Addendum_No._1-23-0030.pdf

PDF 99 KB Posted

Attached to
Pass A Grille Way and Gulf Way from 9th Ave. to 22nd Ave Water Improvement: Phase 2
Solicitation number
23-0030-ITB-CONSTRUCTION STEP 2
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is Addendum No. 1 for an Invitation to Bid (ITB) issued by Pinellas County's Purchasing and Risk Management Division for the Pass A Grille Way and Gulf Way Water Improvement project (Bid Number 23-0030-ITB-CONSTRUCTION). The addendum modifies the original bid submittal dates, changing STEP 1 from September 27, 2022, to October 4, 2022, at 3:00 PM, and STEP 2 from October 6, 2022, to October 13, 2022, at 3:00 PM. Bidders are instructed to acknowledge receipt of this addendum in Section G, Page 65 of the bid package.

The water improvement project involves replacing water mains using Horizontal Directional Drilling (HDD) and open-cut methods in the City of St. Pete Beach, with approximately 175 linear feet of 6" pipe, 4,600 linear feet of 4" pipe, and 1,575 linear feet of 2" pipe. The scope includes installing water services, fire hydrants, blowoffs, and connections to existing water mains. All other specifications, terms, and conditions from the original bid remain unchanged. The addendum is signed by Merry Celeste, CPPB, Division Director of Purchasing and Risk Management, and provides contact information for Pinellas County's Purchasing Department.

View the file

Other files

File Type Posted
Section_F_-_Bid_Submittal_Sheet-protected.xls XLS spreadsheet
APPENDIX_1_-_Permits.pdf PDF
Plans.pdf PDF
ITB.pdf PDF
Section_I_-_Agreement.pdf PDF
Section_E_-_Technical_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Merry Celeste, CPPB Division Director

Purchasing and Risk Management

PLEASE ADDRESS REPLY TO:

400 South Ft. Harrison, Sixth Floor

Clearwater, Florida 33756 Phone: (727) 464-3311

FAX: (727) 464-3925

Website: www.pinellascounty.org/purchase

September 26, 2022

TO: ALL INTERESTED BIDDERS

INVITATION TO BID: Pass A Grille Way and Gulf Way from 9th Ave. to 22nd Ave Water Improvement

BID NUMBER: 23-0030-ITB-CONSTRUCTION

BID SUBMITTAL WAS DUE: STEP 1: September 27, 2022 @ 3:00 P.M.

STEP 2: October 6, 2022 @ 3:00 P.M.

ADDENDUM NO. 1

Following is additional information, clarifications, questions, and responses relative to referenced Bid (ITB):

CHANGE(S):

1. STEP 1 submittal due date is changed from September 27, 2022, to October 4, 2022 @ 3:00 PM

2. STEP 2 submittal due date is changed from October 6, 2022, to October 13, 2022 @ 3:00 PM All other specifications, terms and conditions remain the same.

Please remember to acknowledge receipt of this Addendum in Section G, Page 65 under Addendum No.1 and return with completed bid package.

Sincerely, Merry Celeste, CPPB Division Director Purchasing and Risk Management http://www.pinellascounty.org/purchase

ADDENDUM NO. 1

File details come from the government source that posted it. Updated .