This document is an amendment to a solicitation for relocatable towers. The amendment removes part numbers from CLINs, updates NAICS codes and clauses, incorporates a revised statement of work and questions and answers, extends the response due date to December 15, 2023, and revises proposal instructions and evaluation criteria. Offerors are requested to provide 80-foot and 120-foot relocatable towers capable of tilting, twisting, and flexing within specified parameters under wind loads, as well as automatically switching between various power sources. Proposals are due by December 15, 2023 and will be evaluated based on structural analysis, power requirements, and experience. The award will be made to the lowest priced technically acceptable offeror.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 10

0006 09/22/2023

AAQ-721 LOGISTICS CENTER ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ0721-AFN

OKLAHOMA CITY OK 73125

AAQ-721 LOGISTICS CENTER ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

AAQ721-AFN

OKLAHOMA CITY OK 73125

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

6973GH-23-R-00202

1 copies to the issuing office.

09/22/2023

(x)

Proposals are due NLT 15 December 2023 @ 1600 CST

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jason M. Perry

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

LIST OF CHANGES:

LIST OF CHANGES:

The purpose of this amendment is to remove referenced part numbers in CLINs 00001 and 00002, update clause 3.6.1-17, incorporate Statement of Work Rev 2, extend the SIR due date, incorporate Questions and Answers, and incorporate Section L and M revisions as follows;

FIRST: CLIN 00001 is changed as follows:

From: 120' RELOCATABLE TOWER (CBP ONLY), PART#

PTX-100-120

Electronic & IT: 03 User Product Code: 5998 Requisition No: AC-23-11413-LCSS

To: 120' RELOCATABLE TOWER (CBP ONLY) Electronic & IT: 03 User Product Code: 5998 Requisition No: AC-23-11413-LCSS

SECOND: CLIN 00002 is changed as follows:

From: 80' RELOCATABLE TOWER, PART# PTX-100-80 Electronic & IT: 03 User Product Code: 5998 Requisition No: AC-23-11413-LCSS

To: 80' RELOCATABLE TOWER Electronic & IT: 03 User Product Code: 5998 Requisition No: AC-23-11413-LCSS

THIRD: Clause 3.6.1-17 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022) is hereby updated:

From:

The North American Industry Classification System (NAICS) code for this procurement is:

238120 – Structural Steel and Precast Concrete Contractors.

The small business size standard as defined by the Small Business Administration (SBA) is the following:

For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed [ ].

For NAICS codes based on the number of employees, the average number of employees over the last 24-month period cannot exceed [200].

(End of provision)

To:

The North American Industry Classification System (NAICS) code for this procurement is:

334290 – Other Communication Equipment Manufacturing.

The small business size standard as defined by the Small Business Administration (SBA) is the following:

For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed [ ].

For NAICS codes based on the number of employees, the average number of employees over the last 24-month period cannot exceed [800].

(End of provision)

FOURTH: Statement of Work Rev 2 is hereby incorporated.

FIFTH: The SIR due date is hereby extended as follows:

From: 08 December 2023 To: 15 December 2023

SIXTH: Questions and Answers are hereby incorporated as follows:

Question: In section 2.5, or the statement of work. For the above referenced SIR states that offerors are to analysis per the TIA standard for twist and sway. The TIA standard measures twist and sway at the service wind speed of 60

MPH.

The statement of work says you want the twist and sway measured at the basic wind speed of 90 MPH. For twist and sway, does the FAA want to use service wind speed of 60 MPH or basic wind speed of 90 MPH?

Answer: Please see Statement of Work Rev 2 section 2.5, with revised language highlighted in red.

Question: For the 120ft tower the .25deg and 3.5" deflection requirement are in conflict? 3.5" of deflection equates to .25deg on the 80ft tower but 7” on the 120? Which requirement supersedes?

Reference: SOW – 2.5

Answer: Deflection > a relative horizontal displacement of 1.5% of the height measured between the tip of the structure and its base. (1.2 inches for 80-ft RT and 1.8 inches for 120-ft RT)

Question: In 2.1 12 of the statement of work for 6973GH-23-R-00202, the FAA provides payload information, however we need the approximate weight for the 6 ft. microwave dish which is not given.

Answer: Approximate weight for the 6 ft. microwave dish has been provided in the Statement of Work Rev 2 in section 2.1 paragraph 12, Table 1.

SEVENTH: Section L is hereby revised as follows:

L.1 SET-ASIDE RESTRICTION – Small Business This procurement is a total set-aside and is restricted for competition among Small Businesses.

