70RFPW18QW8000005_RFQ_Pkg.pdf
PDF 2 MB Posted
- Attached to
- CCV Installation
- Solicitation number
- 70RFPW18QW8000005
About this file
RFQ Package for 70RFPW18QW8000005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003.pdf | ||
| 0003_QA_pt_2.pdf | ||
| DFC_QA_0823_.pdf | ||
| Sign_in_sheet.pdf | ||
| Amendment_0002.pdf | ||
| 70RFPW18QW8000005_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70RFPW18QW8000005
CCV Installation
FPS REGION 8 – Denver, CO.
TABLE OF CONTENTS
- Solicitation/Standard Form 1449.
- Contract Clauses, Terms and Conditions & Invoicing Instructions.
- Contract Documents & Attachments.
• Statement of Work (Attachment A).
• Floor Plan (Attachment B).
• Camera List (Attachment C).
• D.O.L Wage Determination – Denver County #2015-5419 R7 (Attachment D).
• Past Performance Project Form (Attachment E).
• Past Performance Questionnaire (Attachment F).
• Contractor checklist (Attachment G).
- Instructions to Offerors, Evaluation, Solicitation Provisions, & Reps and Certs.
CONTRACT CLAUSES, TERMS AND CONDITIONS
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/far/
CLAUSES INCORPORATED BY REFERENCE:
52.203-17 CONTRACTOR EMPLOYEE WHISTEBLOWER RIGHTS AND REQUIREMENT TO
INFORM EMPLOYEES OF WHISTEBLOWER RIGHTS (APR 2014)
52.204-2 SECURITY REQUIREMENTS (AUG 1996)
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
52.204-9 PERSONAL IDENTITY VERIFCIATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)
52.211-6 BRAND NAME OR EQUAL (AUG 1999)
52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (Jan 2017)
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEM (Jan 2017)
ADDENDUM TO 52.212-4
Notwithstanding the claim period stated in FAR 52.233-1, Disputes, and pursuant to FAR 33.206 Initiation of a Claim, the contractor agrees to submit any claim related to this contract (or order) within 12 months after accrual of claim.
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS
(DEC 2013)
52.237-1 SITE VISIT (APR 1984)
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION
(APR 1984)
52.242-15 STOP WORK ORDER (AUG 1989)
52.245-1 GOVERNMENT PROPERTY (Jan 2017)
52.245-9 USE AND CHARGES (APR 2012)
3052.204-71 CONTRACTOR EMPLOYEE ACCESS (SEP 2012)
3052.211-70 INDEX FOR SPECIFICATIONS (DEC 2003)
3052.222-70 STRIKES OR PICKETING AFFECTING TIMELY COPLETION OF THE CONTRACT
WORK (DEC 2003)
July 2018
Original RFQ Package http://www.acquisition.gov/far/
3052.222-71 STRIKES OR PICKETING AFFECTING ACCESS TO A DHS FACILITY (DEC 2003)
3052.228-70 INSURANCE (DEC 2003)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES
OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (Jan 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
_X_ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Oct 2016) (Pub.
L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C. 6101 note).
70RFPW18QW8000005
July 2018
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) [Reserved]
___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (ii) Alternate I (Nov 2011) of 52.219-3.
___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (ii) Alternate I (Jan 2011) of 52.219-4.
___ (13) [Reserved]
_X_ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
___ (iii) Alternate II (Nov 2011).
___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
___ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637 (d)(4)).
___ (ii) Alternate I (Nov 2016) of 52.219-9.
___ (iii) Alternate II (Nov 2016) of 52.219-9.
___ (iv) Alternate III (Nov 2016) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
_X_ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
_X_ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.
632(a)(2)).
70RFPW18QW8000005
July 2018
___ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
___ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
_X_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X_ (28) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
_X_ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
_X_ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
_X_ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
_X_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
___ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.
13627).
___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).
___ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (Oct 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017;
applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O.13693).
___ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
___ (38) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514
70RFPW18QW8000005
July 2018
___ (ii) Alternate I (Oct 2015) of 52.223-13.
___ (39) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-14.
___ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (41) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-16.
_X_ (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).
