KING_S CANYON Tabulation of Bids.pdf
PDF 670 KB Posted
- Attached to
- NV FLAP 39(1) King's Canyon Road
- Solicitation number
- 6982AF20B000026
About this file
This is a tabulation of bids report for a federal highway project to improve Kings Canyon Road located in Nevada. The project is solicited by the Department of Transportation Federal Highway Administration under solicitation number 6982AF20B000026. Two bids were received for the base schedule from Hooker Creek, Inc. at $3,040,546 and MKD Construction, Inc. at $3,951,373, with Hooker Creek, Inc. being the apparent low bidder. The engineer's estimate for the project was $3,525,000. The report provides line item details for over 170 pay items describing the required construction and installation work. Key aspects of the work include roadway construction, drainage structures, fencing, signs, erosion control, and temporary traffic control. The anticipated award date is not provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 06/07/21
1 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF20B000026
Division: Central Federal Lands
State: NV County: Carson City
Federal Land: Hubmoldt-Toiyabe National Forest Opened at: Lakewood
Opened by: Josephine Helms
Date: 06/03/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Hooker Creek, Inc. $3,040,546.00 1015 Anderson St.
Red Bluff, CA 96080
MKD Construction, Inc. bid opening June 3, 2021 $3,951,373.00 20 Stokes Drive Mound House, NV 89706
Engineer's Estimate $3,525,000.00
2 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Hooker Creek, Inc. Lump Sum $300,000.00 MKD Construction, Inc. Lump Sum $744,000.00 Engineer's Estimate ALL LPSM Lump Sum $373,395.00
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Hooker Creek, Inc. $950.00 $29,450.00 MKD Construction, Inc. $750.00 $23,250.00 Engineer's Estimate 31 EACH $1,000.00 $31,000.00
A0060 15215-5000 SURVEY AND STAKING, BOX CULVERT
Hooker Creek, Inc. $1,950.00 $1,950.00 MKD Construction, Inc. $2,950.00 $2,950.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
A0080 15215-7000 SURVEY AND STAKING, PARKING AREA
Hooker Creek, Inc. $10,500.00 $10,500.00 MKD Construction, Inc. $25,960.00 $25,960.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
A0100 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Hooker Creek, Inc. $20,000.00 $16,200.00 MKD Construction, Inc. $7,500.00 $6,075.00 Engineer's Estimate 0.810 MILE $8,000.00 $6,480.00
A0120 15236-2000 SURVEY CONTROL, GRADE FINISHING
Hooker Creek, Inc. $29,000.00 $46,980.00 MKD Construction, Inc. $12,500.00 $20,250.00 Engineer's Estimate 1.620 MILE $10,000.00 $16,200.00
A0140 15301-0000 CONTRACTOR QUALITY CONTROL
Hooker Creek, Inc. Lump Sum $85,000.00 MKD Construction, Inc. Lump Sum $14,750.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
3 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0160 15401-0000 CONTRACTOR TESTING
Hooker Creek, Inc. Lump Sum $72,000.00 MKD Construction, Inc. Lump Sum $92,040.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
A0180 15501-0000 CONSTRUCTION SCHEDULE
Hooker Creek, Inc. Lump Sum $15,000.00 MKD Construction, Inc. Lump Sum $8,850.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0200 15701-0000 SOIL EROSION CONTROL (EROSION CONTROL)
Hooker Creek, Inc. Lump Sum $6,600.00 MKD Construction, Inc. Lump Sum $15,270.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0220 15701-0000 SOIL EROSION CONTROL (NON-STORMWATER CONTROL)