L.2 POINT OF CONTACT

The procurement Contracting Officer (PCO), Jason Perry, is the sole point of contact for this acquisition. Do not contact the program office or program office personnel at any time regarding this acquisition. All written requests, correspondence, and submittals must be sent to the Contracting Officer via email at jason.m.perry@faa.gov. All Offeror questions, concerns, and clarification requests must be made in writing and submitted within ten (10) calendar days of the release of the SIR. Written inquiries received within this timeframe will be answered in writing and provided to all Offerors prior to the required date for submittal of the Offeror proposals. The agency reserves the right to not answer any requests received outside of the above timeframe. Furthermore, Offerors should note that the proposal due date will not be extended solely on the basis of questions received within or beyond the timeframe mentioned above. The FAA will not provide verbal responses to Offeror questions, concerns, and clarification requests initiated via Offeror telephone calls.

L.3 PROPOSAL PREPARATION INSTRUCTIONS

Each offeror shall submit information identified in the volumes as forth in Table L.3-1 below. Page limitations should be treated as maximums. The data submitted should be complete, concise, and relevant to the requirements of the SIR and are required to be submitted in the format outlined below.

Table L.3-1 Proposal Volume Requirements

Volume Number

Volume Title Part Part Title Page

Limit

Number of Copies

I Contract / N/A All Pages N/A Original mailto:jason.m.perry@faa.gov

SIR Sections A through M

I Factor 1 including Sub-factors

Pages Original

II

Technical Approach

II

Factor 2 including Sub-factors

Pages Original

II

Experience Information Forms

II Factor 3 2 Original

I

Completed Section B

N/A Original III Cost/ Price

Note: No references to price shall be made in volume II.

L.4 PROPOSAL FORMATTING INSTRUCTIONS

1) No smaller than one (1) inch margins around the perimeter of each sheet of paper.

2) If printing is on both sides of the paper, it will be counted as two pages.

3) Page size shall be 8.5 x 11 inches.

4) Single or double spacing (offeror’s option)

5) Font: no smaller than 10 point. Times New Roman or Arial style font preferred.

6) Each proposal must be submitted in bound volumes as defined in the above table. A cover sheet must be affixed to each volume, which clearly identifies each volume, volume number, the SIR identification number, and the Offeror’s name. Each volume must be separately bound.

7) A Footer shall be included on the bottom of each page identifying the volume number, page number, and total number of pages.

8) Tab indexing shall be used to identify all proposal sections. Each volume shall be organized in a manner that will facilitate an efficient review.

9) All volumes should be marked ‘Procurement Sensitive’ (Exception: Volume 1: Contract/SIR Documentation)

10) All volumes shall be submitted to the Contracting Officer not later than the proposal due date and time.

11) Offerors must clearly TAB each technical evaluation factor and sub-factor separately. Any support documentation such as Exhibits shall be tabbed as an attachment to the appropriate factor or sub-factor and do not count towards the page limitation.

L.5 CONTRACT /SIR DOCUMENTATION- VOLUME I

This volume will provide necessary documentation to the FAA for preparing the contract document and supporting file. This shall include all SIR pages Section A through K. Offerors must complete, sign, and date ‘Section A, SF- 33, Solicitation, Offer and Award blocks 13 through 17. Contractor fill-ins are self-explanatory. The SF-33, block 16 must be signed by an agent of the company authorized to make the offer. Offerors must complete all Contact Line Items (CLINs) and extended totals in Section B and complete all required clause fill-ins in all Sections of the SIR.

Offerors must clearly identify an exception to the solicitation terms and conditions and provide complete accompanying rationale. Offerors shall provide the Name, Title, Email, and Telephone number of the company point of contact regarding decisions made with respect to your proposal and who possesses the authority to obligate your company contractually.

L.6 TECHNICAL PROPOSAL- VOLUME II

The contractor shall submit a written technical proposal describing their abilities to provide the required supplies identified in the Statement of Work (SOW). The technical proposal must validate the technical evaluation factors and subfactors described herein. The technical proposal must be specific and in sufficient detail to enable an evaluation team to make a thorough evaluation to determine if the proposed supplies meet the requirements of the

Government and to determine that the offeror has a thorough understanding of the requirement. Responses will be evaluated against the evaluation factors as defined in Section M.

