AND INSTALL EXPANSION COMPENSATION FOR ALL PIPING. SUBMIT PLANS, CALCULATIONS
AND EQUIPMENT DATA.
GENERAL MECHANICAL NOTES
T
H
24x12
12"Ø
XXX
GENERAL MECHANICAL SYMBOLS
CA
BA
* ALL SYMBOLS MAY NOT BE USED IN THESE DOCUMENTS.
XXXXXXXX
POINT OF DEMOLITION / DISCONNECT
POINT OF CONNECTION
UNDERLINED TEXT DENOTES EQUIPMENT
REFER TO SCHEDULES
BACK DRAFT DAMPER
MOTORIZED DAMPERTHERMOSTAT
RELATIVE HUMIDITY SENSOR OR HUMIDISTAT
VANE EXTRACTOR
DUCT TAKE-OFF
MITERED ELBOW WITH TURNING VANES
EXHAUST / RETURN AIR FLOW
SUPPLY AIR FLOW
FLEXIBLE DUCT CONNECTION
ROUND DUCT DIAMETER SIZE
ACCESS DOOR IN DUCT
SUPPLY DUCT UP / DOWN
RETURN AIR DUCT UP / DOWN
EXHAUST AIR DUCT UP / DOWN
DOUBLE LINE DUCTWORK WITH INDICATION
OF INSIDE DIMENSIONS
HIDDEN DUCTWORK
EXISTING DUCTWORK TO BE REMOVED
EXISTING DUCTWORK TO REMAIN
X X X X X X
X X X X X X
MD MD
BD
COMPRESSED AIR PIPING
BREATHING AIR PIPING
HIDDEN PIPING
EXISTING PIPING / EQUIPMENT TO REMAIN
EXISTING PIPING / EQUIPMENT TO BE REMOVED
DIRECTION OF FLOW IN PIPE
PIPE ELBOW UP / DOWN
PIPE TOP CONNECTION
PIPE BOTTOM CONNECTION
CAPPED PIPING
PIPING CONTINUATION
PIPE UNION
FLEXIBLE PIPE CONNECTOR
BALL VALVE
BUTTERFLY VALVE
PRESSURE GAUGE WITH BALL VALVE
PIPE REDUCER OR INCREASER
BALL DRAIN VALVE WITH HOSE COUPLING AND CAP
CHECK VALVE
BD
M101 NEW FLOOR PLAN - MECHANICAL
FLOW AND CONTROL - MECHANICALM002
M200 SCHEDULES & DETAILS - MECHANICAL
M201 DETAILS - MECHANICAL
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
M001
COVER SHEET -
MECHANICAL
KR
KR
NTS
VSF
CS
R
VFD
MS
P
SD
ES
SP
HL
FS
H
AQ
MECHANICAL CONTROLS SYMBOL LIST
DPT
DI
AI
AO
DO
T
A
M
T
H
F
VS
SH
OC
TCP
TCU
CO
NO2
L
ALARM
DDC ANALOG INPUT POINT
DDC ANALOG OUTPUT POINT
AIR QUALITY SENSOR
EMERGENCY POWER OFF SWITCH
CARBON MONOXIDE SENSOR
CURRENT SENSOR
DDC DIGITAL INPUT POINT
DDC DIGITAL OUTPUT POINT
DIFFERENTIAL PRESSURE TRANSMITTER
END SWITCH
FLOW MEASURING STATION
FREEZE STAT
ROOM HUMIDISTAT / HUMIDITY SENSOR
HUMIDITY SENSOR
HIGH LIMIT HUMIDISTAT
ELECTRONIC LIQUID LEVEL SENSOR
DAMPER/VALVE MOTOR
MOTOR STARTER
NITROGEN DIOXIDE SENSOR
OCCUPANCY SENSOR
PRESSURE SENSOR
REFRIGERANT SENSOR
SMOKE DETECTOR; FURNISHED AND WIRED BY
DIVISION 26 CONTRACTOR AND MOUNTED BY
DIVISION 23 CONTRACTOR
COOLING TOWER SUMP HEATER
STATIC PRESSURE SENSOR
TEMPERATURE CONTROL PANEL
TERMINAL CONTROL UNIT
ROOM TEMPERATURE SENSOR / THERMOSTAT
TEMPERATURE SENSOR
VARIABLE FREQUENCY CONTROLLER
VARIABLE SPEED FAN SWITCH
MAGNAHELIC PRESSURE GAUGE
HUMIDIFIER
COIL
OPPOSED BLADE DAMPER
PUMP / FAN
CO2 CARBON DIOXIDE SENSOR
PG PROPANE GAS SENSOR
DISCONNECT SWITCH
BTU BTU METER
EPO
G GAS SENSOR
ALL SYMBOLS MAY NOT BE USED IN THESE DOCUMENTS.
*REFER TO VARIABLE FREQUENCY CONTROLLER CONTROL DIAGRAM FOR REQUIRED CONTROL
POINTS FOR ALL VFD & VS SYMBOLS INDICATED.
**REFER TO SPACE THERMOSTAT CONTROL DIAGRAM FOR REQUIRED CONTROL POINTS FOR
ALL SPACE THERMOSTAT SYMBOLS INDICATED.
M002
SCALE: NONE
COMPRESSED AIR SYSTEM FLOW DIAGRAM
COMP-1
EXISTING STORAGE
RECEIVER TANK
NEW WET TANK
EXISTING STORAGE
RECEIVER TANK
NEW DRY TANK
AD-1
~ EXISTING 3" CA
TO SHOPS
AF-1 AF-2 AF-3
3/4" VALVED AND CAPPED.
FULL SIZES VALVED
BYPASS AROUND EACH
DEVICE. TYPICAL.
F.C.
1/2" CD TUBING TO OIL/WATER
SEPARATOR. TYPICAL.
OWS-1
OIL/WATER SEPARATOR.
EXTEND ALL EQUIPMENT
AND DEVICE DRAINS AND
EXISTING TANK DRAINS
TO INLET CONNECTIONS.
EXTEND 3/4" DRAIN LINE
TO FLOOR DRAIN.
M002
SCALE: NONE
BREATHING AIR SYSTEM FLOW DIAGRAM
COMP-2 COMP-3
F.C. F.C.
