Bradford County Courthouse Renovation - Mechanical Documentation

This document set comprises mechanical design and specification sheets for the interior renovation of the Bradford County Courthouse located at 945 N Temple Avenue, Starke, Florida. The project, identified as AB24115, is being designed by Akin Brooks Engineering, Inc. and includes comprehensive HVAC system modifications across the first and second floors of the facility. The scope of work encompasses demolition of existing diffusers, exhaust grilles, return grilles, and specified ductwork; installation of new supply diffusers, return air grilles, and exhaust grilles with reconnection to existing ductwork where applicable; and complete testing, adjusting, and balancing of all mechanical systems. The mechanical work is governed by the Florida Building Code (8th Edition, 2023), Florida Fire Prevention Code, NFPA standards, and industry standards including ASHRAE 62.1, SMACNA, and AMCA specifications. The project is issued at 100% construction documents status as of February 27, 2026, with a drawing date of March 2, 2026.

The specifications detail extensive requirements for metal ductwork fabrication and installation, requiring compliance with SMACNA HVAC duct construction standards and achieving air-tight systems with leakage rates not exceeding 3% for low-pressure systems and 1% for systems rated over 3" W.G. Flexible ductwork is limited to maximum lengths of 6 feet with R-6 insulation minimum. All ductwork shall be externally insulated with 2.2 inches of fiberglass blanket insulation achieving R-6 minimum installed value. Test and balance tolerances require supply air, return air, and outdoor air quantities to be balanced within 5% of design values, with exhaust fans balanced within 10% of design. The contractor is responsible for pre-construction testing of existing equipment (AC-1, AC-2, and exhaust systems), submission of shop drawings for ductwork layout and coordination with structural elements, and completion of pressure testing and duct leakage verification prior to system operation. Additional requirements include vibration isolation for all units, access panels for non-accessible construction, fire damper installation where systems penetrate fire-rated assemblies, and comprehensive as-built documentation on contractor field sets of drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL LEGEND

MD

G

F

FS

S

D

H

T

M

M

M

XXX - ###

S

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

RECTANGULAR ELBOW - MITERED - WITH TURNING VANES

RECTANGULAR ELBOW - MITERED

RECTANGULAR CROSS

RECTANGULAR TEE

ROUND CROSS

ROUND TEE

ROUND ELBOW - 1D

ROUND ELBOW - 1.5D

ROUND ELBOW - 2D

ROUND TAKEOFF WITH DAMPER - CONICAL

ROUND TAKEOFF WITH DAMPER

MOTORIZED DAMPER

GRAVITY DAMPER

FIRE DAMPER

FIRE & SMOKE DAMPER

SMOKE DAMPER

DUCT-MOUNTED SMOKE DETECTOR W/ ACCESS PANEL

ROOM HUMIDISTAT. MOUNT TOP AT 48" AFF

ROOM THERMOSTAT - TEMPERATURE & HUMIDITY. MOUNT

TOP AT 48" AFF

AIRTROL FITTING

AUTOMATIC AIR VENT WITH VALVE

AUTOMATIC BALANCING VALVE

BACKFLOW PREVENTER

VALVE. SEE SPECIFICATIONS FOR TYPE.

CALIBRATED BALANCING VALVE

CHECK VALVE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

FILL VALVE

FLEXIBLE PIPE CONNECTION

PRESSURE GAUGE

PRESSURE OR TEMPERATURE TEST PORT

INLINE STRAINER

INLINE STRAINER WITH BLOWDOWN VALVE

WITH THREADED CONNECTION AND CAP

PLUG VALVE

PRESSURE REDUCING VALVE

RELIEF VALVE

SPEED CONTROLLER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

THERMOMETER

THERMOMETER WELL

UNION; DIELECTRIC WATERWAY (SEE SPECIFICATIONS)

VENTURI FLOW METER

DOOR GRILLE

WATER METER

CONNECT TO EXISTING

UNIT SYMBOL WITH UNIT NUMBER

SA

RA

EA

OA

SA

RA

EA

OA

SA

RA

EA

OA

SUPPLY AIR

RETURN AIR

EXHAUST

OUTSIDE AIR

NEW WORK EXISTING DEMOLITION

DUCT LEGEND

GENERAL NOTES

THE FOLLOWING NOTES ARE TO DEMONSTRATE MINIMUM MECHANICAL CODE COMPLIANCE ONLY. CONTRACTOR IS RESPONSIBLE FOR THE FULL WRITTEN SPECIFICATIONS. IF ANY INCONSISTENCIES ARE PRESENT, THE FULL WRITTEN

SPECIFICATIONS PREVAIL.

AIR DISTRIBUTION:

1. VERIFY COLLAR SIZES ON ALL EQUIPMENT INLETS AND OUTLETS. TRANSITION DUCTWORK AS NECESSARY. EXTERNALLY INSULATE TRANSITIONS AT EQUIPMENT CONNECTIONS.

2. PROVIDE DUCT FLEX CONNECTIONS FOR ALL UNITS. EXTERNALLY INSULATE FLEXIBLE CONNECTIONS.

3. ALL EXHAUST DUCTWORK RUNOUTS SHALL BE RIGID DUCT.

4. DUCT SIZES ARE SHEET METAL SIZES. NO DUCTWORK SHALL RUN PARALLEL WITH AND OVER WALLS.

5. CONTRACTOR SHALL VERIFY CLEARANCE SPACE AVAILABLE, OFFSETS REQUIRED, STRUCTURAL OPENINGS, AND WORK BY OTHER TRADES PRIOR TO FABRICATION OF DUCTWORK. SUBMIT SHOP DRAWINGS ON DUCTWORK LAYOUT.

COORDINATE WITH ROOF TRUSSES/STRUCTURE. PRESSURE TEST ALL DUCTWORK FOR LEAKS. SEE SPECIFICATIONS. RETURN AND EXHAUST DUCT SHALL BE TESTED UNDER NEGATIVE PRESSURE.

EQUIPMENT:

1. PROVIDE FULL SIZE COPPER CONDENSATE DRAINS FROM ALL UNITS TO DISPOSAL POINT INDICATED ON THE DRAWINGS.

2. PROVIDE A TRAP ON ALL CONDENSATE DRAIN OUTLETS. SLOPE ALL CONDENSATE DRAIN PIPING -1/8" INCH PER FOOT.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT, PIPING, AND DUCTWORK SUCH THAT MANUFACTURER'S RECOMMENDED CLEARANCES ARE MET FOR ALL ACCESS PANELS, MOTORS, FANS, BELTS, FILTERS AND AIR INTAKES.

4. PROVIDE VIBRATION ISOLATORS FOR ALL UNITS. SEE SPECIFICATIONS AND DETAILS.

5. PROVIDE ACCESS PANELS IN ALL NON-ACCESSIBLE CONSTRUCTIONS (INCLUDING CEILING, WALLS, ETC) SIZED AND LOCATED AS REQUIRED TO PROVIDE PROPER SERVICE ACCESS IN ACCORDANCE WITH THE MANUFACTURERS

RECOMMENDATION FOR ALL HVAC EQUIPMENT INCLUDING DAMPERS AND VALVES.

6. ALL HVAC EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND UNDER SUPERVISION OF MANUFACTURER'S REPRESENTATIVE.

CONTROLS:

1. MAINTAIN A MINIMUM OF 3'-6" SEPARATION FROM THE HVAC CONTROL WIRING AND OTHER DATA, TV, OR PHONE WIRING TO PREVENT ANY INTERFERENCE.

2. ALL LOW VOLTAGE CONTROL WIRING SHALL COMPLY WITH SPEC AND IN ACCORDANCE WITH ELECTRICAL SPEC REQUIREMENTS.

3. PROVIDE ALL SOFTWARE, PROGRAMMING, GRAPHICS, AND RELATED INTERFACE TO MONITOR THE HVAC SYSTEM VIA INTERNET LOGIN.

GENERAL:

1. PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR SHALL SATISFY HIMSELF AS TO THE ACCURACY OF ALL DATA AS INDICATED IN THESE PLANS AND SPECIFICATIONS AND/OR AS PROVIDED BY THE OWNER. SHOULD THE CONTRACTOR DISCOVER ANY INACCURACIES, ERRORS, OR OMISSIONS IN THE DATA, HE SHALL IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER IN ORDER THAT PROPER ADJUSTMENTS CAN BE ANTICIPATED AND ORDERED.

2. COMMENCEMENT BY THE CONTRACTOR OF ANY WORK SHALL BE HELD AS AN ACCEPTANCE OF THE DATA BY HIM AFTER WHICH TIME THE CONTRACTOR HAS NO CLAIM AGAINST THE OWNER RESULTING FROM ALLEGED ERRORS, OMISSIONS, OR INACCURACIES OF THE SAID DATA.

3. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND COMPLETED IN A FIRST-CLASS WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE BEST MODERN METHODS AND PRACTICE. ANY MATERIALS INSTALLED WHICH DO NOT PRESENT AN ORDERLY AND REASONABLY NEAT AND/OR WORKMANLIKE APPEARANCE, OR DO NOT ALLOW ADEQUATE SPACE FOR MAINTENANCE, SHALL BE REMOVED AND REPLACED WHEN SO DIRECTED BY THE

ARCHITECT/ENGINEER.

4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT ALL EQUIPMENT AND DEVICES THAT MAY REQUIRE MAINTENANCE AND OPERATION ARE MADE EASILY ACCESSIBLE, REGARDLESS OF THE DIAGRAMMATIC LOCATION SHOWN ON

THE DRAWINGS.

5. THE CONTRACTOR SHALL PROTECT EQUIPMENT AND MATERIAL AT ALL TIMES. HE SHALL REPLACE ALL EQUIPMENT AND MATERIAL WHICH ARE DAMAGED AS A RESULT OF INADEQUATE PROTECTION.

6. THOROUGHLY CLEAN ALL EXPOSED PARTS OF APPARATUS AND EQUIPMENT AND REMOVE ALL OIL AND GREASE SPOTS. REPAINT OR TOUCH UP AS REQUIRED TO LOOK LIKE NEW. DURING PROGRESS OF WORK, CONTRACTOR IS TO

CAREFULLY CLEAN UP AND LEAVE PREMISES AND ALL PORTIONS OF BUILDING FREE FROM DEBRIS AND IN A CLEAN AND SAFE CONDITION.

