A04_0040559329_Attach_0002_Drawings_LISQ_Modernize_ADA_Elevator.pdf
PDF 3 MB Posted
- Attached to
- Modernize ADA Elevator at LISQ Federal contract opportunity
- Solicitation number
- 140P5122R0002
About this file
This document package includes construction drawings and specifications for the modernization of an ADA elevator located at the Liberty Square Visitor Education Center Fort Sumter National Historic Park in Charleston, South Carolina. The project involves the replacement of an existing elevator to improve accessibility compliance. Work includes demolition of the existing elevator equipment and installation of a new ADA-compliant elevator and associated mechanical, electrical and plumbing systems. The construction drawings provide details on the scope of demolition and new construction work at the elevator shaft and machine room on three levels. Specifications identify equipment to be installed such as a new elevator car, control systems, lighting, sump pump and ductless HVAC unit. The electrical drawings show locations for new disconnects, switches, receptacles and conduit runs.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KI
NG
S
RO
AD
HARBOR VIEW ROAD
CHARLESTON
HARBOR
SHUTES
FOLLY
ISLAND
MORRIS
ISLAND
JAMES ISLAND
SULLIVAN'S
ISLAND
DRUM
ISLAND
FORT
MOULTRIE
FORT
SUMTER
MID
DL
E
ST
CHARLESTON
MT. PLEASANT
V.C. HQ.&
DOCKSIDE II
ATLANTIC
OCEAN
C O O P E R
R
IV
E R
A S H
LE
Y
R
IV
E R
MAINTENANCE
AREA
526TO
CITY
MARINA
ASHLEY
RIVER
FORT
JOHNSON
SPOIL
AREA
UTILITY
EASEMENT
JAS
PE
R
BL
VD
INTERCOASTAL
WATERWAY
526TOCOLEMAN
BLVD.
PATRIOTS
POINT
COUNTY LINE
PARK HEADQUARTERS
VISITOR CENTER
PARK BOUNDARY
LEGEND
HQ.
V.C.
FORT SUMTER NATIONAL MONUMENT
SCALE OF METERS
SCALE OF FEET
2,000
0 4,000
500 1,000
2,000
C O N C O R D
S T
BROAD
ST.
TRADD
ST.
CALH
OUN
ST.
M E E
TIN
G
S T.
FORT SUMTER
NATIONAL
MONUMENT
SULLIVAN'S
ISLAND
MORRIS
ISLAND
JAMES
ISLAND
DANIEL
ISLAND
C O O P E R
R
IV
E R
AS
H
LE
Y
RI
VE
R
CO.
BERK LEY
CHAR ESTON CO.
E L
LONG POINT ROAD
MATHIS FERRY
RIFL
E R
ANG
E
RO
AD
ATLANTIC
OCEAN
CHARLESTON
MOUNT
PLEASANT
DEPARTMENT OF THE INTERIOR
UNITED STATES
NATIONAL PARK SERVICE
DENVER SERVICE CENTER OF
PKG.
NO.
SHEET
STATEREGION
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING DRAWING NO.
xxxxxx
COUNTY
REVISIONS Date InitialSheetMarkA/E FIRMS QE#:
P Li b e rt y S q u a re V C D w g s R e v it Li b e rt y S q u a re R .r v t
REPLACEMENT OF ADA ELEVATOR
LIBERTY SQUARE VISITOR
EDUCATION CENTER
FORT SUMTER NATIONAL MONUMENT
SOUTHEAST S. CAROLINA
FINAL CONSTRUCTION
DOCUMENTS
CONTRACT #: P16PC00063
PARK FOSU
CHARLESTON
42024150
CHARLESTON, SC
SCALE OF MILES
0 11
ARCHITECT: QUINN EVANS
ANN ARBOR, MI
DETROIT, MI
ELEVATOR
CONSULTANT:
VERTRAN ENTERPRISES
ANNAPOLIS, MD
MEP: APOGEE CONSULTING GROUP
RALEIGH, NC
PROJECT
LOCATION
SHEET# TITLE OF SHEET
G00 COVER SHEET
G01 SYMBOLS AND ABBREVIATIONS
AS00 KEYPLAN & SITE PLAN STAGING
D01 DEMOLITION PLANS
A01 NEW WORK PLANS
A02 SECTIONS
A03 SCHEDULES & DETAILS
A04 DETAILS
DRAWING INDEX
DETAIL / PLAN
BLDG SECTION CUT
DRAWING REFERENCE
SHEET REFERENCE
DRAWING REFERENCE
SHEET REFERENCE
INTERIOR ELEVATION
DETAIL CUT
DRAWING REFERENCE
SHEET REFERENCE
DRAWING REFERENCE
SHEET REFERENCE
A101
1 SIM
A101
SIM
A101
1 SIM
A101
1 SIM
WALL SECTION CUT
DRAWING REFERENCE
SHEET REFERENCE
A101
SIM1
A101
SIM
DRAWING REFERENCE
SHEET REFERENCE
EXTERIOR ELEVATION
A101
1 SIM
1i
XX
ROOM NUMBER
FINISH TYPE
DOOR NUMBER
WALL TYPES
WINDOW NUMBER
CONCRETE-PLAN
DIMENSIONAL LUMBER
(SIZE AS INDICATED)
STEEL
RIGID INSULATION
DISCONTINUOUS LUMBER
(SIZE AS INDICATED)
ELEVATION
CMU
BATT INSULATION
Room name
KEYNOTE
EARTH
ALUMINUM
WOOD
PLYWOOD
XX-XX
MATERIAL DESIGNATION
(REFER TO MATERIALS
SCHED. ).
