This is an Erosion and Sediment Control Plan prepared by Herbert, Rowland & Grubic, Inc. for Mercer County, Pennsylvania, associated with the Repairs of Bridge 1916 project located in Jefferson Township on Route T-547 (Hassel Road). The project involves repairs to bridge abutments and barriers, requiring comprehensive erosion and sediment control measures throughout the construction period. Key construction activities include installation of cofferdams, rip rap scour protection, wing wall tie-back anchors, concrete repairs, and site stabilization. The plan mandates a preconstruction meeting at least 7 days prior to earth disturbance activities, with notification to the Pennsylvania One Call System Inc. required at least 3 days before work begins. Temporary and permanent erosion control measures include compost filter socks, erosion control blankets, seeding with specific formulas and rates, mulching, and pumped water filter bags for dewatering. The contractor must maintain daily and weekly inspections of all best management practices (BMPs) with documentation of deficiencies and corrective actions. Permanent stabilization requires achievement of a minimum uniform 70% perennial vegetative cover before removal of temporary controls.
Fill material imported to the site must meet the Department of Environmental Protection's definition of clean fill, with contractors responsible for performing environmental due diligence. All construction waste must be removed from the site and recycled or disposed in accordance with Pennsylvania solid waste management regulations. Temporary seeding using annual rye (Formula E) is required for areas exposed to traffic, while permanent seeding uses tall fescue and other perennial species (Formula D) applied at specified rates between March 15 and October 15. Topsoil stockpiles shall not exceed 35 feet in height with slopes of 2H:1V or flatter, protected by compost filter socks. The contractor is responsible for street cleaning and preventing off-site sediment tracking, with sediment removal from BMPs disposed of on-site during construction or at approved facilities once stabilization is achieved. Violations of Pennsylvania Clean Streams Law provisions regarding E&S BMP installation and maintenance may result in civil penalties up to $10,000 per day or criminal penalties up to $25,000 for misdemeanors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRICT COUNTY ROUTE SECTION SHEET
OF
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:5
P
L O
T T
E D
CKD: MJA
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
MERCER
EROSION AND SEDIMENT CONTROL NOTES
MJA
CLEAN FILL REQUIREMENTS
DETAILED ON THE APPROVED PLAN, WHETHER LOCATED WITHIN OR OUTSIDE OF THE CONSTRUCTION LIMITS.
SEPARATE EROSION AND SEDIMENTATION CONTROL PLAN FOR EACH SPOIL, BORROW OR OTHER WORK AREA NOT
THE CONTRACTOR MUST DEVELOP, AND HAVE APPROVED BY THE APPROPRIATE COUNTY CONSERVATION DISTRICT, A
APPLICABLE.
CHAPTER 287: RESIDUAL WASTE MANAGEMENT, OR CHAPTER 271: MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS
MANAGED IN ACCORDANCE WITH DEP'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE
"MANAGEMENT OF FILL".
QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF DEP'S POLICY
BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT
THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF A REGULATED SUBSTANCE. IF THE FILL MAY HAVE
DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT
TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE
PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL
VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF
ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B FOR IN DEP'S POLICY "MANAGEMENT OF FILL".
THAT THE FILL MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE
SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS
OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. FILL MATERIALS AFFECTED BY A
THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL.
FILL. CLEAN FILL CAN NOT BE PLACED IN OR ON WATERS OF THE COMMONWEALTH.
FILL IMPORTED TO THE SITE MEETS THE DEPARTMENT OF ENVIRONMENTAL PROTECTION'S (DEP) DEFINITION OF CLEAN
THE OPERATOR(S) WILL BE RESPONSIBLE TO PERFORM ENVIRONMENTAL DUE DILIGENCE AND DETERMINE THAT ALL
SEQUENCE OF CONSTRUCTION
PERMANENT CONTROL MEASURES
RESEEDED AS NECESSARY.
STAND OF VEGETATION IS ACHIEVED AND MAINTAINED. AREAS SHALL BE FERTILIZED AND
SEEDED AND VEGETATED AREAS SHALL BE CHECKED REGULARLY TO INSURE THAT A GOOD 1.
MAINTENANCE:
EROSION AND SEDIMENT POLLUTION CONTROL PLAN.
SEED MIX, REFER TO THE SEEDING NOTES AND SEEDING SCHEDULE TABLE PROVIDED ON THE
ON ALL NON-PAVED DISTURBED AREAS. WITH REGARD TO SOIL PREPARATION AND PERMANENT
FERTILIZING, SEEDING, AND MULCHING WILL BE USED AS A PERMANENT E&S CONTROL MEASURE 1.
INSTALLATION:
A. PERMANENT VEGETATIVE STABILIZATION
BE REMOVED AND PROPERLY DISPOSED.
STABILIZATION WILL BE A UNIFORM 70% PERENNIAL VEGETATIVE COVER) TEMPORARY CONTROL MEASURES CAN
12. ONCE THE SITE HAS BEEN STABILIZED (AS PER PERMANENT SEEDING SPECIFICATIONS, THE STANDARD FOR
INSTALL PERMANENT SEEDING FOR ALL DISTURBED AREAS.11.