BREATHING AIR RECEIVER,
DRYERS, ETC. ON
FACTORY-PROVIDED SKID
2"
2" 2"
2" 2"
3" 2"
2" 2"
2"
3"
3/4
3/4
3/4"
3/4"
1- 1/2
3/4" VALVED AND
CAPPED. TYPICAL
FOR 2.
~ EXISTING 1-1/2" BA
TO SHOPS
1/2" CD TUBING TO NEARBY
FLOOR DRAIN. TYPICAL.
M002
SCALE: NONE
COMPRESSOR VENTILATION FLOW AND CONTROL
COMP-1
M
M
CONNECT COMPRESSOR EXHAUST
DUCT TO EXISTING 38" x 38" MAIN.
BYPASS AIR
DAMPER
COMPRESSOR
CONTROLLER
BACNET
CONNECTION
M
OA
EXISTING OUTSIDE
AIR DAMPER
TS
SPACE TEMP
SENSOR
AI
AO
AO AO
2" CA
2"
CAPPED
EXTERIORMER
N.C.
INSTALL TEMP LINE AND
BYPASS UP TO VALVE FOR
TEMP COMPRESSOR
ENABLING WORK.
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
M002
FLOW AND CONTROL -
MECHANICAL
EF
P.6
Q.1
5.8 7.4
PAINT BOOTH MECH.
PAINT KIT.
X X
X X
X X
X X
X X
XXXXXXXXXXX
X
X X
X X
X X
X X
X X X X X X X X X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXX
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXX
72x60
12x12
X X X X X X X X X X
X X
XXXXXXXXXX
X X
X X
X
X X X X X X X X X X
X X
X X
X X
XXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X X X X X X X X X X
X X
X
XX
X X
X
XXXXXXXXXX
X X X X X X X X X X
X X
X
XX
X X
X
XXXXXXXXXXXXXXXX
XXXXXXXXXX
X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X
XXXXXXXXXX
X X X X X X X X X X
XX
XXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X
X X X X X X X X X X
X
XXXXXXXXXX
X X
X X
X X X X X X X X X X
X X
X X
X X
XXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X X X X X X X X X X
X X
X
XX
X X
X
XXXXXXXXXX
X X X X X X X X X X
X X
X
XX
X X
X
XXXXXXXXXXXXXXXX
XXXXXXXXXX
X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X
XXXXXXXXXX
X X X X X X X X X X
XX
XXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X x1
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X
XXXXXX
X X
X X
X
X X X X X X
EXISTING
EUH-3
EXISTING AIR
COMP-1
EXISTING AIR
COMP-2
EXISTING OIL/
WATER SEPARATOR EXISTING BREATHING
AIR SYSTEM
EXISTING
EF-31
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
MD
X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X
EXISTING
RECEIVER
EXISTING
RECEIVER
EXISTING BMS PANEL
EXISTING EF-31 CONTROLS
EXISTING
ETP-2
XXXXXXXX
X X
X X
X X
X
XXXXXXXX
X X
X X
X X
X
XXXXXXXXXXX
X X
X X
X X
X X
X
XXXXXXXXX
X X
X X
X X
X X
X
X X X X X X X X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X
EXHAUST DUCT SERVING AIR COMPRESSOR
TO BE REMOVED COMPLETE UP TO PLENUM.
PATCH AT MAIN. TYPICAL FOR 2.
EXISTING OUTSIDE AIR PLENUM
AND LOUVER TO REMAIN.
EXISTING EXHAUST AIR
PLENUM AND LOUVER
TO REMAIN.
EXISTING HOUSEKEEPING PAD TO BE
REMOVED COMPLETE. TYPICAL.
X X
XXX
X
X XMDX
X
XXX
X
X XMD
X X
XXX
X
X XMDX
X
XXX
X
X XMD
X X
X X
X X
X X
T
T
EXISTING
EUH-4
X
XXXX
X
X X X X
X
XXXX
X
X X X X
EXISTING AIR COMP-1 SWITCH
TO BE REMOVED.
EXISTING AIR COMP-2 SWITCH
TO BE REMOVED.
P.6
Q.1
5.8 7.4
TEMPORARY 75 HP COMPRESSOR
AND STORAGE TANK
72x60
EXISTING
EF-31
MD
EXISTING OUTSIDE AIR
PLENUM AND LOUVER.
EXISTING EXHAUST AIR
PLENUM AND LOUVER.
12x12
EXISTING
EUH-3
EXISTING BMS PANEL
EXISTING EF-31 CONTROLS
EXISTING
ETP-2
T
T
EXISTING
EUH-4
DR-1WR-1
x1
COMP-1
AD-1
OWS-1
BREATHING AIR
RECEIVER, DRYERS, ETC.
MOUNTED ON
FACTORY-PROVIDED SKIDCOMP-3
COMP-2
38x38
MD
38x38
CONNECT NEW EXHAUST DUCT
SERVING COMP-1 TO EXISTING
38x38 MAIN.
x2
TS
NEW TEMP SENSOR TIED
TO COMP-1 EXHAUST.
OPEN-ENDED DUCT WITH
WIRE MESH SCREEN. TYPICAL.
MD
MD100
SCALE: 1/2"=1'-0"
DEMOLITION PLAN - DUCTWORK
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
MD100
DEMOLITION FLOOR PLAN
DUCTWORK - MECHANICAL
EF
JF
1/2" = 1'-0"
MD100
SCALE: 1/2"=1'-0"
NEW PLAN - DUCTWORK
5.8 7.4 8.4
PAINT BOOTH MECH.
PAINT KIT.
X X
X X
X X
X X
X X
X X X X X X X X
X X
X X
X X
X X
XXXXXXXXX
X X X X X X X
X X
X X
X X
X X
XXXXXXXXX
X X
X X
X X
X X
X X
X X X X X
X X
X X
X X
XXXXXXX
X
X X
X X
X
X X
X X X X X X
X X
X X
X
XXXXXX
X
EXISTING
EUH-3
EXISTING AIR
COMP-1
EXISTING AIR
COMP-2
EXISTING
BREATHING
AIR SYSTEM
EXISTING
EUH-4
T
T
X
XXXX
X
X X X X
EXISTING
RECEIVER
EXISTING
RECEIVER
X
XXXX
X
X X X X
EXISTING AIR COMP-2 SWITCH
TO BE REMOVED.
