Attachment_1,_P45D1900,_Specification_HARRIET_LANE_(WMEC_270A).pdf
PDF 1 MB Posted
- Attached to
- DRYDOCK AVAILABILITY CGC HARRIET LANE Federal contract opportunity
- Solicitation number
- 70Z080-18-Q-P45D1900
About this file
Attachment (1), P45D1900, SPECIFICATION, HARRIET LANE DDL
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HARRIET LANE (WMEC 903)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2018
SOLICITATION 70Z080-18-Q-P45D1900
(Rev-3, 4 May 2018)
USCGC HARRIET LANE (WMEC-270A) DRYDOCK AVAILABILITY FY2018
ii (Rev-3)
TABLE OF CONTENTS
Revisions Record............................................................................................................................... iv Consolidated List of References .......................................................................................................... v Consolidated List of Government-furnished Property ........................................................................... xi Consolidated List of Critical Inspection Items ................................................................................... xiv Principal Characteristics.................................................................................................................... xv General Requirements WORK ITEM 1: Hull Plating (U/W Body), Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (100%) WORK ITEM 4: Propulsion Shaft Fairwaters and Rope Guards, Renew WORK ITEM 5: Appendages (U/W), Leak Test WORK ITEM 6: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 7: Appendages (U/W) - Internal, Preserve WORK ITEM 8: Voids (Non-Accessible), Leak Test WORK ITEM 9: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 10: Propulsion Shafting, Strain Gage Alignment, Inspect WORK ITEM 11: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall WORK ITEM 13: Propulsion Shaft Coating, Renew WORK ITEM 14: Propulsion Shafting, Straighten WORK ITEM 15: Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or
Renew WORK ITEM 16: Propeller Shaft Sleeve(s), Renew WORK ITEM 17: Propulsion Shafting, Optical Or Laser Alignment Check WORK ITEM 18: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 19: Propulsion Shaft Bearings (External), Renew WORK ITEM 20: Propulsion Stern Tube Bearings, Renew WORK ITEM 21: Propulsion Shaft Bearing Housings (External), Inspect WORK ITEM 22: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 23: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 24: Controllable Pitch Propeller (CPP) System, Inspect and Service WORK ITEM 25: Controllable Pitch Propeller Hubs, Remove, Inspect and Reinstall WORK ITEM 26: Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service .. 95 WORK ITEM 27: Removed WORK ITEM 28: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 29: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 30: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 31: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 32: Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair Or Renew WORK ITEM 33: Hawse Pipes, Preserve WORK ITEM 34: Tanks (Ballast), Preserve “100%” WORK ITEM 35: Chain Locker, Preserve 100% WORK ITEM 36: Tanks (Potable Water), Preserve “100%” WORK ITEM 37: Hull Plating Freeboard, Preserve – Partial WORK ITEM 38: Superstructure, Preserve “Partial” WORK ITEM 39: Cathodic Protection / Zinc Anodes, Renew iii (Rev-3)
