This Scope of Work document outlines a bullhog mechanized mastication contract between the U.S. Wildland Fire Service (USWFS) in partnership with the West Desert District-Bureau of Land Management (WDD-BLM) and Utah Division of Wildlife Resources (UDWR) to reduce wildland fire hazards and restore wildlife habitat. The project involves mechanically removing standing live juniper and pinyon trees and saplings across approximately 514 acres located at the south end of Ochre Mountain approximately 8 miles northeast of Ibapah in Tooele County, Utah, on federal BLM lands. The work encompasses elevations ranging from 5,900 to 6,500 feet with slopes between 5% and 30%. Participation is limited to pre-qualified contractors only. No mandatory site visit is required prior to bidding, though potential bidders are strongly recommended to inspect the site to understand general and local conditions affecting contract performance. A pre-work conference will be held prior to work commencement to review project requirements, specifications, schedules, and administrative provisions. The contract performance period spans 154 calendar days from the official Notice-to-Proceed, with an extended performance window of October 12, 2026, through March 15, 2027, and final completion required no later than March 15, 2027.

The contract will be awarded on a per-acre price basis, with compensation based on actual treated acreage. The contractor must furnish all labor, equipment, supervision, transportation, operating supplies, and incidentals, with all costs including mobilization and operating expenses incorporated into the per-acre bid; no fuel surcharges or price adjustments will be negotiated. The contractor must provide at least two mobile tracked or wheeled masticators capable of processing live trees up to 18 inches in diameter, with mulch depth not exceeding four inches and all woody pieces limited to 6 feet in length. Award will be made to the lowest responsive and responsible bidder meeting experience and equipment requirements, with the contractor guaranteeing pricing through project completion. One lump-sum final payment will be issued following final inspection of completed acres, though partial payment requests may be considered at the State's discretion with prior written approval. The State retains the right to issue Minor Change Orders modifying acreage by up to 10% at the original bid price or to negotiate Major Change Orders for more substantial modifications, with change order liability capped at 10% of the original per-acre bid price multiplied by untreated acreage remaining.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B SCOPE OF WORK

KL27-109

PROJECT: Clifton Flat Bullhog LOCATION: Tooele County, approximately 8 miles northeast of lbapah, Utah

PRE-QUALIFICATION:

Pursuant to the Utah Procurement Code, participation in this is limited to pre-qualified contractors only. Bids or quotes submitted by a non-prequalified contractor will not be considered.

Introduction: U.S. Wildland Fire Service (USWFS) in partnership with West Desert District- Bureau of Land Management (WDD-BLM) and Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to provide for wildland fire hazard reduction and wildlife habitat restoration by mechanically removing standing live juniper and pinyon trees and saplings using mechanical mastication (bullhog). This task order requires the Contractor to furnish labor, equipment, supervision, transportation, operating supplies and incidentals. Project area totals approximately 514 acres as identified on attached site map.

SECTION I - PROJECT REQUIREMENTS

SITE SPECIFICS:

Location and Description: Work under this Contract is at the south end of Ochre Mountain approximately 8 miles northeast of Ibapah, Utah in Tooele County. The total number of acres identified for treatment within the project area is approximately 514. The work location is shown on the general location and site maps. Elevations range from 5,900 to 6,500 feet within the project site. Slope ranges from 5% to 30%. The work will occur on Federal (BLM) lands. Rocky areas are present but not consistent throughout the project area. The contractor will be compensated for actual treated acreage of the task order. The treatment boundaries will not be flagged and must be located by GPS. The work location is shown on the general location and site maps.

Acreage: 514.

Access to the site: From Salt Lake City, take Interstate 80 (I-80) west to Wendover, Nevada. Take Exit 410 and head west under the freeway. At the light, turn north on the main street in Wendover and continue west approximately .6 miles. Tum south onto Hwy 93 toward Ely for approximately 25.5 miles. Turn left (east) onto Ibapah Road and continue east and south approximately 29.4 miles toward lbapah. Tum left on the Pony Express Road and continue northeast approximately 5 miles to reach the Clifton Flat area. Multiple access points and routes exist from here. Four (4) wheel drive vehicles are recommended in and around the project

6/22/20:!h area. It will be the contractor's responsibility to get the equipment to the work site. SPECIFIC TASKS:

Work Limits: Only areas shown on the Project Map will be treated. The project areas are identified with OPS unit. It will be the contractor's responsibility to provide a OPS that can load project areas from a computer. Unit boundaries will not be flagged.

