Questions_and_Answers_0001.pdf

PDF 69 KB Posted

Attached to
BLRI 2024 REHABILITATE CAMPGROUNDS
Solicitation number
140P5324R0039
Issued by

About this file

This document contains Questions and Answers related to Amendment 1 of a solicitation for the BLRI 2024 Rehabilitate Campgrounds project. The key details are:

The project consists of rehabilitating accessible and non-accessible campground sites at the Otter Creek Campground and Julian Price Campground along the Blue Ridge Parkway. The work involves removing existing amenities, demolishing existing surfaces, regrading sites, placing new concrete surfaces, and installing new campground site amenities. The contractor will purchase and fabricate the required items like concrete tables, fire rings, and tent pad materials.

The solicitation is a 100% set-aside for Small Businesses, with an estimated contract value between $250,000 and $500,000. It is a Firm-Fixed Price Construction contract with a period of performance from 10/26/2024 to 04/30/2025. The Request for Proposal closes on 8/23/2024 and the question cut-off date is 8/9/2024. A site visit is scheduled for 8/8/2024. The procuring agency is the Department of the Interior National Park Service Southeast Region.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

BLRI - 2024 Campground Improvements

140P5324R0039 – Amendment 1

Questions:

Q1: Which are the accessible sites?

A1: Sites 34A and 35A in A Loop

Q2: Clarify if old tent pad boarder can be left or needs to be disposed of.

A2: Old tent pad boarder will be disposed of by the contractor for every site where a new tent pad is installed.

Q3: Where is the ADA access path (Bid Option 7)?

A3: The accessible pathway sidewalk is to be concrete and provides access to the Loop A bathroom.

Statement of Work Changes Summary: The concrete accessible picnic tables will be government furnished, but it is the responsibility of the contractor to load, transport, and unload the tables. The contract was updated and now reflects that change and the site questions.

File details come from the government source that posted it. Updated .