810-FORM-0001F SRPO RDM Checklist.pdf

PDF 91 KB Posted

Attached to
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
Solicitation number
80GSFC21R0037-eLibrary
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document is a checklist used to evaluate a contractor's Requirements Definition Meeting package, meeting, and memorandum for a NASA sounding rocket mission. The checklist contains criteria such as whether the required engineering staff and payload team are present, whether the RDM package contains a complete description of the launch vehicle and support systems, payload stack, and ground support equipment. It also evaluates whether the RDM package identifies hazardous operations, software changes, and includes a preliminary hazard assessment. The memorandum is required to be submitted within 5 calendar days of the RDM and include meeting attendees, topics discussed, and resulting action items. Contractors are rated on a scale of 1 to 5 for each criteria with 1 being unsatisfactory and 5 being exceptional performance exceeding contract requirements.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
SR Risk Management Plan Official Release - 2010-04-15 signed and scanned.PDF PDF
NSROC III Selection Statement.pdf PDF
SRPO Annual Report 2018.pdf PDF
Wallops Range Users Handbook.pdf PDF
Rocket Report 3rd quarter 2020.pdf PDF
Rocket Report 2nd quarter 2020.pdf PDF
SRPO Annual Report 2020.pdf PDF
SRPO Missions Bluebook September 2021.pdf PDF
SRWG_Findings_Jan_2020.pdf PDF
SRWG_Findings_Feb_2019.pdf PDF
NPR 9501.2.pdf PDF
NPR 7120.8.pdf PDF
NPR 8621.1.pdf PDF
800-PG-8710.3.1 Updated WFF Flex Hose Handling.pdf PDF
NPR 1800.1 Updated.pdf PDF
800-PG-8715.1.1E Danger Area Control and Roadblocks for Hazardous Operations.pdf PDF
GPR 1860.1.pdf PDF
GPR 1600.1.pdf PDF
800-PG-7150.4.1 Updated Software SMA Process.pdf PDF
GPR 8710.3.pdf PDF
GPR 1860.3.pdf PDF
GPR 1700.5.pdf PDF
GPR 8830.1.pdf PDF
GPR 8719.1.pdf PDF
800-PG-8715.1.1E Unmanned Roadblocks_ Danger Area Control for Hazardous Operations April 2021_FINAL_ GDMS (1).pdf PDF
GPR 8500.4.pdf PDF
NPD 4500.1.pdf PDF
GPR 6730.1.pdf PDF
GPR 4520.4.pdf PDF
GPR 1860.4.pdf PDF
NPR 2810.1.pdf PDF
810-PG-7120.1.1E Review of NSROC Sounding Rocket Mission Work Orders.pdf PDF
GPR 1820.1.pdf PDF
GPR 4520.2.pdf PDF
NPR 9710.1.pdf PDF
NPR 1600.3.pdf PDF
NPD 1600.3.pdf PDF
GPR 8800.2 Admin Ext Local Exhaust Ventilation.pdf PDF
NPD 9501.1.pdf PDF
NPD 1600.9 Updated.pdf PDF
NPD 2810.1.pdf PDF
NPD 2530.1.pdf PDF
NPD 1600.2 Updated.pdf PDF
800-PG-8710.0.1D Mission Planning for Fire Alarm Contingencies.pdf PDF
GPR 1700.1.pdf PDF
NPR 1600.2.pdf PDF
GPR 8715.10.pdf PDF
NPD 8610.6.pdf PDF
NPD 1040.4.pdf PDF
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

810-FORM-0001F (March 2018) Requirements Definition Meeting Evaluation Checklist

Contract Number: NNG16WA70C Meeting Date:

Mission Number:

Date of applicable mission initiation conference (MIC):

RATINGS

Evaluate contractor performance for each evaluation criteria and provide ratings and/or comments as appropriate. Utilize the following guidelines:

Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5

After completion of individual categories, circle the summary rating evaluation provided at the end of this form for the composite RDM evaluation of the RDM PACKAGE, MEETING, and

MEMORANDUM.

Evaluation Criteria Comments Payload team (or alternate representatives as necessary) is present at RDM. NSROC Mission Manager is present.

Representative of NSROC Management is present to participate in programmatic decisions

Complete RDM Package is presented at

RDM

RDM Package contains complete engineering staff payload team assignment list description of minimum and comprehensive success criteria

Success criteria are approved (in writing) by the experimenter

RDM Package contains comprehensive Requirements Compliance Matrix concurred by SRPO

RDM package contains complete description of launch vehicle and required support systems

Selected launch vehicle and support systems are adequate and appropriate to meet mission requirements description and drawing of proposed payload stack

Proposed payload stack is adequate and appropriate to meet mission requirements

Necessary ground support systems are identified (launcher, T/M, non-standard T&E facilities, Environmental Control, used by NASA, NSROC, or the experiment team, etc.) in RDM Package

Requirements Definition Meeting Checklist (Page 1 of 3)

RDM Package contains comprehensive schedule which includes (as a minimum) the MIC, RDM, Design Review, Fabrication and Assembly Activities, Pre- Integration Review (PIR), Integration & Testing Activities, Mission Readiness Review, Field Operations, Launch Date, and Post Launch Activities

Schedule is realistic & adequate to meet mission requirements

Resource conflicts (personnel, facilities, equipment, etc.) are identified and mitigated in RDM Package

Other potential problems are identified and mitigated in RDM Package

Approach to meeting mission requirements appears to be cost effective

Any unusual or critical safety issues are identified and mitigated in RDM Package

RDM Package contains a Preliminary Hazard Assessment; the Preliminary Hazard Assessment includes a list of any items that may require a waiver. For missions at all launch locations except WSMR, the RDM Package shall contain a Preliminary Range Safety Data Package

RDM Package identifies hazardous operations procedures that are new or that will be modified

RDM Package contains a Preliminary Flight Performance Assessment

RDM Package contains descriptions of any required software changes or new software developments

RDM Package contains results of Lessons Learned Database search for relevant software issues

Any innovative/creative ideas or partnering with PI or others, to reduce mission costs without degrading scientific return (NSROC initiated exceeding contract requirements)

Any innovative/creative measures planned which will improve the likelihood of mission success and/or exceed contract requirements (NSROC initiated)

Any innovative/creative measures planned which will continue to reduce overall program costs on future missions (NSROC initiated exceeding contract requirements)

Format of RDM Package RDM Package identifies post flight requirements (data products delivery schedules)

Requirements Definition Meeting Checklist (Page 2 of 3)

RDM Memorandum (RDMM)includes the RDM Package as an attachment, documents the RDM, identifies attendees, addresses significant topics of discussion, and identifies Action Items resulting from

RDM

RDMM received on time, within 5 calendar days of RDM

COMPOSITE RDM EVALUATION FOR RDM PACKAGE, MEETING, AND

MEMORANDUM

Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5

COMMENTS:

Evaluator: Date:

(Signature)

COR: Date:

(Signature)

Requirements Definition Meeting Checklist (Page 3 of 3)

File details come from the government source that posted it. Updated .