Attachment B - IDIQ Cost-Type Rate Matrix.pdf
PDF 36 KB Posted
- Attached to
- Systems Engineering Advanced Services (SEAS) II Federal contract opportunity
- Solicitation number
- 80GSFC20R0037
About this file
This document contains an attachment for an indefinite delivery indefinite quantity contract solicitation for systems engineering services. The attachment provides rate matrices for prime and subcontractor direct labor rates by contract year, as well as cost estimating relationships, indirect cost rates, and fixed fee rates for cost-plus-fixed-fee task orders. Position qualifications are also to be proposed for all direct labor categories. The related federal contract opportunity notices a draft RFP will be released in September 2020 for the Systems Engineering Advanced Services II contract, with the final RFP anticipated in November 2020. This contract supports the Engineering and Technology Directorate at NASA Goddard Space Flight Center and Wallops Flight Facility, involving systems engineering, guidance navigation and control, spacecraft propulsion and other services. The single award IDIQ contract has a maximum value of $387 million over five years and is set aside for 8(a) small businesses with a top secret facility clearance.
View the file
Other files for this federal contract opportunity
Show all 50
Systems Engineering Advanced Services (SEAS) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
INDEFINITE DELIVERY INDEFINITE QUANTITY
(IDIQ)
DIRECT LABOR RATES, INDIRECT RATES AND
FEE MATRICES
DRFP 80GSFC20R0037
Contract TBD Attachment B
(03/2015)
IDIQ DIRECT LABOR RATES, INDIRECT RATES
AND FEE MATRICES
Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract. All Task Orders issued will be applied to the guaranteed minimum quantity and maximum quantity as provided in “Minimum/Maximum Amount of Supplies or Services” clause.
1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the direct labor rates as specified below for pricing all task orders:
**Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
**Labor Categories - The Offeror shall provide Prime direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed rates to be used for task order pricing purposes only for the Prime Contractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):
The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:
****CERs Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application. If not applicable, insert “NONE”. Clearly delineate onsite and offsite rates.
3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the indirect rates as specified below for pricing all task orders:
***Indirect Rate
Categories
Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
***Indirect Rate Categories - The Offeror shall complete all Prime indirect rate categories and rates that may be applied against direct and indirect costs under a task order in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application and onsite versus offsite rates.
(03/2015)
4. PRIME FIXED FEE RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fixed fee rate specified below for pricing all Cost-Plus-Fixed-Fee (CPFF) task orders:
*****Fixed Fee
Rate
Base of Application
CY 1 CY 2 CY 3 CY4 CY 5 CY 6
*****The Offeror shall complete the Prime’s fixed fee rate that shall be used to calculate the fixed fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application.
5. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fully-loaded direct labor rates as specified below for pricing the subcontractor direct labor hours on all task orders:
++Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
++Labor Categories - The Offeror shall provide fully-loaded subcontractor direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
Clearly delineate onsite versus offsite rates.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed fully-load rates to be used for pricing purposes only for the Subcontractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
6. POSITION QUALIFICATIONS (For All Prime and Subcontractor Direct Labor Categories):
NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual Subcontractor Direct Labor Category included in Section 5.
| ATTACHMENT B |
| 1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders): |
| 2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders): |
| 3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders): |
| 4. PRIME FIXED FEE RATE MATRIX (For All Task Orders): |
File details come from the government source that posted it. Updated .