A06_WBI_Energy_-_Line_Crossing_and_Encroachment_Permit.pdf
PDF 421 KB Posted
- Attached to
- BASIN VIEW PIPELINE Federal contract opportunity
- Solicitation number
- 140L3423Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2_-_Q_A_0002.docx | DOCX document | |
| Sol_140L3423Q0001_Amd_0002.pdf | ||
| Sol_140L3423Q0001_Amd_0001.pdf | ||
| B09_Questions_and_Answers_0001.pdf | ||
| A06_Schedule_of_Items.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| A06_Maps_and_Drawings.pdf | ||
| A06_WBI_Energy_Checklist.pdf | ||
| A06_Attachment_A_BasinViewPipeline3.pdf | ||
| A06_Specifications.pdf | ||
| Sol_140L3423Q0001.pdf | ||
| B03_Wage_Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Telephone: Fax: Email:
Project Name:
General scope of project:
WBI Energy Crossing/Encroachment Permit
Anticipated construction start date: Anticipated completion date:
Mailing Address:
Company Name: Company Representative:
WBI Energy (WBI) requires any party requesting to cross or encroach onto our easement to comply with the following conditions:
1. Youwill assume full responsibility for any and all damages caused by the construction,operationand maintenance of your facilities or the activities performed.
2. Your facilities will cross beneath our pipeline if at allpossible.
3. At the point of crossing, a minimum separation of 12” will be maintained between your facilities and our pipeline.
4. If Horizontal Directional Drilling(HDD), a separation of 12” greater than the size of the largest reamer will be maintained.
5. If HDD, pipeline shall be exposed 24” on bothsides of the proposed bore path, excavating to a depth 12” below our pipeline.
6. Excavation within 24" of our pipeline shall be performed by hand digging only.
7. Crossing angle shall be as near to 90oaspossible.
8. Crossing shall be inspected by WBI personnel prior tobackfill.
9. WBI Energy will be notified 48 hours prior to any excavation, grading, or drill that is planned to take place.
In addition to complying with conditions listed above, WBI requires more information regarding the potential crossing or encroachment to evaluate your project and the effects it may have on the safety of our facility. The more detailed information you can provide will help WBI evaluate any effect on our facility and expedite an approved crossing/encroachment permit. Please provide as much of the following data as possible for WBI review:
BLM Josh Helm 406-233-2880 jhelm@blm.gov
Type text here
Basin View Pipeline 7/18/2022 9/30/2022
111 Garryowen Rd, Miles City, MT, 59301
BLM to contract installation of 19,829 ft of stock water HDPE pipeline on BLM property.
HDPE pipeline to be buried with 5-6 ft of cover.
Open cut or directional drill option given to contractor (not yet awarded). Over/under to be determined by depth of WBI Energy pipeline.
Encroachment
a. Road surface:
b. Reason for building road:
Item A. and Item B. described below shall be submitted.
For office use only:
TWP RGE Section
County: State:
Approved by: Date:
**Required drawing**
Attach cross section drawing showing grading, ditch cuts, and any sub-excavation
Voltage (if electrical):
Line material (steel, plastic, fiberglass, etc.):
Type of cable (electrical, telecomm, fiber optic, etc.):
Cable crossing
Overhead power crossing
Proposed separtion between facilities:
Construction method (HDD, open cut, plow):
Construction method (HDD, open cut, plow):
Road or temporary access crossingPipeline crossing
Describe encroachment
(parking lot, subdivision, pond, trees, etc.)
Part 1. Type of Crossing or Encroachment
Voltage of line:
Complete and attach
Appendix A. Vehicle
Description form
**Required Appendix A.**
Attach drawing showing the
Location of power poles (not allowed on ROW) and minimum height of overhead line over the ROW.
Crossing position (above or below WBI pipeline):
Crossing position (above or below WBI pipeline):
Proposed separtion between facilities:
Part 2. Drawings or Exhibits
ADDITIONAL APPROVAL NOTES:
Stationing:Pipeline name:
If permanent road, complete
a. and b.
Cable cover (PVC, metal, Cathodic protection type:
**Required cross section**
A. Plan view of crossing or encroachment
a. Title block showing drawing number, revision number, and date
b. North arrow
c. Legal land description
d. Existing buried facilities, road allowances, and ROW, including those belonging to WBI
e. Angle of proposed crossing (crossing angle shall be as near to 90o as possible)
f. Location of encroachment activity
B. Profile view of crossing or encroachment
a. Depth of cover
b. Dimensions (a minimum of 12” separation for crossings)
c. Existing and proposed grade
TBD
TBD
2' min
HDPE (plastic)
N/A
Axle Grouping
Front (Steering)
Single (if necessary)
Tandem (eg. 8 Wheel)
Tri-Axle (eg. 12 Wheel)
TOTAL VEHICLE WEIGHT
(GVW)
Max Vehicle Weight Make Model Track Length Track Width
Appendix A. Vehicle Description Form lbs ft in lbs
(this number must be the total of all previous boxes)
Sketch of the equipment showing the tire configuration (use another page if necessary) psig psig psig psig
A. WHEELED VEHICLE
Make/Model/Description of heaviest wheeled vehicle that will cross the pipeline:
Weight per Axle Group Tire Pressure
B. TRACKED VEHICLE
Make/Model/Description of heaviest tracked vehicle that will cross the pipeline:
lbs lbs lbs lbs