XX
XX LOUVER TAG
REVISION CLOUD
AND INDICATOR
XX
CONSTRUCTION
ASSEMBLY
A COLUMN LINE
BRICK
GROUT
CONCRETE-SECTION
PRECAST CONCRETE
SPRAY
FIREPROOFING
GRAVEL
PARTICLE BOARD
PLASTIC
GLASS
SHIM
2 4
GYPSUM BOARD /
PLASTER
SEALANT & BACKER ROD
(SIZE AS INDICATED)
METAL STUD
METAL TRACK
2 4
ACOUSTICAL CEILING
3/8"
SPRAY FOAM
INSULATION
GEN
INDICATOR LIGHT (G=GREEN,
R=RED)
GENERATOR
WITH KW
MOTOR WITH
HORSEPOWER
GROUND
CONTACT (NORMALLY CLOSED)
THERMAL OVERLOAD RELAY
CONTACT (NORMALLY OPEN)
REMOVABLE ELEMENT
CIRCUIT BREAKER
FUSE
HOMERUN CONDUIT
DISCONNECT SWITCH
DUPLEX RECEPTACLE SUBSCRIPT DENOTES TYPE
GFCI DENOTES GROUND FAULT INTERRUPT
WP DENOTES WEATHER PROOF
METER
CURRENT TRANSFORMER
SINGLE POLE SWITCH
M
CT
S
3/4" X 10' COPPER CLAD
STEEL DRIVEN GROUND ROD
2 AWG BARE TINNED
CU UNLESS NOTED
UNDERGROUND CONDUIT
JUNCTION BOXJ
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEETA/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
08/20/2021
SYMBOLS AND
ABBREVIATIONS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
G01
T TREAD
T&G TONGUE AND GROOVE
T.O. TOP OF
TECH TECHNOLOGY
TEL TELEPHONE
TEMP TEMPERED
THK THICK(NESS)
THRESH THRESHOLD
TOC TOP OF CURB
TOL TOLERANCE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSPARENT, TRANSFORMER
TV TELEVISION
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VU VENTILATION UNIT
VWC VINYL WALLCOVERING
W WIDE, WEST, WIRE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WH WALL HUNG
WP WORK POINT, WEATHERPROOF
WT WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
" INCHES
# NUMBER
& AND
' FEET
@ AT
C CENTER LINE
L ANGLE
± EXIST (OR APPROX) DIM - VIF
PT POINT
PTD PAINT(ED)
PVMT PAVEMENT
QTY QUANTITY
R RADIUS, RISER
RB RUBBER BASE
RC REINFORCED CONCRETE
REF REFERENCE
REINF REINFORCED
REQ /
REQS
REQUIREMENT(S)
REQD /
REQ'D
REQUIRED
RES RESILIENT
RET RETAINING
REV REVISION(S) / REVISE(D)
RFG ROOFING
RH RIGHT HAND
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
RT RIGHT
S SOUTH, SEAL
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SL SLOPE
SLL SOUND / LIGHT LOCK
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
ST STAINLESS
STA STATION
STD STANDARD
STL STEEL
STM STEAM
STN STAIN
STO STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
MEMB MEMBRANE
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MTD MOUNTED
MTG MOUNTING
MTL METAL
N NORTH
N NEUTRAL
NAT NATURAL
NCSBC NORTH CAROLINA STATE BUILDING
CODE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NATIONAL PARK SERVICE
NTE NOT TO EXCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPP HD OPPOSITE HAND
PAR PARALLEL
PART PARTITION
PC PRECAST
PED PEDESTAL
PERF PERFORATE(D)
PI POINT OF INTERSECTION
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLWD PLYWOOD
PNL PANEL(ED)
PR PAIR
PREP PREPARE (SURFACE)
PROV PROVIDE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HP HORSEPOWER
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG ISOLATED GROUND
IN INCH(ES)
INCAN INCANDESCENT
INCL INCLUDE(D,ING)
INSUL INSULATION, INSULATED
INT INTERIOR
INV INVERT
JAN JANITOR
JB JUNCTION BOX
JC JANITOR CLOSET
JT(S) JOINT(S)
N NORTH
KIT KITCHEN
KW KILOWATT
LAM LAMINATE(D)
LAV LAVATORY
LBL LABEL
LF LINEAR FOOT
LH LEFT HAND
LL LIVE LOAD
LP LOW POINT
LTG LIGHTING
LTL LINTEL
M METER
MAS MASONRY
MATL MATERIAL(S)
MAX MAXIMUM
MBJ MAIN BONDING JUMPER
MCB MAIN CIRCUIT BREAKER
MECH MECHANICAL
MED MEDIUM
ENCL ENCLOS(E,URE)
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE(D)
EXH EXHAUST
EXIST/EX EXISTING
EXP EXPOSED, EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAS FASTEN(ER)
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FACE/FINISHED FLOOR
FGL FIBERGLASS
FHC FIRE HOSE CABINET
FIN(S) FINISH(ES)
FIXT FIXTURE
FL FLOOR(ING)
FLAM FLAMMABLE
FLUOR FLUORESCENT
FMC FLEXIBLE METAL CONDUIT
FOC FACE OF CONCRETE
FOS FACE OF STUDS
FP FIREPROOF(ING)
FR FRAME(D,ING)
FT FEET
FTG FOOTING
FUR FURR(ED,ING)
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEC GROUNDING ELECTRODE CONDUCTOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GL GLASS, GLAZING
GOVT GOVERNMENT
GT GROUT
GWB GYPSUM WALLBOARD
H HIGH
HB HOSE BIB
HC HOLLOW CORE
HDR HEADER
C CONDUIT
CAB CABINET
CEM CEMENT
CI CAST IRON
CJ CONTROL JOINT
CKT CIRCUIT
CLG CEILING
CLO CLOSET
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COM COMMUNICATIONS
CONC CONCRETE
COND CONDITION
CONFIG CONFIGURATION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CORR CORRIDOR
CP CONTROL PANEL
CPT CARPET(ED)
CT CERAMIC TILE
CTR CENTER
CU COPPER
D DEEP
DED DEDICATED CIRCUIT
DEG DEGREE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DN DOWN
DR DOOR
DTL DETAIL
DWG(S) DRAWING(S)
E EAST
E-P EPOXY PAINT
EA EACH
EG EQUIPMENT GROUND
EJ EXPANSION JOINT
EL ELEVATION (TOPO)
ELEC ELECTRICAL
ELEV ELEVATION (ARCH),ELEVATOR
EMER EMERGENCY
PC PHOTOCELL
RTU REMOTE (OR RADIO) TELEMETRY UNIT
SE SERVICE ENTRANCE
SPD SURGE PROTECTION DEVICE
STP SHIELDED TWISTED PAIR
TCL TOTAL CONNECTED LOAD
TDL TOTAL DEMAND LOAD
TVSS TRANSIENT VOLTAGE SURGE & SPIKE
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
VFD VARIABLE FREQUENCY DRIVE
A AMP
A/C AIR CONDITIONING
ABA ARCHITECTURAL BARRIERS ACT
ABT ABOUT
ACCESS ACCESSIBLE
ACM ASBESTOS CONTAINING MATERIAL
ACOUS ACOUSTIC
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGG AGGREGATE
AIC AMPS INTERRUPTING CAPACITY
ALT ALTERNATE
ALUM ALUMINIUM
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL, URE)
ASPH ASPHALT(IC)
ASSOC ASSOCIATED
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWG AMERICAN WIRE GAUGE
AWP ACOUSTICAL WALL PANEL
BD BOARD
BFG BELOW FINISHED GRADE
BIT BITUMINOUS, BITUMEN
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BR BRICK
BS BOTH SIDES
BTWN BETWEEN
ABBREVIATIONS
MATERIALS & SYMBOLS ELECTRICAL SYMBOLS
C O O P E R
R
IV
E R
L
IB
E R T Y
W A Y
FREEDOM LN
AQUARIUM WHARF
C O N C O R D
S T.