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
XX
X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
EXISTING
TRAP
PRIMER
ETP-2
X X
XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXX
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
XXXXXXXXXX X X X X X X X X
X
XX
X
XXXXXXXX X X X X X X
X X
X X
X X X
X X
X
X XXXXXXXX X X X X X X X X X XXXXXXXXXXXX X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
3" CA DOWN TO EXISTING
RECEIVER TO REMAIN.
3" CA TO SHOPS
1-1/2" BA TO SYSTEM.
2" CA TOP
2" CA BOTTOM
2" CA FROM AIR COMPRESSOR
TO RECEIVER. TYPICAL FOR 2.
OIL REMOVAL FILTER TO BE
REMOVED. TYPICAL FOR 2.
XXXXXXXXXXX X X X X X X X X X
X X
XX
X
X
X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXX X X X X X X X X
X X
X X
X X X
X X
X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X
XXXX X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
CUT BACK COMPRESSED
AIR TO VERTICAL HEADER.
EXISTING AIR COMPRESSOR TO BE REMOVED
COMPLETE ALONG WITH ALL ASSOCIATED
CONTROLS, CONDENSATE, COMPRESSED AIR
PIPING, ETC. TYPICAL FOR 2.
DEMO EXISTING CONDENSATE
DRAIN LINE SERVING COMP-1
AND COMP-2.
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
DEMOLISH BREATHING AIR
FILTER AND ENTIRE SYSTEM
AND PIPING AS INDICATED
EXISTING HOUSEKEEPING PAD TO
BE REMOVED COMPLETE. TYPICAL.
EXISTING BMS PANEL
EXISTING EF-31 STARTER
EXISTING OIL/WATER SEPARATOR TO
BE REMOVED COMPLETE ALONG WITH
ASSOCIATED PIPING, CONTROLS,
HOUSEKEEPING PAD, ETC.
EXISTING AIR COMP-1 SWITCH
TO BE REMOVED.
EXISTING FLOOR DRAIN. TYPICAL.
EXISTING DRAIN PUMP SERVING
RECEIVER TANK TO REMAIN.
TYPICAL FOR 2.
CUT BACK EXISTING RECEIVER TANK
DRAIN PIPING TO ELBOW FOR FUTURE
CONNECTION. TYPICAL FOR 2.
CUT BACK COMPRESSED AIR TO
EXISTING VALVE IN VERTICAL.
1-1/2" CA
1-1/2" BA
CUT BACK 3" CA FROM
EXISTING VALVE IN
VERTICAL TO TEE
MD101
SCALE: 1/2"=1'-0"
DEMOLITION PLAN - PIPING
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
MD101
DEMOLITION FLOOR PLAN
PIPING - MECHANICAL
EF
JF
1/2" = 1'-0"
5.8 7.4 8.4
PAINT BOOTH MECH.
PAINT KIT.
EXISTING
EUH-3
EXISTING
EUH-4
T
T
EXISTING
TRAP
PRIMER
ETP-2
EXIST 3" CA FROM
RECEIVER TANK TO MAIN.
3" CA TO SHOPS1-1/2" BA TO SYSTEM.
TEMPORARY 2" CA TO CONNECT TO EXISTING
SYSTEM. CONNECT TO EXISTING VALVE.
2" TEMPORARY COMPRESSED AIR
CONNECTION - PROVIDE CAP FOR
PERMANENT INSTALLATION.
ISOLATION VALVE IN
VERTICAL.
EXISTING HOUSEKEEPING
PAD. TYPICAL.
BMS PANEL
EXISTING EF-31 STARTER
LINETYPE DENOTES NEW
HOUSEKEEPING PAD. TYPICAL.
LINETYPE DENOTES EQUIPMENT
CLEARANCE. TYPICAL.
EXISTING FLOOR DRAIN. TYPICAL.
TEMPORARY 75 HP COMPRESSOR
AND STORAGE TANK
WR-1
EXISTING DRAIN PUMP SERVING
RECEIVER TANK TO REMAIN.
TYPICAL FOR 2.
DR-1
AD-1COMP-1
COMP-2
COMP-3
BREATHING AIR
RECEIVER, DRYERS, ETC.
MOUNTED ON FACTORY-PROVIDED SKID
RUN CONDENSATE FROM OIL/WATER
SEPARATOR TO NEARBY FLOOR DRAIN.
AF-1
AF-2
AF-3
OWS-1
NEW CONDENSATE TUBING CONNECTING TO
EXISTING PIPING SERVING RECEIVER TANK.
RUN TO OWS-1. TYPICAL FOR 2.
CONDENSATE TUBING TO RUN TO OWS-1.
LAYOUT IS DIAGRAMATIC. TYPICAL.
CONNECT 2" CA TO
EXISTING 3" VALVE.
2" CA DOWN TO EXISTING
VALVE. TYPICAL FOR 2.
1" BA FROM COMPRESSORS TO
INLET AT SKID.
1-1/2" BA FROM OUTLET AT SKID
TO CONNECT TO EXISTING.
RUN CONDENSATE TO NEARBY
FLOOR DRAIN. TYPICAL FOR 2.
RUN CONDENSATE TO NEARBY
FLOOR DRAIN.
BREATHING AIR COMPRESSOR
SIMILAR TO POWEREX LSE-2005.
TYPICAL FOR 2.
EXHAUST DUCT SERVING COMP-1 TO BE
CONNECTED TO EXISTING PLENUM.
PROVIDE ISOLATION VALVE
AND CHECK VALVE AT
EACH COMPRESSOR.
1" BA
1-1/2" BA
2" CA
2" CA
2" CA
2" BYPASS
PROVIDE A TEMPORARY 75 HP AIR
COMPRESSOR TO SERVE THE
BUILDING DURING THE
CONSTRUCTION PHASE. INCLUDE
ALL PIPING AND ELECTRICAL
CONNECTIONS AND ALL LOGISTICAL
COSTS.