7. DURING THE PROGRESS OF THE WORK, THE CONTRACTOR SHALL RECORD ON THEIR FIELD SET OF DRAWINGS (AS-BUILTS) THE EXACT LOCATION, AS INSTALLED, OF ALL PIPING, DUCTWORK, EQUIPMENT, AND OTHER SYSTEMS WHICH

ARE NOT INSTALLED EXACTLY AS SHOWN ON THE CONTRACT DOCUMENTS.

GENERAL

1. THE WORK COVERED BY THIS DIVISION CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF THE MECHANICAL WORK AS HEREIN CALLED

FOR AND SHOWN ON THE DRAWINGS.

CODES

1. ALL WORK UNDER DIVISION 23 SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CODES LISTED HEREIN. THE DESIGN HAS BEEN BASED ON THE REQUIREMENTS OF THESE CODES; AND WHILE IT IS NOT THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THAT ALL WORK CALLED FOR COMPLIES WITH THESE CODES, HE SHALL BE RESPONSIBLE FOR CALLING TO THE ARCHITECT/ENGINEER'S ATTENTION ANY DRAWINGS OR SPECIFICATIONS THAT ARE NOT IN CONFORMANCE WITH THESE OR OTHER CODES PRIOR TO ORDERING EQUIPMENT OR INSTALLING WORK.

2. COMPLY WITH REGULATIONS AND CODES OF UTILITY SUPPLIERS.

3. WHERE NO SPECIFIC METHOD OR FORM OF CONSTRUCTION IS CALLED FOR IN THE CONTRACT DOCUMENTS, THE

CONTRACTOR SHALL COMPLY WITH CODE REQUIREMENTS WHEN CARRYING OUT SUCH WORK.

4. WHERE CODE CONFLICT EXISTS, GENERALLY THE MOST RESTRICTIVE REQUIREMENT APPLIES. COMPLY WITH

CURRENT CODE EDITION, UNLESS NOTED.

5. ADDITIONAL CODES OR STANDARDS APPLYING TO A SPECIFIC PART OF THE WORK MAY BE INCLUDED IN THAT

SECTION.

6. THE FOLLOWING CODES GOVERN THE WORK:

A. FLORIDA BUILDING CODE - BUILDING - 8TH EDITION (2023).

B. FLORIDA BUILDING CODE - MECHANICAL - 8TH EDITION (2023).

C. FLORIDA BUILDING CODE - ENERGY CONSERVATION - 8TH EDITION (2023).

D. FLORIDA BUILDING CODE - TEST PROTOCOLS FOR HIGH VELOCITY HURRICANE ZONES - 8TH EDITION (2023).

E. FLORIDA FIRE PREVENTION CODE - 8TH EDITION (2023).

a. UNIFORM FIRE CODE (NFPA 1) - 2021 FLORIDA EDITION

b. LIFE SAFETY CODE (NFPA 101) - 2021 FLORIDA EDITION

F. NATIONAL ELECTRIC CODE (NFPA 70) - 2020.

G. STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATION SYSTEMS (NFPA 90A).

a. 2015 IN ACCORDANCE WITH FBC - MECHANICAL - EIGHTH EDITION (2023)

b. 2021 IN ACCORDANCE WITH FAC 69A-3.012 STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION

AND OTHER STANDARDS ADOPTED.

H. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) - 2019

STANDARDS

1. ALL DIVISION 23 MATERIALS, INSTALLATION AND SYSTEMS SHALL MEET THE REQUIREMENTS OF THE FOLLOWING STANDARDS, INCLUDING THE LATEST ADDENDA AND AMENDMENTS, TO THE EXTENT REFERENCED:

A. UNDERWRITERS' LABORATORIES (UL)

B. AMERICAN NATIONAL STANDARDS INSTITUTION (ANSI)

C. AMERICAN SOCIETY OF TESTING MATERIALS (ASTM)

D. NATIONAL FIRE PROTECTION (NFPA)

E. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

F. AIR CONDITIONING AND REFRIGERATION INSTITUTE (ARI)

G. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)

H. AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE)

I. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)

J. STANDARD FOR SMOKE CONTROL SYSTEMS (NFPA 92) – 2018

K. STANDARDS OF THE HYDRONIC INSTITUTE (IBR)

CODES & STANDARDS

ABBREVIATIONS

(UNABRIDGED)

A AMPS; AREA

AAV AUTOMATIC AIR VENT

ABV CLG ABOVE FINISHED CEILING

AC AIR CONDITIONING UNIT

ACH AIR CHANGE PER HOUR

AFF ABOVE FINISHED FLOOR

AH ATOMIZING HUMIDIFIER

AHU AIR HANDLING UNIT

AI ANALOG INPUT

AL ALUMINUM

AM AIRFLOW MONITOR

AMS AIRFLOW MEASURING STATION

AO ANALOG OUTPUT

AP ACCESS PANEL

AS AIR SEPARATOR

BD BALANCING DAMPER

BFF BELOW FINISHED FLOOR

BFP BACKFLOW PREVENTER

BTU BRITISH THERMAL UNITS

BTUH BTU PER HOUR

B BOILER

C CONDENSATE

CAC CONTROL AIR COMPRESSOR

CB CHILLED BEAM

CD CEILING DIFFUSER

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CBWP CHILLED BEAM WATER PUMP

CBWS CHILLED BEAM WATER SUPPLY

CBWR CHILLED BEAM WATER RETURN

CH CHILLER

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEANOUT

CR CONDENSATE RETURN (STEAM)

CSR CURRENT SENSING RELAY

CS CURRENT SENSING (AMPS)

CT COOLING TOWER; COMPRESSION TANK

CU CONDENSING UNIT; COPPER

CV COEFFICIENT OF VALVE

DB DRY BULB

DC DUST COLLECTOR

DDC DIRECT DIGITAL CONTROLS

DEFL DEFLECTION

DG DOOR GRILLE

DI DIGITAL INPUT

DIA DIAMETER

DO DIGITAL OUTPUT

DS DUCT SILENCER

DTG DOOR TRANSFER GRILLE

DTW DUAL TEMPER WATER

DTWR DUAL TEMPER WATER RETURN

DTWS DUAL TEMPER WATER SUPPLY

EA EACH

EAT ENTERING AIR TEMPERATURE

EDH ELECTRIC DUCT HEATER

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

ENT ENTERING

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

EV EXHAUST VALVE

EWT ENTERING WATER TEMPERATURE

EXST,X, EX EXISTING

EXH EXHAUST

°F DEGREES FAHRENHEIT

FBC FLORIDA BUILDING CODE

FCU FAN COIL UNIT

FD FIRE DAMPER, FLOOR DRAIN

FEV FUME EXHAUST VALVE

FG FILTER GRILLE

FH FUME HOOD

FMS FLOW MEASURING STATION

FO FLAT OVAL

FPM FEET PER MINUTE

FRP FIBERGLASS REINFORCED PLASTIC

FSC FAN SPEED CONTROLLER

FT FEET

FT WG FEET OF WATER, GAUGE

FTU FAN TERMINAL UNIT

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GEV GENERAL EXHAUST VALVE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HG HOT GAS

HHW HEATING HOT WATER

HHP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HP HEAT PUMP; HORSEPOWER

HPS HEAT PRESSURE SYSTEM

HR HOUR

HX HEAT EXCHANGER

ID INSIDE DIAMETER

IN. WG INCHES OF WATER, GAUGE

KW KILOWATTS

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LB POUND

LD LINEAR DIFFUSER

LPS LOW PRESSURE STEAM

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSANDS OF BTU'S

MCF THOUSANDS OF CUBIC FEET

MD MOTORIZED DAMPER

MIN MINUTE; MINIMUM

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN, NUMBER

NTS NOT TO SCALE

OA OUTDOOR AIR

OAL OUTDOOR AIR LOUVER

OC ON CENTER

OD OUTSIDE DIAMETER

P PUMP

PCW PROCESS COOLING WATER

PCWP PROCESS COOLING WATER PUMP

PCWR PROCESS COOLING WATER RETURN

PCWS PROCESS COOLING WATER SUPPLY

PH PHASE

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PVC POLYVINYL CHLORIDE

R RADIUS

RA RETURN AIR

RD ROUND DIFFUSER

RAG RETURN AIR GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID

RP REDUCED PRESSURE

RPM REVOLUTIONS PER MINUTE

RAR RETURN AIR REGISTER

RS REFRIGERANT SUCTION

RV ROOF VENT

SA SUPPLY AIR

SAR, SR SUPPLY AIR REGISTER

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DAMPER

SF SQUARE FEET, SUPPLY FAN

SG SOFFIT GRILLE

SIM SIMILAR

SP STATIC PRESSURE

SPEC SPECIFICATION

SR SIDEWALL REGISTER

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STM STEAM

SV SUPPLY VALVE

TEMP TEMPERATURE

TG TRANSFER GRILLE; TEMPERATURE GAUGE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC UNDERCUT DOOR - 3/4"

UG UNDERGROUND

UH UNIT HEATER

V VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VFM VENTURI FLOW METER

VLV VALVE

VRF VARIABLE REFRIGERANT FLOW

VRV VARIABLE REFRIGERANT VOLUME

VVU VARIABLE VOLUME UNIT

WB WET BULB

WPD WATER PRESSURE DROP

AIR DISTRIBUTION SIZING

SUPPLY DIFFUSERS RETURN GRILLES/REGISTERS

CFM RANGE

NOMINAL DUCT

CONNECTION SIZE

0-120

125-250

255-380

385-550

555-740

8ø

6ø

10ø

12ø

14ø

16ø750-1000

CFM RANGE

NOMINAL DUCT

CONNECTION SIZE

0-175

180-300

305-450

455-650

655-900

10ø

8ø

12ø

14ø

16ø

18ø905-1200

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

H E

A

R C

H

IT

E C

T 'S

O R

T

N

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

D

S

P E

C

IF

IC

A

T

IO

N S

C O

M P

L Y

W

IT

H

T H

E A

P P

L

IC

A B

M

IN

IM

U M

B U

IL

D

G

C

O D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E T

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

I

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:48 PM

MECHANICAL LEGEND,

ABBREVIATIONS, CODES AND

STANDARDS

100% CONSTRUCTION

DOCUMENTS

PJD DLB

M001

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

REVISIONS

NO: DATE: REF: BY:

eleen DLB Stamp

T

T

T

A

B

C

2 4 5 6 7

C

VAV-11

VAV-12

S.T.-1 S.T.-2

AC-1

AHU-1

VAV-5

VAV-14VAV-9

VAV-10

1 1

3 3

VAULT BACK OF HOUSE

143A

BOOKS/RECORDS

LOBBY

CONFERENCE

IT ROOM

CORRIDOR

139A

OFFICE

148L

OFFICE

148G

OFFICE

148F

OFFICE

148E

OFFICE

143T

STAIR

ELECTRIC

ADA TOILET

148H

SMALL OFFICE

148I

STORAGE

148J

MENS

WOMENS

ELEVATOR

CUSTODIAL

VSTIBULE

VESTIBULE

CORRIDOR

Room

Room

Room

VESTIBULE

KITCHEN

CLERKS OFFICE

OFFICE

VESTIBULE

148A

STORAGE

148B

STORAGE

148C

Room

Room

Room

TOILET

Room

Room

Room

Room

Room

Room

Room

TOILET

Room

Room

Room

AC-2

KEY NOTES

1. DEMOLISH ALL DIFFUSERS AND EXHAUST / RETURN GRILLES IN PROJECT

AREA.

