Attachment I - PIV Attachment.pdf

PDF 71 KB Posted

Attached to
Systems Engineering Advanced Services (SEAS) II Federal contract opportunity
Solicitation number
80GSFC20R0037
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document outlines procedures for issuing Personal Identity Verification cards to contractor personnel in accordance with Federal Acquisition Regulation clause 52.204-9. The procedures describe seven steps for registration, background checks, card production and issuance. Applicants must provide identity source documents and fingerprints. The Center Chief of Security conducts criminal history and immigration database checks. Investigations are initiated as needed and adjudicated. If investigation results are unfavorable, access is denied. If investigation is incomplete upon start date, a temporary identification card is issued for up to six months. Permanent PIV cards are issued upon completed investigations.

The related federal contract opportunity is a pre-solicitation notice for the Systems Engineering Advanced Services II contract to support engineering organizations at NASA's Goddard Space Flight Center and Wallops Flight Facility. Services include mission and instrument systems engineering, guidance navigation and control, attitude control, and spacecraft propulsion and fluid systems engineering. The acquisition will be an 8(a) set-aside, cost-plus-fixed-fee IDIQ contract with a potential value of $387 million and a five-year period of performance. A draft RFP is anticipated in September 2020 with the final RFP in November 2020. The contract is to be awarded on or around June 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Systems Engineering Advanced Services (SEAS) II, newest first.
File Type Posted
SEAS II-SF30 Amendment 3 signed.pdf PDF
SEAS II- Amendment 3 page 2.pdf PDF
SEAS II-SF30 Amendment 2 signed.pdf PDF
SEAS II- Amendment 2 page 2.pdf PDF
FINAL RFP Amend 2 - Enclosure DD - 4.6.21.pdf PDF
SEAS II Final RFP Questions and Responses Set 1.pdf PDF
SEAS II Amend 1 Page 2.pdf PDF
SEAS II-SF30 Amendment 1.pdf PDF
SEAS II Final RFP Cover Letter.pdf PDF
SEAS II Attachment B - IDIQ Cost-Type Rate Matrix.pdf PDF
SEAS II Attachment H - Contract Historical Data.pdf PDF
SEAS II Attachment K - IAGP Cover Page.pdf PDF
SEAS II Attachment L - GFP GSFC Document 1 Revised.pdf PDF
SEAS II Enclosure DD - Contract Historical Data.pdf PDF
Attachment A - SEAS II Statement of Work.pdf PDF
SEAS II Attachment D - DD 254.pdf PDF
SEAS II Attachment E - Safety and Health Plan Cover Page.pdf PDF
SEAS II Attachment F - Quality Assurance Plan Cover Page.pdf PDF
SEAS II Attachment G - OCI Plan Cover Page.pdf PDF
SEAS II Attachment K - IAGP at WFF.pdf PDF
SEAS II Attachment L - GFP Cover Page.pdf PDF
SEAS II Attachment L - GFP WFF Document 2.pdf PDF
SEAS II Attachment M - IT Security Plan Cover Page.pdf PDF
Exhibits 2-11 SEAS II RFP.pdf PDF
SEAS II Basic RFP Final.pdf PDF
SEAS II Attachment C- Financial Management Reporting.pdf PDF
SEAS II Attachment I - PIV Attachment.pdf PDF
SEAS II Enclosure AA - Quality Assurance Surveillance Plan.pdf PDF
SEAS II Enclosure CC - GPM.pdf PDF
SEAS II Enclosure EE - IT Security Management Plan.pdf PDF
SEAS II Exhibits 1A-1C Cover Page.pdf PDF
Exhibits 1A-1C GPM SEAS II RFP.pdf PDF
Attachment A - SEAS II Draft Statement of Work.pdf PDF
Attachment D - DD 254.pdf PDF
Attachment E - Safety and Health Plan Cover Page.pdf PDF
Attachment K - IAGP Cover Page.pdf PDF
Attachment B - IDIQ Cost-Type Rate Matrix.pdf PDF
Attachment L - GFP GSFC Document 1 Revised.pdf PDF
SEAS II DRFP Cover Letter FINAL.pdf PDF
Enclosure BB - Representative Task Orders.pdf PDF
EXHIBIT 12 Cover Page Past Performance Questionnaire.pdf PDF
Attachment C- Financial Management Reporting.pdf PDF
Exhibits 1A-1C Cover Page.pdf PDF
Enclosure AA - Quality Assurance Surveillance Plan.pdf PDF
Enclosure EE - IT Security Management Plan.pdf PDF
Attachment L - GFP Cover Page.pdf PDF
Enclosure CC - GPM Final.pdf PDF
SEAS II Basic DRFP.pdf PDF
Exhibits 2-11 Cover Page.pdf PDF
SEAS II DRFP GPM Exhibits 2-11.pdf PDF
Show all 50