M101A
SCALE: 1/2"=1'-0"
OPTION A - ONE COMPRESSOR
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
M101
FLOOR PLAN PIPING -
MECHANICAL
EF
JF
SUPPLY RETURN EXHAUST
G90 GALVANIZED
STEEL
TYPICAL
(UNLESS OTHERWISE SPECIFIED)
1. DUCT CONSTRUCTION SHALL MEET SMACNA METAL & FLEXIBLE 2005 3RD EDITION STANDARDS.
VIBRATION-CONTROL
REMARKS:
1. REFER TO SPECIFICATION SECTION 230548 - "VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT" FOR A DESCRIPTION OF EACH VIBRATION CONTROL DEVICE.
FPC - FLEXIBLE PIPE CONNECTIONS
HN - NEOPRENE HANGER
NP - NEOPRENE PAD
* IN ADDITION TO ANY INTERNAL VIBRATION ISOLATION.
MOTORIZED EQUPMENT, FLOOR MOUNTED
PIPING WITHIN 50FT OF CONNECTION TO ANY PIECE OF
EQUIPMENT WITH A MOTOR
DUCTWORK IN MECHANICAL ROOMS OR WITHIN 50FT
OF CONNECTED VIBRATION-ISOLATED EQUIPMENT
PIPE TO COMPRESSOR CONNECTION
BASE ISOLATOR*
FPC
HN
HN
NP4" HOUSEKEEPING PAD
0.25"
1.2"
0.2"
DEFLECTION
FLOOR MOUNTED EQUIPMENT (ALL) -
EQUIPMENT
NOTES:
1. PRESSURE CLASS SHALL BE DEFINED PER SMACNA DUCT CONSTRUCTION
STANDARDS, LATEST EDITION.
2. DUCTWORK, JOINTS, SEALING, AND FITTINGS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS, LATEST EDITION.
DUCT PRESSURE CLASS
APPLICATION PRESSURE CLASS
GENERAL EXHAUST DUCTWORK 2" W.G.
G90 GALVANIZED
STEEL
G90 GALVANIZED
STEEL
APPLICATION
HVAC DUCT/PLENUM MATERIAL
- 470AF-1 MIKROPOR
GON-US-470MP
ITEM MAKE/MODEL ELEMENT
TYPE MAX. CFM REMARKS
COMPRESSED AIR FILTERS
SYSTEM PIPE SIZE CONSTRUCTION PIPING FITTINGS FLANGES
PIPING/TUBING MATERIAL, JOINTS & FITTINGS
UNIONS
2 1/2" AND SMALLER
3" AND LARGER(CA ONLY)
COMPRESSED AIR AND
BREATHING AIR
SOLDER JOINT CONSTRUCTION WITH
THREADED ADAPTERS AS REQUIRED. 95-5
TIN/ANTIMONY SOLDER.
BUTT WELDED CONSTRUCTION WITH FLANGED
CONNECTIONS TO VALVES AND EQUIPMENT
AS REQUIRED.
COPPER, TYPE L, HARD DRAWN, ANSI H23.1,
ASTM B88.
BLACK STEEL, SCHEDULE 40,
SEAMLESS, ASTM A53, GRADE B.
CAST BRONZE OR WROUGHT
COPPER, SOLDER ENDS,
ANSI B16.9 OR ANSI B16.22.
STEEL, CLASS 150, BUTT WELD
ENDS, ANSI B16.9, ASTM A234.
BRONZE SOLDER ENDS, GROUND JOINTS,
ANSI B16.19 OR ANSI B16.22.
STEEL, CLASS 150, WELD TYPE,
ANSI B16.5, ASTM 181, GRADE 1.
STEEL, CLASS 150, WELD TYPE, ANSI
B16.5, ASTM A234, GRADE WPA.
CAST BRONZE, CLASS 150, SOLDER
TYPE, ANSI B16.24.
2" AND SMALLER
2 1/2" AND LARGER
CONDENSATE DRAINS
SOLDER JOINT CONSTRUCTION WITH
THREADED ADAPTERS AS REQUIRED. 95-5
TIN/ANTIMONY SOLDER.
COPPER, TYPE L, HARD DRAWN, ANSI H23.1,
ASTM B88.
CAST BRONZE OR WROUGHT
COPPER, SOLDER ENDS,
ANSI B16.9 OR ANSI B16.22.
BRONZE SOLDER ENDS, GROUND JOINTS,
ANSI B16.19 OR ANSI B16.22.
COPPER, TYPE L, HARD DRAWN, ANSI H23.1,
ASTM B88.
CAST BRONZE OR WROUGHT
COPPER, SOLDER ENDS,
ANSI B16.9 OR ANSI B16.22.
BRONZE SOLDER ENDS, GROUND JOINTS,
ANSI B16.19 OR ANSI B16.22.
USE UNIONS
USE UNIONS
SOLDER JOINT CONSTRUCTION WITH
THREADED ADAPTERS AS REQUIRED. 95-5
TIN/ANTIMONY SOLDER.
MAX. PRESSURE
(PSI)
2"
CONNECTION SIZE
(NPT)
PARTICULATE 470AF-2 MIKROPOR
GON-US-470MX 2902"
COALESCING 470AF-3 MIKROPOR
GON-US-470MY 2902"
NOTES:
1. VFD DRIVEN COMPRESSOR
SULLAIR
SN5509V
UNIT
NO
COMP-1
CFM PSIG
AIR COMPRESSOR
HP VOLTS
ELECTRICAL
PH RPM MAKE/MODEL REMARKS
341 125 75 460 3 1780
SOUND
LEVEL
72 dBA
OWS-1 COMPRESSED AIR 7 IONIC EXCHANGE
RESIN
CLEAN RESOURCES
1DC 350
NOTES:
1. PROVIDE ALL DRAIN LINES AND FITTINGS FROM EQUIPMENT DRAINS. INSTALL PER MANUFACTURER'S INSTRUCTION.
UNIT
NO
SYSTEM
SERVED GALLONS MATERIAL
OIL/WATER SEPARATOR
MAKE/MODEL REMARKS
PRE FILTERING
GENERAL PURPOSE
OIL REMOVAL
SULLAIR
SRD400
UNIT
NO
AD-1
CFM
AIR DRYER
KW VOLT / Ø / HZ
ELECTRICAL MAKE/MODEL REMARKS
400 2.27 460 / 3 / 60 -
INLET
PRESSURE
125 PSIG
INLET
TEMP
100°F
PRESSURE
DROP
1.48 PSID
OUTLET
D.P.
