Attachment 3 Schedule of Services_Blank Price Schedule (Revised).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- DOCKSIDE (DS): USCGC BERTHOLF DS FQ4 FY22
- Solicitation number
- 70Z08022QMECP0010
About this file
This document contains a pricing schedule and cost estimate template for the USCGC Bertholf Dockside Availability FY2022 opportunity. The schedule lists various work items required including cleaning and inspecting tanks, incinerators, and deck drains; modifying AFFF bilge sprinkling piping; preserving and renewing deck coverings; providing tenting and general welding services; and overhauling a starboard steering actuator. Labor rates by trade and location are also provided along with assumptions for composite labor rates and G&A and profit factors. The related federal contract opportunity is solicitation number 70Z08022QMECP0010 for the Bertholf DS FQ4 FY22 with a period of performance from July 6, 2022 to September 3, 2022. The point of contact is Petal Donald at the U.S. Coast Guard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: |
| USCGC BERTHOLF (WMSL-418) DOCKSIDE AVAILABILITY FY2022 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | |||
| D-002 | Incinerator Clean, Inspect and Test | JOB | |||
| D-003 | BERP and QAWTD 01-57-2, Install | JOB | |||
| D-004 | AFFF Bilge Sprinkling Piping, Modify | JOB | |||
| D-005 | Deck Drain, Install | JOB | |||
| D-006 | Decks, Preserve (Full) | JOB | |||
| D-007 | Deck Covering (Slip-Resistant), Renew | JOB | |||
| D-008 | Tenting, Provide | JOB | |||
| O-009 | General Welding, Provide | Job | |||
| D-010 | STBD Steering Actuator, Overhaul | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | ERROR:#VALUE! | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | ERROR:#VALUE! | JOB | ERROR:#VALUE! | |
| O-00Z | Laydays | Day | 5 | ERROR:#VALUE! | |
| Total Price of Definite Items | ERROR:#VALUE! | ||||
| Total Price of Option Items | ERROR:#VALUE! | ||||
| Total Price of Definite and Optional Items | ERROR:#VALUE! |
(11/17/2021)_x000D_ Draft-00 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .