This document is Addendum No. 1 for the Albuquerque Bernalillo County Water Utility Authority's solicitation B2025000012 FY25 Small Diameter SAS Rehab - Trenchless Project. The addendum modifies the original bid documents for a project to rehabilitate small diameter sanitary sewer gravity pipes using trenchless methodologies, including service reinstatement and manhole rehabilitation at various locations throughout Albuquerque, New Mexico. The project is divided into a base bid and an additive alternate based on priority and funding availability. The bid proposal due date has been revised to Wednesday, March 26th, 2025, at 1:30 PM, with a contract duration of 118 days for the base bid and 212 days including the additive alternate.

The addendum provides several key updates, including pre-bid meeting minutes, a mandatory pre-bid sign-in sheet, and answers to bidder questions. Significant modifications include providing a missing project sheet (Sheet C 12 Seq. 15 of 25) and updating the Supplemental Technical Specification Section 33 01 30.72 for Cured-In-Place Pipe (CIPP) lining. The specification changes allow for the use of standard polyester resin instead of more expensive epoxy resins and clarify the third-party laboratory testing requirements for liner samples. The project involves trenchless rehabilitation of sewer lines, with specific requirements for liner installation, service lateral reinstatement, and post-rehabilitation inspections.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
GTC for Construction 05012024.pdf PDF
UNFAIR BUSINESS PRACTICES DISCLOSURE FORM 07012024.pdf PDF
Addendum 3.pdf PDF
B2025000012.pdf PDF
PREFERENCE ELIGIBILITY APPLICATION 07012024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Bids

B2025000012 FY25 SMALL DIAMETER SAS REHAB –

TRENCHLESS PROJECT NO. 3098.00

ADDENDUM NO. 1

Bid Proposals Due: Monday, March 17th, 2025, at 1:30 PM Wednesday, March 26th, 2025, at 1:30 PM

B2025000012: Addendum No. 1

B2025000012, Addendum No. 1 is to provide the pre-bid meeting minutes, the mandatory pre-bid sign in sheet, revise the Bid Proposal due date, address questions received from Bidders, to provide the missing Sheet C 12 Seq. 15 of 25, and to provide the updated Supplemental Technical Specification Section 33 01 30.72 for CIPP.

The Bid Proposal due date is hereby amended to Wednesday, March 26th, 2025, at 1:30 PM.

2201 San Pedro Dr. NE | Building 4, Suite 200 | Albuquerque, NM 87110 | 505-884-0700 | smithengineering.pro

ADDENDUM NO. 1

DATE: February 28, 2025

PROJECT: FY25 Small Diameter SAS Rehab – Trenchless

PROJECT NO.: 3098.00

TO: ALL BIDDERS OF RECORD

This Addendum forms a part of the Contract Documents and modifies or supplements the Project Manual or the Drawings as indicated below. All other provisions of the Contract Documents shall remain unchanged. This Addendum is hereby made a part of the Contract Documents to the same extent as those provisions contained in the original documents and all itemized listings thereof. Bidders shall acknowledge receipt of this Addendum in the appropriate space on the Work Order Offer form.

A. Pre-Bid Minutes and Sign-in sheet

1. The pre-bid meeting minutes are included as Attachment 1.

2. The pre-bid meeting sign-in sheet is included as Attachment 2.

B. Bid Due Date/Time REVISION

1. Work Order Offers are Due: no later than 1:30 p.m. local time on Wednesday, March 26, 2025.

C. Questions/Answers

1. Question: The plans are missing Sheet C 12 Seq. 15 of 25. This is the page for Task 9. Can you please provide?

Answer: The sheet is added to the plans by this addendum (Attachment 3)

2. Question: The Supplemental Technical Specification Section 33 01 30.72 for CIPP calls for 3rd party lab testing samples. How many samples you require?

Answer: The specification is modified to specify the sampling frequency (Attachment 4).

3. Question: The Supplemental Technical Specification Section 33 01 30.72 for CIPP - Section 2.2 A.1 Materials - for water or steam cure material requires approved epoxy, epoxy polyester, or epoxy vinyl ester resin. Epoxy resins are used for pressure pipe applications that require NSF61 drink water standards, and this material is very expensive and not necessary for gravity sewer applications. Question: Will the Owner approve a standard polyester resin which is the typical resin used for gravity sewers?

The initial structural properties as noted in the provided table on pdf page 115 can be met with polyester resin.

Answer: Yes, the specification is modified to allow polyester resin (Attachment 4).

Z:\Purchasing\Procurement Files\RFB Bids\FY25\B2025000012 FY25 Small Diameter SAS Rehab - Trenchless\RFB\3098.00 FY25 Small Diameter SAS Rehab Trenchless-ADDENDUM NO 1.docx

4. Question: Is it possible to extend the bid date for this project by at least a week or two?

This is bidding during spring break and most of us will be out on vacation with our families. At the very least if we can move the bid date to March 26th or 27th?

Answer: Yes, see part B this addendum.

Smith Engineering Company Water Utility Authority

By______________________________

By______________________________

Jared Lujan, P.E. Daven Tagaban, E.A.

Project Engineer Project Manager

2201 San Pedro Drive, NE Building 4, Suite 200 Albuquerque, NM 87110 Tel: 505.884.0700 Fax: 505.884.2376

Rev. 20250226 Q:\SEC---PROJECTS\120101-37\ENGINEERING\Bid_Assist\Trenchless\Pre-Bid\PRE BID minutes.docx

MINUTES FOR PRE-BID MEETING

B2025000012 FY25 Small Diameter SAS Rehab – Trenchless

February 26, 2025 at 1:30 PM

Owner: ABCWUA (3098.00) Owner Project Manager: Daven Tagaban Engineer: Smith Engineering Company Engineer of Record: Jared Lujan, P.E.

