Addendum_No._1-23-0030.pdf
PDF 99 KB Posted
- Solicitation number
- 23-0030-ITB-CONSTRUCTION STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is Addendum No. 1 for an Invitation to Bid (ITB) issued by Pinellas County's Purchasing and Risk Management Division for the Pass A Grille Way and Gulf Way Water Improvement project (Bid Number 23-0030-ITB-CONSTRUCTION). The addendum modifies the original bid submittal dates, changing STEP 1 from September 27, 2022, to October 4, 2022, at 3:00 PM, and STEP 2 from October 6, 2022, to October 13, 2022, at 3:00 PM. Bidders are instructed to acknowledge receipt of this addendum in Section G, Page 65 of the bid package.
The water improvement project involves replacing water mains using Horizontal Directional Drilling (HDD) and open-cut methods in the City of St. Pete Beach, with approximately 175 linear feet of 6" pipe, 4,600 linear feet of 4" pipe, and 1,575 linear feet of 2" pipe. The scope includes installing water services, fire hydrants, blowoffs, and connections to existing water mains. All other specifications, terms, and conditions from the original bid remain unchanged. The addendum is signed by Merry Celeste, CPPB, Division Director of Purchasing and Risk Management, and provides contact information for Pinellas County's Purchasing Department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section_F_-_Bid_Submittal_Sheet-protected.xls | XLS spreadsheet | |
| APPENDIX_1_-_Permits.pdf | ||
| Plans.pdf | ||
| ITB.pdf | ||
| Section_I_-_Agreement.pdf | ||
| Section_E_-_Technical_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Merry Celeste, CPPB Division Director
Purchasing and Risk Management
PLEASE ADDRESS REPLY TO:
400 South Ft. Harrison, Sixth Floor
Clearwater, Florida 33756 Phone: (727) 464-3311
FAX: (727) 464-3925
Website: www.pinellascounty.org/purchase
September 26, 2022
TO: ALL INTERESTED BIDDERS
INVITATION TO BID: Pass A Grille Way and Gulf Way from 9th Ave. to 22nd Ave Water Improvement
BID NUMBER: 23-0030-ITB-CONSTRUCTION
BID SUBMITTAL WAS DUE: STEP 1: September 27, 2022 @ 3:00 P.M.
STEP 2: October 6, 2022 @ 3:00 P.M.
ADDENDUM NO. 1
Following is additional information, clarifications, questions, and responses relative to referenced Bid (ITB):
CHANGE(S):
1. STEP 1 submittal due date is changed from September 27, 2022, to October 4, 2022 @ 3:00 PM
2. STEP 2 submittal due date is changed from October 6, 2022, to October 13, 2022 @ 3:00 PM All other specifications, terms and conditions remain the same.
Please remember to acknowledge receipt of this Addendum in Section G, Page 65 under Addendum No.1 and return with completed bid package.
Sincerely, Merry Celeste, CPPB Division Director Purchasing and Risk Management http://www.pinellascounty.org/purchase
ADDENDUM NO. 1
File details come from the government source that posted it. Updated .