This document provides an amendment to a solicitation for modernizing an ADA elevator at the Liberty Square Visitor Education Center Fort Sumter National Historic Park. The solicitation seeks to replace the existing ADA elevator through a lowest price technically acceptable source selection process. Offerors must demonstrate technical experience modernizing similar elevator systems and a record of relevant past performance. The amendment includes revised evaluation criteria emphasizing price, technical approach, and performance history. To be considered technically acceptable, offers must fully address the technical requirements and performance expectations without omission. The National Park Service will evaluate proposals on an acceptable/unacceptable basis for technical merit and performance risk before considering pricing. The amendment does not modify the March 21, 2022 to December 21, 2022 period of performance for the modernization project.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P5122R0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
01/19/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/19/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide questions and answers and a revised Section M -
Evaluation Factors for Award.
The questions and answers are provided as attachment 0007.
Legacy Doc #: NPS
Period of Performance: 03/21/2022 to 12/21/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Edward Dingle
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Section M - Evaluation Factors for Award
M.1-Evaluation Factors for Award
A. General Considerations. For the purpose of this evaluation, the proposals will be evaluated under the following areas of consideration: price, technical ability/approach, relevant past performance/experience.
The Government intends to evaluate proposals and award on initial proposals. Therefore, the offeror’s initial proposal shall contain the offeror’s best price. If multiple line items are priced, each line item will be evaluated to ensure that balanced pricing exists. If the line items are determined to be unbalanced for the offeror that presents the lowest priced technically acceptable proposal, the Government will allow that offeror the opportunity to balance the line items prior to award. If the offeror cannot, or chooses not to, balance the line items, the Government shall deem the offeror’s proposal as unacceptable. In addition to the evaluation of the proposal for award determination, the Government may consider your past performance from data obtained from other sources.
B. Basis for Award. Award will be made to the selected contractor on the basis of the "best value" Lowest Price Technically Acceptable proposal that the Government determines can best satisfy the objectives and requirements of this Request for Proposal, in a manner most advantageous to the Government. The documentation that is submitted by each offeror in response to the instructions for preparing the proposal will receive a thorough evaluation. Offeror’s must convey to the Government that they are capable to accomplish the work in a coordinated and timely fashion, such that all the needs of the requirement will be accomplished.
Respondents are required to address the acceptable/unacceptable Technical Factor as follows:
Lowest Price Technically Acceptable Evaluation Process
The Government will evaluate all technical proposals on an acceptable/unacceptable basis to determine all offers that meet the minimum technically acceptable requirements. Failure to meet a requirement may result in an offer being determined technically unacceptable. An unacceptable rating for any one factor makes the entire proposal unacceptable. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States Government will not reimburse any offeror for any proposal preparation costs.
Factor 1 - Technical Ability/Approach:
The offeror's proposal provide detailed specific information. Information provided for Technical capability/approach and past performance should be relevant to this requirement as outlined in the Specifications (Construction Document), Drawings, and all other supporting documents. The offeror's proposal shall include a safety/protection plan, and construction sequence to be able to complete this project. Failure to provide sufficient information so that the evaluation team cannot discern if the offeror has a thorough understanding of the work in question may lead to the offeror receiving an unacceptable rating.
Factor 2 – Past Performance
Evaluation: This factor evaluates the past performance of the Offeror to determine the offeror’s relevant and recent performance on the same or similar requirements.
Acceptability Standard: Relevant Experience and Past Performance: The offeror’s elevator project experience information will be evaluated to assess the offeror’s experience level on recent and relevant contracts for similar work.
TECHNICAL RATINGS:
Technical Acceptable/Unacceptable Ratings
Rating Description
Acceptable Proposal clearly meets or exceeds the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
PAST PERFORMANCE RATING:
Past Performance Acceptable/Unacceptable Ratings
Adjectival Rating Description Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
The Government reserves the right to reject any or all proposals if such action is deemed in the best interest of the Government.