2. DUCT RUNOUTS TO DIFFUSERS AND RETURN / EXHAUST GRILLES SHALL

BE LEFT EXISTING TO REMAIN FOR CONNECTION TO NEW DIFFUSERS /

GRILLES TO THE GREATEST EXTENT POSSIBLE UNLESS OTHERWISE

NOTED.

3. DEMOLISH DUCTWORK AS SHOWN.

4. REMOVE AND RETAIN THERMOSTATS DURING DEMOLITION.

5. DEMOLISH DUCTWORK AS SHOWN, CAP AND SEAL OPENING.

SHEET NOTES

A. MECHANICAL EQUIPMENT/ DUCTWORK SIZES, LOCATION, AND LAYOUT

SHOWN FROM EXISTING PLANS AND MAY NOT REFLECT EXACT AS-BUILT

CONDITIONS. CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND

REPORT ANY SIGNIFICANT DEVIATIONS PRIOR TO START OF DEMOLITION.

HVAC PRETEST DIRECTIONS

A. CONTRACTOR SHALL SUBMIT THE RESULTS OF PRE-TEST TO ENGINEER

OF RECORD PRIOR TO START OF ANY CONSTRUCTION.

B. AC-1 & AC-2

a. RECORD CFM, SP, AND DISCHARGE TEMP AT FULL COOL.

b. RECORD CFM, SP, AND DISCHARGE TEMP AT FULL HEAT.

c. RECORD AIRFLOW AT EACH DIFFUSER CONNECTED TO UNIT.

C. RETURN GRILLES

a. RECORD AIRFLOW AT RETURN GRILLES. WHEN RECORDING RETURN

AIRFLOW, ENSURE ALL DOORS IN THE SPACE ARE SHUT.

D. EXHAUST SYSTEM

a. RECORD CFM AT EACH EXHAUST GRILLE IN PROJECT AREA.

b. RECORD ASSOCIATED EXHAUST FAN TOTAL AIRFLOW, SP, EQUIPMENT NAMEPLATE, AND CONDITION IN REPORT.

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

C

H

IT

E C

T 'S

O R

T

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

E

C

IF

IC

A

T

IO

N S

C O

M P

H

T H

E A

P P

L

IC

A B

IM

U M

B U

IL

D

D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:52 PM

MECHANICAL FIRST FLOOR PLAN -

DEMOLITION

100% CONSTRUCTION

DOCUMENTS

PJD DLB

M111

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

N

SCALE: 1/8" = 1'-0"

1 MECHANICAL FIRST FLOOR PLAN - DEMOLITION

REVISIONS

NO: DATE: REF: BY:

NOT IN PROJECT SCOPE

T T T

TTT

T

T

T

T

T

A

B

C

2 4 5 6 7

JURY ROOM

JURY ROOM

TOILET

TOILET

PRISONER DETENTION

PRISONER DETENTION

CIRCUIT JUDGE JUDICIAL ASSISTANT

TOILET

Unoccupied

Unoccupied

CIRCUIT JUDGE

CIRCUIT JUDGE JUDICIAL ASSISTANT

TOILET

HEARING ROOM

OFFICE

VISITING JUDGE

LACTATION ROOM

JURY ROOM

203A

TOILET

TOILET

COURTROOM

203B

COORIDOR

PUBLIC

203C

SECRETARY

JUDICIAL HEARING OFFICER

ELEVATOR

CUSTODIAL

WOMENS

MENS

CORRIDOR

DEPUTY'S ROOM

DEPUTY'S ROOM

NORTH COURTROOM

SOUTH COURTROOM

COURT REPORTER

COURT REPORTER

OFFICE

OFFICE

217OFFICE

OFFICE / RECEPTION

HALL

WAITING

STORAGE

VAULT

FILES

COUNTY JUDGE

LIBRARY

COUNTY JUDGE

HEARING ROOM

Unoccupied

Unoccupied

TOILET

STORAGE

STAFF

TOILET

Unoccupied

Unoccupied

TOILET

TOILET

VAV-44

VAV-28

VAV-36

VAV-53

VAV-21VAV-22

VAV-51 VAV-50 VAV-49 VAV-48

VAV-38

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

C

H

IT

E C

T 'S

O R

T

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

E

C

IF

IC

A

T

IO

N S

C O

M P

H

T H

E A

P P

L

IC

A B

IM

U M

B U

IL

D

D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:55 PM

MECHANICAL SECOND FLOOR

PLAN - DEMOLITION

100% CONSTRUCTION

DOCUMENTS

PJD DLB

M112

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

REVISIONS

NO: DATE: REF: BY:

N

SCALE: 1/8" = 1'-0"

1 MECHANICAL SECOND FLOOR PLAN - DEMOLITION

KEY NOTES

1. DEMOLISH ALL DIFFUSERS AND EXHAUST / RETURN GRILLES IN PROJECT

AREA.

2. DEMOLISH DUCTWORK, RUNOUTS, AND FLEX CONNECTIONS FOR

DIFFUSERS/GRILLES AS REQUIRED TO TRANSISTION TO NEW

DIFFUSERS/GRILLES.

3. REMOVE AND RETAIN THERMOSTAT FOR REINSTALLATION.

SHEET NOTES

A. DUCTWORK AND DIFFUSER LAYOUT AND QTY ARE TAKEN FROM EXISTING

DRAWINGS AND MAY NOT REFLECT EXACT AS-BUILT CONDITIONS.

CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND REPORT ANY

SIGNIFICANT DEVIATIONS PRIOR TO START OF DEMOLITION.

B. AHU-2 SERVING 2ND FLOOR IS LOCATED IN ROOFTOP PENTHOUSE.

NOT IN PROJECT SCOPE

HVAC PRETEST DIRECTIONS

A. CONTRACTOR SHALL SUBMIT THE RESULTS OF PRE-TEST TO ENGINEER

OF RECORD PRIOR TO START OF ANY CONSTRUCTION.

B. EXHAUST SYSTEM

a. RECORD CFM AT EACH EXHAUST GRILLE IN PROJECT AREA.

b. RECORD ASSOCIATED EXHAUST FAN TOTAL AIRFLOW, SP, EQUIPMENT NAMEPLATE, AND CONDITION IN REPORT.

T

T

T

A

B

C

2 4 5 6 7

NOT IN PROJECT SCOPE

1 1

BOOKS/RECORDS

LOBBY

VAV-5

VAV-10

VAV-11

VAV-12

AC-1

AHU-1

10x12 SA 10x12 SA x1

S

A

4-2408 CD-1

130CFM EA

2408 CD-1

150CFM

2408 CD

150CFM EA

x1

S

A

16x12 SA 10x10 SA x1

S

A x1

S

A

8x6 EA

12x12 EG 75CFM 8x4 EA

8x4 EA

12x12 EG

75CFM

4-36X2 LD

150CFM EA

12x12 EG

75CFM

8x4 EA

STORAGE

148J

SMALL OFFICE

148I

OFFICE

148L

OFFICE

148G

OFFICE

148F

OFFICE

148E

OFFICE

143T

CORRIDOR

148M

STAIR

ELECTRIC

VAULT BACK OF HOUSE

143A

Room

Room

Room

CORRIDOR

139A

TOILET

TOILET

STORAGE

148B

STORAGE

148C

VESTIBULE

148A

OFFICE

CLERKS OFFICE

KITCHEN

Room

Room

Room

VESTIBULE

CORRIDOR

WOMENS

MENS

ELEVATOR

CUSTODIAL

VSTIBULE

VESTIBULE

CORRIDOR

Room

Room

Room

Room

Room

Room

Room

Room

Room

CORRIDOR

2408 CD

200CFM2408 CD

125CFM

2408 CD

125CFM

2408 CD

125CFM

4-2406 CD

100CFM EA

2406 CD-1

100CFM

250CFM

2408 CD

75CFM

2406 CD

50CFM

2406 CD

30CFM

2406 CD-1

50CFM

10-2408 CD

200CFM EA

2-2416 RAR-1

750CFM EA

750CFM

2412 FRR

500CFM

ADA TOILET

148H

1208 CD

200CFM

1208 CD

200CFM

12X12 EG

300CFM

12X12 EG

200CFM

12x8 EA x1

S

A x1

S

A

16x16 SA x8

S A x8

S A

12x8 SA

12x8 SA x1

S

A

22x12 SA 16x12 SA 12x12 SA 10x10 SA

24x24 RA

8x

E A

WORK ROOM

AC-2

UC

16x16 RA

F

RETURN UP TO CEILING 16X24 OA

INTAKE LOUVER

EX 11 SQ FT RETURN

AIR OPENING IN WALL

RG

RG

RG

F

18x18 DTG

18x18 DTG18x18 DTG

UC

UC

UC

UC

CAP

UC

UCUC

UC

2410 TG

200CFM

24X24RAR-1

600CFM

14x14 RA x1

R

A

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

C

H

IT

E C

T 'S

O R

T

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

E

C

IF

IC

A

T

IO

N S

C O

M P

H

T H

E A

P P

L

IC

A B

IM

U M

B U

IL

D

D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:57 PM

MECHANICAL FIRST FLOOR PLAN -

NEW WORK

100% CONSTRUCTION

DOCUMENTS

M211

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

N

SCALE: 1/8" = 1'-0"

1 MECHCANICAL FIRST FLOOR PLAN - NEW WORK REVISIONS

NO: DATE: REF: BY:

KEY NOTES

1. PROVIDE ALL NEW DIFFUSERS AND EXHAUST / RETURN GRILLES IN

PROJECT AREA. RECONNECT TO EXISTING DUCTWORK AS INDICATED.

