A3_-_Price_Schedule.pdf
PDF 121 KB Posted
- Attached to
- BLRI 2024 REHABILITATE CAMPGROUNDS
- Solicitation number
- 140P5324R0039
About this file
This document is a Bid Schedule for the Blue Ridge Parkway Rehabilitate Campgrounds project. The project consists of rehabilitating accessible and non-accessible campground sites at the Otter Creek Campground in Virginia and the Julian Price Campground in North Carolina. The work involves removing existing amenities, demolishing asphalt/concrete, regrading, placing new concrete, and installing new campground site amenities such as picnic tables, fire rings, and tent pads.
The Solicitation Number is 140P5324R0039, and the project is estimated to be between $250,000 and $500,000 in value. It is a 100% set-aside for Small Businesses, with a Firm-Fixed Price Construction contract type. The Request for Proposal (RFP) closes on August 23, 2024, at 1 PM EST, and questions are due by August 9, 2024, at 12 PM EST. A site visit is scheduled for August 8, 2024, with a 9 AM EST meeting at Julian Price Campground and a 3 PM EST meeting at Otter Creek Campground. The estimated period of performance is from October 26, 2024, to April 30, 2025.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE Blue Ridge Parkway, Rehabilitate sites at Otter Creek and Julian Price Campgrounds
Unit Cost Cost Unit Cost Cost Unit Cost Cost Unit Cost Cost Base Bid
Otter Creek Campground ‐ Build Tentpads 42 Each
Julian Price Campground‐ Build Tentpads 26 Each
Julian Price Campground‐ Replace Fire Rings (non ADA)
31 Each
Julian Price Campground ‐ ADA site includes ADA table, ADA fire ring, concrete slab, and access walkway to parking (ADA)
2 Each
BASE BID
TOTAL
Julian Price Campground (NC) OPTION 1: Build Tentpads 10 Each 1st Half Loop D OPTION 1 TOTAL
OPTION 2: Build Tentpads 10 Each 2nd Half Loop D OPTION 2 TOTAL
OPTION 3: Build Tentpads 20 Each 1st Half Loop B OPTION 3 TOTAL
OPTION 4: Build Tentpads 22 Each 2nd Half Loop B OPTION 4 TOTAL
OPTION 5: Replace Fire Rings (non ADA) 24 Each Loop D OPTION 5 TOTAL
OPTION 6: Replace Fire Rings (non ADA) 16 Each Loop E OPTION 6 TOTAL
OPTION 7: Rehabilitate ADA access path 120 LF
OPTION 7 TOTAL
Total(s)Location and Work Quantity Demolition (remove old tables, or grills or benches, other etc, disposal) Material Cost (Picnic Table, Grill, lumbar, gravel, concrete, asphalt, ets) Site Preparations (grading, intallation of concrete walk and pad) Installation (of Picnic Table, grill, path, benches, etc)
File details come from the government source that posted it. Updated .