810-FORM-0001F SRPO RDM Checklist.pdf
PDF 91 KB Posted
- Attached to
- NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
- Solicitation number
- 80GSFC21R0037-eLibrary
About this file
This document is a checklist used to evaluate a contractor's Requirements Definition Meeting package, meeting, and memorandum for a NASA sounding rocket mission. The checklist contains criteria such as whether the required engineering staff and payload team are present, whether the RDM package contains a complete description of the launch vehicle and support systems, payload stack, and ground support equipment. It also evaluates whether the RDM package identifies hazardous operations, software changes, and includes a preliminary hazard assessment. The memorandum is required to be submitted within 5 calendar days of the RDM and include meeting attendees, topics discussed, and resulting action items. Contractors are rated on a scale of 1 to 5 for each criteria with 1 being unsatisfactory and 5 being exceptional performance exceeding contract requirements.
View the file
Other files for this federal contract opportunity
Show all 50
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
810-FORM-0001F (March 2018) Requirements Definition Meeting Evaluation Checklist
Contract Number: NNG16WA70C Meeting Date:
Mission Number:
Date of applicable mission initiation conference (MIC):
RATINGS
Evaluate contractor performance for each evaluation criteria and provide ratings and/or comments as appropriate. Utilize the following guidelines:
Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5
After completion of individual categories, circle the summary rating evaluation provided at the end of this form for the composite RDM evaluation of the RDM PACKAGE, MEETING, and
MEMORANDUM.
Evaluation Criteria Comments Payload team (or alternate representatives as necessary) is present at RDM. NSROC Mission Manager is present.
Representative of NSROC Management is present to participate in programmatic decisions
Complete RDM Package is presented at
RDM
RDM Package contains complete engineering staff payload team assignment list description of minimum and comprehensive success criteria
Success criteria are approved (in writing) by the experimenter
RDM Package contains comprehensive Requirements Compliance Matrix concurred by SRPO
RDM package contains complete description of launch vehicle and required support systems
Selected launch vehicle and support systems are adequate and appropriate to meet mission requirements description and drawing of proposed payload stack
Proposed payload stack is adequate and appropriate to meet mission requirements
Necessary ground support systems are identified (launcher, T/M, non-standard T&E facilities, Environmental Control, used by NASA, NSROC, or the experiment team, etc.) in RDM Package
Requirements Definition Meeting Checklist (Page 1 of 3)
RDM Package contains comprehensive schedule which includes (as a minimum) the MIC, RDM, Design Review, Fabrication and Assembly Activities, Pre- Integration Review (PIR), Integration & Testing Activities, Mission Readiness Review, Field Operations, Launch Date, and Post Launch Activities
Schedule is realistic & adequate to meet mission requirements
Resource conflicts (personnel, facilities, equipment, etc.) are identified and mitigated in RDM Package
Other potential problems are identified and mitigated in RDM Package
Approach to meeting mission requirements appears to be cost effective
Any unusual or critical safety issues are identified and mitigated in RDM Package
RDM Package contains a Preliminary Hazard Assessment; the Preliminary Hazard Assessment includes a list of any items that may require a waiver. For missions at all launch locations except WSMR, the RDM Package shall contain a Preliminary Range Safety Data Package
RDM Package identifies hazardous operations procedures that are new or that will be modified
RDM Package contains a Preliminary Flight Performance Assessment
RDM Package contains descriptions of any required software changes or new software developments
RDM Package contains results of Lessons Learned Database search for relevant software issues
Any innovative/creative ideas or partnering with PI or others, to reduce mission costs without degrading scientific return (NSROC initiated exceeding contract requirements)
Any innovative/creative measures planned which will improve the likelihood of mission success and/or exceed contract requirements (NSROC initiated)
Any innovative/creative measures planned which will continue to reduce overall program costs on future missions (NSROC initiated exceeding contract requirements)
Format of RDM Package RDM Package identifies post flight requirements (data products delivery schedules)
Requirements Definition Meeting Checklist (Page 2 of 3)
RDM Memorandum (RDMM)includes the RDM Package as an attachment, documents the RDM, identifies attendees, addresses significant topics of discussion, and identifies Action Items resulting from
RDM
RDMM received on time, within 5 calendar days of RDM
COMPOSITE RDM EVALUATION FOR RDM PACKAGE, MEETING, AND
MEMORANDUM
Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5
COMMENTS:
Evaluator: Date:
(Signature)
COR: Date:
(Signature)
Requirements Definition Meeting Checklist (Page 3 of 3)