887-B405-01_Anode Placement_Rev(-)_signed.pdf

PDF 2 MB Posted

Attached to
Floating Pier Barge for McMurdo Station, Antarctica
Solicitation number
W912BU-23-B-0016
Issued by

About this file

This document includes engineering drawings and calculations for the placement of sacrificial anodes on a floating barge pier to be constructed for McMurdo Station in Antarctica under solicitation number W912BU-23-B-0016 issued by the U.S. Army Corps of Engineers Philadelphia District. The drawings specify installing approximately 12 metric tons of aluminum anodes on the barge's bottom structure to prevent corrosion over its anticipated 10-year service life. The 328-foot by 100-foot by 18-foot barge will be uninspected but classed by the American Bureau of Shipping with notations for deck cargo and anticipated air and sea temperatures.

View the file

Other files

File Type Posted
W912BU-23-B-0016 Amendment 5.pdf PDF
W912BU-23-B-0016 Amendment 4.pdf PDF
W912BU-23-B-0016 Amendment 3.pdf PDF
W912BU-23-B-0016 Amendment 2.pdf PDF
W912BU-23-B-0016 Amendment 1.pdf PDF
W912BU-23-B-0016.pdf PDF
887-B399-01_ABS Structural Scantlings Calculations_Rev(-)_signed.pdf PDF
887-B399-06_Longitudinal Hull Girder Strength Report_Rev(-)_signed.pdf PDF
887-B307-02_Side Plating_Rev(-)_signed.pdf PDF
887-B309-01_Transverse Structure_Rev(-)_signed.pdf PDF
887-B410-03_Tow Foundation Calculations Report_Rev(-)_signed.pdf PDF
887-B311-01_Longitudinal Structure_Rev(-)_signed.pdf PDF
887-B412-01_Barge Permanent Mooring Interface Details_Rev(-)_signed.pdf PDF
887-B460-01_Hull Markings_Rev(-)_signed.pdf PDF
887-B301-01_Midship Section_Rev(-)_signed.pdf PDF
887-B420-01_Deck Fittings Arrangement_Rev(-)_signed.pdf PDF
887-B399-04_Miscellaneous Foundation Calculations Report_Rev(-)_signed.pdf PDF
887-B155-01_Intact Stability Rev(-)_signed.pdf PDF
887-B460-02_Deck Markings_Rev(-)_signed.pdf PDF
887-B105-01_Hull Lines Plan_Rev(-)_signed.pdf PDF
887-B120-01_Towing and Resistance Calculations Report_Rev(-)_signed.pdf PDF
887-B399-05_ABS MVR Finite Element Analysis_Rev(-)_signed.pdf PDF
887-B215-01_General Arrangement and Inboard Profile_Rev(-)_signed (1).pdf PDF
887-B660-03_Ballast Plan_Rev(-)_signed.pdf PDF
887-B205-01_Outboard Profile_Rev(-)_signed.pdf PDF
887-B150-01_Damage Stability Rev(-)_signed.pdf PDF
887-B399-03_ABS Removable Skeg Structural Calculations_Rev(-)_signed.pdf PDF
887-B330-01_Shore Bridge Support_Rev(-)_signed.pdf PDF
887-B399-02_Shore Bridge Support Calculations_Rev(-)_signed.pdf PDF
887-B410-01_Fendering_Rev(-)_signed.pdf PDF
887-B307-01_Deck and Bottom Structure_Rev(-)_signed.pdf PDF
887-B125-01_Hydrostatics Rev(-)_signed.pdf PDF
887-B410-02_Towing Arrangement_Rev(-)_signed.pdf PDF
887-B410-04_Removable Skeg_Rev(-)_signed.pdf PDF
887-B115-01_Weight Estimate Rev(-)_signed.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

051015202530354045505560

D

EC

K

BE

AM

S

L6 x4 x3 8"

MAIN DK

18'-0" ABL

BOTTOM TRANSVERSES (TYP)

SEE REF. 1

N T

BH

D

W T

BH

D

W T

BH

D

N T

BH

D

W T

BH

D

W T

BH

D W T

BH

D

N T

BH

D

N T

BH

D

BOTTOM FRAME (TYP)

SEE REF. 1

RAKE ICE FRAME (TYP)

