This is a Scope of Services document issued by the City of Detroit Construction and Demolition Department for facilities maintenance services at the Detroit Detention Center located at 17601 Mound Road, Detroit, Michigan. The scope encompasses four primary service categories: heating, ventilation, and air conditioning (HVAC) system services, plumbing services, fire protection services, and electrical services. HVAC services include seasonal start-up, inspection and maintenance, repairs, improvements, and system assessments. Plumbing services cover inspection, maintenance, repairs, improvements, water heaters, faucets, toilets, pipes, drainage systems, sewers, valves, meters, pumps, and restrooms. Electrical services include remedying code violations, panel upgrades, wiring repairs, fixture and lamp replacement, power work, lighting upgrades, and generator repairs. Fire protection services require annual inspections and testing per NFPA standards, including fire alarm systems (NFPA 72), sprinkler systems (NFPA 25), kitchen fire suppression systems (NFPA 17A), and roll-down door testing (NFPA 80), with 24-hour monitoring capability. The document does not specify response dates, due dates, site visits, bidder meetings, award dates, or explicit contract terms.
The scope requires contractors to assign a 24/7 available Project Manager with full authority to represent the contractor and qualified personnel possessing required licenses, certifications, and minimum five years of licensed working experience for lead technicians, including a 1st Class Refrigeration Operator License and Universal Section 608 Certification. Contractors must provide all necessary equipment and materials, obtain required permits, maintain professional conduct and appearance, and comply with all applicable federal, state, and local laws and industry standards. The contractor bears responsibility for all errors, oversights, deficiencies, and damage resulting from service execution, with correction costs borne entirely by the contractor. Emergency services require acknowledgment within two hours and on-site arrival within four hours of notification. All services require Owner written authorization before execution, with detailed estimates required for all tasks. The document reserves the Owner's right to withhold payment for incomplete work, errors, or damages caused by the contractor and requires comprehensive documentation and reporting of all services performed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF DETROIT CONSTRUCTION & DEMOLITION DEPARTMENT
SCOPE OF SERVICES
DETROIT DETENTION CENTER
ELECTRIC, FIRE PROTECTION, HVAC AND PLUMBING SERVICES
Date: 7/15/2026
I. INTRODUCTION
A. Intent. As directed by the City of Detroit (hereafter “Owner”), this Scope of Services (hereafter “these Services”) is intended to provide heating, ventilation, and air conditioning (HVAC) system services, Plumbing Services, Fire Protection Services and Electric Services at the Detroit Detention Center, located at 17601 Mound Road, Detroit, MI 48212.
B. Revisions to this Scope of Services. The Owner reserves the right to revise these Services over time to maximize efficiency and to mitigate any potential hazards to public health and safety among HVAC systems across City of Detroit facilities.
C. Clarifications to this Scope of Services. At its sole discretion, the Owner reserves the right to clarify these Services at any time. The Contractor is not entitled to any upward adjustment in price/cost or any additional fee because of any clarifications to these Services by the Owner. The Contractor may be required to deduct costs if the clarification to these Services reduces the work, material, or labor required.
II. GENERAL REQUIREMENTS & PROTOCOLS
A. Project Manager. The Contractor must assign a Project Manager who will serve as the point of contact for the Owner or any enforcement agency or regulatory authority on matters related to these Services. The Project Manager shall have the power and authority to act on behalf of the Contractor on all matters related to the performance and execution of these Services. The Project Manager must be available twenty-four hours per day and seven days per week. If the Project Manager is absent, the Contractor must assign a designee who shall have the same power and authority as the Project Manager for the entire duration of the Project Manager’s absence.
B. Qualified Personnel. The Contractor must assign qualified personnel to perform or execute all aspects of these Services. Personnel must possess all necessary accreditations, licenses, endorsements, or certifications as required by all applicable laws, regulations, rules, or industry standards. Personnel must also possess the necessary experience to execute these Services safely, efficiently, and effectively as required by all applicable laws, regulations, rules, or industry standards or best practices. The Contractor must provide the Owner with copies of the accreditations, licenses, endorsements, certifications, or work history of any person assigned to perform any aspect of these Services upon request.
The lead or supervisory technician who provides any of the services under section III A, B, or C must possess the following credentials:
5 years of licensed working experience
DETROIT DETENTION CENTER
1st Class Refrigeration Operator License Pipefitter of Universal Section 608 Certification
C. Professional Conduct and Appearance. Throughout the execution of these Services, the
Contractor must maintain a friendly and professional demeanor whenever interacting with the public, the Owner, or any representative of an enforcement agency or regulatory authority.