Hooker Creek, Inc. Lump Sum $8,200.00 MKD Construction, Inc. Lump Sum $5,040.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0240 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)
Hooker Creek, Inc. Lump Sum $14,000.00 MKD Construction, Inc. Lump Sum $7,410.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0260 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Hooker Creek, Inc. Lump Sum $2,500.00 MKD Construction, Inc. Lump Sum $3,540.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0280 15802-0000 WATERING FOR DUST CONTROL
Hooker Creek, Inc. Lump Sum $28,000.00 MKD Construction, Inc. Lump Sum $18,300.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
4 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0300 20101-0000 CLEARING AND GRUBBING
Hooker Creek, Inc. $6,200.00 $34,720.00 MKD Construction, Inc. $21,900.00 $122,640.00 Engineer's Estimate 5.6 ACRE $6,500.00 $36,400.00
A0320 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Hooker Creek, Inc. Lump Sum $29,000.00 MKD Construction, Inc. Lump Sum $54,800.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
A0340 20401-0000 ROADWAY EXCAVATION
Hooker Creek, Inc. $14.00 $281,400.00 MKD Construction, Inc. $17.25 $346,725.00 Engineer's Estimate 20,100 CUYD $22.00 $442,200.00
A0360 20402-0000 SUBEXCAVATION
Hooker Creek, Inc. $100.00 $50,000.00 MKD Construction, Inc. $128.00 $64,000.00 Engineer's Estimate 500 CUYD $85.00 $42,500.00
A0380 20441-0000 WASTE
Hooker Creek, Inc. $20.00 $25,100.00 MKD Construction, Inc. $35.00 $43,925.00 Engineer's Estimate 1,255 CUYD $20.00 $25,100.00
A0400 20820-0000 DEWATERING
Hooker Creek, Inc. Lump Sum $18,000.00 MKD Construction, Inc. Lump Sum $14,800.00 Engineer's Estimate ALL LPSM Lump Sum $17,000.00
A0420 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Hooker Creek, Inc. $120.00 $4,200.00 MKD Construction, Inc. $262.00 $9,170.00 Engineer's Estimate 35 CUYD $125.00 $4,375.00
5 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0440 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
Hooker Creek, Inc. $90.00 $4,500.00 MKD Construction, Inc. $125.00 $6,250.00 Engineer's Estimate 50 CUYD $210.00 $10,500.00
A0460 25126-0000 REMOVE AND RESET BOULDER
Hooker Creek, Inc. $580.00 $580.00 MKD Construction, Inc. $900.00 $900.00 Engineer's Estimate 1 EACH $500.00 $500.00
A0480 30111-1000 AGGREGATE SURFACE COURSE, 4-INCH DEPTH
Hooker Creek, Inc. $9.50 $5,662.00 MKD Construction, Inc. $37.00 $22,052.00 Engineer's Estimate 596 SQYD $20.00 $11,920.00
A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2
Hooker Creek, Inc. $30.00 $122,400.00 MKD Construction, Inc. $48.00 $195,840.00 Engineer's Estimate 4,080 TON $50.00 $204,000.00
A0520 30401-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
Hooker Creek, Inc. $49,000.00 $37,240.00 MKD Construction, Inc. $62,750.00 $47,690.00 Engineer's Estimate 0.760 MILE $50,000.00 $38,000.00
A0540 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Hooker Creek, Inc. $165.00 $594,000.00 MKD Construction, Inc. $153.00 $550,800.00 Engineer's Estimate 3,600 TON $140.00 $504,000.00
A0560 40601-0000 FOG SEAL
Hooker Creek, Inc. $1,050.00 $6,300.00 MKD Construction, Inc. $1,500.00 $9,000.00 Engineer's Estimate 6 TON $800.00 $4,800.00
6 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 41102-0000 PRIME COAT
Hooker Creek, Inc. $1.35 $17,280.00 MKD Construction, Inc. $2.20 $28,160.00 Engineer's Estimate 12,800 SQYD $0.60 $7,680.00
A0600 41105-0000 BLOTTER