45°F MAX
EVAPORATOR
TYPE
REFRIGERANT TO AIR
CONDENSING
UNIT
AIR-COOLED
MOISTURE
SEPARATOR
CENTRIFUGAL TYPE
4" HOUSEKEEPING PAD
NOTES:
1. FILTERS TO HAVE 2" HOUSINGS.
2. PROVIDE ZERO LOSS DRAINS AND DRAIN LINES TO OIL/WATER SEPARATOR.
3. SECURE TO WALL WHERE PRACTICAL WITH WALL BRACKET.
4. INSTALL BYPASS LINE WITH AMPLE CLEARANCE FOR SERVICING.
0.6
INITIAL PRESSURE
LOSS (PSI)
1.1
PARTICLE REMOVAL
(MICRON)
0.01
MAX. OIL CARRYOVER
AT 70°F (PPM)
0.5
0.01
176°F
MAX. TEMP.
176°F
176°F
PRESSURE LOSS FOR
ELEMENT CHANGE (PSI)
NOTES:
1. COMP-2 IS LEAD COMPRESSOR. COMP-3 IS STANDBY.
2. PROVIDE DUAL DESSICANT DRYERS, REGULATORS, ALARMS AND FILTRATION STATIONS
ON FACTORY SKID AND ALL INTERCONNECTING PIPING AND WIRING. REFER TO SPECIFICATIONS.
POWEREX
LSE2005
UNIT
NO
COMP-2 /
COMP-3
HP SCFM @
100 PSIG
BREATHING AIR COMPRESSOR
VOLTS SYSTEM F.L.A.
ELECTRICAL MAKE/MODEL REMARKS
20 45.6 460 28
SOUND
LEVEL
58 dBA
TANK SIZE
(GAL.)
BTU/HR
38,180
ROTARY SCREW
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
M200
SCHEDULES & DETAILS -
MECHANICAL
EF
W W
M201
NOT TO SCALE
DUCT CONSTRUCTION DETAIL
DOUBLE
WALL VANES
ONLY ACCEPTABLE WHERE SPACE
DOES NOT PERMIT THE USE OF
RADIUS ELBOWS
AIR FLOW
SUPPLY TAP
AIR FLOW
TAKE-OFF TO EXPOSED
SIDEWALL REGISTER
ACOUSTICALLY
LINED DUCT
DIMENSION DENOTES
CLEAR OPENING
12X8
RADIUS ELBOW
W
W
AIR FLOW
RETURN TAP
AIR FLOW
W
SUPPLY SPLIT
20° MAX
TRANSITION
SQUARE ELBOW
DUCT TAP TO EXPOSED
SIDEWALL REGISTER ONLY
BRANCH
DUCT
VOLUME EXTRACTOR
WITH MANUAL
ADJUSTING LEVER.
R = W OR 12" MAX
R=W R=W
R = W OR 12" MAX BRANCH
DUCT
NOTES:
1. SPECIFICATIONS EXCEED SMACNA STANDARDS
IN SOME INSTANCES.
2. SMACNA SHALL BE CONSIDERED THE MINIMUM
STANDARD UNLESS OTHERWISE NOTED ON
THE DRAWINGS, DETAILS OR IN THE
SPECIFICATIONS.
C-CLAMP WITH
RETAINING CLIP
25" TO 30"
31" TO 42"
43" TO 60"
61" TO 84"
85" AND UP
1 1/2" X 1 1/2" X 1/8"
1 1/2" X 1 1/2" X 1/8"
1 1/2" X 1 1/2" X 1/8"
2" X 2" X 1/4"
2" X 2" X 1/4"
3/8"
3/8"
1/2"
1/2"
1/2"
8'-0" O.C.
6'-0" O.C.
6'-0" O.C.
4'-0" O.C.
4'-0" O.C.
4 SQ. FT.
10 SQ. FT.
10 SQ. FT.
* REDUCE SPACING TO NEXT SMALLER INTERVAL IF DUCT AREA EXCEEDS MAXIMUM
DUCT WIDTH
SUPPORT ANGLE OR EQUIV.
CHANNEL ROD DIA. MAXIMUM SPACING MAXIMUM AREA *
WEDGE EXPANSION ANCHOR
NUT & WASHER
METAL STRAP
SHEET METAL SCREWS EVERY 6"
O.C. FOR FULL HEIGHT OF DUCT.
PROVIDE MINIMUM OF TWO ON
DUCTS SMALLER THAN 6"
2" MINIMUM SUPPORT ANGLE
INSULATION OR LINING.
PROVIDE 1'-0" LONG
SECTION OF RIGID
INSULATION AT EVERY
HANGER UNLESS LINING
IS USED. TYPICAL
DAMPER BLADE
SIDE
BEAM CLAMP
LOCKNUT
TYPICAL
THREADED ROD
THREADED ROD
TYPICAL
1" WIDE METAL STRAP
PRE-POUR
CONCRETE
INSERT
BEAM CLAMP
24" OR SMALLER 25" OR WIDER
M201
NOT TO SCALE
DUCT SUPPORT DETAIL
NOTES:
1. CONCRETE PAD LENGTH, WIDTH AND LOCATION TO BE DETERMINED BY THE MECHANICAL CONTRACTOR BASED ON THE SUBMITTED
EQUIPMENT.
MINIMUM 3000 PSI REINFORCED
CONCRETE FORMED PAD
45° CHAMFER
#4 BARS EACH WAY, PROVIDE HOOK, 90-DEG, AT
ENDS. TYPICAL
1" CLEAR ALL AROUND
M201
NOT TO SCALE
HOUSEKEEPING PAD DETAIL
EXISTING FINISHED FLOOR #4 DOWEL ANCHOR EMBEDDED 4' AND LOCATED
18" O.C. AROUND PERIMETER. FASTEN DOWEL TO
CONCRETE WITH POWERS PE1000 ADHESIVE
ANCHORING SYSTEM OR APPROVED EQUAL
CHIP OR ROUGH UP EXISTING FLOOR SLAB
WITHIN HOUSEKEEPING PAD FORM WORK
AND APPLY LATEX BONDING AGENT ON
ROUGHED UP CONC. ONLY
1"
4"
12" MIN.