Bid Time and Date: Monday March 17, 2025 @ 1:30PM Bid Location: Microsoft Teams (Meeting link provided in Part I) Contract Duration 118 (base bid only), 212 (base bid plus additive alternate) Liquidated Damages $200/day

A. Sign-In: Add your name, company name, email address, and phone number to the Teams chat

B. Project Description:

Rehabilitate small diameter SAS gravity pipe by one of the approved trenchless methodologies including trenchless SAS service reinstatement and manhole rehabilitation at various locations (tasks) throughout Albuquerque New Mexico. Tasks are separated into a base bid and additive alternate 1 based on priority and funding availability.

C. Bid Submittal

1. BID PROPOSAL FORM.

2. UNFAIR BUSINESS PRACTICES DISCLOSURE FORM

3. SFPA LISTING OF SUBCONTRACTORS

4. BID BOND

5. PERFORMANCE BOND

6. LABOR AND MATERIAL PAYMENT BOND

7. CONTRACTOR QUALIFICATIONS FORM

8. PREFERENCE ELIGIBILITY APPLICATION

D. Referenced Standard Specifications

City of Albuquerque: http://www.cabq.gov/planning/plans-publications

ABCWUA:

http://www.abcwua.org/wpcontent/uploads/Builders_Info/Water_Authority_St andard_Specifications_and_Drawings_Feb_2021.pdf

E. Special Conditions

3098.00 FY25 Small Diameter SAS Rehab - Trenchless: Addendum 1 Attachment 1

Pre-Bid Meeting FY25 Small Diameter SAS Rehab – Trenchless

Q:\SEC---PROJECTS\120101-37\ENGINEERING\Bid_Assist\Trenchless\Pre-Bid\PRE BID minutes.docx

Immediate Notification of Sanitary Sewer Overflows

F. Supplemental Technical Specifications Allowances …................................................................ STS-01 21 00 Unit Prices …..…............................................................ STS-01 22 00 Project Management and Coordination …................... STS-01 31 00 Construction Progress Documentation ….................... STS-01 32 00 Submittal Procedures ..…............................................. STS-01 33 00 Temporary Project Signage ..…….................................. STS-01 58 13 Project As-Built Documentation..…............................... STS-01 78 39 Injection Grouting.……………………..………........................ STS-03 64 23 Television Inspection of Sewers ……........................ STS-33 01 30.11 Sewer Line Cleaning ………........................................ STS-33 01 30.41 Sewage Flow Control …….......................................... STS-33 01 30.51 Cured-In Place Pipe Lining ........................................ STS-33 01 30.72 Spiral Wound Pipe Lining ......................................... STS-33 01 30.80 Manhole Rehabilitation ……...................................... STS-33 01 30.81

G. Clarifications / Additional Information

1. Link to download the available Historic CCTV data is provided under Part IV

2. Base Bid Task4:

a. Replacement of exterior drop at manhole J19555 may require temporary power pole support (allowance) to facilitate construction.

b. 8-inch segment under I-40 (J19555 to J19557): Note we are requesting remote obstruction removal of DI offset joint (pre-rehab) and if significant wrinkles are visible after lining then grinding of wrinkles with a post-rehab liner patch.

c. Access to J19557 is from I-40. Manhole is elevated behind a retaining wall.

3. Base Bid Task 5: Note we are requesting to line through a manhole without having access to the manhole.

4. Additive Alternate Task 8 schedule coordination is required with the NMDOT I- 25 project construction team if awarded.

5. Groundwater Depths: Ground water is anticipated at Task 9 only

6. Post Construction Redlines and Survey: Contractor shall provide redlines and survey per supplemental spec 01 78 39. Redlines shall have exhibits of all pavement cuts and SAS services.

H. Questions

1. Deadline for Questions: Friday March 7, 2025.

2. Submit Questions to:

Armida Magallanes, Purchasing Administrator, Central Purchasing Office, Water Authority

Pre-Bid Meeting FY25 Small Diameter SAS Rehab – Trenchless

Q:\SEC---PROJECTS\120101-37\ENGINEERING\Bid_Assist\Trenchless\Pre-Bid\PRE BID minutes.docx

Cell: (505) 488-8727 Email: amagallanes@abcwua.org Address: Post Office Box 568, Albuquerque, New Mexico 87103-0568

3. Written response to questions will be provided via an Addendum. Verbal responses are not binding.

4. Last Addendum Deadline: Wednesday March 12, 2025.

1. Summary Meeting title VIRTUAL MANDATORY PRE-BID MEETING: B2025000012 FY25 Small Diameter SAS Rehab - Trenchless PROJECT NO. 3098.00 Attended participants 13 Start time 2/26/25, 1:21:20 PM End time 2/26/25, 1:44:09 PM Meeting duration 22m 49s Average attendance time 12m 59s