FACTOR 1: SELECTIVE RELOCATABLE TOWER REQUIREMENTS

Selective Relocatable Tower Requirements: The Offeror must provide in a narrative format a structural analysis and supporting documentation that indicates understanding of the scope of work to be performed as defined in the SOW Section 2.5. Specifically, the Offeror has addressed its understanding of and/or how it will comply with the following:

Sub Factor 1.1 – Demonstrate ability to provide a relocatable tower with a Deflection > a relative horizontal displacement of 1.5% of the height measured between the tip of the structure and its base. (1.2 inches for 80-ft RT and 1.8 inches for 120-ft RT) as identified in the para SOW 2.5.

Demonstrate ability to provide a relocatable tower with a Deflection of > 3.50 inches as identified in the para SOW 2.5.

Sub Factor 1.2 – Demonstrate ability to provide a relocatable tower with a Tilt > 4 degrees at any point along its height above ground level (i.e. antenna/dish location on the tower) as identified in the SOW para 2.5.

Demonstrate ability to provide a relocatable tower with a Tilt > 0.25 degrees as identified in the SOW para 2.5.

Sub Factor 1.3 – Demonstrate ability to provide a relocatable tower with a Twist > 4 degrees at any point along its height above ground level (i.e. antenna/dish location on the tower) as identified in the SOW para 2.5.

Demonstrate ability to provide a relocatable tower with a Twist > 0.25 degrees as identified in the SOW para 2.5.

FACTOR 2: RELOCATABLE TOWER POWER GENERATION REQUIREMENTS

Relocatable Tower Power Generation Requirements: The Offeror must provide a narrative and supporting documentation that indicates understanding of the scope of work to be performed as defined in the SOW Section

2.3. Specifically, the Offeror has addressed its understanding of and/or how it will comply with the following:

Sub Factor 2.1 – Demonstrate ability to provide a relocatable tower being capable of switching between grid power, solar power (provided by a 3rd party), and the self-contained power source as identified in the SOW para 2.3(3).

Sub Factor 2.2 – Demonstrate ability to provide a relocatable tower that upon an unexpected loss of grid power, the relocatable tower will be capable of automatically switching to self-contained power without loss of power to the relocatable tower as identified in the SOW para 2.3(4).

Sub Factor 2.3 – Demonstrate ability to provide a relocatable tower that upon unexpected loss of self-contained power, the relocatable tower will be capable of automatically switching to self-contained backup power without loss of power to the relocatable tower as identified in the SOW para 2.3(5).

FACTOR 3: EXPERIENCE INFORMATION

Experience Information: The Offeror must provide the following information needed to aid in the determination of responsibility:

The Offeror must complete and submit two “Experience Information” forms, SIR attachment 2. If the Offeror anticipates using a subcontractor to complete a major portion of this requirement, one of the “Experience Information” forms may cover a project from the subcontractor’s past. All blocks must be filled in and all data must be accurate, current, and complete. All projects submitted must have been underway or completed within the last five (5) years and the projects must be valued at over $5,000,000.00. If the Offeror does not have prior prime contracts to cite, then the Offeror may cite instances on which it has served as a primary subcontractor.

L.7 DETERMINATION OF RESPONSIBILITY

Determination of Contractor Responsibility: The CO will verify contractor’s representations and certifications as reflected in the System for Award Management (SAM) are current and accurate as of the date of the offer is submitted. The offeror shall provide immediate written notice to the Contracting Officer if at any time prior to award the offeror learns that any certification or representation in SAM was erroneous when this offer was submitted or has become erroneous by reason of changed circumstances.

Relevant past performance will be used to evaluate the responsibility of the offeror. Relevancy relates to a project of similar magnitude, scope, and complexity. A Contractor with a record of unsatisfactory past performance will be screened out of the selection process. The Contractor Performance Assessment Reporting System (CPARS) may be used to obtain information regarding the Contractor's past performance. The Government reserves the right to use other sources to obtain past performance information including previous FAA program and contracting personnel, other Federal agencies, state, and local government, and commercial contractors, Contractor references, and the Federal Awardee Performance and Integrity Information System (FAPIIS).

L.8 COST/PRICE PROPOSAL – VOLUME III

(a) Offerors shall sum all proposed prices, to derive a Total Evaluated Price for the proposal using the supplied quantities, and submit a complete Section B.

(b) Offerors must provide CLIN pricing based on the unit price and the total price for each line item.

(c) All proposed cost and price information shall be submitted in the Cost/Price Volume. No references shall be made to proposed costs or prices in Volume II.

(d) The offeror shall describe any assumptions used to develop the proposed prices.