WORK ITEM 40: Drydock WORK ITEM 41: Temporary Services, Provide - Cutter WORK ITEM 42: Air Escape Piping, Repair WORK ITEM 43: Auxiliary Machinery Space #1 Deck, Repair WORK ITEM 44: Bilges (Machinery Space), Preserve “Partial” WORK ITEM 45: Bos’n Hole Deck, Repair WORK ITEM 46: Tanks (Ballast), Repair and Preserve “Partial” WORK ITEM 47: Fathometer Transducer, Renew WORK ITEM 48: Tanks (MP Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 49: Doppler Speed Log, Replace (WMEC-270-17-027) WORK ITEM 50: Deep Water Sounder, Remove (WMEC-270-17-028) iv (Rev-3)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
3/30/2018 1 27 Removed work item 27
3/30/2018 1 47 Remove all items and reference to ODOM4-ECHOTRAC- MKIICG Deep Water Sounder
3/30/2018 1 49 Added work item 49
3/30/2018 1 50 Added work item 50
4/19/2018 2 28 Updated Valve list
5/04/2018 3 37 Changed sqft from 1000 to 1500
5/04/2018 3 38 Changed sqft from 1000 to 1500
5/04/2018 3 Update consolidated GFE list to include GFE from WI-50
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-3)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 243-2, Rev G; Stern Tubes, Strut Brg & Seal A&D Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters and Rope Guards Coast Guard Drawing 901 WMEC 111-001, Rev G, Shell Exp Fwd 101 Coast Guard Drawing 901 WMEC 111-002, Rev F, Shell Exp Aft 182 Coast Guard Drawing 901 WMEC 111-003, Rev H, Shell Exp FR 101-182 Coast Guard Drawing 901 WMEC 111-1, Rev H, Shell Exp Fwd 101 Coast Guard Drawing 901 WMEC 111-2, Rev G, Shell Exp Aft 182 Coast Guard Drawing 901 WMEC 113-1, Rev E, Tank Top Pl & Fr Fwd 101 Coast Guard Drawing 901 WMEC 113-1, Rev E, Tank Top PL & FR Fwd 101 Coast Guard Drawing 901 WMEC 113-2, Rev A, Tank Top PL & FR Aft 182 Coast Guard Drawing 901 WMEC 114-001, Rev F, Skeg Coast Guard Drawing 901 WMEC 114-002, Rev D, Bilge Keels Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters and Rope Guards Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters And Rope Guards Coast Guard Drawing 901 WMEC 114-005, Rev -, Stern Flap Mods to Structure Coast Guard Drawing 901 WMEC 123-002, Rev D, Chain Lkr Bhds & Details Coast Guard Drawing 901 WMEC 123-3, Rev G, Misc Built-In Tanks Coast Guard Drawing 901 WMEC 131-1, Rev G; Mn Dk Pl & Fr, FWD 101 Coast Guard Drawing 901 WMEC 141-1, Rev E; 1st Platform Pl & Fr, FWD 103 Coast Guard Drawing 901 WMEC 184-010, Rev F, Transducer Foundations & Shell Mods Coast Guard Drawing 901-WMEC-184-024 rev-, Struct Mods Incidental to DS60 Doppler Install &
ODOM DWDS Rip-out Coast Guard Drawing 901 WMEC 185-14, Rev K, Auxiliary Machinery Space 1 Foundations Coast Guard Drawing 901 WMEC 201-1, Rev T, Engine Room Arr Coast Guard Drawing 901 WMEC 243-001, Rev K, Shafting Arr Coast Guard Drawing 901 WMEC 243-001, Rev K, Shafting Arrangement Coast Guard Drawing 901 WMEC 243-002, Rev G, Stern Tubes Strut Brg and Seal Arr and Det Coast Guard Drawing 901 WMEC 243-002, Rev G, Stern Tubes, Strut Bearing & Seal Arrangement and
Details vi (Rev-3)
Coast Guard Drawing 901 WMEC 243-002, Rev G, S-Tubes, Strut Brg & Seal A&D Coast Guard Drawing 901 WMEC 243-003, Rev F, Shaft Removal Arr Coast Guard Drawing 901 WMEC 243-003, Rev F, Shaft Removal Arrangement Coast Guard Drawing 901 WMEC 243-004, Rev E, CPP Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev E, Shafting Details Coast Guard Drawing 901 WMEC 243-007, Rev D, Shaft Coupling Assemblies, CPP Coast Guard Drawing 901 WMEC 243-008, Rev A, Hub & Rudder Removal Pad eye A & D Coast Guard Drawing 901 WMEC 243-1, Rev K, Shafting Arr Coast Guard Drawing 901 WMEC 245-001, Rev E, CPCH Prop Hyd Sys Diag Coast Guard Drawing 901 WMEC 245-003, Rev E, Controllable Pitch Propeller Propeller Hub Assembly Coast Guard Drawing 901 WMEC 245-004, Rev E, Controllable Pitch Propeller Escher Wyss 270 ft