The Contractor must also maintain a professional appearance in the execution or performance of these Services. This includes, but is not limited to, company-issued identification that clearly presents the Contractor and employee name.
D. Responsibility for Sub-contractors. The Contractor is responsible for the work of any sub-contractor who performs or executes any aspect of these Services.
E. Equipment and Materials. The Contractor must provide all necessary equipment and materials to execute these Services safely, efficiently, and effectively. The Contractor must interpret equipment and materials in the broadest sense to include vehicles, trailers, containers, tools, personal protection equipment, parts, components, and all other equipment or materials necessary for the performance or execution of these services.
Equipment and materials must meet or exceed the requirements set forth in any applicable law, regulation, rule, or industry standard.
The Contractor must use new factory parts and components free of defects. The Contractor must use parts and components that conform to Original Equipment Manufacturer (OEM) specifications where and when applicable, and the Contractor must notify the Owner where and when non-OEM parts and components may be used. The Owner must approve any non-OEM parts and components prior to delivery and installation.
Upon request, the Contractor must provide the Owner or any enforcement agency or regulatory authority with copies of any available documentation on the equipment or materials used in the performance or execution of these Services.
F. Permits. When required by the Owner, the Contractor must ensure possession of all necessary permits to execute these Services. The Contractor must ensure that all permits are current and valid throughout the performance of any applicable Services. The Contractor must present a copy of any permit to the Owner or any enforcement agency or regulatory authority upon request.
G. Record/Document Creation and Retention. The Contractor must create and/or retain all necessary documents, including photographs, associated with these Services. The Contractor must keep and maintain accurate, complete, and orderly records of all documents associated with these Services for a period of seven (7) years from the date of the last payment under the associated Agreement or assignment of work. The Contractor
DETROIT DETENTION CENTER
must provide any documents associated with these Services to the Owner or any enforcement agency or regulatory authority within a reasonable time of request as determined by the requesting party at its sole discretion. The Contractor must ensure that every document is clear and/or legible. If the requesting party determines that any document is unclear or illegible, the Contractor must either provide a clear and/or legible copy of the document or provide a signed attestation of the information contained in the document within a reasonable timeframe as determined by the requesting party at its sole discretion.
H. Reporting and Requests for Inspections. As directed by the Owner, the Contractor must use the designated system(s) to (a) accurately and timely report on planned and actual activities covered under these Services, and (b) request any required inspections.
The Contractor must comply with the most current version of the policy/protocols on data and document reporting or any other such policy/protocols that the Owner may implement during the term of the Agreement.
I. Cooperation, Coordination, and Communication. The Contractor must fully and openly cooperate, coordinate, and communicate with the Owner on all matters related to the performance or execution of these Services, and the Contractor must comply with any direction or guidance provided by the Owner. Communications may include but are not limited to daily or weekly schedules of any activities associated with these Services.
The Contractor must fully and openly cooperate, coordinate, and communicate with any representative of an enforcement agency or regulatory authority with jurisdiction over any aspect of these Services. Unless governed by any applicable confidentiality rules or laws, the Contractor must immediately convey in writing any communication from an enforcement agency or regulatory authority to the Owner. If the communication is governed by any applicable confidentiality rules or laws, then the Contractor must immediately convey that communication when legally permitted to do so.
J. Monitoring, Inspection, and Oversight. The Contractor must allow the Owner or any representative of an enforcement agency or regulatory authority to monitor or inspect all aspects of these Services at any time.
The Owner may stop all work at an assigned site or all assigned sites if the Contractor improperly performs, or is reasonably suspected of improperly performing, any aspect of these Services. The Owner may also stop work at an assigned site or all assigned sites in the interests of public health, safety, or welfare.
The Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) resulting from a work stoppage by the Owner.
K. Compliance with all Applicable Laws, Regulations, Authorities, Rules, and Industry Standards or Best Practices. The Contractor must perform or execute these Services in
DETROIT DETENTION CENTER
compliance with all applicable, regulations, authorities, rules and industry standards and best practices. The Contractor must ensure that all assigned personnel possess working knowledge of all applicable federal, state, and local laws, regulations, authorities, rules, and industry standards or best practices.