FLEXIBLE DUCT RUNS SHALL NOT EXCEED 8'-0".

2. EXISTING FILTERED RETURN IN CEILING. PROVIDE NEW GRILLE AND

FILTER.

3. REINSTALL THERMOSTAT REMOVED DURING DEMOLITION.

4. CONTRACTOR SHALL FIX SAGGING AND PINCHED VAV BOX INLET

DUCTWORK ALL THE WAY BACK TO MAIN TAKEOFF TO ENSURE SMOOTH

AIRFLOW. WITH NO SHARP BENDS OR KINKS IN FLEXIBLE DUCT.

5. ADJUST BAS SETPOINT FOR VAV MAX CFM SETPOINT AS DESCRIBED IN

TAB DIRECTIONS.

SHEET NOTES

A. MECHANICAL EQUIPMENT/ DUCTWORK SIZES, LOCATION, AND LAYOUT

SHOWN FROM EXISTING PLANS AND MAY NOT REFLECT EXACT AS-BUILT

CONDITIONS. CONTRACTOR SHALL VERIFY FIELD CONDITIONS AS

REQUIRED PRIOR TO COMMENCEMENT OF NEW WORK.

B. THE PROJECT AREA UTILIZES AN EXISTING RETURN AIR PLENUM IN THE

MAIN CORRIDORS. ALL NEW WORK MATERIALS ABOVE CEILING SHALL BE

PLENUM RATED.

C. IF PRETEST OF EXHAUST SYSTEM REVEALS THAT EXISTING EQUIPMENT

WILL NOT SATISFY CODE MINIMUM REQUIREMENTS, EOR SHALL ISSUE

FIELD ORDER TO UPGRADE THE EXHAUST SYSTEM.

TEST AND BALANCE DIRECTIONS

A. SEE SPECIFICATIONF OR FULL TAB DIRECTIONS.

B. VAV BOX TOTALS SHALL BE BALANCED TO EXISTING SCHEDULED

VALUES.

C. BALANCE AHU-1 OA SETPOINT TO 1,100 CFM.

D. BALANCE AC-1 OA SETPOINT TO 150 CFM.

E. BALANCE VAV-11 MAX CFM SETPOINT TO 670 CFM.

F. BALANCE VAV-12 MAX CFM SETPOIN TO 600 CFM.

T T TT

T

T

T

T

T

A

B

C

2 4 5 6 7

C

JURY ROOM

JURY ROOM

TOILET

TOILET

PRISONER DETENTION

PRISONER DETENTION

CIRCUIT JUDGE JUDICIAL ASSISTANT

TOILET

Unoccupied

Unoccupied

CIRCUIT JUDGE

CIRCUIT JUDGE JUDICIAL ASSISTANT

TOILET

HEARING ROOM

OFFICE

VISITING JUDGE

LACTATION ROOM

JURY ROOM

203A

TOILET

TOILET

COURTROOM

203B

COORIDOR

PUBLIC

203C

SECRETARY

JUDICIAL HEARING OFFICER

ELEVATOR

CUSTODIAL

WOMENS

MENS

CORRIDOR

DEPUTY'S ROOM

DEPUTY'S ROOM

NORTH COURTROOM

SOUTH COURTROOM

COURT REPORTER

COURT REPORTER

OFFICE

OFFICE

217OFFICE

OFFICE / RECEPTION

HALL

WAITING

STORAGE

VAULT

FILES

COUNTY JUDGE

LIBRARY

COUNTY JUDGE

HEARING ROOM

Unoccupied

Unoccupied

TOILET

STORAGE

STAFF

TOILET

Unoccupied

Unoccupied

TOILET

TOILET

2412CD

550 CFM

2412 CD

550CFM

2410 CD

350 CFM

2410 CD

300 CFM

2410 CD

300 CFM

2410 CD

370 CFM

12X12 EG

70CFM

12X12 EG

70CFM

12X12 EG

70CFM

12X12 EG

70CFM

6-2412 CD

400CFM EA

24x24 RG

370 CFM

24x24 RG

300 CFM

24x24 RG

300 CFM

24x24 RG

350 CFM

24x24 RAG

500 CFM

24x24 RAG

500 CFM

24X24 EG

300 CFM

24X24 EG

250 CFM

2408 CD

200 CFM

6-2412 CD

500CFM EA

4-24X24 RAG

750CFM EA

3-24X24 RAG

800CFM EA

VAV-22

VAV-21

VAV-51 VAV-50 VAV-49 VAV-48

VAV-28

VAV-44

2408 CD

220 CFM

VAV-36

VAV-38

VAV-53

2406 CD

150CFM

2406 CD

150CFM

250CFM220CFM 200CFM

12X12 EG

70CFM

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

C

H

IT

E C

T 'S

O R

T

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

E

C

IF

IC

A

T

IO

N S

C O

M P

H

T H

E A

P P

L

IC

A B

IM

U M

B U

IL

D

D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:57 PM

MECHANICAL SECOND FLOOR

PLAN - NEW WORK

100% CONSTRUCTION

DOCUMENTS

PJD DLB

M212

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

REVISIONS

NO: DATE: REF: BY:

NOT TO SCALE

1 MECHANICAL SECOND FLOOR PLAN - NEW WORK

KEY NOTES

1. PROVIDE ALL NEW DIFFUSERS AND EXHAUST / RETURN GRILLES IN

PROJECT AREA AS SHOWN. RECONNECT TO EXISTING DUCTWORK.

FLEXIBLE DUCT RUNS SHALL NOT EXCEED 8'-0"; EXHAUST DUCT SHALL

BE HARD DUCTED.

2. REINSTALL THERMOSTAT REMOVED DURING DEMOLITION.

3. BALANCE DIFFUSERS TO PRE-TEST RECORDED VALUES.

SHEET NOTES

A. EXISTING MECHANICAL DUCTWORK SIZES NOT PROVIDED DUE TO LACK OF AVAILABLE

INFORMATION ON AS-BUILT DOCUMENTS. CONTRACTOR SHALL VERIFY DUCT SIZES AS

NECESSARY PRIOR TO ORDERING MATERIALS FOR TAKEOFFS TO ENSURE

COMPATABILITY.

B. THE PROJECT AREA UTILIZES AN EXISTING RETURN AIR PLENUM. ALL NEW WORK

MATERIALS ABOVE CEILING SHALL BE PLENUM RATED.

C. AHU-2 SERVING THE 2ND FLOOR IS EXISTING TO REMAIN AND LOCATED IN MECHANICAL

ROOM ON ROOF.

D. IF PRETEST OF EXHAUST SYSTEM REVEALS THAT EXISTING EQUIPMENT WILL NOT

SATISFY CODE MINIMUM REQUIREMENTS, EOR SHALL ISSUE FIELD ORDER TO UPGRADE

THE EXHAUST SYSTEM.

TEST AND BALANCE DIRECTIONS

A. BALANCE ALL DIFFUSERS TO CFM VALUES INDICATED.

B. VAV BOX TOTALS SHALL BE BALANCED TO EXISTING SCHEDULED VALUES.

C. BALANCE EXHAUST GRILLES TO CFM INDICATED. IF AIRFLOW CANNOT BE

SATISFIED, CONTACT EOR IMMEDIATELY.

D. BALANCE AHU-2 OA SETPOINT TO 3,500 CFM.

MAIN DUCT

FINISHED CEILING

NOTES:

1. DETAIL IS FOR CONCEALED DUCT. WHERE EXPOSED, DUCT RUNOUTS SHALL BE DOUBLE WALL HARD DUCT ALL THE

WAY TO DIFFUSER/GRILLE.

2. PROVIDE ADAPTER WITH SIDE CONNECTION WHERE OBSTRUCTIONS DO NOT ALLOW CONNECTION TO TOP. IF SIDE

ADAPTERS ARE NEEDED AT DIFFUSER/GRILLE, NOTIFY ENGINEER.

3. FOR CEILING DIFFUSERS, FLEX DUCT SHALL BE FULL SIZE OF DIFFUSER NECK.

BALANCING DAMPER IN ALL

DUCT RUNOUTS (THIS MAY BE INTEGRAL

TO SPIN-IN). PROVIDE STANDOFF HANDLE

FOR INSULATED DUCTS.

PROVIDE

FLEXMASTER

FLEXRIGHT 90 DEG

ELBOW SUPPORTS

AND INSTALL PER

MANUFACTURER

SPEC.

SUPPLY DIFFUSERS TO BE

FACTORY INSULATED

ROUND SHEET METAL DUCT SHALL MATCH

DIFFUSER NECK SIZE AND BE INSULATED AS

REQUIRED TO MATCH MAIN DUCT

CONICAL SPIN-IN FITTING

IF CONICAL SPIN-IN CANNOT FIT,

USE SMACNA 45° RECTANGULAR

WITH TRANSITION TO ROUND

CONICAL SPIN-IN FITTING

6'-0" MAXIMUM FLEX LENGTH

PROVIDE SUPPORT STRAPS UP TO

STRUCTURER AS NECESSARY TO ELIMINATE

SAGGING AND PINCHING OF FLEX DUCT

MAIN DUCT

W/4 45°

W

(4"MIN)

4W

PROVIDE STANDOFF

ON INSULATED DUCTS

MIN LENGTH = 6X MIN LENGTH = 6X

X X

H1 H1

H2

SHEET METAL DUCT W/

2" WRAP INSULATION PLUS

1-1/2" CLEAR ALL SIDES

B E

A M

H E

IG

H

T B

O T

T O

M O

F B

E A

M /J

O

IS

T

B O

B /B

O J)

FIN. CEILING HT

FIN. FLOOR

B O

T T

O M

O F

D U

C T

B

O D

FREE AREA OF DUCT AT EASEMENT SHALL

NOT BE LESS THAN 80% OF DUCT FULL FREE

AREA. INCREASE WIDTH IF REQUIRED

FULL RADIUS ELBOW HALF RADIUS ELBOW

W

1.0 X W1.5 X W

NOTES:

1. DIMENSIONS 'A' AND 'B' MUST BE EQUAL ON SQUARE ELBOWS, UNLESS OTHERWISE SHOWN ON

DRAWINGS.