SEE REF. 1

W T

BH

D

W T

BH

D

Sheet of RevisionDrawing NumberScale

DateApproved byChecked byDrawn by

12345678

12345678

D

C

B

A A

B

C

D

Size D om f f oa t t cn h l

Glosten File Number

22105.01

MDC Project Number

USACE MARINE DESIGN CENTER

PHILADELPHIA, PENNSYLVANIA

NSF MCMURDO OFFSHORE INFRASTRUCTURE

FLOATING BARGE PIER 328' X 100' X 18'

SACRIFICAL ANODE PLAN & CALCULATIONS

AIM ALG BGL 2023/06/09

AS NOTED 887-B405-01 1 2 -

1. THE INTENT OF THIS DRAWING IS TO SHOW THE ARRANGEMENT OF SACRIFICIAL ANODES ON THE

HULL BOTTOM STRUCTURE FOR THE MCMURDO STATION BARGE PIER.

2. THE BARGE IS TO BE UNINSPECTED.

3. THE BARGE WILL BE CLASSED FOR ABS NOTATIONS ✠A1, DECK CARGO BARGE AND A -29°C

DESIGN AIR TEMPERATURE AND A -1.9°C SEA WATER TEMPERATURE.

4. APPROXIMATELY 12 MT OF ALUMINUM ANODES ARE REQUIRED.

5. THE MAXIMUM REPLACEMENT INTERVAL IS 10 YEARS. ANODES MUST BE MONITORED ON A

REGULAR BASIS AND REPLACED AS NECESSARY WITHIN THE 10 YEAR CYCLE. HANGING ANODES

MAY BE USED TO EXTEND PERIOD BETWEEN REPLACEMENTS.

6. ALL WELDING, MATERIALS, AND PROCEDURES SHALL COMPLY WITH APPLICABLE ABS RULES.

7. ANODES SHALL BE ALIGNED WITH THEIR LONG AXIS PERPENDICULAR TO CENTERLINE. ANODES

SHALL BE PLACED ON THE FLAT BOTTOM ONLY.

8. ANODES ARE THE ALUMINUM WELD-ON TYPE. ENSURE GOOD CONTACT BETWEEN THE ANODE

AND HULL.

9. ANODE LENGTH SHALL BE AT LEAST 4 TIMES THE WIDTH.

1. GLOSTEN, 887-B307-01, DECK AND BOTTOM STRUCTURE.

GENERAL NOTES

REFERENCES REVISIONS

REVZONE DESCRIPTION DATE APPD

PLAN 1-5B

SACRIFICAL ANODE PLACEMENT

3/32"=1'-0"

SACRIFICIAL ANODE X 99:

ALUMINUM, 270 LBS EACH

NOMINAL DIMENSIONS (90" X 7" X 4")

ELEVATION 1-5A

SACRIFICAL ANODE PLACEMENT

3/32"=1'-0"

NOTIONAL BLOCKING

ARRANGEMENT WITH

2' X 4' BLOCKS

SEE DETAIL 2-3B

SEE DETAIL 2-3A

5"

90°

1"

1"

Sheet of RevisionDrawing NumberScale

DateApproved byChecked byDrawn by

12345678

12345678

D

C

B

A A

B

C

D

Size D om f f oa t t cn h l

Glosten File Number

22105.01

MDC Project Number

USACE MARINE DESIGN CENTER

PHILADELPHIA, PENNSYLVANIA

NSF MCMURDO OFFSHORE INFRASTRUCTURE

FLOATING BARGE PIER 328' X 100' X 18'

SACRIFICAL ANODE PLAN & CALCULATIONS

AIM ALG BGL 2023/06/09

AS NOTED 887-B405-01 2 2 -

DETAIL 2-3A

ICE PROTECTION BRACKETS

3"=1'-0"

DETAIL 2-3B

ICE PROTECTION BRACKETS

1"=1'-0"

ALIGN ICE PROTECTION BRACKETS

WITH LONGITUDINAL STIFFENERS

ANODE

LONG STIFF, TYP

BOTTOM SHELL

ANODE

1" BKT

DH 36

TYP

2023-06-14T18:04:23-0400
Andrew Girdler

PEStamp2:

File details come from the government source that posted it. Updated .