___ (43) 25.223-20, Aerosols (Jun 2016) (E.O. 13693).
___ (44) 52.223-21, Foams (Jun 2016) (E.O. 13696).
_X_ (45) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
___ (46) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C.
chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112- 43).
___ (ii) Alternate I (May 2014) of 52.225-3.
___ (iii) Alternate II (May 2014) of 52.225-3.
___ (iv) Alternate III (May 2014) of 52.225-3.
___ (47) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (48) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (49) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
___ (50) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
___ (51) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
___ (52) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).
70RFPW18QW8000005
July 2018
___ (53) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C.
2307(f)).
_X_ (54) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (55) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (56) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
___ (57) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
___ (58) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
___ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:
_X_ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495)
_X_ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67.).
_X_ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_ _ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C.206 and 41 U.S.C. chapter 67).
_X_ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67).
___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).
_X_ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
___ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C.
1792).
___ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).
70RFPW18QW8000005
July 2018
(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222- 40.
70RFPW18QW8000005
July 2018
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) ____ (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;
10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
3052.212-70 CONTRACT TERMS AND CONDITIONS APPLICABLE TO DHS ACQUISITION OF
COMMERCIAL ITEMS (SEP 2012)
The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference:
(a) Provisions.
____3052.209-72 Organizational Conflicts of Interest.
____3052.216-70 Evaluation of Offers Subject to An Economic Price Adjustment Clause.
____3052.219-72 Evaluation of Prime Contractor Participation in the DHS Mentor Protégé Program.
(b) Clauses.
____3052.203-70 Instructions for Contractor Disclosure of Violations.
70RFPW18QW8000005
July 2018
____3052.204-70 Security Requirements for Unclassified Information Technology Resources.
__X__3052.204-71 Contractor Employee Access.
__X__Alternate I
____3052.205-70 Advertisement, Publicizing Awards, and Releases.
____3052.209-73 Limitation on Future Contracting.
____3052.215-70 Key Personnel or Facilities.
____3052.216-71 Determination of Award Fee.
____3052.216-72 Performance Evaluation Plan.
____3052.216-73 Distribution of Award Fee.
____3052.217-91 Performance. (USCG)
____3052.217-92 Inspection and Manner of Doing Work. (USCG)
____3052.217-93 Subcontracts. (USCG)
____3052.217-94 Lay Days. (USCG)
____3052.217-95 Liability and Insurance. (USCG)
____3052.217-96 Title. (USCG)
____3052.217-97 Discharge of Liens. (USCG)
____3052.217-98 Delays. (USCG)
____3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair. (USCG)
____3052.217-100 Guarantee. (USCG)
____3052.219-70 Small Business Subcontracting Plan Reporting.
____3052.219-71 DHS Mentor Protégé Program.
__X_3052.228-70 Insurance.
____3052.228-90 Notification of Bond Payment Bond Protection. (USCG)
____3052.228-91 Loss of or Damage to Leased Aircraft. (USCG)
____3052.228-92 Fair Market Value of Aircraft. (USCG)
____3052.228-93 Risk and Indemnities. (USCG)
____3052.236-70 Special Provisions for Work at Operating Airports.
70RFPW18QW8000005
July 2018
__X__3052.242-72 Contracting Officer’s Technical Representative.
____3052.247-70 F.o.B. Origin Information.
____Alternate I
____Alternate II
____3052.247-71 F.o.B. Origin Only.
_X__3052.247-72 F.o.B. Destination Only.
BANKRUPTCY (Tailored)
In the event the contractor becomes insolvent or enters into proceedings relating to bankruptcy or business dissolution under any chapter of the United States bankruptcy Code, whether voluntary or involuntary, the contractor agrees to furnish, via overnight or express mail or electronic commerce method authorized by the contract, written notification of the proceeding to the contracting officer responsible for administering the contract. This notification shall be furnished within three days of the initiation of the proceedings and shall include the date on which the petition was filed, the identity of the court in which the petition was filed, and a listing of government contract numbers and contracting officers for all government contracts against which final payment is not made. This obligation remains in effect until final payment under this contract has been made.
SUBMISSION OF INVOICES
1. After award of this contract, but prior to performance, the contractor shall meet with the Contracting Officer and Contracting Officer’s Representative upon request to discuss proper invoice preparation and submission.