2. Participants Name First Join Last Leave In-Meeting Duration Email Participant ID (UPN) Role Kelcourse, Candida 2/26/25, 1:25:09 PM 2/26/25, 1:44:00 PM 18m 51s ckelcourse@abcwua.org ckelcourse@abcwua.org Presenter Laughlin, David K. 2/26/25, 1:25:36 PM 2/26/25, 1:25:37 PM 1s dlaughlin@abcwua.org dlaughlin@abcwua.org Presenter Leanne Goodhue (External) 2/26/25, 1:25:52 PM 2/26/25, 1:42:52 PM 16m 59s LGoodhue@azuria.com LGoodhue@azuria.com Presenter Sam Garrell (External) 2/26/25, 1:25:55 PM 2/26/25, 1:43:36 PM 17m 40s SamG@auiinc.net SamG@auiinc.net Presenter Bill Bullington (External) 2/26/25, 1:28:05 PM 2/26/25, 1:44:02 PM 15m 56s bill@tristarnm.com bill@tristarnm.com Presenter Clay Blair (External) 2/26/25, 1:28:54 PM 2/26/25, 1:42:56 PM 14m 1s cblair@speardnm.com cblair@speardnm.com Presenter Jeremie P Schaefer (Unverified) 2/26/25, 1:28:59 PM 2/26/25, 1:42:51 PM 13m 52s Presenter Jared Lujan (External) 2/26/25, 1:29:12 PM 2/26/25, 1:42:51 PM 13m 39s JaredL@smithengineering.pro jaredl@smithengineering.pro Presenter Tagaban, Daven 2/26/25, 1:29:15 PM 2/26/25, 1:44:06 PM 14m 51s dtagaban@abcwua.org dtagaban@abcwua.org Presenter Richardson, Ege E. 2/26/25, 1:30:04 PM 2/26/25, 1:42:53 PM 12m 48s erichardson@abcwua.org erichardson@abcwua.org Presenter Terry White (External) 2/26/25, 1:30:12 PM 2/26/25, 1:44:09 PM 13m 56s terrywhite@azuria.com terrywhite@azuria.com Presenter Scott Lee 2/26/25, 1:32:47 PM 2/26/25, 1:42:47 PM 10m slee@rainforrent.com slee@rainforrent.com Presenter Armi (Unverified) 2/26/25, 1:37:37 PM 2/26/25, 1:43:54 PM 6m 17s Presenter

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

Type D Single Grate

100+00 100+65

R

IG

EL S

T

SW

G O

FF

B

LV

D

RIG

EL ST

1014 RIGEL ST

SW

RIG

EL S

T

SW

R

IG

EL S

T

SW

1009 RIG

EL ST

SW

1001 RIGEL ST

SW

1030 GOFF BLVD

SW

1040 GOFF BLVD

SW

TAPIA BLVD

START PIPE REHAB

MH: L12662

STATION: 100+00.00

MH DEPTH: 12.45'

END PIPE REHAB

MH: L12663

STATION: 100+65.27

MH DEPTH: 13.22'

8" DIP

6" AC

6"

AC

" C

I

5" G

AS

8' ' A

C

8"

VCP

RIG

EL S

T

SW

1005 RIGEL ST

SW

RIG

EL S

T

SW

2" G

AS

" R

C P

(C U

R

ED

IN

P

LA

C

E

PI

PE

" C

I

6" PVC

8' ' A

C (A

BA

N

D O

N

ED

IN

P

LA

C

E) 8'

' A C

(A

BA

N D

O N

ED

IN

P

LA

C E)

" R

C P

(C U

R

ED

IN

P

LA

C

E

PI

PE

8"

VCP

2"

GAS

NO CCTV AVAILABLE

8' ' A

C

4 (TYP.)

5 6 8

100% SUBMITTAL

BUILD NOTES:#

GENERAL NOTES:

1. BASE MAPPING IS SCHEMATIC ONLY AND IS BASED ON

G.I.S. DATA.

2. REFER TO SUPPLEMENTAL SPECIFICATION 01 78 39 FOR

POST-CONSTRUCTION SURVEY REQUIREMENTS.

3. ABCWUA CCTV FOOTAGE OF THESE LINE SEGMENTS IS

INCLUDED WITH THIS PLANSET FOR BIDDING PURPOSES

ONLY.

4. ALL PROPERTY LINES SHOWN ARE BASED ON G.I.S.

DATA AND ARE FOR CONCEPTUAL REFERENCE. WORK

SHALL BE CONFINED TO EXISTING ALLEYS AND

STREETS - PRIVATE PROPERTY SHALL NOT BE

DISTURBED.

5. ALL DISTURBED NATIVE OR LANDSCAPED AREA SHALL

BE RETURNED TO EXISTING OR BETTER CONDITION.

INCIDENTAL TO CONSTRUCTION.

6. REFER TO SUPPLEMENTAL TECHNICAL SPECIFICATION

33 01 30.51 FOR SEWAGE FLOW CONTROL

REQUIREMENTS.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE

SECURITY.

8. NUMBER OF SERVICE REINSTATEMENTS IS ESTIMATED

IF CCTV DATA IS UNAVAILABLE.

A SURVEY WAS NOT COMPLETED TO PREPARE THESE

DRAWINGS. DATA SHOWN IS FROM ABCWUA GIS DATA

WHICH IS PROJECTED TO THE NM CENTRAL ZONE STATE

PLANE COORDINATES, NAD 83, US SURVEY FOOT, NAVD 88.

20435

BUILD NOTES:

1. PIPE CLEANING AND DEBRIS DISPOSAL, SANITARY SEWER

PIPELINE SIZE AND MATERIAL PER PLAN, PER

SUPPLEMENTAL TECHNICAL SPECIFICATION 33 01 30.41,

COMPLETE.

2. PRE-REHABILITATION CCTV INSPECTION, SANITARY

SEWER PIPELINE SIZE PER PLAN, PER SUPPLEMENTAL

TECHNICAL SPECIFICATION SECTION 33 01 30.11,

COMPLETE.

3. TRENCHLESS METHODOLOGY PIPELINE REHABILITATION,

SANITARY SEWER PIPELINE SIZE PER PLAN, GROUND

WATER IS PRESENT IN TASK 9 - RIGEL ST. AND GOFF BLVD.

(DEEPER THAN 2-FEET BELOW PIPE INVERT), PER

SUPPLEMENTAL TECHNICAL SPECIFICATION 33 01 30.72, 33

01 30.79, 33 01 30.80. FLOW CONTROL MATERIALS, SETUP,

OPERATION, AND REMOVAL SHALL BE INCLUDED IN

PIPELINE REHABILITATION COST, COMPLETE AND IN

PLACE.

4. REINSTATE SERVICE LATERAL CONNECTION ON

(TRENCHLESS) REHABILITATED SANITARY SEWER, PER

SUPPLEMENTAL TECHNICAL SPECIFICATION 33 01 30.72, 33

01 30.79, 33 01 30.80, COMPLETE.