Systems Engineering Advanced Services (SEAS) II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT I

PERSONAL IDENTITY VERTIFICATION (PIV)

CARD ISSUANCE PROCEDURES

FEBRUARY 2015

RFP 80GSFC20R0037

CONTRACT No.: TBD

Contract TBD Attachment I

(02/2015)

PIV Card Issuance Procedures in accordance with FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel

FIPS 201 Appendix A graphically displays the following procedure for the issuance of a PIV credential.

Figure A-1, FIPS 201, Appendix A

The following steps describe the procedures for the NASA Personal Identity Verification Card Issuance (PCI) of a PIV credential:

Step 1:

The Contractor’s Corporate Security Officer (CSO), Program Manager (PM), or Facility Security Officer (FSO) submits a formal letter that provides a list of contract employees (applicant) names requesting access to the NASA Contracting Officer’s Representative (COR). In the case of a foreign national applicant, approval through the NASA Foreign National Management System (NFNMS) must be obtained for the visit or assignment before any processing for a PIV credential can take place. Further, if the foreign national is not under a contract where a COR has been officially designated, the foreign national will provide the information directly to their visit/assignment host, and the host sponsor will fulfill the duties of the COR mentioned herein. In each case, the letter shall provide notification of the contract or foreign national employee’s (hereafter the “applicant”) full name (first, middle and last), social security number (SSN) or NASA Foreign National Management System Visitor Number if the foreign national does not have a SSN, and date of birth. If the contract employee has a current satisfactorily completed National Agency Check with Inquiries (NACI) or an equivalent or higher degree of background investigation, the letter shall indicate the type of investigation, the agency completing the investigation, and date the investigation was completed. Also, the letter must specify the risk/sensitivity level associated with the position in which each applicant will be working (NPR 1600.1, §4.5 is germane)

Further, the letter shall also acknowledge that contract employees may be denied access to NASA information or information systems based on an unsatisfactory background investigation/adjudication. .

After reviewing the letter for completeness and concurring with the risk/sensitivity levels, the COR/host must forward the letter to the Center Chief of Security (CCS). The CCS shall review the OPM databases (e.g., DCII, PIP, et al.), and take appropriate steps to validate the applicant’s investigation status.

Requirements for a NACI or other investigation shall be initiated only if necessary.

Applicants who do not currently possess the required level of background investigation shall be directed to the e-QIP web site to complete the necessary background investigation forms online. The CCS shall provide to the COR/host information and instructions on how to access the e-QIP for each contract or foreign national employee requiring access

Step 2:

Upon acceptance of the letter/background information, the applicant will be advised that in order to complete the investigative process, he or she must appear in-person before the authorized PIV registrar and submit two forms of identity source documents in original form. The identity source documents must come from the list of acceptable documents included in Form I-9, Employment Eligibility Verification, one which must be a Federal1 or State issued picture identification. Fingerprints will be taken at this time.

The applicant must appear no later than the entry on duty date.

When the applicant appears, the registrar will electronically scan the submitted documents; any document that appears invalid will be rejected by the registrar. The registrar will capture electronically both a facial image and fingerprints of the applicant. The information submitted by the applicant will be used to create or update the applicant identity record in the Identity Management System (IDMS).