L. Discrepancies. In the case of any discrepancy between these Services and any applicable laws, regulations, authorities, rules, and industry standards or best practices, the most stringent requirement(s) shall apply as determined by the Owner at its sole discretion.
The executed Agreement incorporates these Services by reference, and in the case of any discrepancy between these Services and the executed Agreement, the most stringent requirement(s) shall apply as determined by the Owner at its sole discretion.
M. Verify the Assigned Site(s) and Work Area. Prior to the execution of any aspect of these
Services, the Contractor must verify the assigned site(s) and identify the designated work area. If questions arise as to which site and/or work area is assigned, the Contractor must immediately contact the Owner for clarification and hold all Services for that site until the Owner provides clarification. Requests for clarification on an assigned site and/or work area shall not entitle the Contractor to any upward adjustment in price/costs or any additional fee for that site. The Contractor is not entitled to any compensation for work performed on any unassigned site(s) and/or work area(s), and the Contractor is responsible for any damage resulting from work performed on any unassigned site(s) and/or work area(s), including all costs to repair or replace any damage.
N. Document Work Area Conditions. The Contractor must document work area conditions as directed by the Owner. Failure to thoroughly and adequately document work area conditions creates a presumption of responsibility on the part of the Contractor for any damage that occurs on or around the assigned work area.
O. Use of Public Streets, Sidewalks, and Alleyways. The Contractor may use public streets and alleyways for the temporary parking of vehicles and equipment that are necessary to perform or execute these Services. However, the Contractor must comply with all applicable federal, state, and local laws, regulations, authorities, and rules, and the Contractor must ensure safe passage of pedestrian and vehicular traffic around the parked vehicles and/or staged equipment or materials.
P. Protection of Persons, Infrastructure, and Surrounding Property. In every aspect of these Services, the Contractor must exercise all necessary and appropriate care to protect all persons from harm or injury and protect infrastructure and property (both real and personal) from damage. This includes but is not limited to any structures, vehicles, improvements (i.e. fencing), appurtenances, and landscaping on surrounding properties.
The Contractor must execute these Services in a manner that avoids the creation of any hazard, undue disturbance, or nuisance to the community.
DETROIT DETENTION CENTER
Q. Corrections. The Contractor is responsible for these Services through the term of the Agreement. The Contractor is responsible for any errors, oversights, or deficiencies in the execution of these Services, and the Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) for the correction of any error, oversight, or deficiency.
Acceptance or approval of any aspect of these Services by the Owner does not relieve the Contractor of the responsibility to correct any errors, oversights, or deficiencies at the Contractor’s expense.
Furthermore, the Contractor is responsible for any damage that results from the execution of these Services, and the Contractor must repair or replace any damaged infrastructure, property, equipment or materials at the Contractor’s expense.
Finally, the Contractor is responsible for any hazardous condition, undue disturbance, or nuisance that results from the execution of these Services, and the Contractor must correct any such hazardous condition, undue disturbance, or nuisance that may adversely affect surrounding persons or property at the Contractor’s expense.
R. Discovery of Impediments. If the Contractor discovers impediments on or adjacent to the assigned work area, the Contractor must notify the Owner immediately. Examples include, but are not limited to, equipment or vehicles blocking access to the assigned work area and/or the presence of hazardous or regulated materials that may require abatement/removal prior to the start of work.
S. Executed Agreement. The Contractor may not perform any aspect of these Services without an executed Agreement from the Owner. If the Contractor performs any work without an executed Agreement, then the Owner reserves the right to disqualify the Contractor from payment for any costs and/or fees for the work performed.
T. Term of Performance. The Contractor must complete these Services within the term of performance stipulated by the Owner. At its sole discretion, the Owner reserves the right to extend the term of performance at any time.
III. HVAC SERVICES
A. HVAC Seasonal Start-Up. As directed by the Owner, the Contractor must complete HVAC system seasonal start-up. Upon completion of seasonal start-up, the Contractor must submit a report in the form, manner, and time frame stipulated by the Owner.
B. HVAC Inspection and Maintenance. As directed by the Owner, the Contractor must regularly inspect and perform scheduled and preventative maintenance on HVAC systems, including all equipment and controls. Upon completion of all inspection or maintenance activities, the Contractor must submit a report in the form, manner, and time frame stipulated by the Owner.
