Addendum 3.pdf

PDF 499 KB Posted

Attached to
B2025000012 FY25 SMALL DIAMETER SAS REHAB - TRENCHLESS
Solicitation number
3098.00
Issued by
New Mexico

About this file

Addendum No. 3 for the FY25 Small Diameter SAS Rehab - Trenchless project is issued by Smith Engineering Company on behalf of the Albuquerque Bernalillo County Water Utility Authority. The addendum, dated March 20, 2025, addresses two specific questions from bidders regarding the project (Project No. 3098.00). The bid proposals are due on Wednesday, March 26th, 2025, at 1:30 PM, and the project involves rehabilitating small diameter SAS gravity pipe using trenchless methodologies, including service reinstatement and manhole rehabilitation at various locations in Albuquerque, New Mexico.

The addendum clarifies two key points: first, that the site security allowance was previously addressed in Addendum 2, and second, that for Bid Item #58 involving an abandoned manhole, the manhole should be filled with lean fill as specified in Keynote 6 on Sheet C-8, rather than aggregate base as originally stated. The document requires bidders to acknowledge receipt of this addendum in the appropriate space on the Work Order Offer form, ensuring all potential contractors are informed of these specific technical clarifications before submitting their bids.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
GTC for Construction 05012024.pdf PDF
UNFAIR BUSINESS PRACTICES DISCLOSURE FORM 07012024.pdf PDF
Addendum 1.pdf PDF
B2025000012.pdf PDF
PREFERENCE ELIGIBILITY APPLICATION 07012024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Bids

B2025000012 FY25 SMALL DIAMETER SAS REHAB –

TRENCHLESS PROJECT NO. 3098.00

ADDENDUM NO. 3

Bid Proposals Due: Wednesday, March 26th, 2025, at 1:30 PM

B2025000012: Addendum No. 3

B2025000012, Addendum No. 3 is to address questions received from Bidders.

2201 San Pedro Dr. NE | Building 4, Suite 200 | Albuquerque, NM 87110 | 505-884-0700 | smithengineering.pro

ADDENDUM NO. 3

DATE: March 20, 2025

PROJECT: FY25 Small Diameter SAS Rehab – Trenchless

PROJECT NO.: 3098.00

TO: ALL BIDDERS OF RECORD

This Addendum forms a part of the Contract Documents and modifies or supplements the Project Manual or the Drawings as indicated below. All other provisions of the Contract Documents shall remain unchanged. This Addendum is hereby made a part of the Contract Documents to the same extent as those provisions contained in the original documents and all itemized listings thereof. Bidders shall acknowledge receipt of this Addendum in the appropriate space on the Work Order Offer form.

A. Questions/Answers

1. Question: In previous projects, site security is an allowance. Under the general notes is states- the contractor shall be responsible for all site security. Can site security be changed to allowance Answer: Site Security Allowance was addressed in Addendum 2.

2. Question: Bid Item #58 states to fill the abandoned manhole with aggregate base, but Keynote 6 on Sheet C-8 calls to fill the manhole with lean fill. Please advise as to which is required Answer: Lean Fill

Water Utility Authority Smith Engineering Company

By______________________________

Jared Lujan, P.E.

Project Engineer

By______________________________

Daven Tagaban, E.A.

Project Manager

Request for Bids

File details come from the government source that posted it. Updated .