SOUTH CAROLINA AQUARIUM
FORT SUMTER
VISITOR EDUCATION
CENTER
LOCATION OF
ELEVATOR TO
BE REPLACED
MAIN PANEL WITH ELEVATOR SHUNT
TRIP BREAKER. REMOVE SHUNT TRIP
FUNCTION FROM ELEVATOR BREAKER.
SITE PLAN LEGEND
GREENERY
HARDSCAPE
CONSTRUCTION LIMIT LINE
LOCATION FOR CONTRACTOR
SUPPLIES AND EQUIPMENT
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEETA/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
PR
08/20/2021
KEYPLAN & SITE PLAN
STAGING
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
AS00
1"= 30' - 0" SCALE OF FEET
15'30' 0' 30' 60'
1" = 30'-0"AS00
1 STAGING & MOBILIZATION
3GFI
GFI
UP
GFI
DN
1. BIDDERS SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTING CONDITIONS
AND THE EXTENT OF MATERIAL AND EQUIPMENT REMOVAL AT EACH FLOOR.
2. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE. PROVIDE TEMPORARY ENCLOSURES, PROTECTION
AND BARRICADES AS NECESSARY TO PROTECT AND SECURE THE BUILDING.
3. FOR AREAS TO RECEIVE NEW FINISH, CONTRACTOR SHALL REMOVE FINISHES AS WELL AS ALL ATTACHMENTS AND
ACCESSORIES IN PREPERATION FOR A NEW WALL FINISH.
4. VERIFY EXISTING FIELD CONDITIONS AND NOTIFY THE CONTRACTING OFFICER OF INCONSISTENCIES BETWEEN THESE DRAWINGS AND ACTUAL CONDITIONS BEFORE PROCEEDING WITH CONSTRUCTION OR DEMOLITION.
5. VERIFY EXISTING CONDITIONS AND SCOPE OF DEMOLITION WORK WITH REQUIREMENTS FOR NEW CONSTRUCTION.
COORDINATE SCOPE OF DEMOLITION WITH REQUIREMENTS FOR NEW CONSTRUCTION SHOWN. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXTENT OF DEMOLITION THAT IS REQUIRED TO EXECUTE NEW WORK.
6. PERFORM SURVEY AND ANALYSIS OF EXISTING BUILDING PRIOR TO COMMENCING WITH DEMOLITION OPERATIONS.
DO NOT REMOVE CONSTRUCTION IF THE STRUCTURAL INTEGRITY OF THE BUILDING MAY BE COMPROMISED UNTIL APPROPRIATE TEMPORARY SUPPORTS ARE IN PLACE. GENERAL CONTRACTOR IS FULLY RESPONSIBLE FOR DESIGN AND INSTALLATION OF ALL NECESSARY SHORING AND BRACING OF EXISTING STRUCTURE REQUIRED FOR
IMPLEMENTATION OF DESIGN.
7. CONTRACTOR IS RESPONSIBLE FOR THE LEGAL DISPOSAL OF ALL DEMOLISHED MATERIALS.
8. GENERAL CONTRACTOR SHALL COORDINATE ALL DISCONNECTS AND SHUT OFFS THAT MAY BE REQUIRED FOR
DEMOLITION.
9. LEAVE FLOOR IN BROOM CLEAN CONDITION AND READY FOR CONSTRUCTION; TYPICAL FOR ALL AREAS OF WORK.
ITEMS TO BE REMOVED
EXISTING WALLS TO REMAIN
EXIST. DOOR
3 4
D
F
16'-0" ±
8'-4" ±
ELEVATOR
UTILITY
02-03
02-04
02-06
02-03
02-08
3 4
D
F
16'-0" ±
8'-4" ±5
R .9
T@
ELEVATOR
ELEVATOR
MECH.
STAIR
02-01
02-02
02-05
02-06
@CEILING
02-07
3 4
D
F
16'-0" ±
ELEVATOR
TEL/COM
CORRIDOR
STAIR
8'-4" ±
02-06
02-0302-03
13121110987654321
F
D
C
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
KEY NOTES
GENERAL NOTES
A/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
D01 08/20/2021
DEMOLITION PLANS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
1/4" = 1' - 0" SCALE OF FEET
2'4' 0 8'4'
02-01 ELECTRICAL DISCONNECTS TO BE REMOVED. EXISTING CIRCUITS TO REMAIN.
02-02 ELECTRICAL DISCONNECTS AND LIGHTING TO BE REMOVED. EXISTING CIRCUITS TO REMAIN. EXISTING FIRE ALARM
DEVICES TO REMAIN.
02-03 EXISTING TO REMAIN
02-04 REMOVE EXISTING ELECTRICAL EQUIPMENT IN PIT. REUSE EXISTING CIRCUIT.
02-05 REMOVE EXISTING DIFFUSER AND RETURN AND CAP DUCTWORK.
02-06 REFER TO ELEVATOR SPECIFICATIONS FOR DETAILED DESCRIPTION OF ELEVATOR COMPONENTS TO BE REMOVED.
02-07 APPROXIMATE LOCATION OF EXISTING FAN COIL UNIT OVER OFFICE CEILING. DEMOLISH UNIT AND ASSOCIATED SUPPLY/RETURN DUCTWORK TO/FROM ELEVATOR MACHINE ROOM. DEMOLISH HYDRONIC PIPING BACK TO MAINS
AND CAP. DEMOLISH THERMOSTAT AND ASSOCIATED CONDUIT AND WIRING.
02-08 SAW CUT DEPRESSION IN ELEVATOR PIT FLOOR. COORDINATE LOCATION WITH INSTALLATION OF SUMP PUMP. SEE
KEYNOTE 22-01 AND DETAIL ON A04.
DEMOLITION LEGEND_PLAN
REFERRED FROM:1/4" = 1'-0"D01 A02
1 ELEVATOR DEMOLITION PLAN - PIER LEVEL
REFERRED FROM:1/4" = 1'-0"D01 A02
2 STAIR/ELEV DEMOLITION PLAN - 1ST FLOOR
REFERRED FROM:1/4" = 1'-0"D01 A02
3 STAIR/ELEV DEMOLITION PLAN - 2ND FLOOR
KEYPLAN
ALSO SHOWN:
ELECTRICAL,
MECHANICAL,
& PLUMBING
GFI
M M
GFI
UP
GFI
M
DN
1. BIDDERS SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND THE
EXTENT OF MATERIAL AND EQUIPMENT REMOVAL AT EACH FLOOR.
2. OBTAIN APPROVAL FROM CONTRACTING OFFICER IF ANY PORTIONS OF CONSTRUCTION ARE REQUIRED TO BE PERFORMED
OUTSIDE OF NORMAL WORKING HOURS.
3. DO NOT SCALE PRINTS, USE FIGURED DIMENSIONS ONLY, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING BUILDING DIMENSIONS, PARTITIONS, WALL LOCATIONS, FLOOR ELEVATIONS AND NOTIFY CO OF ANY DISCREPANCIES IN WRITING PRIOR
TO START OF WORK.