WMEC Blade and Palm Coast Guard Drawing 901 WMEC 245-007, Rev B, Special Tools Coast Guard Drawing 901 WMEC 245-008, Rev C, Controllable Pitch Propeller Actuating Unit Type
300.3 GN
Coast Guard Drawing 901 WMEC 245-008, Rev C, Controllable Pitch Propeller Actuating Unit Type
300.3GN
Coast Guard Drawing 901 WMEC 245-009, Rev L, CPCH Prop Hyd Sys Diag Coast Guard Drawing 901 WMEC 256-001, Rev AA, Main and Auxiliary Water Cooling Diagrams Coast Guard Drawing 901 WMEC 256-001, Rev AB, Main and Auxiliary Water Cooling Diagrams Coast Guard Drawing 901 WMEC 256-001, Rev AB, Mn & Aux SW Cooling Sys Diag Coast Guard Drawing 901 WMEC 256-002, Rev N, Main & Aux Sw Cooling Sys A&D Coast Guard Drawing 901 WMEC 256-002, Rev R, & Aux SW Cooling Sys A&D Coast Guard Drawing 901 WMEC 256-004, Rev A, Aux Salt Water Mods Coast Guard Drawing 901 WMEC 259-002, Rev K, Diesel Exhaust System A & D Coast Guard Drawing 901 WMEC 259-002, Rev K, Diesel Exhaust System Arrangement and Details Coast Guard Drawing 901 WMEC 320-032, Rev D, 60 HZ Pwr Sply to ELEX Equip Coast Guard Drawing 901 WMEC 320-033, Rev, Electronic Power Distribution Coast Guard Drawing 901 WMEC 320-035, Rev AL, As-Built Electrical One-line Diagram Coast Guard Drawing 901 WMEC 321-006, Rev J, Wireways - 02 LVL & Above Coast Guard Drawing 901 WMEC 321-021, Rev B, Wireways Cable Routing Coast Guard Drawing 901 WMEC 400-009, Rev AJ, Command and Surveillance Wiring Data (COED)
VOL. 2
Coast Guard Drawing 901 WMEC 401-001, Rev AN, Arrangement Pilothouse & Bridge Wings Coast Guard Drawing 901 WMEC 401-002, Rev BA, Arrangement Sensor Room & Command Support
Center Coast Guard Drawing 901 WMEC 401-003, Rev R, ARR - ELEX EQPT Space & Store Room Coast Guard Drawing 901 WMEC 401-005, Rev AA, Arrangement Communication Center Coast Guard Drawing 901 WMEC 424-001, Rev, Electronic Navigation Sys Acst Block & ISO Wrg Diag Coast Guard Drawing 901 WMEC 424-002, Rev-, Electronic Navigation Sys Acst Wiring Data Coast Guard Drawing 901-WMEC-424-rev, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring and Details vii (Rev-3)
Coast Guard Drawing 901 WMEC 426-002, Rev V, Doppler Speed Log Block & Isometric Wiring Diagram
Coast Guard Drawing 901 WMEC 501-1, Rev M, Aux Mchry Sp No. 1- Arr Coast Guard Drawing 901 WMEC 501-2, Rev K, Aux Mchry Sp No.2-Arr Coast Guard Drawing 901 WMEC 505-8, Rev C; Bhd, Dk & Shell Piping Penetrations Coast Guard Drawing 901 WMEC 506-1, Rev K, Ovfl AE & ST Sys Diag Coast Guard Drawing 901 WMEC 506-2, Rev J; Overflow, Air Escape and Sounding Tube A&D Fwd
Coast Guard Drawing 901 WMEC 506-3, Rev K, Overflow AE & ST A&D Aft 103 Coast Guard Drawing 901 WMEC 506-3, Rev K, Ovflow AE & ST A&D Aft 103 Coast Guard Drawing 901 WMEC 506-5, Rev A; Ovfl, A.E. and S.T. Mods Coast Guard Drawing 901 WMEC 529-001, Rev N, Ballasting & Emer Bilge Drainage Sys Diagram Coast Guard Drawing 901 WMEC 529-1, Rev N, Ballasting & Emer Bilge Drainage Sys Diagram Coast Guard Drawing 901 WMEC 529-2, Rev K, Blst and Emer Bilge Drain Ins Mchry Sp A&D Coast Guard Drawing 901 WMEC 529-3, Rev J, Blst & Emerg Bilge Drain Outside Mchry Space A & D Coast Guard Drawing 901 WMEC 533-005, Rev H, H&C Potable Water System Mn Dk - A & D Coast Guard Drawing 901 WMEC 533-006, Rev H, H & C Potable Water System, 01 Lvl & Abv A&D Coast Guard Drawing 901 WMEC 533-007, Rev J, H & C Potable Water Blw Mn Dk Coast Guard Drawing 901 WMEC 562-004, Rev E, A & B Class Rudder Assembly Coast Guard Drawing 901 WMEC 562-005, Rev G, A & B Class Rudder Stock And Steering Gear A &