2. FULL RADIUS ELBOW SHALL BE USED AS THE STANDARD. HALF RADIUS ELBOWS SHALL ONLY BE

PERMITTED WHERE FULL RADIUS ELBOWS WILL NOT FIT. MECHANICAL CONTRACTOR SHALL

OBTAIN WRITTEN APPROVAL FROM ENGINEER PRIOR TO INSTALLATION OF HALF RADIUS ELBOWS.

W

B

A

MAINTAIN SAME DIMENSIONS

SQUARE ELBOW WITH TURNING VANES

60" MAX

1" MIN

50" DIA. MAX.24" DIA. MAX.

LOAD RATED

FASTENERS

HANGER

BAND OF

SAME SIZE

AS HANGER

STRAP

HANGER STRAPS

SCREWS MAY BE OMITTED IF

HANGER LOOPS

SCREWS

EXPANSION SHIELDS

CONCRETE ANCHORS

8129 SW 75TH STREET

GAINESVILLE, FLORIDA 32608

352-256-6785 www.superlative.design

T O

T H

E B

E S

T O

F T

C

H

IT

E C

T 'S

O R

T

G

IN

E E

R 'S

K N

O W

L

E D

G E

T

H E

P L

A N

S A

E

C

IF

IC

A

T

IO

N S

C O

M P

H

T H

E A

P P

L

IC

A B

IM

U M

B U

IL

D

D

E S

T

P

L

IC

A B

L E

F

IR

E S

A F

E

A N

D A

R D

S

T E

R M

IN

E

D B

Y T

C

A L

A U

T H

O R

IT

Y

C

O R

D A

N C

E W

IT

H

T

C T

IO

N

A N

D C

H A

P T

F

L S

T A

T U

T E

S

SHEET NO.

DRAWING TITLE:

PROJECT NUMBER:

DRAWING STATUS:

ISSUE DATE:

DRAWN BY: CHECKED BY:

DATE/TIME STAMP:

AKIN BROOKS ENGINEERING, INC.

14260 W NEWBERRY RD #115

NEWBERRY, FL 32669 AB24115

FL LICENSE 35307

352.281.7104

AKINBROOKS.COM 3/2/2026 4:43:58 PM

MECHANICAL DETAILS AND

SPECIFICATIONS

100% CONSTRUCTION

DOCUMENTS

PJD DLB

M301

B R

A D

F O

R D

C O

U N

T Y

C O

U R

T H

O U

S E

R E

N O

V A

T

IO

N S

N

T e m p le A v e S ta rk e F

L

24003

02/27/2026

REVISIONS

NO: DATE: REF: BY:

NOT TO SCALE

1 DUCT RUNOUT TO DIFFUSERS AND GRILLES

NOT TO SCALE

2 BRANCH DUCT TAKEOFF DETAIL

NOT TO SCALE

3 DUCT EASEMENT DETAIL

NOT TO SCALE

4 DUCT ELBOW DETAIL

NOT TO SCALE

5 DUCT HANGER DETAILS

1. GENERAL MECHANICAL:

A. GENERAL

a. THE WORK COVERED BY THIS DIVISION CONSISTS OF PROVIDING ALL LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF THE MECHANICAL WORK AS HEREIN CALLED FOR AND SHOWN ON THE DRAWINGS. REVIEW ALL OTHER CONTRACT DOCUMENTS TO BE AWARE OF CONDITIONS AFFECTING WORK HEREIN. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL BE SATISFIED AS TO THE ACCURACY OF ALL DATA INDICATED ON THE DRAWINGS AND/OR PROVIDED BY THE OWNER. SHOULD THE CONTRACTOR DISCOVER ANY INACCURACIES, ERRORS, OR OMISSIONS IN THE DATA, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER. COMMENCEMENT OF WORK BY THE CONTRACTOR SHALL BE HELD AS AN ACCEPTANCE OF THE DATA BY HIM AFTER WHICH TIME THE CONTRACTOR HAS NO CLAIM AGAINST THE OWNER RESULTING FROM ALLEGED ERRORS, OMISSIONS, OR INACCURACIES OF THE SAID DATA. MATERIALS DELIVERED TO SITE SHALL BE INSPECTED FOR DAMAGE, UNLOADED, AND STORED WITH A MINIMUM OF HANDLING. ALL MATERIAL SHALL BE STORED TO PROVIDE PROTECTION FROM THE WEATHER AND ACCIDENTAL DAMAGE.

ALL WORKERS UNDER THIS SECTION MUST OPERATE WITHIN AND MAINTAIN A CLEAN AND SAFE WORKING ENVIRONMENT. GENERAL CLEANING REQUIREMENTS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. ALL SAFETY PROTOCOLS ESTABLISHED BY THE GENERAL CONTRACTOR SHALL BE STRICTLY ADHERED TO. REPORT ANY

DISCOVERED SAFETY CONCERNS WITH THE PROJECT SUPERINTENDENTS.

B. PRODUCTS

a. EQUIPMENT AND MATERIALS SHALL BE NEW AND THE MOST SUITABLE GRADE FOR THE PURPOSE INTENDED. WHERE PRACTICAL, ALL THE COMPONENTS SHALL BE PRODUCTS OF

A SINGLE MANUFACTURER IN ORDER TO PROVIDE PROPER COORDINATION AND RESPONSIBILITY. CATALOG NUMBERS AND MODEL NUMBERS INDICATED IN THE DRAWINGS AND SPECIFICATIONS ARE USED AS A GUIDE IN THE SELECTION OF THE EQUIPMENT AND ARE ONLY LISTED FOR THE CONTRACTOR'S CONVENIENCE. THE CONTRACTOR SHALL DETERMINE THE ACTUAL MODEL NUMBERS FOR ORDERING EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE WRITTEN DESCRIPTION OF EACH ITEM AND WITH THE INTENT

OF THE DRAWINGS AND SPECIFICATIONS.

C. SHOP DRAWING SUBMITTAL

a. SUBMIT PRODUCT DATA FOR DIFFUSERS. SUBMIT MATERIALS AND METHODS FOR DUCTWORK AND INSULATION.

D. EXECUTION

a. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND COMPLETED IN A FIRST-CLASS WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE BEST MODERN METHODS AND

PRACTICE. ATHE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COORDINATION OF THE MECHANICAL SYSTEMS WITH SHOP DRAWINGS OF THE BUILDING CONSTRUCTION SO THE PROPER OPENINGS AND SLEEVES OR SUPPORTS ARE PROVIDED FOR PIPING, DUCTWORK, OR OTHER EQUIPMENT PASSING THROUGH SLABS OR WALLS.

b. ALL CONNECTIONS TO FIXTURES AND EQUIPMENT SHOWN ON THE DRAWINGS SHALL BE CONSIDERED DIAGRAMMATIC UNLESS OTHERWISE INDICATED BY A SPECIFIC DETAIL ON THE DRAWINGS. THE ACTUAL CONNECTIONS SHALL BE MADE TO FULLY SUIT THE REQUIREMENTS OF EACH CASE AND ADEQUATELY PROVIDE FOR SERVICING. START OF WORK

SHALL BE CONSTRUED AS ACCEPTANCE OF SUITABILITY OF WORK OF OTHERS

2. HVAC METAL DUCTWORK

A. GENERAL

a. ALL SHEET METAL DUCTWORK SHALL COMPLY WITH SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE" FOR FABRICATION AND INSTALLATION OF METAL DUCTWORK. COMPLY WITH NFPA 90A "STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS”. FLEXIBLE DUCTWORK SHALL MEET THE

REQUIREMENTS OF UL-181.

b. APPROVAL SUBMITTALS:

• DUCTWORK, SEALANTS, ADHESIVES, FLEXIBLE DUCT, SPIN-IN FITTINGS

B. PRODUCTS

a. MATERIALS:

• GALVANIZED SHEET STEEL: COMPLY WITH ASTM A 653, LOCKFORMING QUALITY; WITH G 90 ZINC COATING IN ACCORDANCE WITH ASTM A 525; AND MILL PHOSPHATIZED FOR EXPOSED LOCATIONS. STAMP GAUGE AND MANUFACTURER'S IDENTIFICATION ON EACH SHEET. BREAK SHEETS SO THAT IDENTIFICATION IS EXPOSED.

• SUPPORTS: EXCEPT AS OTHERWISE INDICATED, PROVIDE HOT-DIPPED GALVANIZED STEEL FASTENERS, ANCHORS, RODS, STRAPS, TRIM AND ANGLES FOR SUPPORT OF

DUCTWORK.

• FLEXIBLE DUCTS: PROVIDE WITH R-VALUE OF R-6 FOR CONNECTION OF SUPPLY AIR DEVICES IS ACCEPTABLE ONLY WHERE SHOWN ON THE DRAWINGS. PROVIDE WITH REINFORCED METALIZED POLYESTER JACKET THAT IS TEAR AND PUNCTURE RESISTANT, AIRTIGHT INNER CORE WITH NO FIBERGLASS EROSION IN THE AIR STREAM AND AN ENCAPSULATED WIRE HELIX. FLEXIBLE DUCTWORK SHALL HAVE A RECOMMENDED OPERATING PRESSURE OF 6" W.G. FOR SIZES 4" THROUGH 12" DIAMETER AND 4" W.G. FOR SIZES 14" THROUGH 20" DIAMETER. ALL DIAMETERS SHALL BE SUITABLE FOR A NEGATIVE OPERATING PRESSURE OF 0.75" W.G. FLEXIBLE DUCTWORK SHALL MEET THE REQUIREMENTS OF UL-181, FBC MECHANICAL, SBCC, NFPA 90A AND NFPA 90B. ACCEPTABLE MANUFACTURERS: ATCO 36, FLEXMASTER 8M-R6, AND THERMAFLEX M-KE R6.