4. PROTECT EXISTING CONSTRUCTION TO REMAIN.
5. ALL DIMENSIONS PROCEEDED BY A +/- SHALL BE REVIEWED AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO
FABRICATION AND/OR INSTALLATION OF AFFECTED WORK.
6. PATCH, TAPE, SAND ALL DEMOLITION SCARS, INCLUDING BUT NOT LIMITED TO REMOVED PARTITIONS, MILLWORK, SURFACE
MOUNTED ELECTRICAL, ETC.
7. FIRESTOP AND PATCH ALL OPENINGS IN CORE WALLS AT REMOVED CONDUITS AND PIPING UNLESS OTHERWISE NOTED FOR
REUSE.
8. FIRESTOP AND PATCH ALL FLOOR CORES AT REMOVED FLOOR OUTLETS AND PLUMBING UNLESS OTHERWISE NOTED FOR
REUSE.
9. PREP AND PRIME ALL INTERIOR WALLS FOR NEW FINISH.
10. FOR ALL ELECTRICAL EQUIPMENT PROVIDE CORROSION RESISTANT.
11. FIRE SUPPRESSION WORK TO REQUIRE NICET 2 CERTIFICATION.
3 4
D
F
A02
A02
ELEVATOR
UTILITY
16'-0" ±
8'-4" ±
T
CU
SP
23-01
23-02
22-01
23-03
23-04
NP1W:18
NP1W:2,4
26-07
26-16 26-17
26-08
26-09
26-11
26-12
WP
WP
WP
26-10
26-08
WP
TO TOP
OF SHAFT
NP1W:29
NP1W:12
23-05
23-09
23-10
09-01
14-03
05-02
3 4
D
F
A02
A02
ELEVATOR
ELEVATOR
MECH.
STAIR
16'-0" ±
8'-4" ±5
R .9
T@
A04
T
23-07
NP1W:8
NP1W:6
26-03
26-05
26-02
NP1W:20
26-14
NP1W:14,16
NP1W:11
26-06
05-01
07-01
08-01
09-0314-01
TO LIGHT
ABOVE DOOR
14-03
14-04
14-03
TYP.
23-08
23-03
26-03
3 4
D
F
A02
A02
ELEVATOR
STAIR
TEL/COM
CORRIDOR
16'-0" ±
8'-4" ±
A04
26-01
TO
PIT
NP1W:29
26-18
26-19
10-01
14-03
13121110987654321
F
D
C
3 4
D
F
ELEVATOR
ELEVATOR
MECH.
STAIR
26-04
09-0209-02
TO SWITCH
14-02
TYP.
21-01
09-02
05-01 PROVIDE BREAK METAL STAINLESS STEEL CLOSURE. SEAL WITH A SILICONE SEALANT JOINT AT THE LEADING EDGE
OF THIS TRIM. PROVIDE TWO PLASTIC WEEPS PRIOR TO SEALING.
05-02 EXISTING LADDER TO REMAIN
07-01 PATCH AND SEAL ALL MACHINE ROOM AND HOISTWAY PENETRATIONS TO MAINTAIN A MIN. 1 HR FIRE RESISTANCE
RATING.
08-01 PROVIDE NEW DOOR STAINLESS STEEL STOREROOM FUNCTION LOCKSET MATCHING OPERATING TRIM AND TYPE OF
EXISTING DOORS.
09-01 REMOVE EXISTING OIL AND DEBRIS FROM PIT. PREP FOR NEW FINISH PER ELEVATOR SPECIFICATIONS.
09-02 PATCH VACATED OPENINGS WITH GYPSUM SHAFTWALL SYSTEM TO RESTORE FIRE RESISTANCE RATING TO MIN. OF 1
HR.
09-03 CLEAN AND PAINT ELEVATOR MACHINE ROOM WALLS AND FLOORS. REFER TO ELEVATOR SPECIFICATIONS.
10-01 PROVIDE NEW STAINLESS STEEL FRAME FOR EVACUATION SIGN. STYLE TO MATCH ELEVATOR CONTROL PANEL.
14-01 PROVIDE NEW ELEVATOR HOISTWAY DOORS
14-02 PROVIDE NEW ELEVATOR CEILING, LIGHTING, AND FLOORING. REFER TO ELEVATOR SPECIFICATIONS.
14-03 PROVIDE NEW PUSHBUTTON STATIONS AND SIGNAL FIXTURES IN CORRIDOR AND ELEVATOR CAR. TYP EACH FLOOR.
14-04 REFER TO ELEVATOR SPECIFICATIONS FOR DETAILED DESCRIPTION OF ELEVATOR COMPONENTS TO BE UPGRADED
AND MODIFIED.
21-01 RELOCATE MECHANICAL ROOM FIRE SUPPRESSION SPRINKLER TO INDICATED NEW LOCATION. PROVIDE NEW SPRINKLER HEAD CONNECTED TO EXISTING SYSTEM. PROVIDE NEW SPRINKLER PIPING AS REQUIRED. MATERIALS AND INSTALLATION SHALL BE IN COMPLIANCE WITH NFPA 13 (2019) AND OTHER APPLICABLE CODES AND
STANDARDS.
22-01 PROVIDE NEW SUMP PUMP (SP-1). INSTALL IN NEW SAW-CUT DEPRESSION IN ELEVATOR PIT FLOOR. REFER TO DETAIL ON SHEET A04. FIELD COORDINATE EXACT LOCATION OF NEW DEPRESSION WITH EXISTING DRY SUMP AND
ELEVATOR HYDRAULIC LINES.
23-01 PROVIDE NEW INLINE EXHAUST FAN EF-1, SUSPENDED.
23-02 PROVIDE NEW THERMOSTAT FOR EXHAUST FAN. SET THERMOSTAT TO 95 DEGREES F (ADJUSTABLE).
23-03 REFRIGERANT PIPING FROM ABOVE. SIZE, ROUTE AND INSTALL IN STRICT ACCORDANCE WITH EQUIPMENT
MANUFACTURER'S INSTRUCTIONS.
23-04 PROVIDE WALL-MOUNTED CONDENSING UNIT (CU-1), MOUNT ON WALL @ 7' AFF.
23-05 2" SUMP PUMP DISCHARGE, PROVIDE INDIRECT OPEN HUB CONNECTING INTO EXISTING 4" WASTE STACK IN
ADJACENT ROOM. FIRESTOP PENETRATION THROUGH ELEVATOR HOISTWAY.
23-07 1" PUMPED CONDENSATE LINE, CONNECT TO EXISTING CONDENSATE THAT SERVED FAN COIL UNIT. FIELD VERIFY LOCATION OF TIE-IN CONDENSATE PIPING SHALL BE ASTM B88 TYPE L COPPER TUBING WITH SOLDERED JOINTS (95/5 TIN/ANTIMONY SOLDER). FITTINGS SHALL BE ASME B16.18 CAST COPPER OR ASME B16.22 WROUGHT
COPPER.