D Coast Guard Drawing 901 WMEC 562-005, Rev J, A & B Class Rudder Stock And Steering Gear A & D Coast Guard Drawing 901 WMEC 565-005, Rev -, Fin Stabilizer Hydraulic System Diagram Coast Guard Drawing 901 WMEC 565-031, Rev C, Fin Shaft Assembly, w/ Sleeve Fitted NSN 3040-01-
104-5121 Coast Guard Drawing 901 WMEC 581-001, Rev G, Anchor Handling A & D Coast Guard Drawing 901 WMEC 581-002, Rev C, Hawse & Chain Pipes Coast Guard Drawing 901 WMEC 801-009, Rev H, Outboard Profile Coast Guard Drawing 901 WMEC 801-009, Rev J, Outboard Profile Coast Guard Drawing 901 WMEC 801-009, Rev L, Outboard Profile Coast Guard Drawing 901 WMEC 801-012, Rev B, Curves of Form Coast Guard Drawing 901 WMEC 801-022, Rev J, Docking Plan Coast Guard Drawing 901 WMEC 801-6, Rev M; Genl Arr, 1st Platf Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets.
Coast Guard Drawing 905 WMEC 243-002, Rev F, Stern Tubes Strut Brng & Seal – A&D Coast Guard Drawing 905 WMEC 243-006, Rev B, General Arrangement 12.125” Dia. Shaft Type MA
Water Lub., Inboard Stern Tube Seal Coast Guard Drawing 905 WMEC 243-6, Rev C, Shaft Seal A&D Coast Guard Drawing 905 WMEC 424-003, Rev-, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring, and Details Coast Guard Drawing 905 WMEC 562-001, Rev G, Rudder Coast Guard Fleet Drawing FL-184-003, DS-60 Doppler Shell Ring Fabrication, Dia 14" Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly viii (Rev-3)
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters Naval Sea Systems Command (NAVSEA) 0944-LP-005-0010, Propeller Controller Ptch Plant NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Technical Publication (TP) 2698, Oct 2012, Manufacturer’s Instruction Book-SWBS
Group(s) 242-245, Stuffing Box, SWBS 243 Section B Coast Guard Technical Publication (TP) 2699, Mar 2016, Technical Manual for the Controllable-Pitch
Propeller Coast Guard Technical Publication (TP) 2699, Mar 2006, Manufacturer’s Instruction Book – SWBS
Group(s) 245 - 270’ WMEC “A” Class Cutters, Technical Manual for the Controllable-Pitch Propeller
Coast Guard Technical Publication (TP) 2699, Mar 2016, Manufacturer’s Instruction Book-SWBS Group(s) 245, Controllable-Pitch Propeller System
Coast Guard Technical Publication (TP) 2718, Sep 2011, Manufacturer’s Instruction Book - SWBS Group(s) 555-562, 270’ WMEC “A” Class Cutters, Section A, SWBS 561, Steering Gear System, and SWBS 562, Rudder Stock Seal Assembly
Coast Guard Technical Publication (TP) 2719, Aug 2016, Manufacturer’s Instruction Book SWBS Group(s) 565, 270’ WMEC “A” Class Cutters, Fin Stabilizer Machinery
Coast Guard Technical Publication (TP) 4656, Oct 2005, Dual Axis Doppler Sonar Speed Log, MK II - Model DSN-450
Coast Guard Technical Publication (TP) 5454, Nov 2013, Technical Manual for Type MA Mechanical Stern Tube Seal
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities ix (Rev-3)
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D4174, R2015, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems ASTM International (ASTM) D4174, Re-approved 2010, Standard Practice for Cleaning, Flushing, and
Purification of Petroleum Fluid Hydraulic Systems ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An) ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement International Organization for Standardization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids –
Method for Coding the Level of Contamination by Solid Particles – Third Edition International Standard Organization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for
Coding the Level of Contamination by Solid Particles – Third Edition Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-PRF-16173, Sep 2006 Corrosion Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-17672E, Oct 2010, Hydraulic Fluid, Petroleum, Inhibited MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-1687, Sep 1994, Thermal Spray Process for Naval Ship Machinery Application x (Rev-3)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
MIL-STD-2199A(SH), July 2010, Covering for Waterborne Main Propulsion Shafting on U.S. Naval Surface Ships and Submarines
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Jan 2006, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Jan 2011, Chapter 16, Cofferdams
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 11, 2012, Power
Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xi (Rev-3)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,555.00 12 Y **Intermediate Shaft NSN: 2010-01-364-2026 2 ea. 10,000.00 12 N **Stern tube bearing NSN: 3120-01-189-1949 2 ea. 3,000.00 15 N Overhaul kit NSN: 5330-01-527-0959 2 ea. 12,894.00 15 N **Stern tube split seal NSN: 5330-01-359-5555 4 ea. 7,763.86
16 N **Stern tube sleeve NSN:2010-01-345-2315 1 ea. 10,792.56 16 N **Propeller Strut sleeve NSN:2010-01-340-5362 1 ea. 12,725.00
16 N **Intermediate Strut sleeve
NSN:2010-01-345-2314 1 ea. 13,180.16
16 N **Seal sleeve NSN:2010-01-340-6083 1 ea. 8,865.14 19 N Intermediate Strut
Bearing NSN: 3120-01-189-1087 2 ea. 3,875.00
19 Y Propeller Strut Bearing
NSN: 3120-01-189-1088 2 ea. 6,317.00
20 N Stern tube bearing NSN: 3120-01-189-1949 2 ea. 12,700.00 24 Y **Propeller Blade-
LH (Port) NSN: 2010-01-119-3972 1 Set 40,000.00
24 Y **Propeller Blade- RH (Stbd)
NSN: 2010-01-120-2871 1 Set 40,000.00
24 N O-Ring NSN: 5330-01-120-5229 8 ea. 97.00 24 N O-Ring NSN: 5330-01-118-8529 8 ea. 96.00 24 N Blade Washer NSN: 5310-01-335-4361 48 ea. 112.00 24 N O.D. Box Inspection
Kit NSN: 3010-01470-3519 2 ea. 330.00
24 N Filter NSN: 4330-01-177-4069 12 ea. 92.00 24 Y **Oil Feed Bushing NSN: 3120-12-329-5287 2 ea. 4,811.00 24 N **Ball Bearing NSN: 3110-00-156-6745 2 pr. 46.00 24 N **Bearing Bushing NSN: 2010-01-469-8639 2 ea. 450.00 24 N **Bearing Bushing NSN: 3120-12-198-7607 8 ea. 559.00 24 N **Spool valve assembly NSN: 4820-01-513-2509 2 ea. 100.00
25 N Hub installation kit NSN: 2010-01-470-3258 2 ea. 215.00 25 Y **Left hand hub assembly NSN: 2010-01-119-5469 1 ea. 304,313.00
25 Y **Right hand hub assembly
NSN: 2010-01-118-8538 1 ea. 304,313.00
25 N ***CPP Tool Kit N/A 1 set 20,000.00 xii (Rev-3)
25 N **Propeller Blade Bolts, M56 x 3 x 149
(QTY for one (1) hub)
NSN: 5306-01-118-8337 16 ea 14,300.32
25 N **Propeller Blade Bolts, M56 x 136.5 (QTY for one (1)
Hub)
NSN: 5306-01-119-3607 32 ea 27,454.40
26 N *"Special tools" (see
4.2 (Government-loaned installation tools))
N/A 1 set 1,000.00
26 N O.D. Box Inspection Kit
NSN: 3010-01470-3519 2 ea. 330.00
26 N Filter NSN: 4330-01-177-4069 12 ea. 92.00 26 Y **Oil Feed Bushing NSN: 3120-12-329-5287 2 ea. 4,811.00 26 N **Ball Bearing NSN: 3110-00-156-6745 2 pr. 46.00 26 N **Bearing Bushing NSN: 2010-01-469-8639 2 ea. 450.00 26 N **Bearing Bushing NSN: 3120-12-198-7607 8 ea. 559.00 27 N **Spool valve assembly NSN: 4820-01-513-2509 2 ea. 100.00
31 Y ***DSN 450 Mark II Dual Axis Doppler