The Contractor shall immediately upon entering the project area, begin work, locate control points, section comers, and take such action to prevent their destruction.

Mulching: This is a mastication contract. ALL standing live juniper trees and all pinyon pine less than l 0" DBH will be shredded with a wheeled or tracked masticator (bullhog) unless they meet the description of a leave tree. Leave trees are defined as bearing trees, old-growth, or wildlife trees. Old-growth juniper is defined as large, single stemmed trees (generally greater than 18" in diameter measured at 12" above ground) having old-growth characteristics. Wildlife trees are trees with nests showing signs of recent activity or trees with a large nest (nest is greater than 36" in diameter). The contractor will be responsible for identifying and leaving bearing trees, wildlife trees, and large trees with old-growth characteristics once they have been oriented on site by the Contracting Officer's Representative (COR). The COR will meet with the contractor on site and provide a more detailed written and oral description of wildlife trees, trees with old-growth characteristics and bearing trees.

Tree cover, densities and size are variable across the landscape. However, most trees within the project area are medium sized (10-14' tall).

Mulch depth shall not exceed four inches (4"). If mulch exceeds four inches in depth the Contractor shall spread the mulch either mechanically or by hand. All surplus vegetation and slash shall be ground or cut, such that no woody piece is greater than 6 feet (6') in length. No live limbs shall be left on the stump of any ground stem.

Stumps shall be no taller than six inches (6") as measured on the uphill side.

CONTRACTOR FURNISHED EQUIPMENT:

Equipment Requirements: At least two, mobile, tracked or wheeled, hydraulically or PTO driven, mechanical mulching/shredder (bullhog) shall be furnished on a fully operational basis, with a competent, fully qualified operator, and shall be capable of mulching/shredding live trees up to eighteen (18) inches in diameter at 6 inches above ground level measured on the uphill side.

Due to the presence of knapweed, equipment shall be washed with a high-pressure system before entering and exiting project areas. All soil and plant parts shall be removed to prevent the spread of noxious weeds in and out of the project area.

GOVERNMENT FURNISHED PROPERTY:

No Government property shall be furnished on this project.

EQUIPMENT AND WORKMANSHIP:

All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner. The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.

Surface Conditions: Mulching shall not occur under conditions that prevent the proper operation of equipment. These conditions include snow, frozen ground or when the soil exceeds 15% moisture content. When such conditions are encountered, the Contractor shall stop work and notify the Government.

Surface Disturbance: Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work. Equipment and vehicles must not be operated or driven outside of the flagged boundaries except on identified roads or trails. All-terrain vehicles may be used within project areas as long as vehicle use does not create a visible trail. Bullhog use will be prohibited when soils are wet and rutting might occur. All created visible trails and/or ruts will be reclaimed at the expense of the contractor.

Tests for Uniformity: The Project Inspector will conduct tests to determine the uniformity of the Bullhog operation.

CONTRACT TIME:

Project Performance Time: 154 calendar days from the official Notice-to-Proceed {NTP)

Extended performance window: October 12, 2026, through March 15, 2027

SECTION II - BID REQUIREMENTS/INFORMATION

SITE VISIT:

A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

MAPS/FILES

Under no circumstances shall the shape/KML files be considered part of the contractual document. They will be provided for informational purposes only. Any .pdf files provided in this bid document, and the actual physical site location shall govern any contractual interpretation or dispute related to this project.

QUESTIONS:

Only questions specific to the site should be asked at the site visit (if held). Questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing on the Q&A board within the solicitation to keep the process fair and transparent. There are no exceptions to this. Questions asked at the site visit and subsequent answers will be recorded and posted in the solicitation so that all potential bidders can review questions and answers.

BIDDING:

This contract will be bid on a per-acre price. The per-acre price will be extended based on the number of acres to show a total project price. The total price shall include all labor, equipment, and materials necessary to complete the job, which includes all mobilization and operating costs. There will be no fuel surcharges or

6/22/2():!(l adjustments negotiated.

REFERENCES:

Bidding on this project is limited to pre-qualified contractors. Therefore, reference information does not need to be submitted with the bid.

CONTRACT AWARD:

A contract will be awarded to the lowest responsive/responsible bidder who meets any experience and equipment requirements noted elsewhere in this solicitation.