23-08 PROVIDE DUCTLESS SPLIT SYSTEM ON WALL OVER DOOR. (DAC-1)
23-09 12 X 10 EXHAUST DUCT
23-10 NEW 32 X 12 EXHAUST LOUVER OVER DOOR. PROVIDE PLENUM BOX ON BACK OF LOUVER FULL SIZE OF LOUVER.
26-01 INSTALL NEW LIGHT AT TOP OF SHAFT WITH 3-WAY SWITCH TIED TO PIT LIGHTING
26-02 INSTALL NEW 400A ELEVATOR DISCONNECT WITH 100A SHUNT TRIP BREAKER. SHUNT TRIP TO BE ACTIVATED BY ACTUATION OF THE SPRINKLER FLOW SWITCH(S) DESIGNED TO AUTOMATICALLY OPEN THE POWER SUPPLY TO THE ELEVATOR. TIE ELEVATOR EQUIPMENT INTO THE EXISTING FIRE ALARM PANEL. REUSE EXISTING ELEVATOR FEEDER.
26-03 INSTALL TWO NEW 30A DISCONNECTS FOR ELEVATOR CAB LIGHTING AND CONTROLS.
26-04 INSTALL NEW LIGHTING IN ELEVATOR MACHINE ROOM TIED TO EXISTING CIRCUIT, NP1W-11.
26-05 INSTALL NEW GFCI RECEPTACLE TIED TO EXISTING CIRCUIT, NP1W-13
26-06 INSTALL NEW MOTOR RATED SWITCH FOR AC UNIT.
26-07 INSTALL NEW 208V, 2-POLE MOTOR RATED SWITCH FOR NEW SPLIT SYSTEM CONDENSER UNIT.
26-08 INSTALL NEW PIT LIGHTING ON BOTH SIDES OF THE PIT AS SHOWN.
26-09 INSTALL NEW PIT LIGHTING 10' ABOVE PIT FLOOR OR JUST BELOW ELEVATOR CAB WHEN STOPPED ON LEVEL 1.
26-10 INSTALL NEW SIMPLEX RECEPTACLE FOR OIL SCAVENGER-PUMP 3' ABOVE PIT FLOOR.
26-11 INSTALL NEW GFCI RECEPTACLE FOR SERVICE RECEPTACLE IN PIT, NP1W-27.
26-12 INSTALL NEW SIMPLEX RECEPTACLE 5' ABOVE PIT FLOOR FOR SUMP PUMP, NP1W-10.
26-14 INSTALL NEW SWITCH FOR CONDENSATE PUMP.
26-16 INSTALL NEW 120V MOTOR RATED SWITCH FOR EXHAUST FAN.
26-17 NEW ELECTRICAL EQUIPMENT, CONDUIT, LIGHT FIXTURES AND BOXES TO BE IMPERVIOUS TO LIQUID TO A HEIGHT
OF 6' ABOVE LANDING.
26-18 EXISTING SECURITY PANEL.
26-19 EXISTING FIRE ALARM PANEL.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
GENERAL NOTES
KEY NOTES
A/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
A01 08/20/2021
NEW WORK PLANS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
1/4" = 1' - 0" SCALE OF FEET
2'4' 0 8'4'
REFERRED FROM:1/4" = 1'-0"A01 A02
1 ELEVATOR NEW WORK PLAN - PIER LEVEL
REFERRED FROM:1/4" = 1'-0"A01 A02
2 STAIR/ELEV NEW WORK PLAN - 1ST FLOOR
REFERRED FROM:1/4" = 1'-0"A01 A02
4 STAIR/ELEV NEW WORK PLAN - 2ND FLOOR
KEYPLAN
REFERRED FROM:1/4" = 1'-0"A01 A02
3 STAIR/ELEV RCP - 1ST FLOOR
ALSO SHOWN:
ELECTRICAL,
1. BIDDERS SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND THE
EXTENT OF MATERIAL AND EQUIPMENT REMOVAL AT EACH FLOOR.
2. OBTAIN APPROVAL FROM CONTRACTING OFFICER IF ANY PORTIONS OF CONSTRUCTION ARE REQUIRED TO BE PERFORMED
OUTSIDE OF NORMAL WORKING HOURS.
3. DO NOT SCALE PRINTS, USE FIGURED DIMENSIONS ONLY, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING BUILDING DIMENSIONS, PARTITIONS, WALL LOCATIONS, FLOOR ELEVATIONS AND NOTIFY CO OF ANY DISCREPANCIES IN WRITING PRIOR
TO START OF WORK.
4. PROTECT EXISTING CONSTRUCTION TO REMAIN.
5. ALL DIMENSIONS PROCEEDED BY A +/- SHALL BE REVIEWED AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO
FABRICATION AND/OR INSTALLATION OF AFFECTED WORK.
6. PATCH, TAPE, SAND ALL DEMOLITION SCARS, INCLUDING BUT NOT LIMITED TO REMOVED PARTITIONS, MILLWORK, SURFACE
MOUNTED ELECTRICAL, ETC.
7. FIRESTOP AND PATCH ALL OPENINGS IN CORE WALLS AT REMOVED CONDUITS AND PIPING UNLESS OTHERWISE NOTED FOR
REUSE.
8. FIRESTOP AND PATCH ALL FLOOR CORES AT REMOVED FLOOR OUTLETS AND PLUMBING UNLESS OTHERWISE NOTED FOR
REUSE.
9. PREP AND PRIME ALL INTERIOR WALLS FOR NEW FINISH.
10. FOR ALL ELECTRICAL EQUIPMENT PROVIDE CORROSION RESISTANT.
11. FIRE SUPPRESSION WORK TO REQUIRE NICET 2 CERTIFICATION.
FIRST FLOOR
114' - 0"±
PIER LEVEL
100' - 0"±
SECOND FLOOR
129' - 0"±
D F2 A02
ELEVATOR PIT
96' - 0"±
A04
ELEVATOR
MECH.
101ELEVATOR
26-04
23-08
26-14
26-06
09-0309-03
08-01
UTILITY
STAIR
CORRIDOR
26-08
02-03
26-08
26-01
26-01
FIRST FLOOR
114' - 0"±
PIER LEVEL
100' - 0"±
SECOND FLOOR
129' - 0"±
3 41 A02
ELEVATOR PIT
96' - 0"±
26-08
26-11
26-12
05-02
14-03
14-02
14-0414-04
14-02
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
KEY NOTES
GENERAL NOTES
A/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
A02 08/20/2021
SECTIONS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
02-03 EXISTING TO REMAIN
05-02 EXISTING LADDER TO REMAIN
08-01 PROVIDE NEW DOOR STAINLESS STEEL STOREROOM FUNCTION LOCKSET MATCHING OPERATING TRIM AND TYPE OF
EXISTING DOORS.