Sonar speed log
NSN: 5845-01-130-3490 1 ea. 15,509.00
31 Y **Rudder Assembly NSN: 2040-01-486-0550 2 ea. 182,000.00 31 N **Upper Bearing NSN: 3110-01-121-8032 2 ea. 3,910.00 31 N **Rudder Stock
Sleeve NSN: 2040-01-F91-0187 2 ea. 4,269.00
31 N John Crane Seal kit NSN: 5330-01-527-0778 2 ea. 5,955.00 32 N **Thordon Lower
Bearing (SXL 20.7" X 17.5" X 14)
PN: F546150102 2 ea. 1,000.00
32 N Seal PN: 1856959-3 (Sperry Marine) = 17855H1L5
NSN: 5330-01-625-6617
4 ea. 152.00
32 N O-Rings PN: MS9021-381 NSN:
5331-00-763-2637
4 ea. 3.00
32 N Packing NSN: 5330-00-902-5505 2 Roll 177.00 32 N Packing NSN: 5330-00-527-7496 16 FT 5.00 32 N Thordon Bearing Set
Assembly
PN: TG-13886 OPTION 3
NSN: 3110-01-599-8155
2 ea. 6,200.00
32 N Inflatable Seal NSN: 5330-01-103-6518 2 ea. 689.00 32 Y **Roller Bearing NSN: 3110-00-155-9065 2 ea. 1,800.00 32 N Preformed packing NSN: 5331-01-306-4879 2 ea. 15.00 32 N O-ring PN: MS9021-359 NSN:
5331-00-435-0431 2 ea, 90.00
32 N O-ring PN: MS9021-377 NSN:
5331-01-129-0629
2 ea. 156.00
32 N Seal, Plain PN: 1856959-2 (Sperry Marine) = 17444H1L5
NSN: 5331-01-625-4197
4 ea. 60.00 xiii (Rev-3)
32 N **Seal Retainer NSN: 5330-01-382-7103 2 ea. 228.00 32 N Lantern Rings NSN: 4320-01-377-2106 2 ea. 1,167.00 32 N **Seal Housing NSN: 5330-01-382-9160 2 ea. 1,622.00 32 N **Tiller pin NSN: 5315-01-419-1523 4 ea. 1,000.00 32 N **Hydraulic Cylinder NSN: 3040-01-103-6565 4 ea. 4,426.57 32 Y **Fin Stock with sleeves NSN: 3040-01-104-5121 2 ea. 16,109.00
32 Y **Threaded-end rod PN: 1857336 2 ea. 400.00 40 Y *Fin Removal Tools NSN: 5180-01-F10-1826 1 set 15,000.00 47 Y *Transducer Cover
Plate N/A 4 ea. 50.00
49 N *** Fathometer transducer, shallow water, 50-200 kHz
(Airmar Technology SS505) (without adapter plate)
NSN: 5845-01-470-2500 1 ea. 346.83
49 N ***Display Unit, DS60 PN: DS600 1 ea. 1,200.00 49 N ***Distribution Unit, DS60
PN: DS610 1 ea. 1,200.00
49 N ***Transceiver Unit, DS60
PN: DS620 1.ea. 800.00
49 N ***Transducer w/30M Cable
PN: DS630-30 1 ea. 200.00
49 N ***Gate Valve, DS60 PN: DS661 1 ea. 300.00 N Hull ring N/A 1 ea. 350.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Rev-3)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
3 U/W Body, Preserve (100%)
5 Appendages (U/W), Leak Test
8 Voids (Non-Accessible), Leak Test
11 Propulsion Shafting; Remove, Inspect, and Reinstall
12 Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall
15 Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew
17 Propulsion Shafting, Optical Or Laser Alignment Check
18 Propulsion Shaft Bearings (External), Check Clearances
19 Propulsion Shaft Bearings (External), Renew
23 Controllable Pitch Propellers, Clean and Inspect
24 Controllable Pitch Propeller (CPP) System, Inspect and Service
26 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service
29 Sea Strainers - Duplex (All Sizes), Overhaul
30 Sea Strainers - Simplex (All Sizes), Clean and Inspect
31 Rudder Assembly; Remove, Inspect and Reinstall
32 Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair Or Renew
44 Bilges (Machinery Space), Preserve “Partial”
48 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect xv (Rev-3)
PRINCIPAL CHARACTERISTICS
270' WMEC (A-CLASS)
PHYSICAL
Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships 01 level amidships
23' 6" 31' 4"
Full load displacement 1,902.2 long tons Draft, full load to baseline amidships 14' 3" Highest projection above baseline *height approximated
≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-