5. REMOVE AND REPLACE EXISTING RIM, COVER, AND

COLLAR, PER STANDARD TECHNICAL SPECIFICATION 920,

COMPLETE.

6. REHABILITATE EXISTING SANITARY SEWER MANHOLE (4-FT

DIAMETER) INCLUDING CLEANING AND REBUILDING OF

BENCHES, EXCLUDING PROTECTIVE EPOXY OR

POLYURETHANE LINER SYSTEM, PER SUPPLEMENTAL

TECHNICAL SPECIFICATION 33 01 30.81, COMPLETE.

7. REHABILITATE EXISTING SANITARY SEWER MANHOLE (6-FT

DIAMETER) INCLUDING CLEANING AND REBUILDING OF

BENCHES, EXCLUDING PROTECTIVE EPOXY OR

POLYURETHANE LINER SYSTEM, PER SUPPLEMENTAL

TECHNICAL SPECIFICATION 33 01 30.81, COMPLETE.

8. MANHOLE LINING SYSTEM APPLICATION, COMPLETE.

00 20' 40'

ABCWUA EXISTING CCTV

TASK 9 : RIGEL ST AT GOFF BLVD

ALIGNMENT/ STREET MANHOLE TO MANHOLE STATION TO STATION SAS

DIAMETER MATERIAL 8" SAS

LENGTH (FT)

CCTV LENGTH

COMPLETED

PERCENT OF

SEGMENT

SURVEYED

DATE

PERFORMED

RIGEL ST L12662 L12663 100+00.00 100+65.27 8'' DIP 65.27 0.00 0% -

SUBTOTAL PRE-CCTV TASK 9: 65.3

USE (BID ITEM: 33 01 30.111 & 33 01 30.112) 70

N.T.S.

TASK 9 COLLECTION BASIN1

SEWER LINE TRENCHLESS REHABILITATION

TASK 9 : RIGEL ST AT GOFF BLVD

BID ITEMS:

8" SAS POINT REPAIR REMOTE REMOVAL PRE- CCTV

33 01 30.72 33 01 30.79

33 01 30.80.1 33 01 30.4130 33 01 30.4140

33 01 30.111

33 01 30.112

ALIGNMENT/ STREET MANHOLE TO MANHOLE STATION TO STATION SAS DIAMETER LENGTH (FT) EA EA LF

RIGEL ST L12662 L12663 100+00.00 100+65.27 8'' 65.27 0.00 0.00 65.27

SUBTOTAL TASK 9: 65.27 0.00 0.00 65.27

USE 75 0.00 0.00 70

SUB-BASIN

BOUNDARY

REFER TO SHEET SEQUENCE #23

FOR MANHOLE REHABILITATION TABLES.

3098.00 FY25 Small Diameter SAS Rehab - Trenchless: Addendum 1 Attachment 3

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

SD

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

REVISION NO. & DESCRIPTION

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

BY

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY

AutoCAD SHX Text

ENGINEER'S SEAL

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text 1/2"

AutoCAD SHX Text

ATTENTION

AutoCAD SHX Text THIS BAR MEASURES 1" AT FULL SCALE (22x34)

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text 1"

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CROSS CHK'D BY:

AutoCAD SHX Text

DESIGN TRACKING

AutoCAD SHX Text

AS BUILT INFORMATION

AutoCAD SHX Text

DRAWINGS CORRECTED BY:

AutoCAD SHX Text

FIELD VERIFICATION BY:

AutoCAD SHX Text

INSPECTOR'S ACCEPTANCE BY: INSPECTOR'S NAME:

AutoCAD SHX Text

WORK STAKED BY:

AutoCAD SHX Text

CONTRACTOR:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

MAPS/RECORDS INFO.

AutoCAD SHX Text

WATER AUTHORITY CONSTRUCTION PROJECT NO.

AutoCAD SHX Text

ZONE MAP NO.

AutoCAD SHX Text

AutoCAD SHX Text

SEQ. OF

AutoCAD SHX Text

JL

AutoCAD SHX Text 11-2024

AutoCAD SHX Text

JF, FF, AB

AutoCAD SHX Text 11-2024

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FY25 SMALL DIAMETER SAS REHAB - TRENCHLESS

AutoCAD SHX Text 1.

AutoCAD SHX Text 3098.00

AutoCAD SHX Text 11/6/24

AutoCAD SHX Text

TASK 9

AutoCAD SHX Text

RIGEL ST @ GOFF BLVD STA.100+00-STA.100+65(AA I)

AutoCAD SHX Text C12

AutoCAD SHX Text

AutoCAD SHX Text File Path: Q:\SEC---PROJECTS\120101-37\CADD\PLANSET - ABCWUA - TRENCHLESS PACKAGE\RIGEL ST AT GOFF BLVD STA. 100+00 - STA. 100+65 (AA I).dwg LT: RIGEL ST @ GOFF BLVD STA.100+00-STA.100+65(AA I) Date: September 14, 2023

AutoCAD SHX Text G11

AutoCAD SHX Text 1"=20'

Rev. February 2025 33 01 30.72 -1

SUPPLEMENTAL TECHNICAL SPECIFICATION

SECTION 33 01 30.72

CURED-IN PLACE PIPE LINING

– GENERAL

1.1 SECTION INCLUDES

A. Requirements for the rehabilitation of gravity sanitary sewer lines by installation of a Cured -

In-Place Pipe Lining system including reinstatement of service lateral connections. The liner system shall be entirely trenchless excluding pre-approved point repairs. The liner system shall be continuous from manhole to manhole.