09-03 CLEAN AND PAINT ELEVATOR MACHINE ROOM WALLS AND FLOORS. REFER TO ELEVATOR SPECIFICATIONS.
14-02 PROVIDE NEW ELEVATOR CEILING, LIGHTING, AND FLOORING. REFER TO ELEVATOR SPECIFICATIONS.
14-03 PROVIDE NEW PUSHBUTTON STATIONS AND SIGNAL FIXTURES IN CORRIDOR AND ELEVATOR CAR. TYP EACH FLOOR.
14-04 REFER TO ELEVATOR SPECIFICATIONS FOR DETAILED DESCRIPTION OF ELEVATOR COMPONENTS TO BE UPGRADED
AND MODIFIED.
23-08 PROVIDE DUCTLESS SPLIT SYSTEM ON WALL OVER DOOR. (DAC-1)
26-01 INSTALL NEW LIGHT AT TOP OF SHAFT WITH 3-WAY SWITCH TIED TO PIT LIGHTING
26-04 INSTALL NEW LIGHTING IN ELEVATOR MACHINE ROOM TIED TO EXISTING CIRCUIT, NP1W-11.
26-06 INSTALL NEW MOTOR RATED SWITCH FOR AC UNIT.
26-08 INSTALL NEW PIT LIGHTING ON BOTH SIDES OF THE PIT AS SHOWN.
26-11 INSTALL NEW GFCI RECEPTACLE FOR SERVICE RECEPTACLE IN PIT, NP1W-27.
26-12 INSTALL NEW SIMPLEX RECEPTACLE 5' ABOVE PIT FLOOR FOR SUMP PUMP, NP1W-10.
26-14 INSTALL NEW SWITCH FOR CONDENSATE PUMP.
1/4" = 1' - 0" SCALE OF FEET
2'4' 0 8'4'
REFERRED FROM:1/4" = 1'-0"A02 A01
1 STAIR SECTION
REFERRED FROM:1/4" = 1'-0"A02 A01
2 ELEVATOR SECTION
ALSO SHOWN:
ELECTRICAL,
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION
ON FAN SIDE
WASHER
1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm]
NOMINAL WITH MATERIAL TAUT
FLEXIBLE MATERIAL
AS SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON
12" [300mm] CENTERS
RIVET ON 4"
[100mm] CENTERS
SHEET METAL AS SPECIFIED FOR DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEM
ALTERNATE
POSITION OF
BOLT
1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm]
NOMINAL WITH MATERIAL TAUTFLANGED CONNECTION ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
1/2" 1/2"
1/2"
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEETA/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
Designer
Author A03 Checker
08/20/2021
SCHEDULES & DETAILS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
B 4' LED STRIPLIGHT, WET LOCATION SURFACE
LED
80 CRI / 4000K
0-10V DIMMABLE
DRIVER
120-277V 23.8
LITHONIA
OR EQUAL
FEM L48 4000LM LPPFL MD MVOLT GZ10 40K 80CRI
E10WMCP
WET LOCATION RATED
INCLUDE EMERGENCY
BATTERY PACK OPTION
A 4' LED STRIPLIGHT SURFACE
LED
80 CRI / 4000K
LED DRIVER 120-277V 34
LITHONIA
OR EQUAL
ZL1N L48 5000LM FST MVOLT 40K 80CRI E10WLCP WH
INCLUDE EMERGENCY
BATTERY PACK OPTION
TYPE DISCRIPTION MOUNTING LAMP BALLAST/DRIVER VOLTAGE WATTS MANUFACTURER MODEL NUMBER NOTE
LIGHT FIXTURE SCHEDULE
ELEVATOR 208 3 25 hp 100 3 3 - - 8 1/1/2004
NEMA 1 100A BREAKER
ENCLOSURE WITH SHUNT TRIP
CONDENSATE PUMP 115 1 .016kVA 15 1 14 14 14 3/4 1-POLE SWITCH
SP-1 SUMP PUMP 115 1 1/2 hp 20 1 14 14 14 3/4 CORD & PLUG
EF-1 EXHAUST FAN 115 1 1/6 hp 15 1 14 14 14 3/4 MOTOR RATED 1-POLE SWITCH
CU-1 SPIT UNIT (OUTDOOR) 208 1 3.43kVA 20 2 12 - - 12 3/4 MOTOR RATED 2-POLE SWITCH
DAC-1 SPIT UNIT (INDOOR) 208 1 .125kVA 15 2 14 - - 14 3/4 MOTOR RATED 2-POLE SWITCH
TAG DESCRIPTION VOLTS PHASE LOAD MOCP CONDUCTORS NEUTRAL GROUND CONDUIT PLUG DISCONNECT TYPE
EQUIPMENT CONDUCTOR SCHEDULE
PANEL 'NP1W'...
(TOTAL KVA) X 1000 = TOTAL AMPS
VOLTS X 1.732 0
PANEL / FEEDER (TOTAL KVA) 0.00
TOTAL DEMAND AMPERES PER PHASE 0 0 0
NOTE:
ALL MOTOR CIRCUIT BREAKERS SHALL BE HACR RATED.
(N) NEW CIRCUIT
TOTAL KVA PER PHASE 0.00 0.00 0.00 0.00 0.00 0.00
SIGN 0.00 0.00 0.00 125% 0.00 0.00 0.00
DEDICATED RECEPT 0.00 0.00 0.00 100% 0.00 0.00 0.00
NEUTRAL RATING 100% FIX. ELEC. SPACE HEAT 0.00 0.00 0.00 100% 0.00 0.00 0.00
BUS RATING 250A WATER HEATERS 0.00 0.00 0.00 125% 0.00 0.00 0.00
MCB RATING 250A ALL OTHERS 0.00 0.00 0.00 100% 0.00 0.00 0.00
MINIMUM AIC (K AMPS) 10 MOTORS AND
EQUIPMENT
LARGEST 0.00 0.00 0.00 125% 0.00 0.00 0.00
SERVICE ENTR. RATED X YES NO >10KVA@50% 0.00 0.00 0.00
MAIN CIRCUIT BREAKER X YES NO GENERAL USE
RECEPT
0.00 0.00 0.00
<=10 KVA@100% 0.00 0.00 0.00
ISOLATED GROUND BUS YES X NO GENERAL LIGHTING 0.00 0.00 0.00 125% 0.00 0.00 0.00
MOUNTING SURFACE A B C A B C
C/B TEMP. 75 C. RATING 120 208 V 3 PH 4 WIRE
LOAD TYPE
CONNECTED KVA NEC DEM
FACTOR
DEMAND KVA
2.44 2.23 2.64 TOTAL
SUB TOTAL 0.00 0.18 0.00 2.44 2.05 2.64 SUB TOTAL
001 & COL. 8 RECEPT. PIER... --- --- 0.00 1P-20 41 42 1P-20 --- --- 0.00 SPACE
001 LIGHTING --- 0.00 --- 1P-20 39 40 1P-20 --- 0.00 --- LIGHTING TIME CLOCK
GFI-RECPT. PIER LEVEL @ ELEV. 0.00 --- --- 1P-20 37 38 1P-20 0.00 --- --- SPACE
GFI --- --- 0.00 1P-20 35 36 1P-20 --- --- 0.00 RECEPT. NORTH WALL 108
GFI-ENTRY WAY --- 0.00 --- 1P-20 33 34 1P-20 --- 0.00 --- SPARE
105-RECEPTACLE 0.00 --- --- 1P-20 31 32 1P-20 0.00 --- --- BATTERY POWER
ELEVATOR PIT LIGHTING (N) --- --- 0.00 1P-20 29 30 1P-20 --- --- 0.00 SPARE
ELEVATOR PIT GFI RECEPT. --- 0.18 --- 1P-20 27 28 1P-20 --- 0.00 --- SPARE
105 & 107-RECEPTACLE 0.00 --- --- 1P-20 25 26 1P-20 0.00 --- --- SPARE
108-RECEPTACLE --- --- 0.00 1P-20 23 24 1P-20 --- --- 0.00 108 FLOOR RECEPT.
