P1451546584-9913-PID000A.pdf
PDF 331 KB Posted
- Attached to
- DAUNTLESS DOCKSIDE REPAIRS FY19
- Solicitation number
- 70Z080-19-Q-P4571000
About this file
DAUNTLESS DRAWING/REFERENCE - SEE FILE NAME
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
09-7-003 1/2''
09-7-004 1/2''
10-7-001 1''
G 1/2'' 10-7-005
Subject to technical modifications
09-7-002 3/4''
09-8-001 3/4''
10-7-007 1/4''
13-7-002 1/2''
PAL/PAH
11-9-001
PI
12-7-001 G1/2''
1/2'' 10-7-006
1/4'' 08-7-004
1 1/4'' / RP 1/4''
10-3-001
10-7-002 G1''
10-9-003
PDSH
09-7-008 G1/4''
92-7-003 G 3/4''
1/4'' 08-7-006
08-7-005 1/4''
09-7-006 1/4''
3/4''/1/4''
13-7-001 1/2''
11-5-001 1/2"
1/4''/1/2''
1/2''/1/4'' 09-7-011 G1/4''
1/ 2' 1/
4'
1/ 4' 1/
2'
09-7-010 1/4''
11-7-003 G1/4''
1/4''/1/2''
11-7-001 1/2''
95-7-001 1/2''
1/2'' 11-7-005
11-7-006 1/4''
1/4'' 08-7-007
10-9-001
PI
10-9-002
PI
06-7-001
DN25
10-9-006
TE
TAL
TAH
09-7-005 G1/2''
09-8-002
13-9-001
PI
10-9-007
TE
10-9-008
IAL
93.2
1/8'' / 1/4'' 08-7-002
92-7-001 1/2''
1/2'' FNPT / 1/2''BSP / 1/4'' FNPT
92-3-001
90-9-001
LSHH
LAHH
92-7-002 1/2''
93.1
1/ 4' 1/
2' m m
11-9-005
OSH
11 95
10-8-001 13-8-001 Sl op e
11-8-001
10-7-003 1/4''
10-7-004 1/4''
INLET09 EN 102423/4'' PN25
INLET10 DIN1'' PN64
OUTLET11 DIN1/2'' PN64
INLET06 DN25 PN16
OUTLET STU91 ---DN50 ---
OUTLET STU92 EN 102421/2'' PN16
DRAIN93.1 EN 102421/2'' PN25
DRAIN STU93.2 EN 102421/2'' PN25
RETURN TO BILGE TANK95 DIN1/2'' PN64BILGE WATER
LEAK OIL
SLUDGE
SLUDGE TANK AIR VENT
HOTWATER
HOTWATER
BILGE WATER
LIGHT PHASE
CLEAN WATER
BILGE WATER
WATER
F4
F1
F2
F3
SMALL SLUDGE TANK
VOLUME APPROX.
0,06m³
OUTLET13 DIN1/2'' PN64
1/2'' 11-7-002
WSE 5-01-037
10-1-001 10-1-001/M1
M
50 20
HOTWATER
HOTWATER
COMPRESSED AIR
WATER
BILGE WATER FEED
CLEAN WATER OUTLET
BILGE WATER RETURN
OUTLET OF LIGHT PHASE
SLUDGE DISCHARGE
LEAKOIL DRAIN
BILGE WATER
MEDIUMNO.
POS. DESCRIPTION
CONNECTIONTABLE
INLET08 DIN 23531/4'' PN25
10-9-009
SC
12-7-002 1/2''
10-5-001
09-7-001
1/4''/1/2''
09-9-001
PI
DN20
09-7-013
TE
11-7-009 G1/4''
11-7-008 1/2''
DN25/DN32
DN32/DN25
1/ 2' 1/
4'
1/
4' 5/
07-7-001
DN25
2F 1F
3F 4F
3F
4F
2F
1F to B ilg e
1/4'' 08-7-013
PI
1/4''
PCV
08-7-001
M
L
K
I
H
G
F
E
D
C
B
M
L
K
I
H
G
F
E
D
C
B
AA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CAD-Drawingon this drawing We reserve all rights
Description of Revision
Location is electronically stored
Approved
Checked
Created
Revision proof
Date Name
Revision
Client
Copyright reserved
Description
Last modified by
Rev.-Date
Country
Last modified on
Drawing-No.
Scale Size
Rev.-Name
Sheet / Sheets
D-59302 Oelde
GEA Westfalia Separator
WMEC-901 - 913
2211Ka
19.10.2015
06.10.2015
2321CE
US Coast Guard
P&ID
BM_E500 cleandesign
WSE5-01-037
MA_1_546584
2321CE
USA
27.10.2015
C E
SV42080OEL0038\Order Processing - OP\Kundenauftraege\BL_MARINE\USA\US Coast Gurad\Proj. 30033289 - Kom. 1451546584\MA_1_546584.prj@SV42080OEL0038\Projekt/Dokumentablage\Basic and Process Engineering\Zeichnungen\P1451546584-9913-PID000A pr in te d on .1 0.
fo r
P1451546584-9913-PID000A
A001 01
11-9-011
ZS
09-7-014 1/4''
11-7-010 1/4''
D N
D N
OUTLET07 DN25 DIN 2633
Ablauf12 DIN1/2'' PN64
1''/1/2''
1' 1/
2' '1' 1/
2'
3/ 4' 1/
4'
1" 10-4-001
1''/1/2''
1/ 2' 1/
4'
1/2''/1''
3/ 4' 1'
In case of excessive contamination of the product, (particle size >3 mm, fiber length >42 mm) it is recommended to install a basket type pre-strainer with an absolute filter rate of 3 mm.
11-9-002
PT
10-9-018
SIS
LEAK OIL
Preheater Unit Volume 13m³
Assembly: highest place loose supply
Assembly example for customer all dashed lines have to be installed by customer max. Volume complete
Vordruck am Gasventil 1 bar loose supply
Assembly:
loose supply the lowest pointsetting pre-pressure 1 bar
25-30 l
3/4'' 06-7-003
DN40
06-3-001 M
06-7-004
DN40
06-9-001
TC
06-5-001
06-9-002
TAHH
06-9-003
PI
06-9-004
PI
06-9-005
TI
06-9-006
TI
06-7-006 1/2''
06-7-005 1/2''
06-9-008
PI
06-2-001
Sample point
Connection point for presentation of OMD- monitor
Next outlet also the advice to transfer this to sludge or dirty oil tank Next to outlet also overboard valve
Pumping device for test 15ppm alarm
Ø1 mm
COMPRESSED AIR
The counter pressure** must beadjusted with valve 11-7-005
Insulation: Thickness 12mm Material: Mineral woolmatting, Aluminium luminated, WSN76-0210-00
Heater for Pos.: 10-5-001 Position of heater connections
All pipes shown by dashed lines have to be installed by yard
Installation instructions No.: 2058-9601-020 have to be observed
For symbols refer to: DIN 28004, DIN 2429; DIN 2481, DIN 30600
Do not discharge the oily sludge into the public sewage system!
with GEA in advance.
If other materials shall be used, this must be clarified
11-7-020 G1/2''
2321CE19.10.2015A ISSUED FOR INSTALLATION
| Model |
| Layout1 |
File details come from the government source that posted it.