1.2 RELATED SECTIONS

A. Special Condition: Immediate Notification of Sanitary Sewer Overflows

B. STS 33 01 30.41: Sewer Line Cleaning

C. STS 33 01 30.11: Television Inspection of Sewers

D. STS 33 01 30.51: Sewer Flow Control and Bypass Pumping

1.3 REFERENCES

A. City of Albuquerque Standard Specifications for Public Works Construction, as updated.

B. The Greenbook Standard Specifications for Public Works Construction, Latest Edition.

C. Where all or part of a Federal, ASTM, ANSI, AWWA, standard specification, etc. is incorporated by reference in these specifications, the reference standard shall be the latest edition and revision.

1.4 SUBMITTALS

A. Pre-Installation

1. Pipe Installation Plan: The CONTRACTOR shall prepare and submit a plan with trenchless pipeline rehabilitation installation procedures for review and approval at a minimum of 30 working days prior to commencing work. This plan may include a dewatering plan if groundwater is identified to be present.

2. Project specific engineering pipe design calculations (Liner Wall Thickness) for each SAS segment the liner system will be applied. Pipe design shall be calculated and stamped by a professional ENGINEER licensed in the USA and verified by the pipe manufacturer in accordance with ANSI, ASTM, and AWWA standards. Calculations shall include, but not be limited to; soil loads, live loads, hydrostatic loads, pipe stiffness, Standard Dimension Ratio, pipe wall crushing strength, initial and long term (50 years) values of pipe deflection, pipe bonding strain, hydrostatic collapse resistance, constrained buckling strength, and allowable pulling force and length.

3098.00 FY25 Small Diameter SAS Rehab - Trenchless: Addendum 1 Attachment 4

33 01 30.72 -2

3. Shop drawings, catalog data, MSDS sheets, and manufacturer’s technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings pertinent to this project demonstrating compliance with this specification.

4. Liner repair materials, methods, and manufacturer’s recommendations (Repair Specification).

5. Manufacturers' shipping, storage, and handling recommendations for all components of the liner system

6. List of critical equipment needed for the installation of the liner system, List of redundant equipment that will be onsite during each installation.

7. Material data sheets for sealing the liner at manholes.

8. Pressure gauge, recorder, and field equipment certifications (e.g., calibration by an approved certified lab).

9. Identification/notification of any host pipe defects which will impact the cured-in-place pipe installation and a proposed pre-rehabilitation repair method for each defect. Refer to STS 33 01 30.41.

B. Post-Installation

1. An evaluation of all defects witnessed through a review of the post-rehabilitation inspection with repair recommendations for liner pipe found to be unacceptable, per the Section.

1.5 LINER DESIGN CRITERIA

A. The proposed liner or pipe shall be capable of withstanding a minimum fifty- year (50-yr) continuous loading condition.

B. Thickness design of the liner system and pipes shall be for a fully deteriorated host pipe condition. Pipes shall have a minimum wall thickness in accordance with the manufacturer’s recommendations. The minimum wall thickness shall be determined using the following design parameters, unless other design parameters are shown on the plans:

Factor of Safety = 2.0

Long-Term Modulus of Elasticity, psi = 50% of Flexural Modulus

Height of Water Above Top of Pipe, ft = 1.0

Fluid Temperature, degrees F = 80

Soil Density, pcf = 130

Live Load, psi = HS-20 Highway

Ovality Factor, % = 3.0

Modulus of Soil Reaction, psi = 800

C. Refer to plans for minimum rehabilitated/replaced internal diameter of each segment.

1.6 QUALITY ASSURANCE

A. 3rd Party Testing Requirements

33 01 30.72 -3

1. Testing Frequency

a. Contractor shall provide third-party laboratory testing for Cured-In-Place Pipe (CIPP) samples in accordance with ASTM F1216.

b. A minimum of one test sample per installation segment (manhole-to-manhole) or one test sample per 500 linear feet of installed liner, whichever is more frequent.

c. Additional samples may be required at the discretion of the Engineer based on field conditions or critical infrastructure requirements.

2. Sample Collection

a. Test samples shall be obtained by:

1) Cutting a full circumferential section from a service connection opening (coupon).

2) Casting a test plate sample inside the liner during installation if removal from the host pipe is not feasible.

3. Laboratory Testing

a. Testing shall be conducted by an independent third-party laboratory meeting ASTM F1216 requirements.

b. The following tests shall be performed:

1) Flexural Strength per ASTM D790.

2) Flexural Modulus of Elasticity per ASTM D790.

3) Wall Thickness Measurement to verify compliance with the approved design thickness.

c. The cured liner shall meet or exceed the minimum values specified in the design submittal.

4. Reporting and Compliance

a. Test results shall be submitted to the Engineer within 10 days of sample collection.

b. Any failing test results shall require additional samples and testing at no additional cost to the Owner.

c. The Engineer reserves the right to require additional testing if inconsistencies in liner performance are observed.

– PRODUCTS

2.1 MANUFACTURERS

A. Pre-approved structural liner systems.

1. Cured-in-place pipe (CIPP) liner marketed under the trade name “Insituform.”

33 01 30.72 -4

2. Cured-in-place pipe (CIPP) liner marketed under the trade name “InLiner Technologies.”

3. Cured-in-place pipe (CIPP) liner marketed under the trade name “Applied Felts.”

4. Cured-in-place pipe (CIPP) liner marketed under the trade name "IPR"

5. Ultra-Violet glass reinforced Cured-in-place pipe (UV CIPP) liner marketed under the trade name “ALPHALINER”

2.2 MATERIALS

A. Water or Steam Cured-In-Place Pipe (CIPP) Liner

1. CIPP Liner shall either be the Type A – inversion process conforming to ASTM F 1216 or the Type B – pull in place process conforming to ASTM F 1743 for installation using heated water cure or steam cure. The CIPP liner shall use an approved thermosetting polyester resin, vinyl ester resin, epoxy , epoxy polyester resin or epoxy vinyl ester resin-impregnated flexible fabric tube. The tube shall be installed by an inversion method using a hydrostatic head or by pulling it through an existing pipe and inflating by inverting a membrane using a hydrostatic head.