SPARE --- 0.00 --- 1P-20 21 22 1P-20 --- 0.00 --- 105-FAB COIL UNIT
SPARE 0.00 --- --- 1P-20 19 20 1P-20 0.02 --- --- CONDENSATE PUMP (N)
EXTERIOR LIGHTING-WEST --- --- 0.00 1P-20 17 18 1P-15 --- --- 0.51 EF-1 EXHAUST FAN (N)
HANDYCAP DOOR --- 0.00 --- 1P-20 15 16 --- 0.06 ---
ELEV. RM. RECEPT 0.00 --- --- 1P-20 13 14
2P-15
0.06 --- --- DAC-1 ELEV. RM. HVAC SPLIT UNIT -
INDOOR UNIT (N)
ELEV. RM. LIGHTING --- --- 0.00 1P-20 11 12 1P-20 --- --- 1.13 ELEV. PIT OIL RECOVERY (N)
FRONT STEP LIGHTING --- 0.00 --- 1P-20 9 10 1P-20 --- 1.13 --- SP-1 ELEV. PIT SUMP PUMP (N)
EXTERIOR LIGHTING-NORTH 0.00 --- --- 1P-20 7 8 1P-20 1.50 --- --- ELEV. CONTROL (N)
ENTRY WAY LIGHTING --- --- 0.00 1P-20 5 6 1P-20 --- --- 1.00 ELEV. CAB LIGHTING (N)
RM. 103- LIGHTING --- 0.00 --- 1P-20 3 4 --- 1.7 ---
RM. 105-107-LIGHTING 0.00 --- --- 1P-20 1 2
2P-20
1.7 --- --- CU-1 ELEV. RM. HVAC SPLIT UNIT -
OUTDOOR UNIT (N)
A B C A B C
LOAD SERVED
KVA / Phase
CKT
BRKR
CKT
NO
NEUTRAL
A B C
CKT
NO
CKT
BRKR
KVA / Phase
LOAD SERVED
2. PROVIDE DISCONNECT SWITCH, MOTORIZED DAMPER (POWERED FROM FAN CIRCUIT), ELECTRONICALLY COMMUTATED MOTOR, INLET GUARD, AND COOLING THERMOSTAT TO CONTROL FAN OPERATION.
1. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
REMARKS
EF-1 500 0.25 SQUARE INLINE
BACKWARD INCLINED
CENTRIFUGAL
9.5 36% DIRECT 1,274 0.06 1/6 1 115 1750 CONSTANT 1, 2
CFM IN IN BHP HP
TYPE WHEEL
DIAMETER MIN %
EFF
DRIVE
FAN MAX
RPM
NOMINAL
POWER PHASE VOLT RPM
SPEED
CONTROL
MARK
AIR
FLOW
EXT. STATIC
PRESSURE
FAN MOTOR ELECTRICAL
REMARKS
FAN SCHEDULE
3. PROVIDE MANUFACTURER'S PROGRAMMABLE THERMOSTAT.
2. PROVIDE CONDENSATE PUMP. BASIS OF DESIGN IS ASPEN PUMPS "MINI LIME" (OR EQUAL), 100-250 VAC, 0.16 AMPS, 16 WATTS, 3.2 GALLONS/HOUR PUMPING CAPACITY
1. INSTALL PER MANUFACTURER'S INSTRUCTIONS. REFRIGERANT PIPING SHOWN ON PLANS IS FOR REFERENCE ONLY. SIZE, ROUTE AND INSTALL REFRIGERANT PIPING IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
REMARKS:
DAC-1/CU-1
ELEVATOR
MACHINE ROOM
ELEVATOR
MACHINE ROOM
635/470 24 18 17.6 80 67 95 0.6 15 208/1 16.5 20 208/1 1, 2, 3
CFM MBH MBH °F °F °F MCA MOP VOLTS/PHASE MCA MOP VOLTS/PHASE
Db Wb
MIN TOTAL
CAPACITY
MIN SENS
CAPACITY
MIN SEER
EAT OSA
DESIGN
TEMP
INDOOR UNIT OUTDOOR UNITMARK LOCATION
AREA AND/OR BLDG
SERVED
SUPPLY AIRFLOW,
HI/LOW
COOLING CAPACITY ELECTRICAL DATA
REMARKS
DUCTLESS SPLIT SYSTEM AIR CONDITIONER
3. PROVIDE NEMA 4X WEATHERTIGHT CORROSION RESISTANT ENCLOSURE, CONTROL PANEL, CORD AND PLUG, FLOATS AND ALARMS.
2. BASIS OF DESIGN IS STANCOR "OIL MINDER" (OR EQUAL).
1. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
REMARKS
SP-1 ELEVATOR PIT
SIMPLEX
"OIL-MINDER"
EFFLUENT WATER 50 18 1 45 0.5 1 115 3450 CONSTANT 1, 2, 3
GPM FT HP
FLUID
FLOW HEAD
SP. GR.
MIN. %
EFF
NOMINAL
POWER
PHASE VOLT
MAX
RPM
SPEED
CONTROL
REMARKS
MARK LOCATION TYPE
CIRCULATING FLUID ELECTRICAL MOTOR
SUMP PUMP SCHEDULE
REFERRED FROM:1" = 1'-0"A03
1 FLEXIBLE DUCT CONNECTIONS
ALSO SHOWN:
ELECTRICAL,
Y"
X"
W"
Z"
MOUNT UNIT A
MINIMUM OF 7' AFF
BOLT UNIT TO FRAME (TYP.)