2" MINIMUM
1/2"Ø THREADED DOWEL, 12"O.C. ALL AROUND PERIMETER
MIN. 6" TO EDGE OF EQUIPMENT FRAME AROUND
PERIMETER
2 1/2" AND LARGER
FLUIDS LESS THAN 100°F
2" AND SMALLER
FLUIDS GREATER THAN 100°F
2 1/2" AND LARGER2" AND SMALLER
FLUIDS 150°F-250°F 50' FROM ANCHOR
FLUIDS GREATER THAN 250°F 30' FROM ANCHOR
2" AND SMALLER 2 1/2" AND LARGER
UP TO 1 1/4"
UP TO 1 1/4"
1 1/2" & 2"
2 1/2" & 3"
4" & 5"
8", 10", 12"
14" & 16"
18"
20" & 24" 1 1/4" DIA.
1 1/8" DIA.
1" DIA.
7/8" DIA.
3/4" DIA.
5/8" DIA.
1/2" DIA.
3/8" DIA.
3/8" DIA.
3/8" DIA. 8' STEEL
6' COPPER & BRASS
10'
PIPE SIZE ROD SIZE MAX. SPACING
HANGER SCHEDULE
10'
10'
10'
10'
10'
10'
10'
DOUBLE NUTS
AND WASHERS
ROD
HANGER
PIPE
INSULATION
RIGID INSULATION
SHIELD SADDLE
INSULATION INSERT
6"
M201
NOT TO SCALE
PIPE HANGER DETAIL
ATTACHMENT METHOD
NOT PERMITTED
FRICTION CLAMPS
BEAM CLAMP WITH RETAINING
STRAP. MINIMUM RETURN STRAP
SHALL BE 1"
ATTACHMENT METHOD ONLY
ACCEPTABLE FOR PIPING < 2"
PRE-POUR CONCRETE INSERTS WEDGE EXPANSIONMETAL DECK HANGER BOLTS
BEAM CLAMPS
SUPPLEMENTAL STEEL
WELDING PROCEDURE TO BE
SUBMITTED FOR REVIEW
END ATTACHMENTS TO
BE SAME AS LARGEST
HANGER ROD
INTERMEDIATE ATTACHMENTS ONE
SIZE LARGER THAN LARGEST
HANGER ROD
SQUARE STEEL WASHER PLATE. TYPICAL.
BACK TO BACK STRUCTURAL SHAPES
W/SPACERS WELDED AT 24 INTERVALS
TWO HANGER RODS MAXIMUM BETWEEN
STRUCTURAL ATTACHMENT
M201
NOT TO SCALE
PIPE HANGER ATTACHMENT DETAIL
25MIL23702
CSMS Compressor Replacement, Camp Hartell
MARCH 6, 2026
542 North Street, Windsor Locks, CT 06096
No. Description Date
North
CONTRACTOR RESPONSIBLE TO LOCATE
ALL
EXISTING UTILITIES IN PROJECT AREA.
CONTRACTOR TO CONTACT:
- CALL BEFORE YOU DIG @ 811
GENERAL:
Architect/Engineer
REVISION
STATE OF CONNECTICUT
MILITARY DEPARTMENT
Facilities Management
Office
360 Broad Street Hartford, CT
06105
860.493.2725 Fax 860.524.4937
Drawing NUMBER
TRACKING NUMBER
Date
Drawing Title
Project
Drawn by:
App'd by:
Scale:
File as:
102 Madison Avenue, 10th Floor New York, NY 10016
212.695.2422 F 212.695.2423
www.kohlerronan.com E-mail krce@kohlerronan.com
93 Lake Avenue, 3rd Floor Danbury, CT 06810
203.778.1017 F 203.778.1018
TRUE NORTH PROJECT NORTH
KEY PLAN
1 2 3
4 5
Construction Documents 3/6/26
M201
DETAILS - MECHANICAL
EF
KR
NTS
AutoCAD SHX Text
AutoCAD SHX Text
X/#
DUPLEX CONVENIENCE RECEPTACLE - 18" AFF U.O.N.
# MOTOR, # = HORSEPOWER
ELECTRICAL SYMBOLS
SURFACE MOUNTED PANELBOARD AND CLEARANCE
BRANCH CIRCUIT HOMERUN (X = PANELBOARD, # = CIRCUIT NO.)
WALL MOUNTED JUNCTION BOX
J CEILING MOUNTED JUNCTION BOX
CONDUCTOR
J
NON-FUSED DISCONNECT SWITCH, # = SWITCH SIZE
EXISTING CONDUCTOR TO REMAIN
EXISTING CONDUCTOR, EQUIPMENT, OR DEVICE TO BE DISCONNECTED AND REMOVEDXXXXXX
DISCONNECT SWITCH FURNISHED BY DIVISION 22/23, INSTALLED BY CONTRACTOR
A AMPERES
AFF ABOVE FINISHED FLOOR
C CONDUIT
C/B CIRCUIT BREAKER
CKT CIRCUIT
E.C. ELECTRICAL CONTRACTOR
ER EXISTING RELOCATED
ETBR EXISTING TO BE RELOCATED
ETR EXISTING TO REMAIN
FBO FURNISHED BY OTHERS
G GROUND
GFP GROUND FAULT PROTECTION
JB JUNCTION BOX
MCB MAIN CIRCUIT BREAKER
MLO MAIN LUG ONLY
MTD MOUNTED
PNL PANEL
SPD SURGE PROTECTION DEVICE
TW/SH TWISTED SHIELD
U.O.N. UNLESS OTHERWISE NOTED
V VOLTS
VA VOLT-AMPERES
WP WEATHER PROOF
ELECTRICAL ABBREVIATIONS
E001 COVER SHEET - ELECTRICAL
E100 FLOOR PLAN - SECTOR 1 - ELECTRICAL
E101 FLOOR PLAN - SECTOR 2 - ELECTRICAL
E102 FLOOR PLAN - SECTOR 4 - ELECTRICAL
E400 SINGLE LINE DIAGRAM AND PANEL SCHEDULE - ELECTRICAL
DRAWING
NUMBER
ELECTRICAL DRAWING LIST
DRAWING DESCRIPTIONGENERAL
1. WHEN A CONFLICT BETWEEN THE DRAWINGS, NOTES AND/OR SPECIFICATIONS OCCUR, THE MORE
STRINGENT, AND/OR LARGER QUANTITY AND/OR MORE EXPENSIVE SHALL APPLY. THE
REQUIREMENTS LISTED WITHIN NOTES OR SPECIFICATIONS SHALL BE REQUIRED, PROVIDED AND
INSTALLED WHETHER SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT.