2. The fabric tube shall consist of one or more layers of flexible, needled felt or an equivalent non-woven material and have plastic coating(s). The material shall be compatible with and capable of carrying thermosetting polyester resin, vinyl ester resin, epoxy, epoxy polyester resin, or epoxy vinyl ester resin, capable of withstanding installation pressures and curing temperatures, and be compatible with the approved resins used. The approved thermosetting polyester resin, vinyl ester resin, epoxy, epoxy polyester resin or epoxy-vinyl-ester resin shall be compatible with the application and pipeline environment and be able to cure in the presence of water. The initiation temperature for cure shall be as recommended by the resin manufacturer and approved by the ENGINEER. The CIPP liner shall comply with ASTM D 5813 and shall have, as a minimum, the initial structural properties shown in the table below:

Epoxy Resin Properties ASTM Test Method Initial Values psi (Mpa) Flexural Strength D 790 5,000 (34.5) Flexural Modulus D 790 300,000 (2050) Tensile Strength D 638 4,000 (27.5) Tensile Modulus D 638 250,000 (1710)

Polyester, Vinyl-Ester, or Epoxy- Vinyl-Ester Resin Properties ASTM Test Method Initial Values psi (Mpa) Flexural Strength D 790 4,500 (31) Flexural Modulus D 790 250,000 (1710) Tensile Strength D 638 3,000 (20.5) Tensile Modulus D 638 250,000 (1710)

33 01 30.72 -5

The CONTRACTOR shall provide field-cured samples as directed by the ENGINEER. The physical properties of the finished CIPP shall be verified through a field sampling procedure in accordance with ASTM F 1216 or ASTM F 1743 and in accordance with ASTM D 5813.

3. Resin and Tube Acceptance: At the time of resin impregnation, the entire fabric tube shall be inspected for defects. The resin shall not contain fillers, except those required for viscosity control, fire retardance, or extension of pot life.

Thixotropic agents that do not interfere with visual inspection may be added for viscosity control. The opacity of the plastic coating shall not interfere with visual inspection. Resins may contain pigments, dyes, or colors that do not interfere with visual inspection of the CIPP liner or its required properties. Additives may be incorporated that enhance the physical and/or chemical resistance.

B. Ultra-Violet Glass Reinforced Cured-In-Place Pipe (UV CIPP) Liner

1. UV CIPP Liner shall be the pull in place process conforming to ASTM F2019 Fiberglass, cured in place using ultraviolet light and corrosion resistant polyester Npg, orthophthalic or vinyl ester resins shall be used. The tube shall be installed by pulling it through the existing pipe.

2. An inner liner and outer liner film must be used for resin control, to prevent resin migration and contamination. The inner film and out film are certified styrene gas barriers. A pull in place slip sheet is used to cut down friction of the UV CIPP liner as it is pulled in place. The inner film must be removed after the curing and removal of light train. The material shall be manufactured in such a manner as to result in a tight fitting, continuous liner after installation. There shall be no measurable annular space. The liner shall have a snug fit at manhole terminations as shall be evidence by flares.

3. The UV CIPP liner shall be manufactured and wet out with a resin bath to allow for the lowest possible amount of air entrapment, in an ISO 9000 certified and quality-controlled manufacturing plant. There will be not on site wet out. The fiberglass tube shall be seamless and spirally wound including an exterior and interior film that protects and contains the resins used in the liner. The exterior film shall provide a UV light blocker. The UV CIPP liner shall be shipped in wooden crates that protect the liner from UV Light.

4. The wall color of the interior of the pipe surface of the UV CIPP after installation shall be a light reflective color so as not to interfere with visual and/or closed-circuit television (CCTV) inspection of the liner or its required properties.

5. Resin: The resin system shall meet the requirements of ASTM F2019. The resin shall be a chemically resistant UV cured isophthalic polyester or vinyl ester thermoset resin. When cured the UV CIPP shall meet the structural and chemical resistance requirements of ASTM F2019.

6. The UV CIPP liner shall have, as a minimum, the initial structural properties shown in the table below:

UV CIPP Resin Properties ASTM Test Method Initial Values psi (Mpa)

33 01 30.72 -6

Flexural Strength D 790 6,500 (45)

Flexural Modulus D 790 725,000 (5000)

7. The UV CIPP liner shall have, as a minimum, a long-term flexural modulus of 363,500 psi defined as fifty years as determined by ASTM D2990 Test Method.

C. Materials for Sealing Pipe at Manholes

1. A quick setting grout, non-shrink grout or a quick setting epoxy used for sewer applications that is chemical resistant.

– EXECUTION

3.1 EXAMINATION

A. Proceeding with Work specified in this Section shall be interpreted to mean that all conditions, including site conditions, were determined to be acceptable prior to start of Work.

3.2 PREPARATION

A. Complete all pre-approved obstruction removals, pipe cleaning, and point repairs per STS 33

01 30.41. Complete the pre-rehab CCTV inspection including submittal and approval by ENGINEER and OWNER per STS 33 01 30.11. All sewer service connections shall be identified and located prior to liner installation. All sanitary sewer flow control shall be approved by ENGINEER and OWNER and in-place and operational prior to liner installation.

3.3 INSTALLATION:

A. All CIPP installations shall be per manufacture’s written recommendations. Precautions shall be taken to protect the new liner and the existing pipe and manholes from any damage that might result during the insertion process.

B. Water or Steam Cured-In-Place Pipe (CIPP) Liner

1. The outside diameter of the tube being installed shall be sized to allow for expansion so that the CIPP can fit tightly against the existing pipe. CIPP shall be installed in accordance with ASTM F 1216 or ASTM F 1743 and the CONTRACTOR'S recommendations as approved by the ENGINEER. Immediately prior to installation, the CIPP liner tube shall be saturated with resin (on or off the work site) and stored/transported at a cool temperature as recommended by the resin manufacturer.