OPERATIONS ON THE SITE.
CONTINUE TO SPREAD TOPSOIL ON ALL AREAS TO BE RE-SEEDED, OR RE-TREATED. BEGIN FINE GRADING 10.
PLACE CONCRETE FOR ABUTMENT/BARRIER REPAIRS.9.
STREAM IMMEDIATELY.
REMOVE CONCRETE TO PERFORM ABUTMENT AND BARRIER REPAIRS. REMOVE ANY DEBRIS THAT FALLS INTO THE 8.
INSTALL WING WALL TIE-BACK ANCHORS.7.
INSTALL RIP RAP SCOUR PROTECTION, REMOVE COFFERDAM, AND RESTORE FLOW.6.
SHALL BE REMOVED IMMEDIATELY. ANY DAMAGED SECTION OF COFFERDAM SHALL BE REPAIRED IMMEDIATELY.
DEWATER THE WORK AREA WITH A PUMPED WATER FILTER BAG. ANY WATER THAT ENTERS THE WORKZONE 5.
ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
EXCAVATE AS REQUIRED FOR INSTALLATION OF RIP RAP SCOUR PROTECTION AND DISPOSE OF MATERIAL IN 4.
DETAILS.
INSTALL COFFERDAM AT THE LOCATION SHOWN ON THE PLAN DRAWINGS AND IN ACCORDANCE WITH THE 3.
WASHOUT, AT ALL LOCATIONS INDICATED ON THE PLAN.
INSTALL COMPOST FILTER SOCKS, INCLUDING COMPOST FILTER SOCKS FOR STOCKPILE AND CONCRETE 2.
FIELD MARK LIMITS OF DISTURBANCE AND ESTABLISH SURVEY BENCHMARKS AND REFERENCE POINTS.1.
ACCORDANCE WITH THE STANDARD DETAIL AND THE MANUFACTURER'S RECOMMENDATIONS.
COFFERDAMS SHALL BE INSTALLED IN CAUSED BY CONSTRUCTION ACTIVITY. TEMPORARY
TEMPORARY COFFERDAMS WILL BE USED TO PROTECT IMPOUNDED WATER FROM THE TURBIDITY
E. TEMPORARY COFFERDAM
MANUFACTURER'S RECOMMENDATIONS.
WATER FILTER BAGS SHALL BE INSTALLED IN ACCORDANCE WITH THE STANDARD DETAIL AND THE
PROVIDE A PRETREATMENT FILTRATION OF THE WATER BEFORE IT LEAVES THE SITE. PUMPED WILL
PUMPED WATER FILTER BAGS WILL BE USED TO CLEAN EQUIPMENT AND CONTAMINATED WATER AND
D. PUMPED WATER FILTER BAGS
RESEEDED AS NECESSARY.
STAND OF VEGETATION IS ACHIEVED AND MAINTAINED. AREAS SHALL BE FERTILIZED AND
SEEDED AND VEGETATED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD 1.
MAINTENANCE:
TO SEEDING NOTES.
TO THE SEEDING SCHEDULE TABLE; WITH REGARD TO SOIL PREPARATION AND SEEDING, REFER
INCLUDING STOCKPILED SOIL MATERIALS. WITH REGARD TO THE TEMPORARY SEED MIX, REFER
TRAFFIC, SHALL NOT REMAIN UNSEEDED OR COVERED BY MULCH FOR MORE THAN FOUR DAYS,
ON ALL NON-PAVED DISTURBED AREAS. EXPOSED SOILS, NOT SUBJECT TO CONSTRUCTION
FERTILIZING, SEEDING, AND MULCHING WILL BE USED AS A TEMPORARY E&S CONTROL MEASURE 1.
INSTALLATION:
C. TEMPORARY VEGETATIVE STABILIZATION
ALL DAMAGED SECTIONS OF THE EROSION CONTROL BLANKET SHALL BE REPLACED.1.
MAINTENANCE:
RECOMMENDATIONS.
USE STAPLE PATTERN D FOR ALL BLANKET INSTALLATIONS AS PER THE MANUFACTURER'S 2.
WITH THE MANUFACTURER'S RECOMMENDATIONS.
INSTALL THE EROSION CONTROL BLANKETS IN TEN FOOT VERTICAL INCREMENTS IN ACCORDANCE 1.
INSTALLATION:
ACCORDANCE WITH THE STANDARD DETAIL.
ON ALL SLOPES GREATER THAN 3:1 AND IN THE LOCATIONS SHOWN ON THE PLAN AND IN INSTALLED
THE NORTH AMERICAN GREEN C125BN EROSION CONTROL BLANKET OR APPROVED EQUAL SHALL BE
B. EROSION CONTROL BLANKET
DUE TO WEATHERING.
ADHERE TO ANY MANUFACTURER'S RECOMMENDATIONS FOR REPLACING COMPOST FILTER SOCK 3.
SOIL DISTURBANCE.