UNISTRUT FRAME
CLEARANCE IN
ACCORDANCE WITH
EQUIPMENT
MANUFACTURER'S
INSTRUCTIONS
REFRIGERANT
LIQUID AND SUCTION
LINES
W
ALL
CLEARANCE IN
ACCORDANCE WITH
EQUIPMENT
MANUFACTURER'S
INSTRUCTIONS
CLEARANCE IN
ACCORDANCE WITH
EQUIPMENT
MANUFACTURER'S
INSTRUCTIONS
W1
W
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND
INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE
SINGLE THICKNESS VANE TYPE REGARDLESS OF W
DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2"
[50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm]
TRAILING EDGE.
4. WHEN W EQUALS W2 AND W1 IS GREATER THAN
20" [500mm] VANES SHALL BE DOUBLE VANE
TYPE.
SECTION
"A-A"
ACCESS PANEL
ACCESS DOOR
SECTION
"B-B"
"A"
"A"
INSULATION
DUCT
GASKET
INSULATION
NOTES:
1. LATCHES SHALL BE OF THE
WEDGE TYPE TO CLOSE
DOORS TIGHTLY.
2. HINGES ON THE ACCESS
DOORS SHALL HAVE NON-
CORROSIVE PINS.
3. SEE SMACNA 2006, FIGURE
9-15.
"B" "B"
CASING
INSULATION
GASKET
HANDLE INSIDE
FLEXIBLE WASHER
FACTORY
FABRICATED LATCH
EXISTING
ELEVATOR
PIT/HOISTWAY
ELECTRIC
OUTLET BY
ELECTRICAL
CONTRACTOR
POWER SUPPLY
MULTI-PIN CONNECTOR
AND CORD IN CONDUIT.
LENGTHS AS REQUIRED.ELEVATOR
MACHINE
ROOM
UTILITY
ROOM
FLOOR
JUNCTION BOX
GATE
VALVE
1. STANCOR "OIL MINDER" (OR EQUAL) SURFACE-
MOUNTED EFFLUENT PUMP, 0.5HP, 115 VOLT, 3450
RPM, 2" DISCHARGE. SURFACE MOUNT PUMP IN NEW
DEPRESSION IN PIT FLOOR. MOUNT ALUMINUM ANGLE
AND EXPANDED METAL CAGE OVER TOP OF SUMP
PUMP.
2. STANCOR (OR EQUAL) CHECK VALVE.
3. STANCOR OIL-MINDER (OR EQUAL), 115V, 1Ø
CONTROL SYSTEM WITH OPTIONAL BUILT IN AUDIBLE
AND VISUAL ALARM WHEN PUMP DOES NOT RUN DUE
TO OIL IN PIT, HIGH AMPERAGE OF HIGH LIQUID
CONDITION. PROVIDE SILENCING BUTTON FOR AUDIBLE
ALARM BUILT INTO PANEL. PANEL SHALL HAVE
ADDITIONAL CONTACT FOR A REMOTE ALARM
LOCATION.
4. JUNCTION BOX WILL BE PROVIDED WITH MULTI-PIN
CONNECTOR AND CORD IN LENGTHS AS REQUIRED;
25 FT. IS STANDARD, OPTIONAL 25FT. INCREMENTS
AVAILABLE.
5. ALL BURIED PUMP PRESSURE DISCHARGE PIPING
SHALL BE PROTECTED WITH TAPECOAT CT (OR
EQUAL) CORROSION PROTECTION TAPE.
6. OIL-MINDER POWER CABLE, PROBE CABLE AND
FLOAT CABLE (ALL 16' LONG).
7. HIGH LIQUID ALARM FLOAT WITH CLAMP DEVICE TO
MOUNT TO PUMP DISCHARGE PIPING.
8. ORIENT FLOAT AS LOW AS POSSIBLE WITHIN
DEPRESSION TO ACTIVATE WHEN DEPRESSION FILLS
WITH WATER AND DEACTIVATE WHEN EMPTY. FLOATS
ARE SHOWN DIAGRAMMATICALLY ONLY.
9. SAW CUT A NEW DEPRESSION IN ELEVATOR PIT
FLOOR SLAB TO ALLOW FOR ADEQUATE COLLECTION
OF WATER INTO SUMP PUMP INLET. DEPRESSION
SHALL BE 6" DEEP, APPROXIMATELY 18"x18" SQUARE
(COORDINATE ACTUAL LENGTH AND WIDTH WITH SUMP
PUMP AND FLOAT SYSTEM).
05-01
A04
SEALANT &
BACKER ROD
1 1/2" X 1/4" THK.
STL. PLATE (CONT.)
ON STL SHIMS
3/4 X 3/4 X 1/8
SS ANGLE, CONT.
EXIST ELEV.
DOOR & FRAME
MIN. 18 GA. S.S.
PROVIDE 3/8" DIA.
WEEP HOLES AT 6"
FROM EACH END
NOTE: SET EDGE OF S.S.
BRAKE METAL IN CONT. BED
OF CONCEALED SILICONE
SEALANT AT S.S. ANGLE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEETA/E FIRM:
OF
PKG.
NO.
SHEET
xxxxxxQUINN EVANS
ARCHITECT:
DRAWING NO.
ANN ARBOR, MI
DETROIT, MI
MECHANICAL &
ELECTRICAL:
APOGEE
RALEIGH, NC
P L ib e rt y S q u a re V C D w g s R e v it L i b e rt y S q u a re R .r v t
A04 08/20/2021
DETAILS
REPLACEMENT OF ADA ELEVATOR
FORT SUMTER NATIONAL MONUMENT
05-01 PROVIDE BREAK METAL STAINLESS STEEL CLOSURE. SEAL
WITH A SILICONE SEALANT JOINT AT THE LEADING EDGE OF
THIS TRIM. PROVIDE TWO PLASTIC WEEPS PRIOR TO SEALING.
A04
3 DUCTWORK SQUARE VANE ELBOWS
A04
4 ACCESS PANEL AND DOOR DETAIL
A04
6 SECTION AT SUMP PUMP
ALSO SHOWN:
ELECTRICAL,
MECHANICAL,
& PLUMBING
A04
WALL MOUNTED CONDENSING
UNIT INSTALLATION DETAIL
REFERRED FROM:1/4" = 1'-0"A04 A01
2 TYPICAL ELEVATOR DOOR ELEVATION
REFERRED FROM:1" = 1'-0"A04 A02
5 HEADER AT PIER LEVEL DOOR
| Sheets |
| G00 - COVER SHEET |
| G01 - SYMBOLS AND ABBREVIATIONS |
| AS00 - KEYPLAN & SITE PLAN STAGING |
| D01 - DEMOLITION PLANS |
| A01 - NEW WORK PLANS |
| A02 - SECTIONS |
| A03 - SCHEDULES & DETAILS |
| A04 - DETAILS |
File details come from the government source that posted it. Updated .