The contractor and government shall agree on a standardized invoice format to be used for submission of all invoices under this contract that meets the requirements of FAR 52.212-4 Contract Terms and Conditions – Commercial Items, Paragraph (g) “Invoice.” Use of a standardized invoice format will facilitate timely invoice reviews and approvals. Failure to use the agreed standardized invoice format shall result in rejection of invoices.
2. Invoices shall be submitted for payment within 30 days after acceptance by FPS of 70RFPW18QW8000005.
Invoices submitted prior to FPS acceptance for 70RFPW18QW8000005 will be rejected. Invoices shall not contain any employee Personally Identifiable Information (PII). Invoices shall be submitted via one of the following three methods:
a. By mail: NPPD-FPS-Region 8
DHS, NPPD
Attn: FPS Region 8 Invoice Financial Operations-Burlington P.O. Box 1279 Williston, VT 05495-1279
b. By facsimile (fax): # 802-288-7658. The invoice submission shall include a cover sheet with the contractor’s point of contact information and # of pages.
c. By e-mail: NPPDInvoice.Consolidation@ice.dhs.gov
The invoice number and FPS Region 8 shall be annotated in the subject line of the e-mail. Only (1) invoice shall be submitted per e-mail message. The invoice attached to the e-mail shall be in Portable Document Format (PDF).
Invoices submitted by other than these three methods will not be processed and will be returned.
3. Contractors shall provide an informational copy of each invoice to the Contracting Specialist at lynn.e.miller@hq.dhs.gov concurrent with submission to the designated billing office referenced above.
4. In addition to the information required for a proper invoice as identified in FAR 52.212-4 (g)(1), Contract Terms and Conditions – Commercial Items, (MAY 2015), the contractor shall include the following information:
a. Annotate “FPS Region 8” on the face of each invoice.
b. Clearly identify the date the services were delivered and the final inspection signed off on by the
Government.
c. Cite the identical CLIN description on the invoice as what is cited within the CLIN description listed in the contract.
5. Contractors shall submit only one invoice per Purchase Order. Invoice shall be submitted after Final Inspection and Acceptance has been granted by an FPS Inspector. Failure to comply with these submission requirements will result in rejection of the invoice.
mailto:NPPDinvoice.consolidation@dhs.gov
Federal Protective Service
National Protection and Programs Directorate U.S. Department of Homeland Security
STATEMENT OF WORK
for
New Installation of Closed Circuit Video (CCV) System
January 29, 2018
Internet Protocol CCV System Installation
Denver Federal Center Building 50
6 AVE & Kipling Street Lakewood, CO 80225
GSA Complex Number: CO0527
STATEMENT OF WORK
TABLE OF CONTENTS
A. BACKGROUND
B. PURPOSE
B.1 DESCRIPTION OF EXISTING SYSTEM…………………………………………………………………………………4
B.2 DESCRIPTION OF NEW SYSTEM……………………………………………………………………………………….4
C. SCOPE
C.1 GENERAL
C.2 INSTALLATION REQUIREMENTS
C.3 VIDEO STORAGE REQUIREMENTS
C.4 CONTROL ROOM MONITORS
C.5 NETWORKING EQUIPMENT
C.6 OPERATING SYSTEMS UPDATES AND SERVICE PACKS
C.7 WIRELESS POINT-TO-POINT
C.8 ATTACHMENTS………………………………………………………………………………………………………...10
D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND REQUIREMENTS
D.1 NETWORK VIDEO MANAGEMENT SYSTEM
D.2 MINIMUM SERVER AND WORKSTATION REQUIREMENTS
D.3 IP NETWORK VIDEO CAMERA MINIMUM REQUIREMENTS
D.4 NETWORK MANAGED SWITCH
E. ADDITIONAL PROJECT REQUIREMENTS
E.1 DESIGN STANDARDS
E.2 MATERIALS AND EQUIPMENT
E.3 ELECTRICAL AND CABLING REQUIREMENTS
E.4 FINAL INSPECTION AND ACCEPTANCE
E.5 CLEANLINESS, PROTECTION, AND PATCHING
E.6 WARRANTY AND MAINTENANCE
E.7 SAFETY AND HEALTH
E.8 QUALITY CONTROL PLAN
E.9 TRAINING