Step 3:

Upon the applicant’s completion of the investigative document, the CCS reviews the information, and resolves discrepancies with the applicant as necessary. When the applicant has appeared in person and completed fingerprints, the package is electronically submitted to initiate the NACI. The CCS includes a request for feedback on the NAC portion of the NACI at the time the request is submitted.

Step 4:

Prior to authorizing physical access of a contractor employee to a federally-controlled facility or access to a Federal information system, the CCS will ensure that a check has been performed with the National Crime Information Center (NCIC) and Interstate Identification Index. In the case of a foreign national, a national check of the Bureau of Immigration and Customs Enforcement (BICE) database will be performed for each applicant. If this process yields negative information, the CCS will immediately notify the COR/host of the determination regarding access made by the CCS.

Step 5:

Upon receipt of the completed NAC, the CCS will update IDMS from the NAC portion of the NACI and indicate the result of the suitability determination. If an unsatisfactory suitability determination is

1 A non-PIV government identification badge, including the NASA Photo Identification Badge, MAY NOT BE USED for the original issuance of a PIV vetted credential rendered, the COR will advise the contractor that the employee is being denied physical access to all federally-controlled facilities and Federal information systems.

Based on a favorable NAC and NCIC/III or BICE check, the CCS will authorize the issuance of a PIV federal credential in the Physical Access Control System (PACS) database. The CCS, based on information provided by the COR/host, will determine what physical access the applicant should be granted once the PIV issues the credential.

Step 6:

Using the information provided by the applicant during his or her in-person appearance, the PIV card production facility creates and instantiates the approved PIV card for the applicant with an activation date commensurate with the applicant’s start date.

Step 7:

The applicant proceeds to the credential issuance facility to begin processing for receipt of his/her federal credential.

The applicant provides to the credential issuing operator proof of identity with documentation that meets the requirements of FIPS 201 (DHS Employment Eligibility Verification (Form I-9) documents. These documents must be the same documents submitted for registration.

The credential issuing operator will verify that the facial image, and optionally reference finger print, matches the enrollment data used to produce the card. Upon verification of identity, the operator will locate the employee’s record in the PACS database, and modify the record to indicate the PIV card has been issued. The applicant will select a PIN for use with his or her new PIV card. Although root data is inaccessible to the operator, certain fields (hair color, eye color, et al.) may be modified to more accurately record the employee’s information.

The applicant proceeds to a kiosk or other workstation to complete activation of the PIV card using the initial PIN entered at card issuance.

ALTERNATIVE FOR APPLICANTS WHO DO NOT HAVE A COMPLETED AND

ADJUDICATED NAC AT THE TIME OF ENTRANCE ON DUTY

Steps 1 through 4 shall be accomplished for all applicants in accordance with the process described above.

If the applicant is unable to appear in person until the time of entry on duty, or does not, for any other reason, have a completed and adjudicated NAC portion of the NACI at the time of entrance on duty, the following interim procedures shall apply.

1. If the documents required to submit the NACI have not been completed prior to EOD, the applicant will be instructed to complete all remaining requirements for submission of the investigation request. This includes presentation of I-9 documents and completion of fingerprints, if not already accomplished. If the applicant fails to complete these activities as prescribed in NPR 1600.1 (Chapters 3 & 4), it may be considered as failure to meet the conditions required for physical access to a federally-controlled facility or access to a Federal information system, and result in denial of such access.

2. Based on favorable results of the NCIC, the applicant shall be issued a temporary NASA identification card for a period not-to-exceed six months. If at the end of the six month period the NAC results have not been returned, the agency will at that time make a determination if an additional extension will be granted for the temporary identification card.

3. Upon return of the completed NAC, the process will continue from Step 5.

PIV Card Issuance Procedures in accordance with FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel
Figure A-1, FIPS 201, Appendix A
Step 1:
Step 3:
Upon the applicant’s completion of the investigative document, the CCS reviews the information, and resolves discrepancies with the applicant as necessary. When the applicant has appeared in person and completed fingerprints, the package is electroni...
Step 4:
Step 6:
Step 7:

File details come from the government source that posted it. Updated .