ORIGINAL ONE TO CREATE MORE SEDIMENT STORAGE CAPACITY WITHOUT SLIGHTLY BEHIND THE
FILTER SOCK. ALTERNATELY, A SECOND COMPOST FILTER SOCK CAN BE PLACED ON TOP OF AND
ACCUMULATION HAS REACHED ONE-HALF (1/2) OF THE EFFECTIVE HEIGHT OF THE COMPOST
REMOVE SEDIMENT AT THE BASE OF THE UPSLOPE SIDE OF THE COMPOST FILTER SOCK WHEN 2.
NECESSARY REPAIRS WILL BE MADE IMMEDIATELY.
THE COMPOST FILTER SOCK SHALL BE INSPECTED AFTER EVERY PRECIPITATION EVENT. ANY 1.
MAINTENANCE:
SEDIMENT RETENTION.FILTRATION AND
FILLING IN THE SEAM BETWEEN THE SOIL SURFACE AND THE DEVICE, WHICH WILL IMPROVE
LOOSE COMPOST MUST BE BACKFILLED ALONG THE UPSLOPE OF THE COMPOST FILTER SOCK, 2.
DEPTH BELOW THE GROUND SURFACE AT THE SPECIFIED INTERVALS.REQUIRED
SUPPORT STAKES WILL BE DRIVEN INTO THE CENTER OF THE COMPOST FILTER SOCK AT THE 1.
INSTALLATION:
ACCORDANCE WITH THE STANDARD DETAIL.
COMPOST FILTER SOCK SHALL BE INSTALLED AT THE LOCATION SHOWN ON THE PLAN AND IN
A. COMPOST FILTER SOCKS
MAINTAIN RECORDS OF ALL INSPECTIONS.
MANUFACTURER'S RECOMMENDATIONS AND THE STANDARD DETAIL. THE CONTRACTOR SHALL
REPLACE ANY DAMAGED SECTIONS OF THE EROSION CONTROL BLANKETS IN ACCORDANCE WITH THE 8.
NECESSARY.
OF VEGETATION IS ACHIEVED AND MAINTAINED. AREAS SHALL BE FERTILIZED AND RESEEDED AS
SEEDED AND VEGETATED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND 7.
STREETS IN A CLEAN AND DUST-FREE CONDITION.
MUD. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN STREETS OF MUD AND KEEP THE
ALL SITE ENTRANCE AND EXIT POINTS SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE TRACKING OF 6.
SHALL BE DISPOSED OFFSITE AT A PADEP APPROVED FACILITY.
ESTABLISHED AND THE TEMPORARY E&S CONTROLS ARE REMOVED, ALL ACCUMULATED SEDIMENTS
DISPOSED OF BY SPREADING IT ONSITE. ONCE A UNIFORM 70% PERENNIAL VEGETATIVE COVER IS
DURING CONSTRUCTION, SEDIMENT REMOVED FROM THE EROSION CONTROL DEVICES SHALL BE 5.
CONTROLS. ADDITIONAL CONTROL MEASURES SHALL BE IMPLEMENTED AS NEEDED.
ALL DISCHARGE LOCATIONS SHALL BE INSPECTED TO ASCERTAIN THE EFFECTIVENESS OF THE 4.
ALL SLOPES SHALL BE CHECKED FOR SIGNS OF EROSION AND/OR SEDIMENTATION.3.
BACKFILL MATERIAL.
FILTER SOCK. ANY EROSION OR UNDERCUTTING WILL BE REPAIRED IMMEDIATELY WITH COMPACTED
WHERE ACCUMULATIONS HAVE REACHED ONE-HALF (1/2) THE ABOVE GROUND HEIGHT OF THE
COMPOST FILTER SOCK ACCUMULATED SEDIMENTS SHALL BE REMOVED, AS REQUIRED, IN ALL CASES 2.
REPLACED BY THE END OF THE WORKING DAY.
EVENT TO MAINTAIN THEIR EFFECTIVENESS. ANY DAMAGED CONTROLS SHALL BE REPAIRED OR
ALL TEMPORARY E&S CONTROL MEASURES SHALL BE INSPECTED DAILY AND AFTER EACH RUNOFF 1.
SEEDING SCHEDULE
8/1 TO 10/15
AND
3/15 TO 6/1
1000 SY
800LBS./
1 BELOW
SEE NOTE
5 LBS./1000 SY%
15 LBS./100 SY%
30 LBS./1000 SY%
10%
30%
60%
FESCUE
RED FESCUE, OR CHEWING
TALL FESCUE, CREEPING
FORMULA D)
(PENNDOT
PERMANENT
3/15 TO 10/15
1000 SY
413 LBS./
1000 SY
207 LBS./
5-5-5 AT
10 LBS./1000 SY100%ANNUAL RYE
FORMULA E
(PENNDOT
TEMPORARY
SEEDING DATELIMING RATEFERTILIZERAPPLICATION RATE
WEIGHT
% BY
SPECIESAPPLICATION
COMPLETED IN WORK AREAS. MULCH SHALL NOT BE USED UNDER FABRIC.
EQUAL. EROSION CONTROL FABRIC SHALL BE INSTALLED IMMEDIATELY AFTER SEEDING OPERATIONS HAVE BEEN
CONTROL FABRIC OR APPROVED COVER SEEDED SLOPES WHERE THE GRADE IS 3:1 OR GREATER WITH EROSION 5.