E.10 Configureation Management……………………………………………………………………………………………..25 E.11 Component/Device Configurations………………………………………………………………………………………26 E.12 Network Settings…………………………………………………………………………………………………………26 E.13 Wireless Network Security ………………………………………………………………………………………………27 E.14 Audit and Accountability…………..……………………………………………………………………..………………27 E.15 Identification and Authentication/Access Control……………………...…………………………………...……………28 E.16 Data Protection……………………………………………………………………………………………………………28 E.17 User Accounts…….………………………………………………………………………………………………………29 E.18 Incident Management and Disaster Recovery…………………………………………………………………………….29 E.19 Software Maintenance…………………………………………………………………………………………………….29
70RFPW18QW8000005
July 2018
E.20 Enterprise Architecture………….……………………………………………………………………………………….30
F. DELIVERABLES
F.1 GENERAL
F.2 REQUEST FOR QUOTATION (RFQ)
F.3 PRE-INSTALLATION DELIVERABLES
F.4 POST-INSTALLATION DELIVERABLES
G. PROJECT ADMINISTRATION
G.1 WORK AUTHORIZATION
G.2 PERIOD OF PERFORMANCE
G.3 Place(s) of Performace…………………………………………………………………………………………………
G.4 CONTACTS
G.5 SPECIAL SCHEDULING REQUIREMENTS
G.6 CONTRACTOR ACCESS AND USE OF PREMISES
G.7 SECURITY REQUIREMENTS
G.8 CONTRACTOR SUITABILITY REQUIREMENTS
G.9 Government Acceptance Period………………………………………………………………………………………….38
H. APPLICABLE STANDARDS
H.1 GENERAL
H.2 ACCESSIBILITY REQUIREMENTS (SECTION 508)
I. ACCOUNTABLE PROPERTY
I.1 Definitions…... ……………………………………………………………………………………………………………41 I.2 Deliverables……..…………………………………………………………………………………………………………42 I.3 Invoices….…………………………………………………………………………………………………………………43 I.4 Property Accountability…………..……………………………………………………………………………………….43 I.5 Physical Inventory………..………………………………………………………………………………………………..43 I.6 Property Disposal……...…………………………………………………………………………………………………..44 I.7 Lost, Stolen, Damaged or Destroyed (LDD) Property……………………………………………………………………44
J. INFORMATION TECHNOLOGY SECURITY
J.1 Security Certificaztion/Accreditation……………….……………………………………………………….…………….45 J.2 Security Review and Reporting……………...…………………………………………………………………………….45 J.3 Continuous Monitoring………...………………………………………………………………………………………….45
A. BACKGROUND
A.1 The Federal Protective Service (FPS) is the federal law enforcement agency responsible for the protection and security of federal facilities, employees, and visitors. FPS actively works to reduce security vulnerabilities of federal facilities from criminal, terrorist, accidental, and natural disaster threats to ensure properties remain safe, secure, and available to the American public and employees of the federal Government.
A.2 The following Statement of Work (SOW) and guidelines have been developed by the
Department of Homeland Security (DHS), National Protection and Programs Directorate (NPPD), Federal Protective Service (FPS) to mitigate threats and vulnerabilities pertaining to federal buildings and Government leased spaces. The SOW and regulations were developed with the notion that the security posture of each federally owned building or Government leased space is unique.
B. PURPOSE
B.1 Description of Existing System
This facility does not have an existing Closed Curcuit Television System.
B.2 Description of New System
B.2.1 This SOW is for the purchase and installation of a new standalone, Network Video
Management System (NVMS), five (5) fixed single sensor IP cameras, eight (8) multi sensor IP cameras, two (2) client workstations, three (3) flat panel monitors, two (2) uninterupped power supply, two (2) network switchs, install communication device to communicated with command center utilizing existing TropOs mesh system, fiber patch, and all additional equipment and appurtenances necessary for a fully functional IP based CCV system located at the Denver Federal Center Building 50, 6th AVE & Kipling Street Denver, CO. All equipment listed in this SOW shall be fully integrated.
