Amendment 0003 provides answers to Contractor questions inadvertently left off the original QA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003.pdf | ||
| DFC_QA_0823_.pdf | ||
| Sign_in_sheet.pdf | ||
| Amendment_0002.pdf | ||
| 70RFPW18QW8000005_0001.pdf | ||
| 70RFPW18QW8000005_RFQ_Pkg.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• C3.3 Windows and the NVMS software shall be configured to use MS Active Directory for authentication o Will NVMS be added to existing Domain? No.
o Will the NVMS be added to any BLM or government network? No.
o Will a Government IT Network Admin be available to join NVMS Server and
Clients to existing MS Active Directory? No, the CCV system will not be networked with any other Government network.
• C.6.8 The Contractor shall install a wireless communication device to communicate with existing TropOs mesh system. The mesh system shall allow remote view of CCV images from the FPS command center located at building 1, Denver Federal Center.
o What TropOS hardware is mounted and used on Building 1?
Please provide current model numbers of TropOs hardware used at building 1? Model 5320 o How does FPS command center building 1 connect to TropOs wireless? The mesh hardware is plug and play into the network switches.
o Who is responsible for configuring TropOs wireless in building 50? The contractor shall install and configure.
• C.3 Video Storage Requirements o Is the storage requirement based on cameras full frame rate, or (15) frames per second? Storage shall be calculated at 15 FPS.
• C.4 Control Room Monitors o Are both the workstations installed at visitor’s access control desk and facility security office in building 50? One shall installed at the visitors access control center and the other in the facility security office.
o Is a client monitoring station required to be installed in Building 1? No.
If government is providing client hardware in building 1, will the specs of the hardware be available for review? Client hardware information is not available at this time other than it is a Panasonic DVR.
o Who is responsible for supplying client hardware for building 1? Client hardware already in place
• Where is 120 VAC power located for each of the UPSs? Power in located inside the telephone closet and in the security office.
• Will an AutoCAD drawing of the floor plan be provided? No, this office does not have access to AutoCAD.
• Page 30 of 110 E1.2 Infrastructure Design: is the HVAC system at each switch location adequate? Not sure what is being asked here. I believe that the SOW is asking that the contractor provide those in their design.
• Where is the Facility Security Office located? See attached.
• Can hangers/hooks be used instead of conduit above suspended ceiling areas? Per SOW
E.3.4: Industry approved hangers/hooks may be substituted for conduit, if allowed by applicable codes and/or regulations, in the advent wire, cable, and fiber runs are installed above a suspended ceiling. Hangers and hooks are acceptable.
Protecting People and Federal Facilities Across the Country Federal Protective Service
Head end location 16 Port Switch
UPS
4 10
3 2
16 Port Switch /
UPS
90° camera
180° camera
270° camera
360° camera
Security office
Presenter Presentation Notes
1. Install 270° 4 sensor camera viewing E-2 pedestrian entrance/exit.
2. Install 180° 3 sensor camera viewing W-1 basement pedestrian entrance/exit.
3. Install 270° 4 sensor camera viewing S-1 pedestrian entrance/exit, basement access.
4. Install 270° 4 sensor camera viewing loading dock.
5. Install 180° 3 sensor camera viewing N-2 pedestrian entrance/exit.
6. Install 90° single sensor camera viewing W-5, utility room.
7. Install 270° 4 sensor camera viewing E-4 utility room/N-1 pedestrian entrance/exit.
8. Install 270° 4 sensor camera viewing E-1 pedestrian entrance/exit.
9. Install 90° single sensor camera viewing security office entrance.
10. Install 90° single sensor camera viewing entrance to directors office.
11. Install 360° 4 sensor camera viewing lobby.
12. Install 90° single sensor camera viewing switch room/basement access.
13. Install 90° single sensor camera viewing freight elevator.