TOPSOIL. ALL AREAS RECEIVING SEEDING SHALL HAVE A MINIMUM OF 6" OF ORGANIC 4.
S.Y.), MULCH TO BE ANCHORED WITH WOOD CELLULOSE FIBER AT 750 LBS./AC. OR EQUAL.
LBS./AC. (1240 LBS./1000 ALL SEEDED AREAS SHALL BE MULCHED WITH STRAW APPLIED AT A RATE OF 6000 3.
SPECIFICATION ITEMS OBTAINED USING PENNDOT PUBLICATION NO. 4082.
31-0-0 IBDU FERTILIZER AT 61 LBS./1000 S.Y. C.
OR
LBS./1000 S.Y.32-0-0 TO 38-0-0 SULFUR COATED UREA FERTILIZER AT 59-50 B.
OR
38-0-0 UREA FORM FERTILIZER AT 50 LBS./1000 S.Y.
AND
10-20-20 ANALYSIS COMMERCIAL FERTILIZER AT 140 LBS./1000 S.Y. A.
SHALL BE APPLIED AS FOLLOWS:
ABSENCE OF A SOIL TEST, FERTILIZER FERTILIZER SHALL BE APPLIED IN ACCORDANCE WITH A SOIL TEST. IN THE 1.
SEEDING NOTES
OF TRAVEL). MAKE MULTIPLE PASSES WITH THE CRIMPER AS NECESSARY TO SECURE THE STRAW.
USE A CRIMPER DISK (A SPECIFICALLY-DESIGNED HEAVY DISK WITH NO OFFSET TO THE DIRECTION B.
WITH A HYDROSEEDER OVER THE STRAW; OR,
APPLY 750 TO 800 POUNDS PER ACRE APPLICATION OF WOOD CELLULOSE FIBER MULCHA.
POUNDS PER ACRE. PROMPTLY TACK STRAW INTO PLACE USING ON OF THE FOLLOWING METHODS:
BALE-BUSTER OR USING A WOOD CELLULOSE FIBER (NOT PAPER PULP) HYDROMULCH AT A RATE OF 750
PROMPTLY AND EVENLY APPLY STRAW (NOT HAY) MULCH AT A RATE OF 3 TONS PER ACRE USING A 5.
PLACEMENT, USE HYDROSEEDING TECHNIQUES.
MAY BE CONSIDERED COMPLETE. IF SLOPES ARE TOO STEEP TO PERMIT SEED PREPARATION AND
AND TECHNIQUE THAT MINIMIZES RUTTING OF THE SURFACE. IF A BRILLION SEEDER IS USED, THIS STEP
LIGHTLY CULTIPACK TO PRESS SEED INTO SEEDBED USING EQUIPMENT (SUCH AS A LIGHT TRACTOR) 4.
STEP MAY BE SKIPPED.
RUN DOZER SO TRACK MARKS ARE PARALLEL TO SITE CONTOURS. IF A BRILLION SEEDER IS USED, THIS
LIGHT TRACTOR) AND TECHNIQUE THAT MINIMIZES RUTTING OF THE SURFACE. IF TRACKING IS DONE, PREPARE SEEDBED BY CULTIPACKING OR TRACKING WITH A DOZER USING EQUIPMENT (SUCH AS A3.
FERTILIZERS FOR MORE THAN ONE HOUR.
MULCH USING A HYDRO SEEDER AS LONG AS SEED AND INOCULANT IS NOT IN A SLURRY WITH
PREPARATION. ON EXTREMELY STEEP SLOPES, AMENDMENTS MAY BE APPLIED WITH THE SEED AND
SLOPES DO NOT PERMIT TILLAGE, TRACK SLOPE WITH A DOZER AS DESCRIBED UNDER SEEDBED
WHERE SLOPES PERMIT, PROMPTLY DISK ALL AMENDMENTS UNDER A 3 TO 6-INCH DEPTH. WHERE 2.
REFER TO THE SEEDING SCHEDULE FOR APPLICABLE SOIL AMENDMENTS.1.
AS FOLLOWS:
SOIL PREPARATION AND SEEDING PROCEDURES, TO BE APPLIED IN THE ORDER PRESENTED, ARE
TEMPORARY CONTROL MEASURES MAINTENANCE PROGRAM 1 5
12/18/2025
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:0
P
L O
T T
E D
CKD: MJA
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
MERCER
EROSION AND SEDIMENT CONTROL NOTES
MJA
GENERAL EROSION & SEDIMENT CONTROL NOTES
RECYCLING & DISPOSAL OF WASTE MATERIAL
USED AS CLEAN FILL.