1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4- 1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers 2 Propeller diameter 9' 0" Number of blades, Each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,210 gal.
JP-5 total (95%) 25,890 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,237 gal.
1 (Rev-3)
00000_0917_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of
2 (Rev-3) this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3 (Rev-3)
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2:
International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine
979. Column 3: Various.
3.7.2 SFLC Standard Specification 0000 General Requirements.
4 (Rev-3)
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-3)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WO RK ITEM # WO RK ITEM TITLE
LO CATION OF WORK (INCL. FRAME #’S) AREA (SQ FT)
CHECKPOINT 1 – COATING SYSTEM CO MPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STO RAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all t imes, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CO NDITIO NS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATIO N
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATIO N
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER CO AT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE CO AT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TO P COAT APPLICATIO N
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTIO N
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME O F Q P-1/NACE INSPECTO R SIGNATURE CERT. # DATE / TIME
6 (Rev-3)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATIO N, PRIMER CO AT,
BARRIER CO AT, TO P COAT,
ETC…)
LO CATION (FRAME &
DECK, RELATIO N TO
EQ UIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-3)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
SURFACE PREPARATIO N METHO D PRO FILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHO D C) FOR ABOVE 15 READINGS:
8 (Rev-3)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATIO N METHO D PRO FILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-3)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SO LUBLE SALT CO NDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LO CATIONS CO NDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-3)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
CO ATING MFG PRO DUCT NAME BATCH
INDUCTIO N
TIME
CO ATING SYSTEM SEQ UENCE
(PRIMER/TO UCHUP/3RD COAT, ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPO T 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LO CATION (FRAME REFERENCE):
SPO T 1 2 3 4 5 O VERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATIO N
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATIO N
1 AVG. BMR DEVIATIO N
APPLICATIO N METHO D (AIRLESS, CONVENTIO NAL SPRAY,
RO LLED)
AVERAGE DFT
11 (Rev-3)
11000_1016_FLT
REC_11000_UWHIB_FLT_270A WMEC (ALL) (1211)
WORK ITEM 1: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 114-001, Rev F, Skeg Coast Guard Drawing 901 WMEC 114-002, Rev D, Bilge Keels Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters and Rope Guards Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry
Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
12 (Rev-3)
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
• A hull repair supervisor and a marker.
• Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.
3.2.1 Hull plating. Inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 Inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.