Hooker Creek, Inc. $138.00 $2,622.00 MKD Construction, Inc. $275.00 $5,225.00 Engineer's Estimate 19 TON $250.00 $4,750.00
A0620 41201-0000 TACK COAT
Hooker Creek, Inc. $750.00 $4,500.00 MKD Construction, Inc. $1,825.00 $10,950.00 Engineer's Estimate 6 TON $1,000.00 $6,000.00
A0640 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
Hooker Creek, Inc. $280.00 $35,000.00 MKD Construction, Inc. $163.00 $20,375.00 Engineer's Estimate 125 SQYD $250.00 $31,250.00
A0660 60101-0000 CONCRETE (HEADWALL AND WINGWALLS FOR 6'X4' BOX CULVERT)
Hooker Creek, Inc. $5,500.00 $99,000.00 MKD Construction, Inc. $2,225.00 $40,050.00 Engineer's Estimate 18 CUYD $2,400.00 $43,200.00
A0680 60103-1960 CONCRETE, HEADWALL FOR 36-INCH EQUIVALENT DIAMETER PIPE CULVERT
Hooker Creek, Inc. $16,000.00 $16,000.00 MKD Construction, Inc. $9,100.00 $9,100.00 Engineer's Estimate 1 EACH $6,500.00 $6,500.00
A0700 60201-0800 24-INCH PIPE CULVERT (HDPE)
Hooker Creek, Inc. $265.00 $25,970.00 MKD Construction, Inc. $120.00 $11,760.00 Engineer's Estimate 98 LNFT $200.00 $19,600.00
7 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0720 60201-0800 24-INCH PIPE CULVERT
Hooker Creek, Inc. $160.00 $15,680.00 MKD Construction, Inc. $120.00 $11,760.00 Engineer's Estimate 98 LNFT $160.00 $15,680.00
A0740 60201-0900 30-INCH PIPE CULVERT (HDPE)
Hooker Creek, Inc. $315.00 $21,420.00 MKD Construction, Inc. $215.00 $14,620.00 Engineer's Estimate 68 LNFT $230.00 $15,640.00
A0760 60201-1100 42-INCH PIPE CULVERT (HDPE)
Hooker Creek, Inc. $265.00 $68,900.00 MKD Construction, Inc. $260.00 $67,600.00 Engineer's Estimate 260 LNFT $330.00 $85,800.00
A0780 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $115.00 $111,550.00 MKD Construction, Inc. $150.00 $145,500.00 Engineer's Estimate 970 LNFT $140.00 $135,800.00
A0800 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $200.00 $6,800.00 MKD Construction, Inc. $180.00 $6,120.00 Engineer's Estimate 34 LNFT $185.00 $6,290.00
A0820 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $200.00 $10,000.00 MKD Construction, Inc. $210.00 $10,500.00 Engineer's Estimate 50 LNFT $255.00 $12,750.00
A0840 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Hooker Creek, Inc. $500.00 $2,500.00 MKD Construction, Inc. $725.00 $3,625.00 Engineer's Estimate 5 EACH $650.00 $3,250.00
8 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
Hooker Creek, Inc. $1,200.00 $1,200.00 MKD Construction, Inc. $1,000.00 $1,000.00 Engineer's Estimate 1 EACH $750.00 $750.00
A0880 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
Hooker Creek, Inc. $1,200.00 $1,200.00 MKD Construction, Inc. $1,135.00 $1,135.00 Engineer's Estimate 1 EACH $1,600.00 $1,600.00
A0900 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
Hooker Creek, Inc. $2,400.00 $2,400.00 MKD Construction, Inc. $1,950.00 $1,950.00 Engineer's Estimate 1 EACH $2,250.00 $2,250.00
A0920 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $315.00 $13,860.00 MKD Construction, Inc. $755.00 $33,220.00 Engineer's Estimate 44 EACH $850.00 $37,400.00
A0940 60211-0900 END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $725.00 $1,450.00 MKD Construction, Inc. $750.00 $1,500.00 Engineer's Estimate 2 EACH $1,000.00 $2,000.00
A0960 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
Hooker Creek, Inc. $1,000.00 $1,000.00 MKD Construction, Inc. $2,200.00 $2,200.00 Engineer's Estimate 1 EACH $1,200.00 $1,200.00
