Addendum 2 Rehabilitate Maintenance Building Loading Dock.pdf
PDF 236 KB Posted
- Attached to
- Rehabilitate Maintenance Building Loading Dock
- Solicitation number
- 7617
- Issued by
- Kentucky
About this file
This Addendum Number 2 modifies the contract documents for the Rehabilitate Maintenance Building Loading Dock project at Louisville Muhammad Ali International Airport, issued by the Louisville Regional Airport Authority on August 14, 2026. The addendum addresses revisions to plan sheets and contractor questions submitted during the bidding process. A mandatory site visit for prospective bidders was conducted on August 12, 2026 at 9:30 AM. Key modifications include revisions to Sheet A500 P100, specifically changing Note 23 from "RE: 4/A200" to "RE: 4/A103" and reducing the guard rail quantity from 185 linear feet to 140 linear feet (approximately 75 LF adjacent to the building and 65 LF on top of the retaining wall). The guard rail must meet KYTC Standard Drawing No. RBR-001-13 with end treatments required. Additional clarifications address existing trench drain and drain tile protection, pavement specifications referencing Sheet S101, relocation of access control and electronic surveillance systems associated with man door relocations, metal awning/welded steel canopy details per Sheet A500 Section 6, and dock leveler specifications per Addendum No. 1 with installation per Section 11 13 00.
The addendum clarifies that no electrical short circuit, coordination, or arc-flash studies were conducted; no geotechnical investigation was performed; and no contaminated soils have been recorded for the site. The Louisville Regional Airport Authority will provide record data and facility access to the selected bidder upon request prior to construction. No alternates or unit prices are required, and no Buy American provisions apply to the contract. The Contractor must maintain the existing fire alarm system throughout construction and coordinate any modifications with the LRAA through the Construction Inspector. Working hours, laydown areas, and dock operability will be coordinated with the LRAA prior to construction commencement to accommodate both Contractor needs and LRAA operations. Prevailing wage requirements apply per Section 2 of the Special Conditions. The project includes standard insurance and bonding requirements, with Builder's Risk versus Contractor's Protective Liability provisions detailed in Section I 1.C of the Special Conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER 2
REHABILITATE MAINTENANCE BUILDING LOADING DOCK
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
AUGUST 14, 2026
This Addendum Number 2, consisting of four (4) pages, is issued in connection with the above-described Contract Documents. The Louisville Regional Airport Authority, pursuant to provisions contained in said Documents, hereby advises all interested parties that changes have been made to the Contract Documents as follows:
Certain changes have been made to the Plan Sheets, such changes to occur on the following numbered pages. The attached sheet CDC-1 lists the actual correction and/or revision, with reference to the subject sheet number. All revisions to the Plan Sheets contained in the Addendum are hereto made part of the Contract Documents.
A500 P100
The attached sheets CQ-1-2 lists the Contractor Question with answers.
LOUISVILLE REGIONAL AIRPORT AUTHORITY
KYLE HARTLAGE, PE.
VICE PRESIDENT OF PLANNING & DEVELOPMENT
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
AUGUST 14, 2026
CDC-1
PLANS
SHEET CHANGE
A500
P100
Revise Note 23 from ‘RE: 4/A200’ to ‘RE: 4/A103’ Revised plan sheets not being reissued with addendum.
Revise quantity of guard rail from ‘185’ to ‘140’ LF. Revised plan sheets not being reissued with addendum.
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
AUGUST 14, 2026
CQ-1
CONTRACTOR QUESTIONS
1. Will a formal site visit to access the building be coordinated? A site visit for prospective bidders was conducted on 8/12/26 @ 9:30 AM.
2. Is there going to be site access following the pre-bid? See Question 1
3. Can the total linear footage of guardrail which is to be installed be confirmed? On sheet P100, it indicates 185 +- LF, but this quantity is not shown when you scale the drawings. Also, will any end treatments be required? The project contains approximately 75 LF of guard rail adjacent to the building as shown on Sheet A600 Section 10 Guardrail at Existing CMU Wall and approximately 65 LF on top to the retaining wall as shown on Sheet A600 Section 2 Section Detail @ Dock. The note on Sheet P100 is to be revised from 185 to 140. End treatments are to be provided.
