This document is an amendment to a federal solicitation for highway construction work. The solicitation is for the SD FTNP 10(9) project located in Badlands National Park and the Minuteman Missile Visitors Center. The work includes mill and overlay and reconstruction at two locations in Badlands National Park, and slurry seal work at the Minuteman Missile Visitors Center, which can be completed under the main schedule or two options. The amendment replaces pages in the special contract requirements and modifies language around survey and staking measurements as well as quality control plan requirements. Offerors must acknowledge receipt of the amendment by the specified date and time or their bid may be rejected. The federal Department of Transportation and Federal Highway Administration are agencies involved in this procurement.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1 2
A001 12-17-2019 SD FTNP 10(9)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JOSEPHINE HELMS
6905001
6982AF19B000005
12/02/2019
0*
*See Item 14
INVITATION FOR BID
Special Contract Requirements (SCRs) - Replace page E-20 with page E-20 attached to this Amendment.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT
IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
Reestablishing missing control points and stakes will be measured under Special labor, Hired survey services when it is paid by the hour.
152.07 Delete the fourth paragraph and substitute the following:
Do not measure miscellaneous survey and staking.
152.07 Add the following:
Measure centerline verification and staking only one time per project.
152.07 Add the following:
Survey and culvert plotting required under 152.05(g)(1) through (4) will be measured under Special labor, Hired survey services when it is paid by the hour.
Section 153. — CONTRACTOR QUALITY CONTROL Description
153.01 Add the following:
This work also consists of using EEBACS to prepare electronic “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes), including entering labor, equipment, subcontractors, and inspection records into the system.
Construction Requirements
153.02 Qualifications.
(a)(1) Full-time, on-site QCM. Add the following:
(4) A degree from a 4-year construction management, construction engineering, or similar program, and having at least 3 years’ experience as (a) a highway construction contractor foreman, project engineer, or equivalent, or (b) a federal or state highway construction lead inspector or equivalent.
153.03 Quality Control Plan (QCP).
(b) Quality control procedures
(2) Add the following: List the material to be tested by pay item, tests to be conducted, the location of sampling, and the frequency of testing.
Add the following:
(d) Subcontractors and suppliers. Include the work of all subcontractors. If a subcontractor is to perform work under this Section, explain how the subcontractor’s inspection plan will interface with the Prime Contractor first tier subcontractors and lower tier subcontractors and organizations, and the