20161019 Letter and Sketch (Crane Outrigger).pdf
PDF 236 KB Posted
- Attached to
- USCGC IDA LEWIS DOCKSIDE REPAIRS Federal contract opportunity
- Solicitation number
- 70Z08522QIBCTX303
About this file
This document outlines a solicitation for dockside repair services of the USCGC IDA LEWIS, a 175 foot Coastal Buoy Tender. The solicitation is a request for quotes under FAR Part 12 for commercial items and FAR Subpart 13.5 for simplified procedures. The NAICS code is 336611 for ship repair with a small business size standard of 1,250 employees, making this a total small business set aside. Services include ship repair and associated support work to be performed over 49 calendar days starting June 2nd and ending July 21st, 2022 at the cutter's home pier in Newport, Rhode Island. Quotes are due by February 7th, 2022 with award anticipated on or around April 7th, 2022. This is a firm fixed price contract administered by the United States Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CRANE ENTRY PROCEDURE-FILLABLE WITH NEW P-1.pdf | ||
| AMEND 0003 CONT.doc | DOC document | |
| Amendment 0003 USCGC IDA LEWIS DS.pdf | ||
| Attachment 1 SOS Revised amendment 0002.xls | XLS spreadsheet | |
| Attachment 2 IDA LEWIS (WLM 175) DS.pdf | ||
| Amendment 0002 USCGC IDA LEWIS DS.pdf | ||
| Amendment 0001 USCGC IDA LEWIS DS.pdf | ||
| Attachment 6 JOTFOC IDA LEWIS Redacted.pdf | ||
| Attachment 4 Request for Clarification.docx | DOCX document | |
| Attachment 1 SOS.xls | XLS spreadsheet | |
| (S1.12) Combined Synopsis Sol CGC IDA LEWIS.doc | DOC document | |
| Attachment 2 IDA LEWIS (WLM 175) DS FQ2 MAS 22R1.pdf | ||
| Attachment 5 USCG Ombudsman Notice.docx | DOCX document | |
| Attachment 3 Past Performance Information Form.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/ueShore
ENGINEERING L.L.C.
Mr. Carlos Montanez Engineering Department Mass. Maritime Academy
RE: Navsta Quay Boiler Hoist Plan
Dear Mr. Montanez, Richard W. Gilbert, P.E.
October 19, 2016
BlueShore Engineering LLC has reviewed the outrigger plan developed by Imperatore Corporation, dated October 11, 2016, for the boiler hoist. The existing bulkhead has the ability to support the crane outrigger pressures when placed as shown on the attached sketch. The condition imposes less than half of the allowable lateral earth pressure on the bulkhead.
Contractor shall ensure that the unrepaired area of the existing bulkhead is not loaded.
Feel free to contact us if you have any questions, comments or concerns.
Best Regards, Ri4hard W. Gilbert, P.E.
President
1029 Teaneck Road, 2nd Flr, Teaneck, New Jersey 07666
No.
o, (
R G!STERED
PROFESSIONAL ENGINEER
CIVIL
tel. (201) 817-2001 rwg@blueshorellc.com blueshorellc.com