STUMPS AND VEGETATIVE MATERIAL IF THEY ARE SEPARATE FROM OTHER WASTE AND ARE
WASTE FROM LAND CLEARING, GRUBBING AND EXCAVATION, INCLUDING TREES, BRUSH,
UNCONTAMINATED SOIL, ROCK, STONE, GRAVEL, BRICK, BLOCK, CONCRETE, USED ASPHALT,
SUBSTANCES, BRICKS, BLOCK AND UNSEGREGATED CONCRETE. THIS DOES NOT INCLUDE:
STRUCTURES, INCLUDING, BUT NOT LIMITED TO: WOOD, PLASTER, METALS, ASPHALTIC
WASTE RESULTING FROM THE CONSTRUCTION OR DEMOLITION OF BUILDINGS OR OTHER
REGULATIONS § AT 25 PA. CODE 260.1 ET. SEQ., § 287.1 ET. SEQ. THIS INCLUDES SOLID
OR DISPOSED IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT
ALL CONSTRUCTION/DEMOLITION WASTE MUST BE REMOVED FROM THE SITE AND RECYCLED
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS
SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED
DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING
AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE
LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, AND THE E&S PLAN PREPARER, TO AN ON-SITE
PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO
AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED
AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE
PROVIDED ON THE PLAN DRAWINGS.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE
LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH
GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE
SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS
SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
7. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL
OFFICE OF THE PA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
8. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL
CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
9. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN
FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL
AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL
DUE TO ANALYTICAL TESTING.
10. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY.
MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH
RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND
RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
11. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND
AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE
AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
12. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE
CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED
IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY
ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
13. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE
PLAN DRAWINGS.
14. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES
AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
15. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN
OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
SATISFACTORY FILLS.
16. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE
INCORPORATED INTO FILLS.
17. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
18. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE
WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
19. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED
GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED
AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THE PLAN.
20. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE
COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO
SLUMPING, SLIDING, OR OTHER MOVEMENTS.
21. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE
LOCAL CONSERVATION DISTRICT OR THE PA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
22. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM
LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO
RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL
PENALTIES BEING INSTITUTE BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE
PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000
PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO
$25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
23. CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
24. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND
CONSTRUCTION MATERIAL/WASTES.
25. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY
BACKFILLED AND THE CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE
LINING. ANY BASE FLOW WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE
MANNER DESCRIBED IN THIS PLAN UNTIL SUCH RESTORATION IS COMPLETE.
Rh - RED HOOK SILT LOAM, LOW TERRACE
SUBSURFACE DRAIN OR OTHER APPROVED METHOD. FOR
SPECIFICATION WITH THE STANDARD AND ACCORDANCE IN HANDLED
BE SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL 7.
SURFACES. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN 6.
MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE 5.
SATISFACTORY FILLS.
THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
FOREIGN OR OBJECTIONABLE MATERIALS OTHER OR ROOTS, SOD,
FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, 4.
TO EXCEED 9 INCHES IN THICKNESS.
NOT ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS 3.
REQUIREMENTS OR CODES.
ACCORDANCE WITH LOCAL BE COMPACTED IN SHALL ETC. CONDUITS,
AND BUILDINGS, STRUCTURES, SUPPORT TO INTENDED FILL
PROBLEMS. SUBSIDENCE OR OTHER RELATED SLIPPAGE, SETTLEMENT,
EROSION, ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE 2.
OBJECTIONABLE MATERIAL.
REMOVE TREES, VEGETATION, ROOTS, AND OTHER TO TOPSOIL OF
STRIPPED AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND 1.
SOILS LEGEND
SOILS LIMITATIONS NOTES
SOIL LIMITATIONS
SOIL NAME
C U
T B
A C
K S
C A
V E
C O
R R
O S
IV
E
T O
C O
N C
R E
T E
S
T E
E L
D R
O U
G H
T Y
E A
S
IL
Y E
R O
D
IB
L E
F L
O O
D
IN
G
S E
A S
O N
A L
H
IG
H W
A T
E R
T A
B L
E
D E
P T
H T
O S
A T
U R
A T
E D
Z O
N E
H Y
D R
IC
\H
Y D
R
IC
I N
C L
U S
IO
N
S
P R
O N
E
L O
W S
T R
E N
G T
H
L A
N D
S L
ID
E
S L
O W
P E
R C
O L
A T
IO
N
P
IP
IN
G
P O
O R
S O
U R
C E
O F
T O
P S
O
IL
F R
O S
T A
C T
IO
N
S H
R
IN
K -S
W E
L L
P O
T E
N T
IA
L
S
IN
K H
O L
E
P O
N D
IN
G
W E
T N
E
COMBINATION OF THESE AND/OR OTHER METHODS.
TO ANOTHER SOIL TYPE, IMPORT OTHER SOILS FOR THESE FACILITIES, OR IMPLEMENT
LOCATE FACILITIES THAT MAY BE SUSCEPTIBLE TO DAMAGE FROM SHRINK OR SWELLING
SHRINK-SWELL
PRONE TO FROST, OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER METHODS.
FACILITIES ON OTHER SOIL TYPES, DO NOT CONSTRUCT EMBANKMENTS DURING PERIODS
WATER RETENTION BASINS AND STORM WATER DETENTION BASINS, LOCATE THOSE
IMPORT OTHER SOIL FOR EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS, STORM
FROST ACTION
TOPSOIL AND STOCKPILE THESE FOR USE DURING RESTORATION.
AND APPLICATION RATES. IDENTIFY SOILS ON-SITE THAT ARE ADEQUATE SOURCES OF
AS TOPSOIL. PERFORM SOIL TESTS TO DETERMINE THE REQUIRED SOIL AMENDMENTS
IDENTIFY AND RESOLVE CHARACTERISTICS THAT RENDER THE SOIL TYPES POORLY SUITED
TOPSOIL
POOR SOURCE OF
COMBINATIONS OF THESE AND/OR OTHER METHODS.
