A06_WBI_Energy_Checklist.pdf

PDF 764 KB Posted

Attached to
BASIN VIEW PIPELINE Federal contract opportunity
Solicitation number
140L3423Q0001
Issued by
Department of the Interior Bureau of Land Management Montana-Dakotas

View the file

Other files for this federal contract opportunity

Other files attached to BASIN VIEW PIPELINE, newest first.
File Type Posted
Amendment_2_-_Q_A_0002.docx DOCX document
Sol_140L3423Q0001_Amd_0002.pdf PDF
B09_Questions_and_Answers_0001.pdf PDF
Sol_140L3423Q0001_Amd_0001.pdf PDF
A06_Schedule_of_Items.pdf PDF
Past_Performance_Questionnaire.doc DOC document
A06_Attachment_A_BasinViewPipeline3.pdf PDF
A06_Specifications.pdf PDF
Sol_140L3423Q0001.pdf PDF
A06_Maps_and_Drawings.pdf PDF
B03_Wage_Determination.pdf PDF
A06_WBI_Energy_-_Line_Crossing_and_Encroachment_Permit.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBIENERGY

TRANSMISSION

An MDU Resouas GfOl4) COll¥)ll1y

Criteria for WBI Energy easements:

1. No fencing, trees or shrubs shall be allowed within 25 feet of our pipeline facilities.

2. No utility or other parallel encroachments are allowed within 25 feet of our pipeline facilities.

3. Any proposed equipment crossings must have WBI Energy prior approval.

4. No structures, either permanent or temporary are allowed within 25 feet of our pipeline facilities.

5. Any proposed grading or ground disturbance within 25 feet of our pipeline facilities must have prior approval of WBI Energy.

6. Any proposed water drainage reroute or retention ponds over or within 25 feet of WBI Energy facilities must have prior approval of WBI Energy.

Criteria for WBI Energy pipeline crossings:

1. You will assume full responsibility for any and all damages caused by the construction, operation and maintenance of your facilities.

2. For utility crossings WBI Energy requires a minimum of 12" separation between the new facility and our pipeline for trenching.

3. Excavation within 24"of our pipeline shall be performed by hand digging only.

4. When crossing is done by horizontal drilling, a separation of 12" greater than the size of the largest reamer will be maintained. The pipeline will be exposed 24" on both sides of the proposed bore path, excavating to a depth of 12" below our line throughout the drilling process to ensure the pipeline is not damaged.

5. When crossing stay as close to perpendicular as possible.

6. Your facilities will cross beneath our pipeline if at all possible.

7. Notify us of your crossing through the one call system. A WBI Energy representative will mark our pipeline and must be present to witness all crossings prior to backfi ll.

8. Do not expose more than 12' length of pipe without prior engineering approval.

9. No vibratory compaction within 25' of pipeline.

10. No heavy equipment is permitted to drive over the pipeline until approved engineering is done by WBI Energy to determine loading and vibration over the high pressure pipel ine.

11. WBI Energy will be notified 24 hours prior to any excavation or drill that is planned to take place.