Note: The Government anticipates that pricing of this requirement will be based on adequate price competition; if however, competition does not materialize, the Contracting Officer may require upon request ‘other than certified cost and pricing’ supporting data deemed necessary to adequately evaluate the reasonableness of the price after receipt of proposals.

L. 9 COMMUNICATIONS WITH OFFERORS

All reference documents for this solicitation are available on the Sam.gov web site at http://sam.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

Specific attention is invited to AMS paragraph 3.2.2.3.1.2.2, Communications with Offerors. The FAA may communicate with one or more Offerors at any time during the SIR process. Communications with one offeror does not necessitate communications with other offerors, since communications may be offeror-specific. Information determined to have common application and not considered prejudicial to offerors will be communication to all offerors.

L.10 SUBMISSION OF OFFERS

All offers are subject to all terms and conditions set forth and contained in this SIR. If all requested information is not furnished in the offeror’s proposal, the offeror’s proposal may be determined to be non-responsive and ineligible for contract award. Only one proposal from each offeror shall be considered. The FAA reserves the right to consider as acceptable only those proposals submitted in accordance with the requirements set forth in the SIR/RFO which demonstrate an understanding of the complexity and scope of the requirements. The FAA further reserves the right to reject, as unacceptable, proposals deleting or altering technical requirements.

CAUTION – Late Submissions, Modifications, and Withdrawals: See Section L, AMS Provision 3.2.2.3-14. All offers are subject to all terms and conditions set forth and contained in this solicitation. Electronic submissions are acceptable; however, the original and required copies of the proposals must be received by the due date and time specified.

L.11 PROPOSAL PREPARATION AND SUBMITTAL COSTS

This SIR is not to be construed as a contract or a commitment of any kind. The Government and/or the FAA shall not be liable for payment of, nor reimburse offerors or contractors for any and all costs incurred in the preparation and/or submittal of a proposal in response to this SIR or resultant task order. All proposal preparation and submittal costs are at the risk of the offeror or contractor.

L.12 DISPOSITION OF UNSUCCESSFUL PROPOSALS

Submitted Proposals will not be returned to the offeror. Proposal originals will be retained in the contract file.

L.13 DEBRIFING OF UNSUCCESSFUL OFFERORS

Written notice of award to unsuccessful Offerors will be provided within three (3) business days of contract award.

Successful or unsuccessful offerors may request a debriefing by providing a written request to the CO within three http://sam.gov/

(3) business days after receiving the notice of award. Debriefing will be conducted only after completion of source selection activities and award of contract. All Offerors who notify the CO within three (3) business days of receipt of the award notification are entitled to a debriefing. The FAA will make every effort to provide the debriefing within two weeks after receipt of the request for debriefing.

EIGHT: Section M is hereby revised as follows:

M.1 SOURCE SELECTION GENERAL INFORMATION

M.2 BASIS FOR CONTRACT AWARD

This source selection will be conducted in accordance with the Federal Aviation Administration’s (FAA) Acquisition Management System (AMS). It is the FAA’s intent to award a contract to the Offeror whose proposal is judged to represent the best value to the FAA. The best value is defined as Lowest Priced Technically Acceptable (LPTA). While the Government source selection evaluation team and the SSO will strive for maximum objectivity, the source selection process, by its nature, is subjective; therefore, professional judgment is implicit throughout the entire process.

As set forth in AMS 3.2.2.3-19 Contract Award (July 2004), the Government reserves the right to award without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. Be advised that the competitive range, if required, may be reduced for purposes of efficiency pursuant to AMS 3.2.2.3.

Proposals must be submitted in accordance with the instructions of Section L. Proposals not submitted in accordance with Section L may be considered nonresponsive and removed from further consideration. Upon receipt of proposals, the Government will conduct an initial evaluation. The Government may conduct communications with offerors whose exclusion from or inclusion in the competitive range is uncertain. Communications shall not provide an opportunity for any offeror to revise its proposal.

M.3 NUMBER OF CONTRACTS TO BE AWARDED

The Government intends to select one contractor for this acquisition. However, the Government reserves the right to award no contract at all, depending on the quality of proposals, prices submitted and the availability of funds.

Multiple awards will not be considered.

