This is a pre-proposal conference presentation for the High-throughput Automated Phenotyping Platform (HTP-APP) procurement, which is part of the Microbial Molecular Phenotyping Capability (M2PC) project at Pacific Northwest National Laboratory's Environmental Molecular Sciences Laboratory. The procurement is for a $47M firm-fixed-price contract to design, fabricate, install and test a fully operational automated system for high-throughput microbial phenotyping.
Key requirements include capacity to perform 500 strain experiments and 100 microbiome experiments per week, obtain 1,000,000 multimodal analytical measurements per month, and enable remote operation. The system must include automation software, integration hardware, BSL-2 enclosures, and off-the-shelf equipment. The procurement uses a two-step source selection process with proposals due January 24, 2025 (Step 1) and April 18, 2025 (Step 2 for down-selected offerors). Questions and intent to propose are due January 13, 2025. The system will be installed in a new facility being built in parallel, requiring coordination with the facility contractor. The contract includes stretch goals for increased throughput that can be proposed within the $47M ceiling price, with additional priced options above that amount. A third-party commissioning agent will verify the system meets requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M2PC Project Overview
Sam Paulsen Project Manager
Agenda
Project Schedule
Project Scope
Coordinating with Facility D/B Contractor
Contracting Approach
Scope: Key Performance Parameters (KPPs)
Description of Scope *Threshold KPP Objective KPP
Demonstrate HTP culturing of microbial isolates and consortia
Capacity to operate M2PC with 500 strain experiments per week
Capacity to operate M2PC with 2000 strain experiments per week
Capacity to operate M2PC with 100 microbiome experiments per week
Capacity to operate M2PC with 500 microbiome experiments per week
Demonstrate HTP assaying and phenotyping of microbial isolates and consortia
Capacity to operate M2PC to obtain 1,000,000 multimodal analytical measurements per month
Capacity to operate M2PC to obtain 3,000,000 multimodal analytical measurements per month
Provide capability for remote planning and operations
Demonstrate that remote users can run pre-defined EMSL protocols to be executed autonomously within M2PC across culturing, assaying, and analyses
Demonstrate that remote users can perform dynamic experimental intervention with help from EMSL staff by modifying an executed protocol during the experimental timeframe
Facility 24,500 sq. ft. 50,000 sq. ft.
Scope statement: Provide a high-throughput microbial molecular phenotyping capability and a facility that houses and supports the capability.
H ig h-th ro ug hp ut
A ut om at ed
P he no ty p in g P la tfo rm
H T
P -A
P P
Fa ci lit y
Schedule: High-Level
M2PC Acquisition Strategy (and Facility) – Procurement Lead Garrett Hyatt – Acquisition Lead Specialist
High-Throughput Automated Phenotyping Platform (HTP-APP) – Procurement Lead
Samantha Ernst – Acquisition Lead Specialist
Integration of the two procurements is key Working to a single, integrated schedule
• High-throughput phenotyping specifications include integration with design build contractor. Includes facility constraints.
• Design
• Install
• Facility specifications includes integration with the high-throughput phenotyping contractor. Defines facility constraints.
• Design
• Construction
M2PC requires two major procurements
The M2PC will be a single facility focused on microbial molecular phenotyping
It requires two major procurements to complete
Solicitations timed to support award shortly after CD 2/3
Automation laboratory facility coordination
N
Characteristic Value/Constraint Comments
Automation lab size 12,000 ft2 Open space, could have some columns
Utilities location Fed from Overhead
120V & 208V Power Defined number in P- Spec
Actual locations will be adjusted during design
Exotic power Not provided HTP-APP contractor would need to provide transformers for exotic power
CA, N2
Defined number in P- Spec
Actual locations will be defined during coordinated design
Vacuum exhaust, direct exhaust, snorkels
Defined number in P- Spec
Actual locations will be defined during coordinated design
Heat load TBD BTU/hr Verified during design
Partnering with facility contractor
• Design & schedule
• Facility requirements for the system
Automation laboratory facility coordination
Facility Contractor delivers to ~4ft of connection point.
HTP-APP contractor performs final connections.