A0980 60220-1200 6 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Hooker Creek, Inc. $2,200.00 $105,600.00 MKD Construction, Inc. $2,000.00 $96,000.00 Engineer's Estimate 48 LNFT $2,500.00 $120,000.00
9 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 60401-0000 MANHOLE
Hooker Creek, Inc. $19,000.00 $38,000.00 MKD Construction, Inc. $21,225.00 $42,450.00 Engineer's Estimate 2 EACH $16,000.00 $32,000.00
A1020 60405-0000 MANHOLE ADJUSTMENT
Hooker Creek, Inc. $1,200.00 $2,400.00 MKD Construction, Inc. $1,825.00 $3,650.00 Engineer's Estimate 2 EACH $1,300.00 $2,600.00
A1040 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Hooker Creek, Inc. $50.00 $1,250.00 MKD Construction, Inc. $315.00 $7,875.00 Engineer's Estimate 25 LNFT $35.00 $875.00
A1060 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
Hooker Creek, Inc. $42.00 $78,960.00 MKD Construction, Inc. $45.00 $84,600.00 Engineer's Estimate 1,880 LNFT $60.00 $112,800.00
A1080 61101-0000 WATER SYSTEM
Hooker Creek, Inc. Lump Sum $19,000.00 MKD Construction, Inc. Lump Sum $27,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A1100 61108-1000 ADJUST WATER VALVE
Hooker Creek, Inc. $1,000.00 $2,000.00 MKD Construction, Inc. $850.00 $1,700.00 Engineer's Estimate 2 EACH $1,000.00 $2,000.00
A1120 61501-0100 SIDEWALK, CONCRETE
Hooker Creek, Inc. $80.00 $12,400.00 MKD Construction, Inc. $105.00 $16,275.00 Engineer's Estimate 155 SQYD $135.00 $20,925.00
10 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1140 61504-1000 ACCESSIBILITY RAMP, CONCRETE
Hooker Creek, Inc. $400.00 $3,200.00 MKD Construction, Inc. $510.00 $4,080.00 Engineer's Estimate 8 SQYD $150.00 $1,200.00
A1160 61901-2500 FENCE, SPLIT RAIL, 3 RAIL
Hooker Creek, Inc. $45.00 $22,500.00 MKD Construction, Inc. $35.00 $17,500.00 Engineer's Estimate 500 LNFT $35.00 $17,500.00
A1180 61902-0900 GATE, METAL
Hooker Creek, Inc. $5,500.00 $11,000.00 MKD Construction, Inc. $17,700.00 $35,400.00 Engineer's Estimate 2 EACH $18,000.00 $36,000.00
A1200 61907-0000 FENCE POST
Hooker Creek, Inc. $570.00 $570.00 MKD Construction, Inc. $800.00 $800.00 Engineer's Estimate 1 EACH $750.00 $750.00
A1220 61921-1000 REMOVE AND RESET FENCE
Hooker Creek, Inc. $12.00 $10,320.00 MKD Construction, Inc. $25.00 $21,500.00 Engineer's Estimate 860 LNFT $30.00 $25,800.00
A1240 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Hooker Creek, Inc. $160.00 $6,400.00 MKD Construction, Inc. $165.00 $6,600.00 Engineer's Estimate 40 HOUR $190.00 $7,600.00
A1260 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
Hooker Creek, Inc. $165.00 $6,600.00 MKD Construction, Inc. $245.00 $9,800.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00
11 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1280 62201-2750 MOTOR GRADER
Hooker Creek, Inc. $193.00 $7,720.00 MKD Construction, Inc. $305.00 $12,200.00 Engineer's Estimate 40 HOUR $300.00 $12,000.00
A1300 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
Hooker Creek, Inc. $183.00 $7,320.00 MKD Construction, Inc. $185.00 $7,400.00 Engineer's Estimate 40 HOUR $290.00 $11,600.00
A1320 62301-0000 GENERAL LABOR
Hooker Creek, Inc. $47.00 $1,880.00 MKD Construction, Inc. $95.00 $3,800.00 Engineer's Estimate 40 HOUR $120.00 $4,800.00
A1340 62302-0000 SPECIAL LABOR (BIOLOGIST)
Hooker Creek, Inc. $315.00 $6,300.00 MKD Construction, Inc. $205.00 $4,100.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