B.2.2. The CCV system shall monitor vehicle traffic, personnel entry, emergency exits, interior high pedestrian traffic areas, and the exterior perimeter of the facility. The CCV system shall retain video for a minimum of 30 days and have an additional 25% additional storage space for future expansion. Storage shall be calculated at full camera resolution, full frame rate, and low compression.
C. SCOPE
C.1 General
C.1.1 As part of the pre-bid process, FPS may have a site visit and all interested Contractors are invited to attend. The purpose of the site visit is for Contractors to survey the site and review the requirements of this SOW. A site visit will be scheduled by the COR/FPS PM. All questions relevant to this SOW shall be submitted in writing to
70RFPW18QW8000005
July 2018 the Contract Specialist at lynn.e.miller@hq.dhs.gov. The Contractor shall not make or assume any changes to this SOW without written approval from the FPS CO.
C.1.2 The Contractor shall provide and install and configure the system as described and/or shown herein. The system shall include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The Contractor shall also supply all cabling and miscellaneous materials necessary to interconnect all equipment installed in accordance with this Statement of Work (SOW).
C.1.3 The Contractor shall be required to be familiar with all applicable codes while carrying out the work outlined in this SOW. The Contractor shall complete the work pursuant to this SOW following all applicable codes and standards including, but not limited to:
Occupational Safety and Health Administration (OSHA), Underwriters Laboratories (UL), National Fire Protection Association (NFPA), National Electrical Code (NEC), and any additional federal, state and local codes and policies.
C.1.4 The Contractor shall furnish all tools and equipment necessary to complete all work outlined in this SOW. Under no circumstances shall the Contractor be authorized the use of Government owned property, tools or equipment, to complete work in accordance with this SOW, unless otherwise specified in writing by the FPSCO.
C.1.5 In the event any operational system or utility (e.g. fire, IDS, HVAC) is required to be disabled or turned off, forty-eight (48) hour notice shall be required and approved in writing by the GSA Building Manager, FPS Inspector, and/or FPS PM prior to deactivation.
a) The Contractor, prior to departing for the day, shall ensure all system(s) previously disabled or turned off are functioning properly. A basic functional test shall be required to determine proper functionality of the system(s) and should be reported to the FPS PM.
b) In the event a system is non-functional once enabled or turned on, it shall be the responsibility of the Contractor, at no additional cost to the Government, to restore the system(s) prior to departure from the site.
c) If the Contractor fails to restore all system(s) before departing, they shall be liable for all costs incurred by the Government to restore system(s) functionality.
C.1.6 All personnel engaged in installation activities pursuant to this SOW shall be licensed by the state, local authority, and/or the city local authority in the required trades or professions which require licensing by such jurisdictions. The type and level of license shall be consistent with requirements of the jurisdictions and work to be performed by this SOW.
C.1.7 It shall be the sole responsibility of the contractor to employ personnel licensed and qualified to carry out all tasks outlined in this SOW. At no time during the installation shall the contractor require Government personnel to complete tasks required to be completed by the contractor as covered by this SOW.
70RFPW18QW8000005
July 2018
C.1.8 The Contractor shall be solely responsible for ensuring their employees and subcontractors abide by all requirements of the contract. At all times while work is being performed in accordance with this contract, the Contractor shall have a supervisory representative available to answer questions, resolve issues, supervise company employee(s), and subcontractor(s).
C.1.9 The Contractor shall provide a daily access schedule to coordinate installation activities. The schedule shall be submitted as part of the project plan.
C.1.10 The Contractor shall maintain a separate set of drawings, schematics, and wiring diagrams of the CCV system to be used for creating as-built drawings. This set shall be accurately kept up to date by the Contractor, noting all changes and additions to the CCV system and shall be available for the final inspection walkthrough.
C.1.11 The Contractor may be required to attend installation construction meetings.
C.2 Installation Requirements
C.2.1 The Contractor shall install all system components and appurtenances in accordance with manufacturer’s instructions following all applicable local, state and federal codes and policies. All appurtenances, such as, but not limited to connectors, terminators, and mounting hardware shall be supplied by the Contractor, as well as, all adjustments, alignments, programming, and configuration required for a complete and optimal CCV operating system.