M2PC Project R&D Technical Overview
Theva Thevuthasan Project Manager
Performance Requirements
Agenda
Various Requirements
KPPs and KPPs - Stretch Goals
System Testing and Training
Performance Requirements/ Specifications
Mission needs
Science workshop
Design Guiding Principles
Discussion w/ potential users
Conceptual design
• Key performance parameters requirements
• Science core functions
• General system requirements
• Scheduling software requirements
• Safety requirements
• Testing, training and operations
Science Core Functions
Five dynamically interconnected core scientific functions are required as foundations to formulate the concept to achieve those KPPs:
• Media
• Cultivation
• Sample preparation
• Strain engineering
• Analytical capabilities
Science Core Functions
Media
- Configurable to bulk dispense a single media type into many plates and different media type and composition to every well, every plate, and/or tubes.
Cultivation
- Create experimental diversity so that a wide range of environmentally relevant parameter space can explored, including cultivation temperatures, light exposures, humidity changes, various gas concentrations, and shaking speeds.
- Maximum number of incubators should be incorporated into automated system
- Is it possible to monitor the growth – e.g., optical density
Sample preparation
- Multiple capabilities - heating, cooling, shaking, lyophilizing, bead beating
Strain engineering
- Provide strain building capability to support the genetic diversity
Analytical capabilities
- Automated plate readers
- Microcopy, cytometry, cell sorting, sequencing, PCR, various LC and GC
- Mass Spectrometry capabilities – at least five distinct capabilities or more
- Emerging capabilities – leading technological edge
Project KPPs
KPP# KPP title KPP threshold, minimum requirement
KPP 1
Demonstrate HTP culturing of microbial isolates and consortia
(i)Capacity to operate M2PC with execution of 500 new strain experiments per week.
(ii)Capacity to operate M2PC with execution of 100 new microbiome experiments per week.
KPP 2
Demonstrate HTP assaying and phenotyping of microbial isolates and consortia.
Capacity to operate M2PC to obtain 1,000,000 multimodal analytical measurements per month.
KPP 3
Provide capability for remote planning and operations.
Demonstrate that remote users/operators can run pre-defined EMSL protocols to be executed autonomously within M2PC across culturing, assaying, and analyses.
Minimum throughputs required to meet the project scope requirements
KPP 1 Testing
Strain Experiments
•Constructing mutant plasmids to create a test panel
•Transforming plasmids to create engineered microbial strains
•Cultivating strains across different media, nutrient/metals & carbon sources, temperatures, pH, etc. - analyzing their growth
Example
•Construct 500 single or multiple gene knockout/up-regulated constructs
•Use 12 replicates of each
•Grow each in 4 media types with 2 different carbon sources
•Test growth at multiple time points
•Total of 500 “experiments” performed in 500 96-well plates at multiple time points
Microbiome Experiments
•Creating communities of one or more unique microbes in varying proportions and a variety of media/growth conditions
•Perturbations - temperature range, pH range, various metal ion concentrations, primary or secondary metabolites and different carbon and/or nitrogen sources.
KPP 2 Testing
Multimodal Analysis
• Capturing scientifically relevant data
- during the growth of microorganisms
- functional responses associated with experimental perturbations
- after sample processing/preparation
Example
• Various spectroscopy and spectrometry measurements can be carried out to characterize the growth and processed samples.
• Cell characteristics including cell size, cell count and cell cycle can be measured using spectral and image cytometry.
• Characterization using Gas chromatography (GC) or Liquid chromatography (LC) coupled with UV, fluorescence detection (FLD), mass spectrometry (MS), or refractive index detection (RID) to detect the chemical components.
• Characterization using automated microscopy.
KPP Stretch Goals Increase throughputs within the available contract cost
Stretch Goals
Stretch Requirement
#1
KPP #1(i): Provide a minimum of 625 strain experiments per week
KPP #1(ii): Provide a minimum of 125 microbiome experiments per week
KPP #2: Provide a minimum of 1,250,000 multimodal analytical measurements per month.