M.4 REJECTION OF UNREALISTIC OFFERS

The Government may reject any proposal that is evaluated to be unrealistic in terms of program requirements, contract terms and conditions, or an unrealistically high or low price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

M.5 CORRECTION POTENTIAL OF PROPOSALS

The Government will consider, throughout the evaluation, the ‘correction potential’ of any proposal uncertainty. The judgment of such ‘correction potential’ is within the sole discretion of the Government. If an aspect of an offeror’s proposal not meeting the Government’s requirements is not considered correctable, the offeror may be eliminated from further consideration.

M.6 ELIGIBILTY FOR AWARD

An offeror must be determined responsible to be eligible for award. To be eligible for award, the contractor must be technically and financially capable of performing the work.

M. 7 EVALUATION PROCESS

Each proposal will be evaluated on the basis of its written submissions, including cost/price information. Separate technical and cost/price proposal volumes are required as described in Section L. Proposals must be submitted in accordance with the instruction of Section L.

M.8 EVALUATION FACTORS

The following evaluation factors and sub-factors will be used to evaluate each proposal.

FACTOR 1: SELECTIVE RELOCATABLE TOWER REQUIREMENTS

FACTOR 2: RELOCATABLE TOWER POWER GENERATION REQUIREMENTS

FACTOR 3: EXPERIENCE INFORMATION

FACTOR 4: COST/PRICE . Cost/Price proposal will be evaluated and applied in the best value determination but will not be scored.

M.9 BEST VALUE

The offer that provides the overall “best value” to the Government will be selected. The best value will be based on the Lowest Priced Technically Acceptable proposal.

M.10 SCORING METHODOLOGY

Rating Description

Acceptable:

Based on the offeror’s response, the Government has a reasonable expectation that the offeror will successfully provide the required effort.

Unacceptable:

Based on the offeror’s response, the Government has no reasonable expectation that the offeror will successfully provide the required effort.

M.11 TECHNICAL APPROACH – VOLUME II

The proposal shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. General statements that the Offeror understands the requirements of the work to be performed, or simple rephrasing or restating of the FAA’s requirements, will not be considered adequate and may be cause for rejection of the proposal. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation solely on the information presented in the offeror’s proposal. The Government will not assume that an Offeror possesses any capabilities not specified in the written proposal.

FACTOR 1: SELECTIVE RELOCATABLE TOWER REQUIREMENTS

Selective Relocatable Tower Requirements: The Offeror must provide in a narrative format a structural analysis and supporting documentation that indicates understanding of the scope of work to be performed as defined in the SOW Section 2.5. Specifically, the Offeror has addressed its understanding of and/or how it will comply with the following:

Sub Factor 1.1 – Demonstrate ability to provide a relocatable tower with a Deflection > a relative horizontal displacement of 1.5% of the height measured between the tip of the structure and its base. (1.2 inches for 80-ft RT and 1.8 inches for 120-ft RT) as identified in the para SOW 2.5.

Demonstrate ability to provide a relocatable tower with a Deflection of > 3.50 inches as identified in the para SOW 2.5.

Sub Factor 1.2 – Demonstrate ability to provide a relocatable tower with a Tilt > 4 degrees at any point along its height above ground level (i.e. antenna/dish location on the tower) as identified in the SOW para 2.5.

Demonstrate ability to provide a relocatable tower with a Tilt > 0.25 degrees as identified in the SOW para 2.5.

Sub Factor 1.3 – Demonstrate ability to provide a relocatable tower with a Twist > 4 degrees at any point along its height above ground level (i.e. antenna/dish location on the tower) as identified in the SOW para 2.5.

Demonstrate ability to provide a relocatable tower with a Twist > 0.25 degrees as identified in the SOW para 2.5.

Criteria:

Acceptable: Based on the offeror’s response, the Government has a reasonable expectation that the offeror will successfully provide the required effort.

Unacceptable: Based on the offeror’s response, the Government has no reasonable expectation that the offeror will successfully provide the required effort.

FACTOR 2- RELOCATABLE TOWER POWER GENERATION REQUIREMENTS

Relocatable Tower Power Generation Requirements: The Offeror must provide a narrative and supporting documentation that indicates understanding of the scope of work to be performed as defined in the SOW Section

2.3. Specifically, the Offeror has addressed its understanding of and/or how it will comply with the following:

Sub Factor 2.1 – Demonstrate ability to provide a relocatable tower being capable of switching between grid power, solar power (provided by a 3rd party), and the self-contained power source as identified in the SOW para 2.3(3).

Sub Factor 2.2 – Demonstrate ability to provide a relocatable tower that upon an unexpected loss of grid power, the relocatable tower will be capable of automatically switching to self-contained power without loss of power to the relocatable tower as identified in the SOW para 2.3(4).

Sub Factor 2.3 – Demonstrate ability to provide a relocatable tower that upon unexpected loss of self-contained power, the relocatable tower will be capable of automatically switching to self-contained backup power without loss of power to the relocatable tower as identified in the SOW para 2.3(5).

Criteria:

Acceptable: Based on the offeror’s response, the Government has a reasonable expectation that the offeror will successfully provide the required effort.

Unacceptable: Based on the offeror’s response, the Government has no reasonable expectation that the offeror will successfully provide the required effort.

FACTOR 3- EXPERIENCE INFORMATION

Experience Information: The Offeror must provide the following information needed to aid in the determination of responsibility:

The Offeror must complete and submit two “Experience Information” forms, SIR attachment 2. If the Offeror anticipates using a subcontractor to complete a major portion of this requirement, one of the “Experience Information” forms may cover a project from the subcontractor’s past. All blocks must be filled in and all data must be accurate, current, and complete. All projects submitted must have been underway or completed within the last five (5) years and the projects must be valued at over $5,000,000.00. If the Offeror does not have prior prime contracts to cite, then the Offeror may cite instances on which it has served as a primary subcontractor.

Evaluation Criteria: The Government's Technical Evaluation Team will review the project experience of the offeror, including subcontractors, on projects provided. Offerors must meet all of the following minimum acceptability standards to receive an "ACCEPTABLE" on this factor:

DETERMINATION OF CONTRACTOR RESPONSIBILITY:

Determination of Contractor Responsibility: The CO will verify contractor’s representations and certifications as reflected in the System for Award Management (SAM) are current and accurate as of the date of the offer is submitted. The offeror shall provide immediate written notice to the Contracting Officer if at any time prior to award the offeror learns that any certification or representation in SAM was erroneous when this offer was submitted or has become erroneous by reason of changed circumstances.

Relevant past performance will be used to evaluate the responsibility of the offeror. Relevancy relates to a project of

EXPERIENCE EVALUATION RATINGS

Rating Description

Acceptable Based on the offeror’s experience record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Unacceptable Based on the offeror’s experience record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

similar magnitude, scope, and complexity. A Contractor with a record of unsatisfactory past performance will be screened out of the selection process. The Contractor Performance Assessment Reporting System (CPARS) may be used to obtain information regarding the Contractor's past performance. The Government reserves the right to use other sources to obtain past performance information including previous FAA program and contracting personnel, other Federal agencies, state, and local government, and commercial contractors, Contractor references, and the Federal Awardee Performance and Integrity Information System (FAPIIS).

FACTOR 5: COST/PRICE – VOLUME IV

(a) In order to determine the overall best value to the FAA and ensure all relevant factors are considered, a Total Evaluated Price (TEP) will be assigned to each Offeror’s price proposals. Based on the total dollar amount, TEPs will then be ranked from the lowest to the highest.

(b) For evaluation purposes, the total evaluated price includes the sum of all CLINs.

(c) The Cost/Price evaluation team will not have access to technical proposals during the initial detailed evaluation.

Likewise, the technical evaluation team will not have access to cost/price proposals during the initial detailed evaluation. After competition of initial detailed evaluations, the technical and price evaluation teams may have access to the other team’s proposals only as authorized by the Contracting Officer.

(d) The FAA will assess each cost/price proposal for completeness to ensure that the data provided is sufficient to allow complete price analysis and evaluation of proposed prices and includes all information required by Section L of the SIR.

(e) The FAA will evaluate each offeror’s proposed prices in Section B of the SIR for reasonableness and realism.

A price is reasonable if it does not exceed what a prudent person would pay in the conduct of a competitive business.

(f) It is anticipated that proposed prices received resulting from this SIR will be determined fair and reasonable based on adequate price competition. If reasonableness of price is not determined through adequate price competition, then the FAA may require and utilize additional information or supporting data to establish the reasonableness of price.

(g) Realism is an assessment of the offeror’s proposed price elements and the extents to which such elements are realistic for the work performed, reflect a clear understanding of the contract requirements and are consistent with the technical proposal. Unbalanced or unrealistic estimates will be deemed reflective of an inherent lack of technical competence or indicative of failure to comprehend the complexity and risk of contract requirements, and may be grounds for rejection of the proposal.

M.12 SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to award no contract at all, depending on the quality of the proposals, prices submitted and the availability of funds. Multiple awards will not be considered.

NINTH: No other changes to the solicitation.