C.2.2 The Contractor shall provide and install a complete IP based CCV system to include, but not limited to, Network Video Management System (NVMS) capable of viewing, recording, playback, and exporting of video, cameras, servers, RAID 6 video storage, workstations, communicate system, and network routers/switches. Provide and install camera mounts and other appurtenances, premise wiring, and system hardware as required for a complete and fully operational system as specified in this SOW. The installed system shall easily be expandable for future growth. Contractor shall install communication hardware to match exsisting communicaiton mesh system.
C.2.3 The Contractor, for all equipment/device(s) requiring licensing, shall purchase/install license(s) as required by the manufacturer. All licensing fees shall be nonrecurring.
C.2.4 All equipment required to be wall-mounted shall be mounted.
C.2.5 The Contractor shall be responsible to provide the necessary equipment and tools to access all equipment which is not accessible by ladder.
C.2.6 All measurements and equipment locations are approximate and shall be verified by the
Contractor for accuracy and installation feasibility. The Government shall not be held responsible for any error or variation in any measurements or other data listed, nor shall the Contractor, because of an error or variation in any measurement listed, be relieved
70RFPW18QW8000005
July 2018 of the responsibility to carry out the requirements in accordance with the true intent and meaning of the specifications without additional cost to the Government.
C.2.7 All ceiling tiles removed to accommodate installation shall be returned at the end of the work day.
C.2.8 The Contractor shall remove and haul debris from the project site daily and dispose of in a proper, acceptable manner in accordance with all federal, state and local laws and regulations, off of the job site property. The debris created from this project shall not be disposed of at the job site, in Government dumpsters, or on Government property.
C.2.9 The Contractor shall install and configure cameras in accordance with manufactures recommendations and industry best practices for optimal live view and recording.
C.2.10 The Contractor shall verify all camera views with the FPS PM prior to installation.
C.2.11 The Contractor, when removing the existing cameras, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed utilizing a silicone sealent and/or patched accordingly to protect against weather exposure, unless otherwise designated for reuse. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure throughout the installation period.
C.3 Video Storage Requirements
C.3.1 The Contractor shall calculate appropriate storage for all cameras recording at fifteen
(15) frames per second (fps) at the device (Camera, not total system), maximum resolution, and minimum compression. Storage capacity shall be capable of storing video for a minimum of thirty (30) days. The Contractor shall calculate and provide video storage requirements; the Contractor shall include enough storage for an additional number (5) cameras for future expansion maintaining the thirty (30) day minimum requirement. Contractor shall provide load calcualtions with request for questions.
C.3.2 The Contractor shall configure the installed CCV system to function in a Network
Domain environment, not as a workgroup.
C.3.3 Windows and the NVMS software shall be configured to use MS Active Directory for authentication.
C.3.4 The Contractor shall not apply power to the NVMS until, at a minimum; the following checks have been completed. All results shall be submitted in writing to FPS PM.
a) All equipment has been installed and connected in accordance with manufacturer’s instructions.
70RFPW18QW8000005
July 2018
b) All installed and/or reused wiring has been tested accordingly (e.g. shorts, opens, continuity).
c) Power supplies have been verified to operate at the correct voltage, phase, and frequency. Satisfaction of the above requirements shall not relieve the Contractor of responsibility for incorrect installation, defective equipment, or collateral damage as a result of Contractor work/equipment.
C.3.5 The Contractor shall ensure all system devices are configured appropriately for time synchronization. All devices shall be configured for time synchronization with the NVMS Server.
C.3.6 The Contractor shall demonstrate to the COR/FPS PM that the completed NVMS installation complies with the contract requirements. Using an approved test procedure, all physical and functional requirements of the project shall be demonstrated and shown. The test procedure shall include techniques and requirements for validating all significant system functions. The Contractor shall provide all test equipment and personnel required for final testing. Test results shall be provided in writing to the COR/FPS PM for review.
C.4 Control Room Monitors
C.4.1 The contractor shall provide and install three (3) 22” LED-backlite flat screen desktop monitors.
Salient Charactoristics:
a) Pixel Pitch; 0.282mm
b) Contrast ratio; 1000:1
c) resolution:1680 x 1050 at 60 Hz
Monitors shall be ENERGY STAR qualified
C.4.2 The contractor shall install two (2) monitors at the guard monitoring station located adjacent to the visitors access control desk. One (1) monitor shall be installed within the facility security office.