EXECUTION.

• SPIN-IN FITTINGS: PROVIDE ROUND BRANCH RUN-OUTS AS FOLLOWS. SUPPLY AIR DIFFUSER CONNECTIONS SHALL BE CONICAL WITH DAMPER AND ONE INCH HIGH

INSULATION STAND-OFF EQUAL TO CROWN 3200 DS OR FLEXMASTER CBD-BO.

b. DUCTWORK:

• FOR DUCT ROUTING, LOCATE DUCTWORK RUNS, EXCEPT AS OTHERWISE INDICATED, VERTICALLY AND HORIZONTALLY.COORDINATE LAYOUT WITH STRUCTURE AND LIGHTING

LAYOUTS AND SIMILAR FINISHED WORK. WHERE DUCTS PASS THROUGH FIRE-RATED FLOORS, WALLS, OR PARTITIONS, PROVIDE FIRESTOPPING BETWEEN DUCT AND SUBSTRATE. INSTALLING CONTRACTORS SHALL PROVIDE ALL SPECIALTIES INCLUDING DAMPERS, ACCESS DOORS, AND FLEX CONNECTORS AS REQUIRED TO SUPPORT A

COMPLETE AND FUNCTIONAL INSTALLATION.

c. SHOP FABRICATION:

• SHOP FABRICATE DUCTWORK IN 4, 8, 10 OR 12-FT LENGTHS WHERE POSSIBLE. PREASSEMBLE WORK IN SHOP TO GREATEST EXTENT POSSIBLE, SO AS TO MINIMIZE FIELD

ASSEMBLY OF SYSTEMS.

• LIMIT ANGULAR TAPERS TO 30° FOR CONTRACTING TAPERS AND 20° FOR EXPANDING TAPERS.

d. FACTORY-FABRICATED LOW PRESSURE DUCTWORK (MAXIMUM 2" W.G.):

• MATERIAL: GALVANIZED SHEET STEEL COMPLYING WITH ASTM A 527, LOCKFORMING QUALITY, WITH ASTM A 525, G90 ZINC COATING, MILL PHOSPHATIZED.

• GAUGE: 28-GAUGE MINIMUM FOR ROUND DUCTS AND FITTINGS, 4" THROUGH 8" DIAMETER. 26-GAUGE MINIMUM 9" THROUGH 14", 24-GAUGE MINIMUM 15" THROUGH 26"..

• ACCEPTABLE MANUFACTURERS: SEMCO MFG., INC., UNITED SHEET METAL DIV., UNITED MCGILL CORP, OR APPROVED EQUAL

C. EXECUTION

a. METAL DUCTWORK:

• ASSEMBLE AND INSTALL DUCTWORK IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES WHICH WILL ACHIEVE AIR-TIGHT (5% LEAKAGE FOR SYSTEMS RATED 3" AND UNDER; 1% FOR SYSTEMS RATED OVER 3") AND NOISELESS (NO OBJECTIONABLE NOISE) SYSTEMS, CAPABLE OF PERFORMING EACH INDICATED SERVICE. INSTALL EACH RUN WITH MINIMUM NUMBER OF JOINTS. ALIGN DUCTWORK ACCURATELY AT CONNECTIONS, WITHIN _" MISALIGNMENT TOLERANCE AND WITH INTERNAL SURFACES SMOOTH.

SUPPORT DUCTS RIGIDLY WITH SUITABLE TIES, BRACES, HANGERS AND ANCHORS OF TYPE WHICH WILL HOLD DUCTS TRUE-TO-SHAPE AND TO PREVENT BUCKLING.

• ROUTE DUCTWORK RUNS, EXCEPT AS OTHERWISE INDICATED, VERTICALLY AND HORIZONTALLY. AVOID DIAGONAL RUNS WHEREVER POSSIBLE. LOCATE RUNS AS INDICATED BY DIAGRAMS, DETAILS AND NOTATIONS OR, IF NOT OTHERWISE INDICATED, RUN DUCTWORK IN SHORTEST ROUTE WHICH DOES NOT OBSTRUCT USEABLE SPACE OR BLOCK ACCESS FOR SERVICING BUILDING AND ITS EQUIPMENT. HOLD DUCTS CLOSE TO WALLS, OVERHEAD CONSTRUCTION, COLUMNS, AND OTHER STRUCTURAL AND PERMANENT

ENCLOSURE ELEMENTS OF BUILDING.

b. FLEXIBLE DUCT:

• MAXIMUM LENGTH: FOR ANY DUCT RUN USING FLEXIBLE DUCTWORK, DO NOT EXCEED 6'-0" EXTENDED LENGTH. FLEXIBLE DUCT SHALL ONLY BE ALLOWED AS DETAILED ON

THE DRAWINGS. MINIMUM LENGTH: FOR ANY DUCT RUN USING FLEXIBLE DUCTWORK, USE A MINIMUM OF 3’-0” EXTENDED LENGTH SECTION.

• INSTALL IN ACCORDANCE WITH SECTION III OF SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE". SUPPORT FLEXIBLE DUCTS TO ELIMINATE

PINCHING AND KINKING WHICH WOULD RESTRICT FLOW. BENDS SHALL BE MADE WITH AT LEAST ONE DUCT DIAMETER.

• DOWNSTREAM OF VAV BOXES: PEEL BACK INSULATION AND SLIDE THE INNER CORE OVER THE SPIN-IN OR DIFFUSER NECK, SEAL WITH DUCT SEALANT AND INSTALL PANDUIT

STRAP TIGHTLY. SLIDE INSULATION BACK OVER THE INNER CORE AND SECURELY TAPE THE INSULATION OUTER JACKET.

c. LEAKAGE TESTS: AFTER EACH DUCT SYSTEM IS COMPLETED, TEST FOR DUCT LEAKAGE IN ACCORDANCE WITH SECTIONS 3 AND 5 OF THE SMACNA HVAC AIR DUCT LEAKAGE TEST

MANUAL. TEST PRESSURE SHALL BE EQUAL TO PRESSURE CLASS OF DUCT, LESS 0.5" STATIC PRESSURE. REPAIR LEAKS AND REPEAT TESTS UNTIL TOTAL LEAKAGE IS LESS THAN 3% OF SYSTEM DESIGN AIR FLOW FOR LOW PRESSURE SYSTEMS AND LESS THAN 1% FOR SYSTEMS RATED OVER 3".

3. EXTERIOR INSULATION FOR DUCTWORK

A. APPROVAL SUBMITTALS: SUBMIT PRODUCT DATA FOR INSULATION, COVERINGS, ADHESIVES, SEALERS

B. PRODUCTS

a. ACCEPTABLE MANUFACTURERS: KNAUF, OWENS-CORNING, JOHNS MANVILLE, CERTAIN TEED

b. FLAME/SMOKE RATING: PROVIDE COMPOSITE MECHANICAL INSULATION (INSULATION, COVERINGS, SEALERS, MASTIC, AND ADHESIVE) WITH A FLAME SPREAD RATING OF 25 OR

LESS, AND A SMOKE-DEVELOPED RATING OF 50 OR LESS AS TESTED BY ANSI/ASTM 84.

c. FLEXIBLE FIBERGLASS INSULATION: ASTM C553, TYPE I, CLASS B-3 (TEMPERATURE LESS THAN 350°F). DUCT WRAP SHALL BE 0.75 PCF DENSITY WITH UL RATED ALUMINUM FOIL

VAPOR BARRIER (FSK).

d. GENERAL PURPOSE MASTIC: BENJAMIN FOSTER 35-00 SERIES, CHILDERS CP-10, OR APPROVED EQUAL. THE FINAL SELECTION OF THIS PRODUCT FOR THE SPECIFIC APPLICATION

INDICATED IS THE RESPONSIBILITY OF THE INSULATION SUPPLIER. THE INSULATION SYSTEM MUST MEET THE SPECIFIED APPLICATION.

e. VAPOR BARRIER SEALANT: BENJAMIN FOSTER 30-65, CHILDERS CP-34, OR APPROVED EQUAL. PROVIDE "LOW ODOR" TYPE. PROVIDE WATER-BASED PRODUCT. THE FINAL

SELECTION OF THIS PRODUCT FOR THE SPECIFIC APPLICATION INDICATED IS THE RESPONSIBILITY OF THE INSULATION SUPPLIER. THE INSULATION SYSTEM MUST MEET THE

SPECIFIED APPLICATION.

f. ADHESIVE: BENJAMIN FOSTER 85-60, CHILDERS CP-82, CHILDERS CP-127, OR APPROVED EQUAL. PROVIDE WATER-BASED PRODUCT. THE FINAL SELECTION OF THIS PRODUCT FOR THE SPECIFIC APPLICATION INDICATED IS THE RESPONSIBILITY OF THE INSULATION SUPPLIER. THE INSULATION SYSTEM MUST MEET THE SPECIFIED APPLICATION.

g. FIBER-GLAS MESH: 10X10 MESH. FOSTER MASTAFAB, CHIL GLASS #10 OR EQUAL.

C. EXECUTION

a. INSTALLATION OF INSULATION:

• CLEAN AND DRY DUCTWORK PRIOR TO INSULATING. WRAP INSULATION SHALL EXTEND MINIMUM OF 6" OVER CONNECTION TO EXISTING INTERIOR LINED DUCTWORK.

• ADHERE INSULATION TO DUCT WITH 50 PERCENT COVERAGE USING APPROVED INSULATION ADHESIVE APPLIED IN 6-INCH WIDE SWATHS WITH 6-INCH SPACES BETWEEN

SWATHS. ADDITIONALLY SECURE INSULATION WITH PERFORATED PINS AND TUFF-BOND OR BY SELF-STICKING PINS WITH A 3/8" SELF-TAPPING SCREW. SPACE ON 12-INCH CENTERS AND 3 INCHES FROM ALL EDGES. DUCTS UP THROUGH 24" WIDE ONLY REQUIRE ONE ROW OF PINS. DUCTS OVER 24" WIDE SHALL HAVE PINS SPACED AS

DESCRIBED HEREIN.