DETROIT DETENTION CENTER
C. HVAC Repairs, Improvements & Other Service(s). As directed by the Owner, the Contractor must repair any malfunctioning or non-functioning HVAC system, improve upon any existing HVAC system, and perform any other requested HVAC service(s). The Contractor shall not perform any service until authorized by the Owner in writing. This includes, but is not limited to, all electrical, plumbing, pipefitting, structural and mechanical aspects of the HVAC system(s) as determined by the Owner.
a. System Investigation/Assessment. As directed by the Owner, the Contractor must thoroughly investigate or assess any HVAC system to identify the cause of the failure, and the Contractor must thoroughly investigate or assess any existing HVAC system to determine the feasibility of any requested improvements or other services. The Contractor must report on any investigation or assessment in the form, manner, and time frame stipulated by the Owner.
b. HVAC Service(s) Estimate. The Contractor must submit a detailed estimate for each assigned task to the Owner for evaluation and approval. The Contractor shall not perform any service until authorized by the Owner in writing. If additional service(s) are required, the Contractor shall not perform any additional work until a revised estimate is authorized by the Owner.
c. Emergency Services. The Owner shall have the sole and final authority in determining those services designated as an “Emergency”. The Contractor must acknowledge an emergency request in writing within two (2) hours of the emergency notification by the Owner, and the Contractor must arrive on-site within four (4) hours of the emergency notification unless otherwise authorized by the Owner. The Contractor must provide a detailed estimate to the Owner within one (1) calendar day of the emergency notification by the Owner. The Contractor must begin emergency services within one (1) calendar day of receiving authorization from the Owner.
If the Contractor fails to meet any of the specified standards for emergency response, the Contractor must bill for those services at the non-emergency rates stipulated in the agreement.
d. HVAC Task Report. Upon completion of the service(s), the Contractor must submit a report of the task activities in a form, manner, and time frame stipulated by the Owner.
D. HVAC Parts, Supplies & Equipment. As requested by the Owner, the Contractor must provide all necessary HVAC parts, supplies and equipment. Upon receiving the request from the Owner, the Contractor must provide multiple quotes for each requested part, supply or equipment. If the Contractor is unable to provide multiple quotes for a part, DETROIT DETENTION CENTER supply or equipment, the Contractor must provide an explanation for the sole quote.
The Contractor shall not proceed with any order absent approval of the Owner in writing. The Contractor must coordinate delivery of the part(s), supply(ies), equipment to the location(s) directed by the Owner.
IV. PLUMBING SERVICES
A. Plumbing Inspection and Maintenance. As directed by the Owner, the Contractor must regularly inspect and perform scheduled and preventative maintenance on plumbing systems, including all equipment and controls. Preventive maintenance may include pressure testing, and video inspections with associated recordings. Upon completion of all inspection or maintenance activities, the Contractor must submit a report in the form, manner, and time frame stipulated by the Owner.
B. Plumbing Repairs, Improvements & Other Service(s). As directed by the Owner, the Contractor must repair any malfunctioning or non-functioning plumbing, improve upon any existing plumbing, and perform any other requested plumbing service(s). This includes, but is not limited to, all water heaters, faucets, toilets, pipes, drainage, sewers, valves meters, traps, water lines, pumps, restrooms, drinking fountains and any other aspects of the plumbing system(s) as determined by the Owner.
i. System Investigation/Assessment. As directed by the Owner, the Contractor must thoroughly investigate or assess any malfunctioning or non-functioning plumbing system to identify the cause of the failure, and the Contractor must thoroughly investigate or assess any existing plumbing system to determine the feasibility and installation of any requested improvements or other services. The Contractor must report on investigation/assessment in the form, manner, and time frame directed by the Owner.
ii. Plumbing Service(s) Estimate. The Contractor must submit a detailed estimate for each assigned task to the Owner for evaluation and approval. The Contractor shall not perform any service until authorized by the Owner. If additional service(s) are required, the Contractor shall not perform any additional work until a revised estimate is authorized by the Owner.
iii. Plumbing Service(s) Term of Performance. The Contractor must complete each assigned task within the term of performance approved by the Owner.
C. Emergency Services. The Owner shall have the sole and final authority in determining those services designated as an “Emergency”. The Contractor must acknowledge an emergency request in writing within two (2) hours of the emergency notification by the Owner, and the Contractor must arrive on-site within four (4) hours of the emergency notification unless otherwise authorized by the Owner. The Contractor must provide a detailed estimate to the Owner within one (1) calendar day of the emergency notification by the Owner. The Contractor must begin emergency services within one (1) calendar day of receiving authorization from the Owner.