2. Curing: After tube placement is completed, the CONTRACTOR shall provide a suitable heat source and distribution equipment to distribute or recirculate hot water or steam throughout the installed CIPP liner tube. Temperature shall be maintained during the curing period as recommended by the resin manufacturer and approved by the ENGINEER. After the tube is cured, a cool-down period shall be used prior to opening the downstream end, reinstate service lateral connections, and returning normal flow back into the system.

33 01 30.72 -7

Heat curing of the resin shall occur within the manufacturer's approved recommended period (pot life). The water in the CIPP shall be cooled to below 100°F (38°C) before discharge.

C. Ultra-Violet Glass Reinforced Cured-In-Place Pipe (UV CIPP) Liner

1. Liner installation shall be in accordance with ASTM F2019, Section 6.

2. Resin Impregnation: The liner tube shall be impregnated with resin in accordance with ASTM F2019, Section 6.3.1, with the following requirements:

The fabric tube shall be totally impregnated with resin (wet out) in the manufacturers plant under quality-controlled conditions. The impregnation equipment shall contain devices to secure the proper distribution of the resin (resin bath). Certification documentation concerning date, type of resin, resin volume, mixing ratio, liner thickness, temperature, type of glass fiber, manufacturing date shall be stamped and/or marked on the finished uncured fiberglass liner by the UV CIPP manufacturer

3. Tube Insertion: A plastic slip-sheet shall be installed in the bottom half of the pipe prior to liner insertion. The slip-sheet is used to protect the outer film from damage during insertion from offset joints, broken pipe, or slightly protruding taps. In addition, it will increase flow characteristics and reduce friction during the pull-in process. Once the slip-sheet is in place, the shipping crate is opened, and the pre-impregnated spiral wound fiberglass liner is prepared for insertion into the host pipe following manufacturer procedures. Care should be taken to protect the ends of the liner from contaminates within the sewer such as moisture. A double capstan, constant tension winch shall be used to pull the spiral wound fiberglass liner into position. The double capstan, constant tension winch must be capable of documenting the amount of tension used to pull the liner into the pipe. Maximum pulling forces established by the manufacturer will not be exceeded. The tube shall be pulled-in through an existing manhole or approved access point and fully extend to the next designated manhole or termination point. During the pull-in process, the liner is manually fed into the pipe by the install technician. Care should be taken during this process not to tear or damage the outer film, thus exposing the liner to contaminates within the pipe. Lubricants used for tube insertion shall be subject to the approval of the OWNER.

4. Curing: Once the liner has been inserted into the host pipe, an end plug or packer is used to cap one end of the liner to prepare for initial pressurizing. The packer should be secured with a strap to prevent it from being expelled due to pressure. The other end of the liner is held closed manually by the technician.

The liner is then pressurized using forced air to the initial pressure of one 1 psi.

The spiral wound fiberglass liner shall be cured with a UV light source (i.e. light train). The UV light train should be assembled according to the manufacturer's specifications for the liner diameter. Once initial air pressure is achieved, the technician shall insert the light train into the open end of the liner. When inserting the light train, care should be taken not to damage the inner film material or the light train. After the light train is inside the liner, a packer is secure, fill liner inflation may begin. The air pressure will be raised at one 1 psi increments and held for approximately ten 10 minutes before increasing the

33 01 30.72 -8 pressure to the next level. Typical optimum inner air pressure is between 6 psi and 8 psi. However, the CONTRACTOR shall follow the manufacturer's recommendation for inner liner pressure according to the actual liner design used for the specific installation. Once optimum inner air pressure is achieved, a visual "pre-curing inspection of the liner will be done using CCTV. Once the "pre-cure" inspection is completed and the OWNER'S representative gives approval, the actual curing of the liner can begin. Curing of the spiral wound fiberglass liner is achieved through exposure to UV lights. The lights are energized in sequence according to the manufacturer specifications. The UV light train shall be capable of curing the fiberglass liner at a curing rate of up to 10-lf (linear feet) per minute

5. Record of Curing: For the liner to achieve the required water tightness and specified mechanical properties, the following parameters must be controlled during the entire curing process, giving the OWNER a record of the curing process over every segment of the entire length of the liner. This demonstrates that the entire liner is cured properly and completely. The recording will include:

a. Curing speed.

b. Light source working and wattage.

c. Inner air pressure.

d. Exothermic (curing) temperatures.

e. Date and time.

f. Length of liner.

6. Record of the curing parameters will be accomplished using a computer and database that are tamper proof. During the curing process, infrared sensors will be used to record exothermic curing temperature data. The parameters for curing speed, inner air pressure and wattage are defined in the Quality Tracker UV curing protocol issued by the manufacturer. The optimal curing speed, or travel speed of the energized UV light train, is determined for each length of liner based on liner diameter, liner thickness, and exothermic reaction temperature. A video will be recorded using CCTV during the curing process. The liner is cured once the energized light train has traveled the entire length of the liner.

7. Post Curing: The outer film that has been manufactured to control resin loss, liner thickness, and contamination of the resin by water or other contaminants as well as a styrene barrier, shall remain in-place after UV curing of the liner has been completed. The inner film will be removed no sooner than 30 minutes after the curing of the liner is complete. Ensure the curing method provides uniform temperature application for effective curing throughout the liner

3.4 END SEALS

A. The finished linear shall be cut smooth and parallel with the manhole wall. The interface between the host pipe and the pipe liner shall be sealed 360 degrees.