C.4.3 The contractor shall procure and install two (2) video workstations and associated video user software licenses. One (1) video workstation shall be installed the visitors access control desk and one (1) video workstation installed within the faculty security office.
C.5 Networking Equipment
C.5.1 As required per this SOW, the contractor shall purchase, provide, install, and configure all equipment, components, and necessary appurtenances for a complete and appropriately configured Ethernet network connecting all devices of the NVMS.
C.5.2 The Contractor shall configure installed switches for Trunk line communication between the switches.
70RFPW18QW8000005
July 2018
C.5.3 The Contractor shall configure installed switches with Virtual Local Area Network
(VLAN) and appropriate VLAN Routing. VLAN’s to be configured are:
CO0527 CCV
C.5.4 All equipment shall be rack mountable, if possible. All equipment that is not rack mountable shall be installed on the wall. An appropriately sized piece of ¾” plywood shall be mounted on the wall, painted with fire retardant paint, and all equipment mounted on the plywood. Final mounting location shall be approved by the FPS PM.
C.5.5 The Contractor shall install a new CCV client workstation at the visitors access control desk and facility security office. Location of workstations shall be coordinated with the FPS PM before installation.
C.5.6 The Contractor shall install hardware based, packet filtering firewalls in accordance with the Network Settings specifications.
C.5.7 The Contractor shall ensure that all installed monitors that are Wi-Fi-capable have that capability disabled.
C.6.8 The Contractor shall install a wireless communication device to communicate with existing TropOs mesh system. The mesh system shall allow remote view of CCV images from the FPS command center located at building 1, Denver Federal Center.
C.6.8 The Contractor shall install a fiber communication link between system switchs utilizing multi-mode fiber.
C.6 Operating Systems Updates and Service Packs
C.6.1 Operating systems and software applications shall be capable of being updated/patched after delivery. The Contractor shall ensure that all installed server(s) and client workstation(s) Operating System Software (OS), at the time of installation, are current with all security updates/patches, service packs, revisions, and shall provide through the warranty period. The NVMS and all other installed software shall be the current version with all applicable updates and installed in accordance with manufacturers recommendations.
C.6.2 The Contractor shall remove and/or disable all software components that are not required for the operation and maintenance of the camera system; and shall provide documentation to the FPS PM on what is removed and/or disabled. The software to be removed and/or disabled shall include, but is not limited to: games, device drivers for network devices not delivered, messaging services (e.g., MSN, AOL IM), Servers or clients for unused Internet services, unused networking and communications protocols, unused document processing utilities (Microsoft Word, Excel, PowerPoint, Adobe Acrobat, OpenOffice, etc.).
70RFPW18QW8000005
July 2018
C.6.3 The Contractor shall provide notification of patches affecting security within a pre-negotiated period as identified in the patch management process.
a) Pre-Contract Award – The Contractor shall provide details on their patch management and update process. Responsibility for installation and update of patches shall be identified.
b) Post-Contract Award - The Contractor shall provide notification of known vulnerabilities affecting Contractor-supplied or required OS, application, and third-party software within 30 days after public disclosure.
C.7 Wireless Point-to-Point (NOT APPLICABLE)
C.8 Attachments
C.8.1 CCV Locations: See floor plans (Attachment A. The contractor and FPS shall verify all camera installation locations to provide the optimal view prior to any installation.
C.8.2 CCV Locations: See Camera List (Attachment B. The contractor and FPS shall verify all camera installation locations to provide the optimal view prior to any installation.
D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND
REQUIRMENTS
D.1 Network Video Management System
D.1.1 All equipment shall be equivalent to Avigilon Control Center, Milestone, or Genetec and the NVR shall be a product specifically designed for closed circuit television recording, processing, and archiving. All equipment must be commercially off the shelf. No proprietary equipment will be accepted.
D.1.2 The NVMS shall support these essential software capabilities:
a) Live video monitoring
b) Recording of video
c) Playback of video from local or remote location(s)
d) Integral alarm/event management
e) Video export
D.1.3 The NVMS shall store/archive video using one of the following techniques:
a) Internal Disk Storage
b) Direct Attached Storage
c) Storage Area Network
D.1.4 The NVMS shall include image storage with configurable resolutions and frame rates.