• APPLY OPEN MESH GLASS FABRIC EMBEDDED IN VAPOR BARRIER MASTIC. THEN APPLY A SECOND COAT OF GENERAL PURPOSE MASTIC WITH ALUMINUM GREY COLOR. THIS

FINISH SHALL BE COMPLETE OVER ALL RIGID INSULATION.

• INSULATE ALL SUPPLY AND RETURN DUCTWORK ABOVE CEILINGS, IN CHASES, OR ELSEWHERE WITH 2.2" THICK FIBERGLASS BLANKET INSULATION WITH VAPOR BARRIER

(INSTALLED R-VALUE OF 6.0 MINIMUM).

4. GRILLES, REGISTERS, AND CEILING DIFFUSERS

A. GENERAL

a. APPROVAL SUBMITTALS: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA FOR AIR OUTLETS AND INLETS INDICATING CONSTRUCTION, FINISH, AND MOUNTING.

• DIFFUSERS

• RETURN GRILLES

b. O&M DATA SUBMITTALS: SUBMIT CLEANING INSTRUCTIONS FOR FINISHES AND SPARE PARTS LISTS. INCLUDE THIS DATA AND A COPY OF APPROVAL SUBMITTALS IN O&M MANUAL.

B. PRODUCTS

a. PERFORMANCE: PROVIDE GRILLES, REGISTERS AND CEILING DIFFUSERS THAT HAVE, AS MINIMUM, TEMPERATURE AND VELOCITY TRAVERSES, THROW AND DROP, AND NOISE

CRITERIA RATINGS FOR EACH SIZE DEVICE EQUAL TO THE BASIS OF DESIGN.

b. CEILING AND WALL COMPATIBILITY: PROVIDE GRILLES, REGISTERS AND DIFFUSERS WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT WALL AND CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CEILING MODULE OR WALL WITH ACCURATE FIT AND ADEQUATE SUPPORT.

c. APPEARANCE: ALL GRILLES AND REGISTERS SHALL BE STEEL CONSTRUCTION, UNLESS OTHERWISE NOTED, WITH UNIFORM MATCHING APPEARANCE FOR EACH TYPE OF OUTLET.

CEILING MOUNTED GRILLES AND REGISTERS SHALL BE SET TO BE SIGHT TIGHT FROM THE PREDOMINANT EXPOSURE.

d. FINISH: ALL CEILING MOUNTED GRILLES, REGISTERS, AND DIFFUSERS SHALL BE FINISHED WITH BAKED WHITE ENAMEL UNLESS OTHERWISE SPECIFIED.

e. ACCEPTABLE MANUFACTURERS: TITUS, METAL AIRE, PRICE

f. SQUARE CEILING DIFFUSERS (CD)

• PROVIDE DIFFUSER AS SPECIFIED ON PLANS. ALTERNATE DIFFUSERS FROM TITUS OR METAL AIRE MAY BE CONSIDERED IF THEY SATISFY PERFORMANCE AND SIZE REQUIREMENTS FOR APPLICATION. PROVIDE LAY-IN PANEL AS REQUIRED. BASIS OF DESIGN IS PRICE SCD/SCDA.

• DIFFUSER BACK SHALL BE FACTORY INSULATED.

g. LINEAR DIFFUSER (LD)

• PROVIDE LINEAR SUPPLY SLOT DIFFUSERS WITH FULL 180 DEGREE ADJUSTABLE AIR PATTERN AND COMPLETE FLOW CONTROL INCLUDING BLANK OFF. THEY SHALL HAVE 3 X 3/4" WIDTH SLOTS; INDIVIDUALLY ADJUSTABLE THROW PATTERN, AND SLOPED SHOULDER PLENUM. PROVIDE JOINING AND ALIGNMENT STRIPS, END CAPS, MITRED CORNERS, AND FRAME TYPE SUITABLE FOR CEILING INSTALLATION. PROVIDE INSULATED PLENUMS FOR SUPPLY DIFFUSERS. BOD IS PRICE SDS W/ SDA PLENUM. COORDINATE

INSTALLATION FRAME/TRIM OPTIONS WITH ARCHITECT PRIOR TO PURCHASE.

h. TRANSFER GRILLE (TG)

• PROVIDE RETURN REGISTERS WITH ONE SET OF 1/2" SPACED, 45 DEGREE FIXED LOUVERS, PARALLEL TO THE LONG DIMENSION. BASIS OF DESIGN: TITUS 350 FL OR

METALAIRE RH, PRICE 630.

i. FILTERED RETURN AIR REGISTERS (FRR)

• PROVIDE FILTER RETURN GRILLES WITH ONE SET OF 45 DEGREE, FIXED LOUVERS, PARALLEL TO THE LONG DIMENSION. PROVIDE FRAME AND HINGED CORE WITH PROVISION

FOR ONE INCH THICK FILTERS. TITUS 350FF OR METALAIRE RHEF, PRICE 630FF.

j. RETURN AIR GRILLE / EXHAUST AIR GRILLE (RAG / EG)

• PROVIDE RETURN GRILLES WITH ONE SET OF 1/2" SPACED, 45 DEGREE FIXED LOUVERS, PARALLEL TO THE LONG DIMENSION WITH SCREWDRIVER OPERATED LOUVER. BASIS

OF DESIGN: PRICE 630 OR APPROVED EQUAL.

MECHANICAL SPECIFICATIONS

5. DUCTWORK ACCESSORIES

A. CODES AND STANDARDS

a. SMACNA COMPLIANCE: COMPLY WITH APPLICABLE PORTIONS OF BOTH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE" AND "FIRE, SMOKE AND

RADIATION DAMPER INSTALLATION GUIDE FOR HVAC SYSTEMS" .

b. UL COMPLIANCE: CONSTRUCT, TEST, AND LABEL FIRE DAMPERS IN ACCORDANCE WITH UL STANDARD 555 "FIRE DAMPERS AND CEILING DAMPERS". CONSTRUCT, TEST AND LABEL SMOKE DAMPERS IN ACCORDANCE WITH UL STANDARD 555S "LEAKAGE RATED DAMPERS FOR USE IN SMOKE CONTROL SYSTEMS" .

c. NFPA COMPLIANCE: COMPLY WITH APPLICABLE PROVISIONS OF NFPA 90A "AIR CONDITIONING AND VENTILATING SYSTEMS" PERTAINING TO INSTALLATION OF DUCTWORK

ACCESSORIES.

B. PRODUCTS

a. APPROVAL SUBMITTALS

• LOW PRESSURE MANUAL DAMPERS

• FIRE DAMPERS

b. MANUAL DAMPERS

• LOW PRESSURE MANUAL DAMPERS: PROVIDE 16 GAUGE DAMPERS OF SINGLE-BLADE TYPE (12" MAXIMUM BLADE WIDTH) OR MULTIBLADE TYPE. DAMPER BLADES TO BE

GANG-OPERATED FROM A SINGLE SHAFT WITH NYLON OR BALL BEARINGS ON EACH END. PROVIDE INDEXED LOCKING QUADRANT. PARALLEL OR OPPOSED BLADE STYLE IS ACCEPTABLE. PROVIDE 2" STANDOFF ON LOCKING QUADRANT FOR EXTERNALLY INSULATED DUCT

c. FIRE DAMPERS

• FIRE DAMPERS: PROVIDE CURTAIN TYPE FIRE DAMPERS, UL CLASSIFIED AND LABELED PER UL 555, OF TYPES AND SIZES INDICATED. CONSTRUCT CASINGS AND BLADES

OF GALVANIZED STEEL. DAMPER SHALL NOT RESTRICT DUCT FREE AREA WHEN OPEN. DAMPERS SHALL BE RATED FOR DYNAMIC CLOSURE UNDER FLOW AND PRESSURE.

PROVIDE SLEEVES AND MOUNTING ANGLES. PROVIDE FUSIBLE LINK RATED AT 160 TO 165° F UNLESS OTHERWISE INDICATED. PROVIDE DAMPER WITH POSITIVE LOCK IN

CLOSED POSITION. ALL DAMPERS SHALL BE SPRING ACTIVATED. BASIS OF DESIGN:

• 1-1/2 HR: RUSKIN IBD2 - STYLE B FOR RECTANGULAR, STYLE CR FOR ROUND, STYLE CO FOR OVAL.

• 1-1/2 HR: RUSKIN IBDT FOR TRANSFER GRILLES IN NARROW PARTITIONS.

• 3 HR: RUSKIN IBD23 - STYLE B FOR RECTANGULAR, STYLE CR FOR ROUND, STYLE CO FOR OVAL.

d. ACCEPTABLE MANUFACTURERS

• AIR BALANCE, INC., AMERICAN WARNING & VENTILATING, ARROW LOUVER AND DAMPER, PENN VENTILATOR CO., RUSKIN MFG. CO., GREENHECK

C. EXECUTION

a. FIRE DAMPERS

• NOTIFY ENGINEER AT LEAST 48 HOURS IN ADVANCE OF CEILING INSTALLATION OR CHASE CLOSURE SO THAT COMPLETE [FIRE DAMPER] INSTALLATION CAN BE OBSERVED.

A COPY OF THE MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE AT THE SITE.

• OPERATE INSTALLED DUCTWORK ACCESSORIES TO DEMONSTRATE COMPLIANCE WITH REQUIREMENTS. TEST FOR AIR LEAKAGE WHILE SYSTEM IS OPERATING. REPAIR OR REPLACE FAULTY ACCESSORIES AS REQUIRED TO OBTAIN PROPER OPERATION AND LEAKPROOF PERFORMANCE.

6. TEST AND BALANCING

A. AIRFLOW TOLERANCES

a. AIRFLOW MEASUREMENT: AIRFLOW MEASUREMENTS FOR AIR HANDLING UNITS (AHU), EXHAUST FANS (EF) AND VAV BOXES SHALL BE OBTAINED BY DUCT TRAVERSE AND REPORTED IN THE TAB REPORT WITH THE [[INDICATED BAS READING FROM AHU OR EF FLOW RINGS AND] VAV BOX CONTROLLER READINGS FOR COMPARISON. THE LOCATION OF THE TRAVERSE SHALL BE INDICATED ON A SKETCH INCLUDED IN THE TAB REPORT. IF AIRFLOW IS DETERMINED BY ANY OTHER MEANS THAN A TRAVERSE (I.E., SUM OF OUTLETS, OR OTHER INDIRECT METHOD) IT SHALL BE CLEARLY STATED IN THE TAB REPORT. ORGANIZE TAB REPORT CONTEMPORANEOUS DATA SO THAT THE FOLLOWING CAN BE READILY

CHECKED:

• COMPARISON OF ACTUAL CFM TO DESIGN CFM AND PERCENT VARIANCE.