4. Vehicular crash rail / guardrail - governing specification and quantity. Guard rail is to meet KYTC Standard Drawing No. RBR-001-13 as noted on Sheet P100.
5. Reference to Sheet S200 (CMU infill) - sheet not in the bid set. Revise Sheet A100 Note 23 from S200 to S103.
6. New pavement and paver replacement - limits, section and specification? Refer to Sheet S101 for new pavement. Existing pavement removed for plumbing installation shall match existing (assume 8-inch PCC for bidding purposes).
7. Topsoil and seeding — pay item T-905-1 and missing specification. Disturbance/Restoration of grass areas is not in the project. Should the Contractor disturb grass areas with his operations, they shall be repaired to the satisfaction of the LRAA.
8. Trench drain, drain tile and lamb’s tongue gutter outlet? The existing trench drain and drain tile are to be protected in place. Any damage as a result of the Contractor’s operations shall be repaired to the satisfaction of the LRAA.
9. Access control (Spec 28 13 00) - extent of scope. The project includes the relocation of access control associated with the relocation of the man door. Refer to plans and specifications for further information.
10. Electronic surveillance (Spec 28 20 00) - extent of scope; IP vs. analog. The existing system is IP. The project includes the relocation of electronic surveillance associated with the relocation of the man door. Refer to plans and specifications for further information.
11. Metal awning vs. welded steel canopy - system type and dimensions? See Sheet A500 Section 6 for construction details and Sheet A500 for dimensions.
12. Specification sections referenced but not included in the book? Not able to address as specific sections are not provided. Additional clarification/information will be provided to the selected bidder as needed.
CQ-2
13. Electrical short circuit, coordination and arc-flash studies? No studies were conducted for the project. The LRAA will provide record data and access to the facility to the selected bidder upon request prior to the start of construction.
14. Geotechnical report and unsuitable subgrade? No geotechnical investigation was performed for this project.
15. General and Site-Specific Environmental Controls document; contaminated soils? The LRAA has no records of contaminated soils for the site.
16. Alternates and unit prices - confirm none required. None required
17. DBE submittal requirements at a zero percent goal? Correct
18. Subcontractor listing threshold and evidence of competency. See Section 20-05 of the General Conditions for listing threshold. Refer to Section I 7 of the Special Conditions for competency.
19. Prevailing wage, federal funding and Buy American. Wages: See Section 2 of the Special Conditions. The project is funded by the LRAA. There are no Buy American provisions in the contract.
20. Fire alarm - scope, existing manufacturer, acceptance testing and AHJ coordination. The Contractor shall be required maintain the existing fire alarm system in working order throughout the project. The Contractor will coordinate with the LRAA through the Construction Inspector for any required modifications to existing control system.
21. Working hours, laydown, utilities, parking, dock operability and NTP date. The LRAA will coordinate the date of the Notice to Proceed after approval from the Board and the signing of the contract. Working hours, laydown area and dock operability will be coordinated with the LRAA prior to the start of construction to meet the needs of the Contractor and minimize impacts to LRAA operations. The Contractor shall minimize and utility interruption and maintain existing utility service though out the project.
22. Builder’s Risk vs. Contractor’s Protective Liability insurance. Refer to Section I 1.C of the Special Conditions
23. Bidder’s financial statement - acceptable form and preparer. Refer to Section 20-01 of the General Conditions.
24. Dock leveler - Addendum No. 1 vs. Specification Section 11 13 00. The dock leveler to be provided shall be as stated in Addendum No. 1. Installation shall be in accordance with Section 11 13 00 and the Manufacture’s recommendations.
25. Owner programming access and integrator coordination - access control, CCTV, fire alarm. The Contractor will coordinate with the LRAA through the Construction Inspector for any required modifications to existing control systems.
| 2026-08-14T09:58:20-0400 | |
| Kyle Hartlage |