D.1.5 The NVMS shall be compatible with, but not limited to: H.264, MPEG4, and MJPEG video compression formats.
D.1.6 The NVMS shall be capable of system fail-over and redundancy options.
D.1.7 NVMS System Architecture
a) The NVMS shall operate on a TCP/IP managed digital network.
b) The system software shall operate in a Client/Server configuration across a Local
Area Network (LAN) or Wide Area Network (WAN).
c) Streams live and recorded video up to 60 frames per second.
d) Support prioritizing streaming at 30 frames per second on 4K (8MP) cameras.
e) Streams live and recorded video from cameras up to a resolution of 7K (30 MP) —
6720 x 4488.
f) Decompresses H.264 video through the client graphics card to help leverage the client’s total processing power.
g) Scalable to support up to 100 servers and/or 10,000 cameras per site.
h) All recorded video and audio is digitally signed using 256-bit encryption so video can be authenticated for evidentiary purposes.
i) Secure video and audio data by securely transmitting all command and control data via TCP/IP using cryptographic keys based on SSL to prevent eavesdropping or tampering.
j) External system alarms can be can be pre-selected and configured to be monitored and trigger event driven video operations.
k) Video and audio recording can be defined by a recording schedule assigned to each video source.
l) Recording schedules are based on event types that trigger video recording over a time period each day per week.
m) Video recording can also occur manually by user triggered recording.
n) Alarms and rules can be triggered by self-learning video analytics based events
o) Each recorded event includes a pre-event and post-event recording option to provide context for a given situation.
p) Reference frame recording is an option when no events are detected.
q) Motion detection is provided for each individual video source with adjustable sensitivity, threshold and detection zones.
r) Primary and secondary video streams from each H.264 video source are recorded and maintained for a set amount of time before the primary stream is discarded as a means of increasing record time.
s) The maximum recorded video retention time can be set for each video source.
t) The Video Analytics Activity overlay displays a color-coded bounding box around moving objects categorized as humans or vehicles.
u) Configure the ability to display analytics activity for individual cameras or for the system.
v) The ability to stream video and audio is limited only by the system hardware capabilities.
70RFPW18QW8000005
July 2018
w) The application window display can be shared with other users for collaborative investigations while viewing both live and recorded video.
x) Live and recorded video and audio can be streamed simultaneously on the same monitor.
y) Operating System shall be certified to work by the Video Management Software’s manufacturer and be one of the following: Windows 7 or newer and Windows 12 or newer.
z) Support recording and management of video and audio sources through the use of industry standard drivers. These drivers shall include: ONVIF Profile S, Publically Published API.
aa) Support the following video analytic event types when captured by supported cameras: Objects in area, object loitering’ objects crossing defined line, object appears or enters area, object not present in area, objects enter area, objects leave area, object stops in area, anticipated direction of travel is violated, scene dramatically changes in an unexpected fashion.
bb) Support the ability to export media and provide the following options.
cc) Export recorded video in the following formats: Native (AVE), JPEG, PNG, TIFF, AVI, Print. Export recorded audio in the following formats: WAV, Native (AVE), AVI. Export a still frame of video as displayed in the video preview area: Native
(AVE), JPEG, PNG, TIFF.
dd) Native (AVE) format exports shall:
ee) Digitally sign recorded video and audio using 256-bit encryption so video can be authenticated for evidentiary purposes.
ff) Be able to export video from one or multiple camera streams simultaneously.
gg) Support exporting multiple video segments from different spans of time.
hh) Support reviewing of exported or backed-up video and audio in a dedicated player.
ii) Support playback of exported clips in synchronized, sequential time.
jj) Support playback of multiple clips in continuous, sequential order.
kk) Support exporting of video in lower frame-rates than originally recorded.
ll) Support exporting of a designated area from the camera’s recorded field of view.
mm) Support re-export into Native or other supported formats.
nn) Provide a record of the video source properties, including but not limited to:
Camera model, Firmware version, Location, MAC address, Serial number, Resolution.
D.1.8 All components/equipment licensing fees for the newly installed NVMS shall be nonrecurring.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.