USE OF SUBCONTRACTORS:

The Project Manager must approve the use of all subcontractors in writing prior to their performance of any work on the project. Any company or individual who submitted a bid on the project, was offered the project as the low bidder, and declined that award, or who defaulted on project after being awarded the contract, is ineligible to be a subcontractor for, or an employee of, the successful bidder.

SECTION III - ADDITIONAL REQUIREMENTS

ENVIRONMENT AL CONSIDERATIONS:

Project sites shall be cleaned up, and all refuse removed by the Contractor. The Contractor shall be responsible for the disposal of materials in a manner consistent with State, Federal, and local laws and for all expenses incurred with the disposal. Public or private access roads damaged by the Contractor shall be restored at the contractor's expense to the same condition they were in at the commencement of work.

Use of 2-wheel and 4-wheel vehicles is permitted in the project areas. Off-road driving will be prohibited when soils are wet and rutting may occur.

Hazardous Materials:

1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).

2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.

3. Incidental (de minimus) leaks from fittings, gaskets, or ruptured hoses will not subject the contractor to remedial requirements and will be considered normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance is required.

4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on-site only if the fluids are captured, containerized, and removed from public lands for proper disposal.

6/22/202()

PUBLIC ACCESS:

Access into and through the project site shall remain open to the public at all times. The Contractor shall maintain roadways free of vehicles, tools, and debris.

SECURITY OF EQUIPMENT AND PROPERTY:

The Contractor may leave equipment at the work site, however, the Contractor shall be solely responsible for the protection of equipment and is solely responsible if the equipment is lost, stolen, or damaged.

CREW SUPERVISION:

1. The contractor shall designate one English-literate supervisor who will be on site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours before the change takes effect.

2. The person designated by the Contractor, as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew's work, (2) advising them as to improper work methods,

(3) providing instructions for correcting any improper work methods encountered.

3. Emergency transportation will be provided by the Contractor at all times.

WORK CAMPS:

Work camps may be established only in locations authorized in advance by the Project Manager in coordination with the Government. Should such a camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. Upon vacating a camp and before final payment, the Contractor shall remove all refuse and other signs of occupancy to the satisfaction of the Project Manager.

WORK HOURS:

Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. Work hours may extend into darkness only when the contractor's equipment is suitably outfitted with exterior lighting sufficient to allow safe operation; AND only when mutually agreed upon between the contractor and the project manager. Work may be done on Saturday, Sunday, and legal national holidays as mutually agreed between the Contractor and the Project Manager.

WORK SCHEDULE:

The work schedule shall be submitted at the pre-work conference.

DELAYS:

The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other workload, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires,

(4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.

6/22/20:!o

Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State's contract termination rights under the contract.

Note: "Unusually severe weather" means weather that is outside the normal weather patterns for a specific area at a specific time of the year. For example, strong wind and snowstorms in fall and winter, or strong wind, rain or hailstorms in spring and summer are not considered unusually severe. An unusually severe snow, wind or rainstorm is one that is worse than even the harshest normal conditions during a season.

PROJECT MEETINGS:

Location: Meetings shall be held at the project site, or as determined by the Project Manager.

Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

Presentation: The Contractor shall be prepared to summarize and explain procedures planned for each project and present the work schedule requested in the specifications.

Progress Meetings:

Location: Meetings shall be held at the project site, or as determined by the Project Manager.

Notification: Meetings may be called by either the Project Manager or the Contractor. Request shall state who should attend.

FIRE DANGER SEASON:

If the Project Manager allows the Contractor to continue work during the periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the Project Manager

PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA:

The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.

Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.

The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.

PROTECTION OF CULTURAL RESOURCES:

6/22/202/-l

Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C.431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object that is or may be entitled to protection under these Acts regardless of when the area, object, or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.

The contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture against destruction, obliteration, removal, or damage during the Contractor's operations. The contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the Contractor to proceed. The contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve the Contractor from civil or criminal remedies otherwise provided by law.

NOTICE TO PROCEED:

Unless notified by the project manager that notice-to-proceed will be delayed, receipt of the contract or purchase order by email shall constitute a Notice to Proceed. The Project Manager may issue a separate delayed notice-to-proceed for any reason including adverse soil, vegetative, climatologic, or other environmental conditions.

