A06_Schedule_of_Items.pdf
PDF 62 KB Posted
- Attached to
- BASIN VIEW PIPELINE Federal contract opportunity
- Solicitation number
- 140L3423Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2_-_Q_A_0002.docx | DOCX document | |
| Sol_140L3423Q0001_Amd_0002.pdf | ||
| B09_Questions_and_Answers_0001.pdf | ||
| Sol_140L3423Q0001_Amd_0001.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| A06_WBI_Energy_Checklist.pdf | ||
| A06_Attachment_A_BasinViewPipeline3.pdf | ||
| A06_Specifications.pdf | ||
| Sol_140L3423Q0001.pdf | ||
| A06_Maps_and_Drawings.pdf | ||
| B03_Wage_Determination.pdf | ||
| A06_WBI_Energy_-_Line_Crossing_and_Encroachment_Permit.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Pay Item No. Description Est.Quantity Pay Unit Unit Price Total Amount
1 01505(1) Mobilization 1 Lump Sum $ $
2 02229(1) Trenching/Plowing (5 Ft. Common), Backfilling and Compacting 17,846 Linear Feet $ $
3 02229(2) Trenching/Plowing (5 Ft. Rock), Backfilling and Compacting 1,983 Linear Feet $ $
4 02229(3) Utility Crossings 1 Each $ $
5 02665(1) 2", DR 11, 200 psi, HDPE 4710 Pipe 18,437 Linear Feet $ $
6 02665(2) 2", DR 9, 250 psi, HDPE 4710 Pipe 1,242 Linear Feet $ $
7 02665(3) 1-1/2", DR 11, 200 psi, HDPE 4710 Pipe 150 Linear Feet $ $
8 02665(4) Curb Stop Valve Assembly (1.5 inch) 4 Each $ $
9 02665(5) Pressure Reducing Valve Assembly 1 Each $ $
10 02665(6) Air Relief Valve Assembly 4 Each $ $
11 02665(7) Hydrant Assembly 5 Each $ $
12 02910(1) Reclamation 1 Lump Sum $ $
Total Lump Sum Bid (All or None) Total:
*Note: Footage quantities are estimates.
BASIN VIEW PIPELINE
Schedule of Items