FACILITIES ON OTHER SOIL TYPES, LIMIT EMBANKMENT SLOPE STEEPNESS, OR IMPLEMENT
WATER RETENTION BASINS AND STORM WATER DETENTION BASINS, LOCATE THOSE
IMPORT OTHER SOIL FOR EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS, STORM
PIPING
SUCH AS COMPOST AT THOSE LOCATIONS.
TRAFFIC AT THOSE LOCATIONS, TILL SOIL IN THOSE LOCATIONS, ADD SOIL AMENDMENTS
LOCATE INFILTRATION FACILITIES TO ANOTHER SOIL TYPE, RESTRICT CONSTRUCTION
SLOW PERCOLATION
IMPLEMENT A COMBINATION OF THESE AND/OR OTHER METHODS.
FOR CUT/FILL SLOPES, REDUCE SLOPE, INSTALL EROSION CONTROL MATTING, OR
CONSTRUCTION, OR IMPLEMENT A COMBINATION OF THESE AND/OR OTHER METHODS.
LOCATE ROADWAYS TO OTHER SOIL TYPES, IMPORT OTHER SOILS FOR THESE ROADWAY
LANDSLIDE PRONE
LOW STRENGTH \
WATER FILTER BAGS TO DEWATER DISTURBED ARES DURING CONSTRUCTION.
OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER METHODS. UTILIZE PUMPED
SELECT VEGETATIVE SPECIES TOLERANT TO WET CONDITIONS, TILE VEGETATED AREAS,
SOILS
WETNESS & HYDRIC
WATER TABLE,
ZONE, SEASONAL HIGH
DEPTH TO SATURATED
AND/OR OTHER METHODS.
PERMANENT LININGS OTHER THAN GRASSES, OR IMPLEMENTING COMBINATIONS OF THESE
INCREASE CHANNEL WIDTH, SELECT VEGETATION WITH A GREATER RETARDANCE, SELECT
PROVIDE TEMPORARY OR PERMANENT CHANNEL LINING, DECREASE CHANNEL GRADE,
EASILY ERODIBLE
AREAS, OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER METHODS.
SELECT VEGETATIVE SPECIES TOLERANT TO DRY CONDITIONS, IRRIGATE VEGETATED
DROUGHTY
OTHER METHODS.
MATERIALS IN LIEU OF CONCRETE OR STEEL, OR A COMBINATION OF THESE AND OR
PROTECT CONCRETE AND STEEL WITH PROTECTIVE COATINGS, SELECT ALTERNATIVE
CONCRETE OR STEEL
CORROSIVE TO
MATS, BONDED FIBER MATRIX, OR A COMBINATION OF THESE AND/OR OTHER METHODS.
TRENCHING. STABILIZE BANKS IMMEDIATELY WITH SEED, MULCH, EROSION CONTROL
CONDUCT TRENCHING OPERATIONS IN ACCORDANCE WITH OSHA TECHNICAL MANUAL FOR
CUTBANKS CAVE
RESOLUTIONLIMITATION
SOIL LIMITATION RESOLUTIONS
RED HOOK X X X X X X X XC/S
X
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:4
P
L O
T T
E D
CKD: MJA
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
6MERCER
N81°14'27"E
11 12
P
P
EROSION AND SEDIMENT CONTROL PLAN
PROPOSED LEGEND
1000 EXISTING CONTOUR
LOD LIMITS OF DISTURBANCE
SOIL BOUNDARY / SOIL TYPE
PROPOSED COFFERDAM
P
PUMP
PUMP WATER FILTER BAG
CONCRETE WASHOUT
TOPSOIL LOCATIONPROPOSED RIP RAP
Rh
3 5
LIMIT OF DISTURBANCE (TYP.)
COFFERDAM (TYP.)
PUMPED WATER FILTER BAG
CONCRETE WASHOUT
STOCKPILE
TOPSOIL T-547 (HASSEL ROAD)
STA 12+25.00
LIMIT OF WORK
T-547 (HASSEL ROAD)
STA 11+00
LIMIT OF WORK
CONDITIONS WHILE PLACING RIP RAP SCOUR PROTECTION.
CONTRACTOR IS TO PLACE AND RELOCATE PUMP AS NECESSARY TO MAINTAIN DRY WORKING
PUMPED WATER FILTER BAG TO BE USED TO DEWATER WORK AREA BEHIND COFFERDAM.
NOTE:
5 0 5 10 FEET
SCALE
Rh
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:4
P
L O
T T
E D
CKD: MJA
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
MERCER
TOPSOIL/DEBRIS
STOCKPILE
EXISTING GROUND
NOT TO SCALE
TOPSOIL/ DEBRIS STOCKPILE DETAIL
INSTALL COMPOST FILTER SOCK
AROUND ENTIRE STOCKPILE
2 BAG MINIMUM HEIGHT ABOVE BASE FLOW
STACKED SANDBAGS OPTION
NOT TO SCALE
SANDBAG DIVERSION DAM OR COFFERDAM
SANDBAGS
IMPERVIOUS MEMBRANE
FLOW ELEVATION
NORMAL STREAM
CLAMPS
FILTER BAG
THE FOLLOWING STANDARDS:
THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET
STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH
NOTES:
IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE
MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE
MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE
ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST
STEEPNESS.
NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE
NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER
BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL
RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION
ALREADY ATTACHED.
SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS
BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS
BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL
80 SIEVEASTM D-4751AOS % RETAINED
70%ASTM D-4355UV RESISTANCE
350 PSIASTM D-3786MULLEN BURST
110 LBASTM D-4833PUNCTURE
205 LBASTM D-4632GRAB TENSILE
60 LB/INASTM D-4884AVG. WIDE WIDTH STRENGTH
MINIMUM STANDARDTEST METHODPROPERTY
PLAN VIEW
(RECOMMENDED)
STRAPS
HEAVY DUTY LIFTING
PUMP
INTAKE HOSE
WELL VEGETATED, GRASSY AREA
HOSE
DISCHARGE
FILTER BAG
DISCHARGE HOSE
CLAMPS
INTAKE HOSE
PUMP
ELEVATION VIEW
WELL VEGETATED, GRASSY AREA
GRADE
EXISTING
ACCEPTABLE TO ENGINEER AND OWNER.
ALTERNATIVE COFFERDAMS MAY BE UTILIZED BY CONTRACTOR IF 2.
MATERIALS AND CONSTRUCTION REQUIREMENTS.
CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTION OF COFFERDAM 1.
NOTES
25' DIAMETER
PLAN VIEW
24" DIA. COMPOST FILTER
SOCK. 4' MIN. OVERLAP ON
UPSLOPE SIDE OF FILTER RING
2"x2"x36" WOODEN
STAKES PLACED 5' O.C.
DIRECT CONCRETE
WASHOUT WATER INTO
FILTER RING
A
A
MAXIMUM DEPTH OF
CONCRETE WASHOUT
FILTER RING HEIGHT
24" DIA. COMPOST
FILTER SOCK
2"x2"x36"
WOODEN STAKES
PLACED 5' O.C.
M
I N
SECTION A-A
CONCRETE WASH-OUT DETAIL
NOT TO SCALE
NOTES:
1. PROVIDE PROPER SIGNAGE FOR CONCRETE DELIVERY VEHICLE DRIVERS SO THAT THEY
ARE AWARE OF THE PRESENCE OF WASHOUT FACILITIES.
2. WASHOUT FACILITIES SHOULD NOT BE PLACED WITHIN 50' OF STORM DRAINS, OPEN
DITCHES, OR SURFACE WATERS. UNDER NO CIRCUMSTANCES SHOULD WASH WATER BE
ALLOWED TO ENTER ANY SURFACE WATERS.
3. WHEREVER POSSIBLE, CONCRETE WASHOUTS SHOULD BE LOCATED ON SLOPES NOT
4. A SUITABLE IMPERVIOUS GEOMEMBRANE SHOULD BE PLACED AT THE LOCATION OF THE
WASHOUT. COMPOST SOCKS SHOULD BE STAKED IN THE MANNER RECOMMENDED BY THE
MANUFACTURER AROUND PERIMETER OF THE GEOMEMBRANE SO AS TO FORM A RING
WITHIN THE ENDS OF THE SOCK LOCATED AT THE UPSLOPE CORNER. CARE MUST BE
TAKEN TO ENSURE CONTINUOUS CONTACT OF THE SOCK WITH THE GEOMEMBRANE AT
ALL LOCATIONS. WHERE NECESSARY, 18" SOCKS MAY BE STACKED ONTO 24" SOCKS
AND STAKED SO AS TO FORM A TRIANGULAR CROSS SECTION.
GEOMEMBRANE
NOT TO SCALE
PUMPED WATER FILTER BAG
EROSION AND SEDIMENT CONTROL DETAILS
DISTRICT COUNTY ROUTE SECTION SHEET
OF
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:4
P
L O
T T
E D
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
MERCER
DISTRICT COUNTY ROUTE SECTION SHEET
OF
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:4
P
L O
T T
E D
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
MERCER
REV
NO
REVISIONS DATE BY APPD
D-9012 CADD (02-90) REVISED (04-17)
D
E C
:5
P
L O
T T
E D
CKD: MJA
HERBERT, ROWLAND & GRUBIC, INC.
220 WEST KENSINGER DRIVE
SUITE 100
CRANBERRY TOWNSHIP, PA. 16066
T-547
JEFFERSON TOWNSHIP
1-0
DES: EJT DWG: EJT
6MERCER
F L
O W
F L
O W
DISTURBED AREA
UNDISTURBED AREA
SECTION
PLAN VIEW
DISTURBED AREA UNDISTURBED AREA
MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED.
S RECOMMENDATIONS.’ACCORDING TO MANUFACTURER
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED
BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;
REPLACED WITHIN 24 HOURS OF INSPECTION.
S SPECIFICATIONS OR ’DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER
COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT.
PLAN.
HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND
TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED
BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE
CONTROL MANUAL.
MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION
SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL
NOTES:
COMPOST FILTER SOCK
FILTER MEDIA
BLOWN/PLACED
PLACED 10 FT ON CENTER
2 IN. x 2 IN. WOODEN STAKES
CONTOURS
EXISTING
SOCK
FILTER
COMPOST PLACED 10 FT ON CENTER
2 IN. x 2 IN. WOODEN STAKES
M
IN
COMPOST FILTER SOCK DETAIL
NOT TO SCALE
STAPLE PATTERN GUIDE
E
DC
BA
1.2 STAPLES PER SY0.7 STAPLES PER SY
3.5 STAPLES PER SY1.75 STAPLES PER SY
3.8 STAPLES PER SY
1 1/2'
3'
3'
3'
20"
10"
20"
RECOMMENDATIONS.
SITE CONDITIONS. CONSULT MANUFACTURER FOR SPECIFIC
INCREASED STAPLE RATES MAY BE NECESSARY DEPENDING UPON 2.
AN ALTERNATE MATTING BE USED.
MATTING ONLY. CONSULT MANUFACTURER FOR PATTERN SHOULD
STAPLE PATTERN INDICATED IS FOR USE WITH SPECIFIED 1.
NOTES
NOT TO SCALE
2 YEARS1 YEAR6 MONTHS9 MONTHS6 MONTHS
LOGEVITY
MINIMUM FUNCTIONAL
100% @ 1000 HRS100% @ 1000 HRS-23% @ 1000 HRS23% @ 1000 HRS
(ASTM G-155)
ORIGINAL STRENGTH
ULTRAVIOLET STABILITY %
202 PSI44 PSI26 PSI26 PSI-TENSILE STRENGTH
1/8"3/8"3/8"3/8"3/8"MESH OPENING
32"
24"
18"
12"
32"
24"
18"
12"
32"
24"
18"
12"
32"
24"
18"
12"
18"
12"
DIAMETERS
SOCK
PHOTO-DEGRADABLEPHOTO-DEGRADABLEBIO-DEGRADABLEPHOTO-DEGRADABLEPHOTO-DEGRADABLE
CHARACTERISTICS
MATERIAL
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS.
3/16" MAX. APERTURE SIZE
VIA NEEDLE PUMCH)
(WOVEN LAYER AND NON-WOVEN FLEECE MECHANICALLY FUSED
COMPOSITE POLYPROPYLENE FABRIC
OUTER FILTRATION MESH
3/4"x3/4" MAX. APERTURE SIZE
FUSION-WELDED JUNCTURES
CONTINUOUSLY WOUND
HDPE BIAXIAL NET
INNER CONTAINMENT NETTING
TWO-PLY SYSTEMS
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
5 MIL HDPE5 MIL HDPE3 MIL HDPEMATERIAL TYPE
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
5.0 dS/m (mmhos/cm) MAX.SOLUBLE SALT CONCENTRATION
SIEVE
30% - 50% PASS THROUGH 3/8"
PARTICLE SIZE
30% - 60%MOISTURE CONTENT
5.5 - 8.5pH
FIBROUS AND ELONGATEDORGANIC PORTION
25% - 100% (DRY WEIGHT BASIS)ORGANIC MATTER CONTENT
COMPOST STANDARDS
EROSION CONTROL MULCH BLANKET INSTALLATION
NOT TO SCALE
AND STAPLED.
OVERLAPPED 4" (MIN.)
BLANKET EDGES
FLOW
IN DIRECTION OF WATER
SLOPE, ROLL BLANKETS
STARTING AT TOP OF
COMPACT SOIL.
STAPLE, BACKFILL AND
IN 6" x 6" ANCHOR TRENCH, INSTALL BEGINNING OF ROLL
OF BLANKET.
PRIOR TO INSTALLATION
FERTILIZER, & SEED)
APPLICATION OF LIME,
(INCLUDING
PREPARE SEED BED
BLANKETED.
LENGTH OF SLOPE BEING
PATTERN FOR STEEPNESS AND
RECOMMENDED STAPLING
REFER TO MANUFACTURER'S
STAPLE SECURELY.
DOWNSLOPE BLANKET (SHINGLE STYLE).
UPSLOPE BLANKET OVERLYING THE
OVERLAP BLANKET ENDS 6" (MIN.) WITH THE
CONTACT.
MAINTAIN GOOD SOIL
BE STRETCHED; IT MUST
THE BLANKET SHOULD NOT
RESTORED OR REPLACED WITHIN 4 CALENDAR DAYS.
THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS SHALL BE
UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE
BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT 6.
RECOMMENDATIONS.
THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH MANUFACTURER'S 5.
MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET.
THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO
BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL 4.
SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.3.
SLOPE.
PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF 2.
PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET.
SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE 1.
NOTES
5 5
EROSION AND SEDIMENT CONTROL DETAILS
| 01 - T0033660447ESC_GN |
| 02 - T0033660447ESC_GN |
| 03 - T0033660447ESC_PL |
| 04 - T0033660447ESC_DT |
| 05 - T0033660447ESC_DT |
File details come from the government source that posted it. Updated .