DETROIT DETENTION CENTER
i. If the Contractor fails to meet any of the specified standards for emergency response, the Contractor must bill for those services at the standard and overtime rates stipulated in the agreement.
D. Plumbing Task Report. Upon completion of the service(s), the Contractor must submit a report of the task activities in a form and manner directed by the Owner.
E. Plumbing Parts, Supplies & Equipment. As requested by the Owner, the Contractor must provide all necessary plumbing parts, supplies and equipment. Upon receiving the request from the Owner, the Contractor must provide multiple quotes for each requested part, supply or equipment. If the Contractor is unable to provide multiple quotes for a part, supply or equipment, the Contractor must provide an explanation for the sole quote.
The Contractor shall not proceed with any order absent approval of the Owner. The Contractor must coordinate delivery of the part(s), supply(ies), equipment to the location(s) directed by the Owner.
V. ELECTRICAL SERVICES
A. Electrical Inspection and Maintenance. As directed by the Owner, the Contractor must regularly inspect and perform scheduled and preventative maintenance on electrical systems, including all equipment and controls. Preventive maintenance may include pressure testing, and video inspections with associated recordings. Upon completion of all inspection or maintenance activities, the Contractor must submit a report in the form, manner, and time frame stipulated by the Owner.
B. Electrical Repairs, Improvements & Other Service(s). As directed by the Owner, the Contractor must repair any malfunctioning or non-functioning electrical, improve upon any existing electrical, and perform any other requested electrical service(s). This includes, but is not limited to, Remedy of code violations, Electrical panel upgrades, Wiring, Fixture, ballast or lamp repair and/or replacement, Primary and secondary power work, Exterior building and parking lot lighting replacement and/or upgrades, Generator repairs and service, Transfer switch installs, Sound equipment repairs and any other aspects of the electrical system(s) as determined by the Owner.
C. System Investigation/Assessment. As directed by the Owner, the Contractor must thoroughly investigate or assess any malfunctioning or non-functioning electrical system to identify the cause of the failure, and the Contractor must thoroughly investigate or assess any existing electric system to determine the feasibility and installation of any requested improvements or other services. The Contractor must report on investigation/assessment in the form, manner, and time frame directed by the Owner.
a. Electrical Service(s) Estimate. The Contractor must submit a detailed estimate for each assigned task to the Owner for evaluation and approval. The Contractor shall not perform any service until authorized by the Owner. If additional service(s) are required, the Contractor shall not perform any additional work until a revised estimate is authorized by the Owner.
DETROIT DETENTION CENTER
b. Electrical Service(s) Term of Performance. The Contractor must complete each assigned task within the term of performance approved by the Owner.
c. Emergency Services. The Owner shall have the sole and final authority in determining those services designated as an “Emergency”. The Contractor must acknowledge an emergency request in writing within two (2) hours of the emergency notification by the Owner, and the Contractor must arrive on-site within four (4) hours of the emergency notification unless otherwise authorized by the Owner. The Contractor must provide a detailed estimate to the Owner within one (1) calendar day of the emergency notification by the Owner. The Contractor must begin emergency services within one
(1) calendar day of receiving authorization from the Owner. If the Contractor fails to meet any of the specified standards for emergency response, the Contractor must bill for those services at the standard and overtime rates stipulated in the agreement.
i. Electrical Task Report. Upon completion of the service(s), the Contractor must submit a report of the task activities in a form and manner directed by the Owner.
d. Electrical Parts, Supplies & Equipment. As requested by the Owner, the Contractor must provide all necessary electrical parts, supplies and equipment. Upon receiving the request from the Owner, the Contractor must provide multiple quotes for each requested part, supply or equipment. If the Contractor is unable to provide multiple quotes for a part, supply or equipment, the Contractor must provide an explanation for the sole quote. The Contractor shall not proceed with any order absent approval of the Owner. The Contractor must coordinate delivery of the part(s), supply(ies), equipment to the location(s) directed by the Owner.