#2
KPP #1(i): Provide a minimum of 750 strain experiments per week
KPP #1(ii): Provide a minimum of 150 microbiome experiments per week
KPP #2: Provide a minimum of 1,500,000 multimodal analytical measurements per month
#3
KPP #1(i): Provide a minimum of 875 strain experiments per week
KPP #1(ii): Provide a minimum of 175 microbiome experiments per week
KPP #2: Provide a minimum of 1,750,000 multimodal analytical measurements per month
#4
KPP #1(i): Provide a minimum of 1000 strain experiments per week
KPP #1(ii): Provide a minimum of 200 microbiome experiments per week
KPP #2: Provide a minimum of 2,000,000 multimodal analytical measurements per month
General System Requirements Minimum requirements for the complete system
Modular
• Replace broken or old instruments
• Incorporate emerging technologies
• Minimize system downtime
Flexible
• Flexibility to move instruments
• Flexibility to move processes
Expandable
• Adaptable for future technologies
• Expand the components with minimum disturbance
Overall System
• Maximize throughput
• High efficiency
• High uptime
System Control Software Requirements
Automation System Control Software
• Parameterization of protocols
• Interleaved dynamic scheduling – protocols run in parallel
• Error recovery – location of the error and remote resolutions
• Reconfiguring - updated accordingly within the software system within minutes
• Security and Safety - accessibility by operators and different classes of users
• High uptime and Simulation – should be able to simulate a workflow
• Operable with EMSL data management and LIMS system
• Remote planning and operation
EMSL LIMS
Automation system control software needs to interact with:
• EMSL LIMS – L7 Enterprise Science Platform (L7/ESP)
• A team is working on L7/ESP – they will be interacting with contractor
• Connections - L7/ESP is equipped with a wide range of pre-built connectors
• Experimental Design – L7/ESP incorporates experiment design capabilities
• Data Processing – L7/ESP data analysis and third-party software systems, and logistics systems.
Safety and Security
Some Important Safety Considerations:
Bio Safety - BSL-2
• exposed to potentially infectious aerosols, droplets, or splashes from BSL-2 controlled organisms shall be placed within a biocontainment enclosure
Robotics Safety
• intrinsically safe per consensus standards
Electrical Safety
• NRTL, UL, CSA … certified instruments and electrical components
Cyber Security
• ensuring that all infrastructure and IoT devices comply with NIST SP 800-213
Laboratory Facility Coordination
• The system will be located in a new facility which will be built in parallel
• Collaborate and coordinate with the facility design-build contractor to locate the utilities and facility characteristics needed to house the capability
• Mechanical and electrical utilities will be provided by the facility contractor – HTP-APP contractor will make the final connections
• Facility limitations are listed in the document
Testing, training and operations
System testing
• Factory acceptance testing
• Onsite functional testing (Installed)
• KPP verification testing (Witnessed by 3rd Party Commissioning Agent and Battelle team)
Training to our staff
• At least 4 researchers
• At least 2 weeks
One-year operations
• Warranty for one year
• List of consumables for one year
Hardware redundancy
• 5%
RFP Overview
Samantha Ernst
HTP-APP RFP Package
• Request for Proposal (RFP) including Draft Contract
• Attachments 1-10
RFP is currently publicly posted to:
• SAM.gov
• PNNL’s Acquisition Supplier Portal (ASP)
M2PC HTP-APP - RFP Overview https://sam.gov/opp/3640065498e845949175b9a3bd92f8ce/view https://ebs.pnnl.gov/ViewSolicitation.aspx?SolID=1478
Acquisition Strategy & Characteristics
• Procure a fully operational system that is designed, fabricated, installed, and tested.
• System includes software, integration hardware, BSL-2 enclosure(s), OTS equipment
• HTP-APP and facility design proceeds concurrently, each informing the other throughout the design process
• Facility construction will have a “ready for equipment” milestone that triggers the ability to start installation of the
HTP-APP
• 3rd Party Commissioning Agent for HTP-APP to verify system meets capability and throughput requirements
• Procured by Battelle via separate subcontract
M2PC HTP-APP
Acquisition Strategy
Acquisition Strategy & Characteristics cont.