CONTRACT PERFORMANCE:

The Contractor shall begin work within seven (21) calendar days from the effective date of the notice to proceed. The Contractor shall continue the performance of the work under the contract without delay or interruption except by causes beyond his control identified in the Delays clause. While an extended performance window is provided in this statement of work, this extended window is designed for contractors who may have multiple contracts to complete for the State of Utah at the same time as this contract. The extended performance window is not to be construed as a full performance time window just for this project unless approved in advance in writing by the State's project manager. Once the contractor is on site working, the contractor shall work diligently and complete all work within the project performance time in the Contract Time clause below.

It is the contractor's sole responsibility to complete contract performance regardless of the contractor's current workload, including other state contracts. If necessary, the contractor will be expected to take whatever means are necessary to ensure timely contract performance. At the discretion of the contractor, this may include sub-contracting, additional equipment/manpower, and/or any other necessary action. Any necessary action taken by the contractor to ensure timely completion shall be at no additional expense to the State of Utah beyond the original contract price.

INSPECTION:

Surveillance Plan: The Government will inspect completed acres and provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to ensure that work complies with the contract specifications.

Final Inspection:

6:.22/20:!h

Location: Meeting shall be held at the project sites, or as determined by the Project Manager.

Notification: The Contractor shall notify the Project Manager at least three (3) working days before the completion date so the Government can schedule the final inspection.

Deficiencies: The Contractor shall correct deficiencies, and project areas will be re-inspected by the Project Manager.

ACCEPTANCE:

Based on inspection results, if the quality level falls below contract specifications, the Project Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspension work order to resolve the problem, during which time contract time will continue to run.

If untreated or unsatisfactorily treated areas are the primary reason for unsatisfactory work, the Contractor shall rework acres designated by the Government until satisfactory work quality is obtained.

PAYMENT:

One lump-sum final payment will be made for the actual number of acres completed following a final inspection of the completed project, and consistent with the payment clause in the State's standard terms and conditions.

Normally, requests for partial payments will not be considered. However, if a partial payment request is considered, approval of said request sha11 be at the total discretion of the State. The contractor must get a partial payment request approved in writing before submitting an invoice for partial payment. Partial payment invoices received without prior approval will be returned to the contractor as not proper for payment.

WINTER STOPPAGE:

At the sole discretion of the State and or the Federal Partner this contract may be stopped at any time due to frozen soil or other winter conditions. Once the contract work is stopped for winter, the state may pay the contractor and cancel the remaining portion of the contract or issue a resumption of work order when spring weather permits. The contractor must proceed diligently with all work as weather permits until a stop-work order is issued.

CHANGE ORDERS:

Minor Change Order. If the State determines that a change in the Scope of Work is necessary, they may modify acreage totals or parcel configuration by up to 10% of the originally proposed Project Area by providing written notice to the Contractor ("Minor Change Order"). Issuance of a Minor Change Order does not excuse the Contractor from their obligation to perform the work under their original per-acre bid price, nor does it excuse the State from paying Contractor for work completed to project specifications. Changes in acreage or parcel configuration will add or exchange work areas with characteristics similar to those in the original Project Area. When possible, a Minor Change Order should be implemented so as to leave a consolidated and contiguous project area having similar access to that originally described in the Scope of Work.

Major Change Order. If the State determines that a change in the Scope of Work is necessary, and that change does not qualify as a Minor Change Order, the State and the Contractor may negotiate a Major Change Order as an amendment to the original contract. Examples of Major Change Orders include: (1) a reduction or cancellation of acreage that is greater than 10% of the original Project Area or (2) a change in the Project Area such that the new project characteristics are not comparable to those described in the original Scope of Work.

6!'.22/2026

Major Change Orders may authorize an increase in the unit price of per-acre bid submitted by the Contractor, payment of part or all of equipment mobilization costs incurred by the Contractor, or a combination of both. Any Major Change Order shall be supported by documentation supporting the equitable adjustment in contract terms and is subject to approval by the State of Utah Division of Purchasing.

Change Order Limitations. The sum of all payments made under one or more Change Orders on a single contract may not exceed the liability cap for the contract, calculated by identifying the per-acre bid price, and multiplying that figure by 10% of the acreage within the Project Area that remains untreated. For example, the maximum payment authorized under a Major Change Order would be calculated as follows:

$50 per acre bid price x ( I0% of 500 acres left untreated) = $2,500 Maximum or $250 per acre bid price x (10% of 1250 acres left untreated)= $31,250 Maximum Nothing in this Section relieves the Contractor from their obligation to perform as described in Section 1, unless the State determines that a change order is appropriate. Under no circumstances may a Change Order exceed the total approved contract price. In most cases, the actual Change Order amount will be substantially less than the maximum liability cap for the contract. Nothing herein shall be construed as eliminating or modifying a Contractor's obligation to mitigate damages they may incur due to the circumstances necessitating a Major Change Order, or the State's right to terminate an Agreement in lieu of issuing a Change Order.