33 01 30.72 -9

3.5 REINSTATE SERVICE LATERAL CONNECTION

A. All live services shall be immediately reinstated after the liner installation (pipeline rehabilitation) is complete. Inactive service lines to a vacant lot, vacant building, or to an occupied residence with more than one service line serving the property, shall be defined as a “live” service, and shall be reinstated. It is the CONTRACTOR’S responsibility to locate all live services prior to rehabilitation activities. Each service lateral connection shall be noted by its size, position from a reference manhole, and orientation with respect to the circumference of the pipe. Reinstatement shall be accomplished from the interior of the sewer line by means of a television camera and a remote-controlled cutting device. Holes cut through the rehabilitation liner shall be neat and smooth and shall match the bottom of the reinstated service line. The service opening shall be reinstated to a minimum of 95 percent and a maximum of 100 percent of the service lateral pipe area. Service lateral openings that expand in diameter between the exterior and interior of the pipe wall shall be reinstated by cutting a hole in the liner that is 95 percent to 100 percent of the expanded diameter. The new edge shall be crack free with no loose or abraded material. Reinstated services that do not conform to this section shall be repaired and CCTV video confirmation.

The repair method shall be compatible with the lining system per the lining system manufacturer and as approved by OWNER. No extra payment shall be made for the repair and CCTV video confirmation.

B. The CONTRACTOR shall have a fully operational backup device for reinstating service laterals. If for any reason the remote cutting device fails during the reinstatement of a service lateral, the standby device shall be immediately deployed to complete the work. The backup device shall be fully functional without requiring removal of parts from the primary device. The backup equipment shall be onsite throughout the reinstatement process and will be periodically tested upon request of the ENGINEER. If for any reason the CONTRACTOR is unable to remotely reinstate a service lateral connection, the CONTRACTOR shall reinstate the service lateral connection by open cut.

C. Service lateral reinstatement by open cut includes locating all interfering utilities, existing surface removal, excavation, dewatering, reinstatement of service lateral connection, backfilling, surface restoration, temporary flow bypassing, and sewer dewatering.

Reinstatement of service lateral connection by open cut includes the removal and replacement of the first five (5) feet of service lateral, cutting of liner for the service opening, and installing a pre-fabricated fitting (Inserta-Tee® or equivalent) with the manufacturer’s specifications so that a complete water-tight seal is achieved. The new service line shall be connected to the existing service line with a flexible coupling and stainless-steel bands, as approved by OWNER. The service lateral connection at the pipeline shall be encased in lean fill, a minimum of six inches (6") below and twelve inches (12") above and on the sides of the pipe. The lean fill construction shall be inspected and approved by the OWNER prior to completing the trench backfilling.

3.6 ACCEPTANCE OF WORK

A. After completion of the lining, reinstatement of service lateral connections, and rehabilitation of the manholes, the CONTRACTOR shall perform a CCTV inspection in accordance with STS 33 01 30.11.

B. The CONTRACTOR shall review each post-rehabilitation CCTV inspection and provide an evaluation of liner defects and repair specifications for unacceptable defects to the ENGINEER. Level 1 Defects may be repaired by the CONTRACTOR or a pay adjustment will be

33 01 30.72 -10 applied to the unit price for Pipeline Rehabilitation within the pipeline segment (manhole to manhole). All Level 2 Defects are unacceptable and must be repaired by the CONTRACTOR.

C. Evaluation criteria of liner defects:

1. A defect is identified that disrupts or impedes the normal flow characteristics of the pipe consisting of liner wrinkles or lumps/bulges:

Level 1 Defect = Defect size is <15% of Internal Diameter;

Level 2 Defect = Defect size is >15% of Internal Diameter

2. A defect is identified that impedes any future inspection or cleaning of the pipe (Level 2 Defect);

3. A defect is identified that compromises the structural integrity of the liner system. (Level 2 Defect)

4. A defect is identified that penetrates through the liner system not including an accepted service re-instatement;

Level 1 Defect = Penetration is between the 10 and 2 position and the penetration is less than 3 inches in diameter

Level 2 Defect = Penetration is between the 3 and 9 position OR the penetration is greater than 3 inches in diameter.

5. Service re-instatement does not meet requirements of this specification. (level 1 Defect)

D. A defect that is identified due to a host pipe deficiency including a partially or fully degraded section shall be repaired by the CONTRACTOR but paid for by the OWNER if:

1. The location of the host pipe deficiency was identified in writing to the ENGINEER under STS 33 01 30.41.

2. A CCTV inspection video of the pipe is provided that was performed not more than 12 hours before the pipe liner was installed during no flow or low flow (less than 25% full) conditions showing no existing loose debris.

3. OWNER and ENGINEER recognize that due to the severe degradation of some host pipes, defects caused by host pipe deficiency versus CONTRACTOR error/negligence will be decided on a case by case basis.

3.7 POST-REHABILITATION POINT REPAIR/LINER PATCH

A. This subsection specifies the trenchless liner patch installation or point repair of rehabilitated pipelines to repair a liner defect.

1. TRENCHLESS LINER PATCH: A trenchless liner patch shall be up to 4 linear feet long and be approved by the liner manufacturer. The removal, extraction, and disposal of debris/obstruction in between the host pipe and pipe liner using a remote device shall be completed prior to patch installation. The CONTRACTOR is responsible for installing the patch in the correct location to completely cover the liner defect.

33 01 30.72 -11

2. POST-REHABILITATION POINT REPAIR: A Point Repair shall include up to 12 linear feet of rehabilitated pipeline replacement by excavation. Remove only that amount of rehabilitated pipeline or sewer service connection that is identified as exhibiting an unacceptable defect. New sewer pipe shall be per 33 31 11 Public Sanitary Sewerage Gravity Piping. Transitions shall be flexible couplings with stainless-steel bands and a trenchless liner patch extending a minimum of 1 foot upstream and downstream of the transition. The flexible coupling shall be backfilled with lean fill to a thickness of at least 12 inches from the pipe exterior in all lateral and vertical directions. The trenchless liner patch shall be approved by the liner manufacturer and compatible with the replacement pipe. Reinstatement of service lateral connection (if patch covered a service lateral) is incidental to the point repair.

END OF SECTION 33 01 30.72