• Firm Fixed Price Contract with Set Price of $47M
• Minimum requirements plus stretch goals that can be met within the set contract amount are the basis for award
• Two-Step, Best Value, Source Selection
• Proposals Evaluated in accordance with an approved Source
Selection Plan (SSP) and established Evaluation Criteria in the
RFP
• 2 Phase Review and Approval required by DOE-PNSO &
DOE IRB/HCA
• Acquisition Plan & Request for Proposal - Completed
• Contract Award
M2PC HTP-APP
Acquisition Strategy
M2PC HTP-APP
Source Selection
Source Selection
Approach: Two-Step, “Best Value”, Source Selection
Step 1: Review and Evaluation of all Offerors Received Verify Mandatory Go/No-Go Requirements are Met Evaluate & Score Step 1 Technical Proposals – no conceptual design Top 3 Offerors Advance to Step 2
Step 2: Evaluation of Highest Qualified Offerors Conduct Oral Presentations/Interviews Evaluate & Score Step 2 Technical (conceptual design) and Price
Proposals Stipends to the unsuccessful Step 2 Offerors (after contract award)
Basis of Award: Best Value Contract award will be made to the Offeror with the highest evaluated proposal for Step 2 who’s determined to be the “best value"
Request for Proposal (RFP)
Key Elements and Structure Scope Overview Basis of Award o 2-Step, Source Selection o Stipends (for Step 2 Unsuccessful Offers) o Set Contract Price and Funding Profile
Information/Instructions Draft Contract o Contract Clauses & Requirements o Terms and Conditions
Attachments o Performance Specification o General Requirements o Conceptual Design Report (for Information/Reference Only) o Proposal Submission Requirements o Evaluation Criteria o Notification of Intent to Propose o Price Proposal and Milestone Worksheet o Reps and Certs o Supplement to the General Provisions o Onsite Work Hazards Form
M2PC HTP-APP
Request for Proposal
Items for Awareness - Conceptual Design Report (CDR)
The CDR is being included as part of the RFP is to mitigate conflict of interest concerns.
Ensures all potential Offerors have the same information available from the CDR development effort in order to eliminate any unequal access to information concerns.
Section 2.2.1 in the P-Spec discusses the CDR, how it was used in the process, that it is for information only.
The CDR does NOT indicate or establish requirements or criteria that are to be used as part of the offered HTP-APP system designs.
Items for Awareness - Price Proposal and Stretch Goals
Offers with a higher number of stretch goals committed to within the set firm fixed price (as part of the base) will be evaluated more favorably.
Propose price on all stretch goal options which are associated with a "No" that are in excess of the set price of $47M.
Pricing of stretch goal options is the incremental difference between each stretch goal.
Items for Awareness - Milestones
Milestone payment amounts must add up to $47,000,000 and shall be equitable for the amount of work and duration anticipated for each proposed milestone.
Milestones should align with the proposed conceptual project schedule and take into consideration the funding profile limitations, major project milestones, and coordination with the facility contractor.
Milestone payment schedule will be incorporated into the final contract award.
RFP Responses
• Thoroughly review the RFP and all accompanying attachments
• Provide proposal in accordance with Proposal Submission
Requirements and Evaluation Criteria
Submit via email to Samantha.Ernst@pnnl.gov
Questions submitted by 4:00pm Pacific Time on January 13, 2025
Intent to Propose submitted by 4:00pm Pacific Time on January 13, 2025
Step 1 Proposals due by 4:00pm Pacific Time on January 24, 2025
Step 2 Proposals due by 4:00pm Pacific Time on April 18, 2025 (for down-selected Offerors only)
RFP Response Requirements mailto:Samantha.Ernst@pnnl.gov
| M2PC Project Overview | |
| Agenda | |
| Scope: Key Performance Parameters (KPPs) | |
| Schedule: High-Level | |
| M2PC requires two major procurements | |
| Automation laboratory�facility coordination | |
| Automation laboratory�facility coordination | |
| M2PC Project R&D Technical Overview | |
| Agenda | |
| Performance Requirements/ Specifications | |
| Science Core Functions | |
| Science Core Functions | |
| Project KPPs | |
| KPP 1 Testing | |
| KPP 2 Testing | |
| KPP Stretch Goals��Increase throughputs within the available contract cost | |
| General System Requirements ��Minimum requirements for the complete system | |
| Automation System Control Software Requirements | |
| EMSL LIMS | |
| Safety and Security | |
| Automation Laboratory Facility Coordination | |
| Testing, training and operations | |
| RFP Overview | |
| M2PC HTP-APP - RFP Overview | |
| Slide Number 25 | |
| Slide Number 26 | |
| M2PC HTP-APP���Source Selection | |
| Slide Number 28 | |
| Items for Awareness | - Conceptual Design Report (CDR) |
| Items for Awareness | - Price Proposal and Stretch Goals |
| Items for Awareness | - Milestones |
| RFP Response Requirements |