VI. FIRE PROTECTION SERVICES
A. Annual Inspections and Testing. As directed by the Owner, Contractor will be required to test all existing fire alarm systems and fire suppression systems for proper operation, identify any potential malfunctions of systems equipment and provide preventative maintenance to specified locations. The Contractor will inspect and test the systems listed ensuring that all systems meet and are tested in accordance with the following (or most current) standard to ensure:
A. Fire Alarm systems meet NFPA 72 and the national Fire Alarm Code.
B. Annual Fire Sprinkler System testing and maintenance meet NFPA 25.
C. Kitchen Fire Suppression Systems bi-annual testing and maintenance meet NFPA
17A.
D. Roll Down Door testing and maintenance meet NFPA 80.
E. System testing and documentation shall be done as prescribed by the NFPA standards and requirements of the local authority having jurisdiction (NFPA 10, NFPA 25 and NFPA 72).
DETROIT DETENTION CENTER
B. Fire Protection Maintenance Requirements. As directed by the Owner, the Contractor must regularly inspect and perform scheduled and preventative maintenance on Fire Protection systems, including all equipment and controls. Upon completion of all inspection or maintenance activities, the Contractor must submit a report in the form, manner, and time frame stipulated by the Owner.
C. Fire Monitoring Requirements. The Contractor will provide 24-hour Fire alarm systems monitoring service at all assigned locations, as determined by the Owner. When receiving an alert the Contractor must immediately notify 911 officials and subsequently notify the Owner.
D. Fire Protection Repairs, Improvements & Other Service(s). As directed by the Owner, the
Contractor must repair any malfunctioning or non-functioning Fire Protection system, improve upon any existing Fire Protection system, and perform any other requested Fire Protection service(s). This includes, but is not limited to, all electrical, plumbing, pipefitting, structural and mechanical aspects of the Fire Protection system(s) as determined by the Owner.
A. System Investigation/Assessment. As directed by the Owner, the Contractor must thoroughly investigate or assess any Fire Protection system to identify the cause of the failure, and the Contractor must thoroughly investigate or assess any existing Fire Protection system to determine the feasibility of any requested improvements or other services. The Contractor must report on any investigation or assessment in the form, manner, and time frame stipulated by the Owner.
B. Fire Protection Service(s) Estimate. The Contractor must submit a detailed estimate for each assigned task to the Owner for evaluation and approval. The Contractor shall not perform any service until authorized by the Owner. If additional service(s) are required, the Contractor shall not perform any additional work until a revised estimate is authorized by the Owner.
C. Emergency Services. The Owner shall have the sole and final authority in determining those services designated as an “Emergency”. The Contractor must acknowledge an emergency request in writing within two (2) hours of the emergency notification by the Owner, and the Contractor must arrive on-site within four (4) hours of the emergency notification unless otherwise authorized by the Owner. The Contractor must provide a detailed estimate to the Owner within one
(1) calendar day of the emergency notification by the Owner. The Contractor must begin emergency services within one (1) calendar day of receiving authorization from the Owner.
i. If the Contractor fails to meet any of the specified standards for emergency response, the Contractor must bill for those services at the non-emergency rates stipulated in the agreement.
DETROIT DETENTION CENTER
D. Fire Protection Task Report. Upon completion of the service(s), the Contractor must submit a report of the task activities in a form, manner, and time frame stipulated by the Owner.
VII. COMPENSATION
A. Pre-Invoice Review. Prior to submitting any invoice, the Contractor must submit a request to the Owner to review the associated data and documentation that evidences satisfactory completion of the Services for which a payment request will be submitted.
The Contractor must submit the request in a form and manner prescribed by the Owner.
B. Request for Payment. The Contractor must submit all requests for payment in the form and manner prescribed by the Owner. The request for payment must include all supporting documentation required or requested by the Owner. Payment for each assigned site is based upon (a) the Owner-approved prices and (b) the review and approval of all necessary data and documentation that substantiates satisfactory completion of these Services.
C. Withholding Payment. The Owner reserves the right to withhold any payment amount in part or in whole until all work is completed in accordance with these Services as determined by the Owner.
Furthermore, the Owner reserves the right to withhold any payment in an amount equivalent to the costs incurred for the correction of any errors, oversights, or deficiencies on the part of the Contractor. The Owner also reserves the right to withhold any payment in an amount equivalent to costs incurred for the repair or replacement of any damage caused by the Contractor, and finally, the Owner reserves the right to withhold any payment in an amount equivalent to costs incurred for the correction of any hazardous condition, undue disturbance, or nuisance caused by the Contractor.