2. THE DRAWINGS AND SPECIFICATIONS ARE DIVIDED INTO SECTIONS TO MEET THE NEEDS OF THE
ARCHITECT, THE ENGINEERS, AND THE DESIGN CONSULTANTS. THEY ARE NOT PREPARED AS
INSTRUCTIONS TO THE CONTRACTOR FOR HOW TO BUY OUT OR SUBCONTRACT THE WORK. THE
CONTRACTOR IS RESPONSIBLE FOR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS,
REGARDLESS OF WHERE IT IS SHOWN. FOR EXAMPLE, ELECTRICAL WORK IS SHOWN ON FP-SERIES DRAWINGS AS WELL AS ON M-SERIES DRAWINGS AND E-SERIES DRAWINGS. TO AVOID OMITTING ANY
COMPONENT OF THE PROJECT, REFER TO ALL THE CONTRACT DOCUMENTS IN THEIR ENTIRETY.
WIRING & RACEWAY:
1. THE DRAWINGS SHOW THE GENERAL LAYOUT AND TYPICAL DETAILS. PROVIDE COMPLETE SYSTEMS.
DRAWINGS ARE BASED ON THE SPECIFIED EQUIPMENT. RACEWAY LAYOUTS, BOXES, AND WIRING OF
THE SYSTEMS ARE SUBJECT TO APPROVED SHOP DRAWINGS.
2. ENSURE THAT ITEMS TO BE FURNISHED FIT THE SPACE AVAILABLE. MAKE NECESSARY FIELD MEASUREMENTS TO ASCERTAIN SPACE REQUIREMENTS, INCLUDING THOSE FOR CONNECTIONS, AND PROVIDE SUCH SIZES AND SHAPES OF EQUIPMENT THAT FINAL INSTALLATION SHALL SATISFY THE
INTENT OF THE DRAWINGS AND SPECIFICATIONS.
3. LOCATIONS OF OUTLETS, SWITCHES, APPLIANCES, ETC. AS SHOWN ON ELECTRICAL PLANS ARE
APPROXIMATE; COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS AND DETAILS, AND
WITH JOB CONDITIONS. INSTALL SWITCHES WITH "OFF" POSITION DOWN. INSTALL RECEPTACLES
WITH GROUNDING POLE IN THE UP POSITION FOR VERTICAL MOUNTING AND AT LEFT FOR
HORIZONTAL MOUNTING.
4. LOCATE AND INSTALL ELECTRICAL EQUIPMENT, JUNCTION AND PULL BOXES, PANELBOARDS, SWITCHES, CONTROLS, AND OTHER APPARATUS REQUIRING MAINTENANCE, INSPECTION, AND
OPERATION SO AS TO BE READILY ACCESSIBLE.
RACEWAY INSTALLATION:
1. IN ALL ARCHITECTURALLY FINISHED SPACES, CONDUITS AND CABLES SHALL BE RUN CONCEALED IN HUNG OR FURRED CEILINGS, SLABS, MASONRY, AND PARTITIONS UNLESS OTHERWISE INDICATED.
SAW CUTTING AND FINISHED PATCHING SHALL BE REQUIRED IN EXISTING SLABS AND MASONRY
WALLS. IN UNFINISHED SPACES, RACEWAYS MAY BE RUN EXPOSED.
2. UNLESS OTHERWISE INDICATED, EXACT ROUTING OF RACEWAYS SHALL BE DETERMINED BY THE
CONTRACTOR TO SUIT PROJECT REQUIREMENTS AND FIELD CONDITIONS.
3. PROVIDE SEPARATE RACEWAYS, JUNCTION BOXES, PULL BOXES AND WIREWAYS FOR ALL
EMERGENCY SYSTEM WIRING.
WIRING INSTALLATION:
1. DO NOT USE WIRE SMALLER THAN NO. 12 AWG FOR ANY POWER OR LIGHTING CIRCUIT. USE LARGER
SIZES WHERE INDICATED, AS REQUIRED BY CODES, AND AS FOLLOWS:
30 AMPERE CIRCUIT: NO. 10
40 AMPERE CIRCUIT: NO. 8
50 AMPERE CIRCUIT: NO. 6
60 AMPERE CIRCUIT: NO. 4
A. MINIMUM HOMERUN AND BRANCH CIRCUIT WIRING SIZES AND MAXIMUM HOMERUN CONDUIT FILL FOR
120 VOLT, 20 AMPERE CIRCUITS SHALL BE AS FOLLOWS:
CIRCUIT HOME RUN CONDUIT SIZE
LENGTH WIRE SIZE WIRE SIZE (8 WIRES/CONDUIT)
0' TO 50' #12 #12 3/4"
51' TO 100' #12 #10 3/4"
101' TO 200' #10 #8 1"
GREATER THAN 200' - REQUEST DIRECTION FROM ENGINEER.
NOTE: PROVIDE DERATING PER CODE WHEN INSTALLING MORE THAN 3 CURRENT CARRYING
CONDUCTORS IN CONDUIT.
B. HOME RUNS AND BRANCH CIRCUIT WIRING FOR 277 VOLT, 20 AMPERE CIRCUITS SHALL BE AS
FOLLOWS:
CIRCUIT HOME RUN CONDUIT SIZE
LENGTH WIRE SIZE WIRE SIZE (8 WIRES/CONDUIT)
0' TO 100' #12 #12 3/4"
100' TO 200' #12 #10 3/4"
GREATER THAN 200' - REQUEST DIRECTION FROM ENGINEER.