A1360 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Hooker Creek, Inc. $280.00 $11,200.00 MKD Construction, Inc. $300.00 $12,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A1380 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Hooker Creek, Inc. $255.00 $10,200.00 MKD Construction, Inc. $280.00 $11,200.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00
A1400 62407-0000 PLACING CONSERVED TOPSOIL
Hooker Creek, Inc. $6.50 $13,000.00 MKD Construction, Inc. $35.00 $70,000.00 Engineer's Estimate 2,000 CUYD $45.00 $90,000.00
12 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1420 62510-2000 SEEDING, HYDRAULIC METHOD
Hooker Creek, Inc. $2,500.00 $9,500.00 MKD Construction, Inc. $9,250.00 $35,150.00 Engineer's Estimate 3.8 ACRE $4,000.00 $15,200.00
A1440 62515-2000 MULCHING, HYDRAULIC METHOD
Hooker Creek, Inc. $5,000.00 $19,000.00 MKD Construction, Inc. $18,000.00 $68,400.00 Engineer's Estimate 3.8 ACRE $3,500.00 $13,300.00
A1460 62901-0000 ROLLED EROSION CONTROL PRODUCT
Hooker Creek, Inc. $11.00 $83,600.00 MKD Construction, Inc. $12.00 $91,200.00 Engineer's Estimate 7,600 SQYD $7.00 $53,200.00
A1480 63301-0000 SIGN SYSTEM
Hooker Creek, Inc. $600.00 $18,600.00 MKD Construction, Inc. $545.00 $16,895.00 Engineer's Estimate 31 EACH $500.00 $15,500.00
A1500 63308-0000 OBJECT MARKER
Hooker Creek, Inc. $580.00 $2,320.00 MKD Construction, Inc. $100.00 $400.00 Engineer's Estimate 4 EACH $315.00 $1,260.00
A1520 63309-0000 DELINEATOR (GUIDE POST)
Hooker Creek, Inc. $100.00 $12,000.00 MKD Construction, Inc. $91.00 $10,920.00 Engineer's Estimate 120 EACH $70.00 $8,400.00
A1540 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Hooker Creek, Inc. $0.28 $9,856.00 MKD Construction, Inc. $0.38 $13,376.00 Engineer's Estimate 35,200 LNFT $0.40 $14,080.00
13 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1560 63405-0050 PAVEMENT MARKINGS, SYMBOLS
Hooker Creek, Inc. $58.00 $232.00 MKD Construction, Inc. $175.00 $700.00 Engineer's Estimate 4 EACH $200.00 $800.00
A1580 63501-0000 TEMPORARY TRAFFIC CONTROL
Hooker Creek, Inc. Lump Sum $120,000.00 MKD Construction, Inc. Lump Sum $192,000.00 Engineer's Estimate ALL LPSM Lump Sum $165,000.00
A1600 64603-1000 FIXTURE, VAULT TOILET
Hooker Creek, Inc. $63,000.00 $63,000.00 MKD Construction, Inc. $80,000.00 $80,000.00 Engineer's Estimate 1 EACH $60,000.00 $60,000.00
A1620 64604-3000 FIXTURE, PEDESTRIAN RAILING
Hooker Creek, Inc. $72.00 $6,624.00 MKD Construction, Inc. $150.00 $13,800.00 Engineer's Estimate 92 LNFT $300.00 $27,600.00
A1640 64605-1000 FIXTURE, KIOSK
Hooker Creek, Inc. Lump Sum $2,300.00 MKD Construction, Inc. Lump Sum $1,475.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
A1660 64620-0000 REMOVE AND RESET (INFORMATION SIGNS)
Hooker Creek, Inc. $1,500.00 $1,500.00 MKD Construction, Inc. $2,000.00 $2,000.00 Engineer's Estimate 1 EACH $7,500.00 $7,500.00
A1680 64620-0400 REMOVE AND RESET MAILBOX
Hooker Creek, Inc. $160.00 $2,880.00 MKD Construction, Inc. $1,150.00 $20,700.00 Engineer's Estimate 18 EACH $275.00 $4,950.00
14 out of 14Source Selection Information - See FAR 2.101 & 3.104
Project No: NV FLAP 39(1)
Project Name: Kings Canyon Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1700 64620-1000 REMOVE AND RESET HISTORIC MARKER
Hooker Creek, Inc. $3,500.00 $3,500.00 MKD Construction, Inc. $5,800.00 $5,800.00 Engineer's Estimate 1 EACH $7,000.00 $7,000.00
Total Schedule - All Items
Hooker Creek, Inc. $3,040,546.00 MKD Construction, Inc. $3,951,373.00 Engineer's Estimate $3,525,000.00
| 2021-06-15T15:22:43-0600 | |
| JOSEPHINE P HELMS |