• COMPARISON OF SUPPLY AIR CFM TO RETURN PLUS OUTDOOR AIR CFM.

• COMPARISON OF EACH AHU SUPPLY AIR CFM TO THE SUM OF ITS TERMINALS.

• COMPARISON OF EACH TERMINAL (SUCH AS VAV BOX OR SUPPLY VALVE) TOTAL CFM TO THE SUM OF THE OUTLETS FOR THE TERMINAL.

• COMPARISON OF EACH EF CFM TO THE SUM OF THE INLETS FOR THE EF.

• COMPARISON OF TOTAL OUTDOOR AIR CFM TO TOTAL CONDITIONED EXHAUST CFM FOR EACH ZONE, FLOOR, OR AHU AS APPLICABLE. PROVIDE AN INDICATION OF THE NET

POSITIVE OR NEGATIVE CFM FOR THAT ZONE, FLOOR, OR AHU.

b. AIR HANDLING: THE SUPPLY AIR, RETURN AIR AND OUTDOOR AIR QUANTITIES SHALL BE BALANCED WITHIN ±5% OF DESIGN VALUES.

• BALANCE DUAL DUCT SYSTEMS WITH ALL AIR THROUGH THE COLD DECK. RECHECK FOR NOISE LEVEL IN OCCUPIED SPACES AT 50% BYPASS.

• SET DAMPERS, VOLUME CONTROLS AND FAN SPEEDS TO OBTAIN SPECIFIED AIR DELIVERY WITH MINIMUM NOISE LEVEL AND MINIMUM ENERGY USE. REBALANCE AS REQUIRED

TO ACCOMPLISH THIS. SIMULATE FULLY LOADED FILTERS DURING TEST.

c. EXHAUST FANS: THE EXHAUST FAN QUANTITIES SHALL BE SET AS REQUIRED TO MAINTAIN THE DESIGN EXHAUST TERMINAL FLOWS WITHIN ±5% OF DESIGN VALUES. IF NO EXHAUST

TERMINALS EXIST, EXHAUST FAN AIR QUANTITIES SHALL BE BALANCED WITHIN ± 10% OF DESIGN VALUES.

• STATIC PRESSURE MEASUREMENT: STATIC PRESSURE (SP) MEASUREMENTS FOR EFS SHALL BE OBTAINED AT BOTH SUCTION AND DISCHARGE SO THAT TOTAL STATIC

PRESSURE (TSP) CAN BE REPORTED. PLOT DESIGN CFM AND SP ON FAN CURVE AND INCLUDE IN TAB REPORT. IN ADDITION, THE STATIC PRESSURE DROP ACROSS EACH COMPONENT OF THE EQUIPMENT (SUCH AS COILS, FILTERS, ETC.) SHALL BE REPORTED AND SHOWN ON A SKETCH INCLUDED IN THE TAB REPORT. ORGANIZE TAB REPORT

CONTEMPORANEOUS DATA SO THAT THE FOLLOWING CAN BE READILY CHECKED

d. TERMINAL UNITS: THE AIR QUANTITIES ASSOCIATED WITH VAV BOXES AND OTHER TERMINAL UNITS SHALL BE BALANCED WITHIN ±5% OF DESIGN VALUES.

e. CEILING DIFFUSERS, SUPPLY REGISTERS, RETURN AND EXHAUST INLETS: BALANCE TO AN AIR QUANTITY WITHIN ±10% OF THE DESIGN VALUES. WHERE THE DRAWINGS INDICATE A

DESIGN PRESSURE DIFFERENTIAL FOR THE ROOM, AIR QUANTITIES SHALL BE FURTHER ADJUSTED TO A MORE RESTRICTIVE TOLERANCE AS REQUIRED TO ESTABLISH THE

PRESSURE DIFFERENTIAL.

• SET GRILLE DEFLECTIONS AS NOTED ON PLANS. MODIFY DEFLECTIONS IF REQUIRED TO ELIMINATE DRAFTS OR OBJECTIONABLE AIR MOVEMENT. RECORD AIR TERMINAL

VELOCITY AFTER COMPLETION OF BALANCE WORK. RECORD FINAL GRILLE AND REGISTER DEFLECTION SETTINGS IF DIFFERENT FROM THAT SPECIFIED ON CONTRACT

DRAWINGS.

B. TEMPERATURE TOLERANCES

1. AIR HANDLING TEMPERATURES: THE CONTROLLED TEMPERATURES AT AHUS SHALL BE VERIFIED TO BE UNDER CONTROL WITHIN ± 1°F OF DESIGN VALUES.

2. ROOM TEMPERATURES: BALANCE SYSTEMS AND CONTROLS WITHIN ±2°F OF INDICATED SETTINGS.

C. APPROVAL SUBMITTALS

a. SUBMIT THE NAME OF THE PROPOSED TEST AND BALANCE COMPANY FOR THE ENGINEER'S APPROVAL WITHIN THIRTY (30) DAYS AFTER AWARDING OF CONTRACT.

b. SUBMIT PROJECT SPECIFIC TAB FORMS SHOWING HOW REQUIREMENTS OF THIS SECTION WILL BE DOCUMENTED.

D. PRODUCTS

a. PATCHING MATERIALS

• EXCEPT AS OTHERWISE INDICATED, USE SAME PRODUCTS AS USED BY ORIGINAL INSTALLER FOR PATCHING HOLES IN INSULATION, DUCTWORK AND HOUSINGS WHICH HAVE BEEN CUT OR DRILLED FOR TEST PURPOSES, INCLUDING ACCESS FOR TEST INSTRUMENTS, ATTACHING JIGS, AND SIMILAR PURPOSES.

b. TEST INSTRUMENTS

• UTILIZE TEST INSTRUMENTS AND EQUIPMENT OF THE TYPE, PRECISION, AND CAPACITY AS RECOMMENDED IN THE REFERENCED STANDARD. ALL INSTRUMENTS SHALL BE IN

GOOD CONDITION AND SHALL HAVE BEEN CALIBRATED WITHIN THE PREVIOUS SIX (6) MONTHS (OR MORE RECENTLY IF REQUIRED BY STANDARD).

E. EXECUTION

a. TEST, ADJUST AND BALANCE SYSTEMS DURING SUMMER SEASON FOR AIR CONDITIONING SYSTEMS AND DURING WINTER SEASON FOR HEATING SYSTEMS, INCLUDING AT LEAST A PERIOD OF OPERATION AT OUTSIDE CONDITIONS WITHIN 5°F WET BULB TEMPERATURE OF MAXIMUM SUMMER DESIGN CONDITION, AND WITHIN 10°F DRY BULB TEMPERATURE OF MINIMUM WINTER DESIGN CONDITION. WHEN SEASONAL OPERATION DOES NOT PERMIT MEASURING FINAL TEMPERATURES, THEN TAKE FINAL TEMPERATURE READINGS WHEN

SEASONAL OPERATION DOES PERMIT.

b. THE CONTRACTOR SHALL RETURN FOR A CHANGE OF SEASONS TEST AT NO ADDITIONAL COST TO THE OWNER AND SUBMIT THE REVISED TAB REPORT.

c. PUNCH LIST: PREPARE A DEFICIENCY (PUNCH)LIST FOR THE CONTRACTOR WITH A COPY TO THE ENGINEER THAT LISTS ALL ITEMS THAT ARE INCORRECTLY INSTALLED OR ARE

FUNCTIONING IMPROPERLY. PROVIDE A RETEST AFTER ALL ITEMS ARE CORRECTED.

d. PREPARE TAB REPORT OF TEST RESULTS, INCLUDING INSTRUMENTATION CALIBRATION REPORTS, IN FORMAT RECOMMENDED BY APPLICABLE STANDARDS, MODIFIED AS REQUIRED

TO INCLUDE ALL DATA LISTED HEREIN.

e. MARK EQUIPMENT SETTINGS, INCLUDING DAMPER CONTROL POSITIONS, VALVE INDICATORS, FAN SPEED CONTROL LEVERS, AND SIMILAR CONTROLS AND DEVICES, TO SHOW FINAL

SETTINGS AT COMPLETION OF TAB WORK. PROVIDE MARKINGS WITH PAINT OR OTHER SUITABLE PERMANENT IDENTIFICATION MATERIALS.

f. INCLUDE IN THE TAB REPORT RECOMMENDATIONS FOR CORRECTING UNSATISFACTORY MECHANICAL PERFORMANCES WHEN SYSTEM CANNOT BE SUCCESSFULLY BALANCED.

F. NAMEPLATE DATA

a. COMPLETE NAMEPLATE DATA FOR ALL EQUIPMENT.

b. MOTOR DATA TO INCLUDE HORSEPOWER, PHASE, VOLTAGE, RPM, FULL LOAD NAMEPLATE CURRENT, FUSE RATING IN DISCONNECT SWITCH, NUMBER OR MANUFACTURER'S SIZE

DESIGNATION, AND AMPERE RATING OF OVERCURRENT AND LOW VOLTAGE PROTECTION DEVICES IN STARTERS.

Sheets
M001 - MECHANICAL LEGEND, ABBREVIATIONS, CODES AND STANDARDS
M111 - MECHANICAL FIRST FLOOR PLAN - DEMOLITION
M112 - MECHANICAL SECOND FLOOR PLAN - DEMOLITION
M211 - MECHANICAL FIRST FLOOR PLAN - NEW WORK
M212 - MECHANICAL SECOND FLOOR PLAN - NEW WORK
M301 - MECHANICAL DETAILS AND SPECIFICATIONS
2026-03-02T17:12:24-0500
David Brooks
2026-03-02T17:12:38-0500
David Brooks
2026-03-02T17:12:42-0500
David Brooks
2026-03-02T17:12:48-0500
David Brooks
2026-03-02T17:12:50-0500
David Brooks
2026-03-02T17:12:51-0500
David Brooks

File details come from the government source that posted it. Updated .