6/22/2026

�-:;� Cl1"fton Flat - Bullhog BureauoflandManagcment II

�'"'l •

Land Ownership

.A. West Desert 01stnct Office ..-. 491 John Glenn Rd NORTH Sall Lake City. UT 84116

08 .09

'-'---I

Ochre MountarnI

�6I

Clifton Flat

31 32

- Bullhog: 514 Acres Surface Management Agency Bureau of Land Management

No�anenty1$tnade by tha fMHuofLandManagement as to theICQJl'e,;y. rella�lt'f orcompletenessof ltlese Ullta foe lldMdualuse°' &Qgtegateuse�thothecdata

0.5 1 Mrles

Scale: 1:30,000 8/25/2026

WEST DESERT BLM

FUELS MANAG�MENT

;;::==,:::,=Cl

I on Imagery

"ft Fl a t - 8 u I lhOQ

Nowanllnl:y ts madebytheBuieauof landManagement as tolhe&COJl'q, relubday,orcom�tentu cl tnese da'.1to, ndMdualuseOf 8991'9Q1le use w:1'odltf dala

0.5 I MIH

Scale: I:30.000 8/25/2026

,':'izif.".

WEST o:'",.•s•.,-R.,.T�B"!'L�MI!'

FUELS MANAGEMENT

""' West Desert District Off,ce .-,. 491 Jahn Glenn Rd Bureauof Land ManagementII NORTH SaltlakeCny.UT84116

BureauoflandManagement�-;.;, Cl1"fton Flat - Bullhog II

� • ..6. West Desert D1str1ct Office. . .

· V1cm1ty�

� 491 John Glenn nd IIORTH Sall Lake City, UT 84116 end�==•=B•O=HH7E�VICtfL:E���===========(;)::==========::d'".!!i�J

SAIT FIATS 80 80

Wendover Air Force Base

FERBER HILLS

IOPE

HG£

OUTCH

MOUHTA.IH

Ougway Proving Ground

Fish Springs National WIidiife Refuge

Nov.aranr, rsmadeby the Eueauof land Management 0

10 20 Mt�t j:f-•,.,,,.

· to lheaaua,;y reQbMy o, COl'fipAe:enes&o( tnese Wt�fcx n.lMdual use or awega!euse wthOlilerdata

Scale: 1:500,000 8/25/2026

WEST DESERT BLM FUELS MANAGEMENT

6 22 20:!h

�-.- Clifton Flat - Bullhog Land Ownership

Bureau of Land Management .....491 John Glenn Rd Salt Lake City, UT 84116 West Desert District Office

II

..._NORTH

ao,..OotJt

I ( \ 1\.\ ) rn

West Desert District rn

,,.--)--/ V

, -f
1}J !J \ /
\\'l

\.0 r r

. ,"'I

1\

_J,,
�'

,,..J t✓/

- - I

> ,, J� C I

Clifton Flat

{J
-Bullhog: 514 Acres

e:-+ J

Surface Management Agency Bureau of Land Management Private State of Utah

No warranty ismade by theBureauof LandManagement0
as lo the accuracy, reliability, or completenessof theseI

0.5 1 Miles

No warranty is made by the Bureau of Land Management0
as_tothe accuracy,reliability, or completenessof theseI

0.5 Miles

BONNEVlrLE SALT HATS

District

9587 ft

GOSHUTE

MOUNT A/NS

Wendover Air Force Base lOPE NGE

0.., FERBER HlllS

DUTCH MOUNTAIN

8571 ft

Dugway Proving Ground

SPRING1CREEK

Fl AT

DEEP CREEK Fish Springs National Wildlife Refuge ! .. Project Area a::

Nowarranty ismade by the Bureau of Land Management0
as.tothe acx:uracy,reliability,or completenessof theseI

10 20 Miles I image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image41.jpeg image42.jpeg image43.jpeg image44.jpeg image45.jpeg image1.png image46.jpeg image47.jpeg image48.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg

File details come from the government source that posted it. Updated .