NOTE: PROVIDE DERATING PER CODE WHEN INSTALLING MORE THAN 3 CURRENT CARRYING
CONDUCTORS IN CONDUIT.
2. DO NOT USE WIRE SMALLER THAN NO. 14 AWG FOR CONTROL CIRCUITS UNLESS OTHERWISE
RECOMMENDED BY THE EQUIPMENT OR SYSTEM MANUFACTURER ON WIRING SHOP DRAWINGS, AND
SO APPROVED BY THE ENGINEER.
3. WHERE GREATER THAN THREE (3) CURRENT-CARRYING CONDUCTORS ARE INSTALLED IN ANY ONE
CONDUIT OR CABLE, CONDUCTORS MUST BE DERATED AND SIZES INCREASED, IF NEEDED, TO
ACCOMMODATE CONDUCTOR DERATING AS REQUIRED BY NEC ARTICLE 310.
4. CONDUCTORS SHALL BE COMPLETELY INSTALLED AND CONNECTED. PROVIDE ALL TERMINALS, LUGS, AND CONNECTORS TO SUIT THE APPLICATION, AND IN COMPLIANCE WITH EQUIPMENT
MANUFACTURERS' RECOMMENDATIONS.
5. UNDER NO CIRCUMSTANCES SHALL ANY SWITCH OR CIRCUIT BREAKER BREAK A NEUTRAL
CONDUCTOR.
6. THE CIRCUIT NUMBERS INDICATED ON THE DRAWINGS ARE INTENDED AS A GUIDE FOR PROPER CONNECTION OF CIRCUITS AT PANELBOARDS; HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO ENSURE THAT THE FINAL CIRCUITING WORK FULFILLS THE FOLLOWING
CONDITIONS:
A. LOADS ON PANELBOARD BUSSES SHALL BE PHASE-BALANCED AS EVENLY AS POSSIBLE.
7. PROVIDE SEPARATE NEUTRALS FOR EACH CIRCUIT. WHERE MULTIPLE CIRCUITS ARE INSTALLED IN THE SAME RACEWAY OR ENCLOSURE, IDENTIFY NEUTRALS WITH CORRESPONDING BRANCH CIRCUIT
PHASE CONDUCTOR NUMBERS.
GROUNDING INSTALLATION:
1. EQUIPMENT GROUNDING
A. INSTALL AN INSULATED GROUND CONDUCTOR, RUN IN THE RACEWAY WITH THE PHASE
CONDUCTORS, FOR EACH FEEDER SERVING: PANELBOARDS, MOTORS, EQUIPMENT AND APPLIANCES
UNLESS OTHERWISE NOTED.
B. INCLUDE AN INSULATED GROUND CONDUCTOR IN ALL CONDUIT RUNS CONTAINING SECTIONS OF
FLEXIBLE CONDUIT UNLESS OTHERWISE NOTED.
C. INCLUDE AN INSULATED GROUND CONDUCTOR IN ALL BRANCH CIRCUIT RACEWAYS OR CABLES
UNLESS OTHERWISE NOTED.
SHORT CIRCUIT, COORDINATION, AND ARC FLASH STUDIES
1. CONTRACTOR SHALL PROVIDE A SHORT CIRCUIT, ARC FLASH, AND COORDINATION STUDY (REFER TO SPECIFICATIONS). TO ACCURATELY PERFORM THE STUDIES, STUDIES SHALL INCLUDE, BUT ARE NOT LIMITED TO, THE EXISTING UTILITY TRANSFORMER, EXISTING GENERATOR, EXISTING SWITCHBOARDS, EXISTING PANELBOARDS, EXISTING CONDUIT AND WIRE, AND EXISTING MOTOR LOADS WHERE
INDICATED ON SINGLE LINE / RISER DIAGRAM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING EQUIPMENT MANUFACTURERS, THE UTILITY COMPANY, AND OWNER FOR INFORMATION
ON EXISTING EQUIPMENT REQUIRED BY THE STUDIES.
OTHER TRADES EQUIPMENT WIRING:
1. UNLESS OTHERWISE INDICATED OR SPECIFIED HEREIN, ALL MOTORS, MOTOR STARTERS, MOTOR
CONTROLLERS, VARIABLE SPEED/FREQUENCY DRIVES, AND ASSOCIATED CONTROL DEVICES ARE
FURNISHED UNDER OTHER DIVISIONS AND INSTALLED UNDER THIS DIVISION. COORDINATE
INSTALLATION AND LOCATIONS WITH OTHER DIVISION CONTRACTORS.
2. POWER WIRING FROM THE INDICATED SOURCE TO THE STARTER/CONTROLLER/DRIVE UNIT, AND FROM THE STARTER/CONTROLLER/DRIVE UNIT TO THE MOTOR, INCLUDING ANY LOCAL DISCONNECT SWITCHES PROVIDED AND/OR INSTALLED BY THIS DIVISION, AND ALL ASSOCIATED LUGS, TERMINALS, AND CONNECTIONS, IS THE WORK OF THIS DIVISION.
3. CONTROL CIRCUIT WIRING IS GENERALLY FURNISHED AND INSTALLED UNDER OTHER DIVISIONS, EXCEPT THAT ANY SUCH WIRING SHOWN ON ELECTRICAL DRAWINGS IS WORK OF THIS DIVISION.
4. COOPERATE AND COORDINATE WITH THE OTHER TRADES IN THE INSTALLATION, CONNECTION, AND
TESTING OF MECHANICAL EQUIPMENT. PERFORM WORK OF THIS SECTION IN ACCORDANCE WITH
EQUIPMENT MANUFACTURERS' INSTRUCTIONS.
COORDINATION DRAWINGS:
1. DEVELOP AND SUBMIT COORDINATION DRAWINGS AS OUTLINED.
A. SHEET METAL AND PLUMBING SHOP DRAWINGS THAT HAVE BEEN COORDINATED WITH OTHER
DRAWINGS SHALL BE SUBMITTED TO ENGINEER FOR REVIEW. DRAWINGS MUST BE RETURNED FROM ENGINEER EITHER "REVIEWED" OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .