cae-1700951-e007 signed.pdf

PDF 274 KB Posted

Attached to
West Columbia, SC CAE RCAG Tower Replacement Federal contract opportunity
Solicitation number
6973GH-21-R-00072
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This solicitation requests proposals for the demolition of four existing guyed antenna towers and construction of four new free-standing antenna towers at the Columbia Metropolitan Airport in West Columbia, South Carolina. Contractors must furnish all materials, equipment, labor, transportation, insurance, licenses, permits, and supervision necessary to complete the work according to the attached specifications, drawings, and other contract documents. Proposals are due by May 14, 2021 and must be submitted electronically to michelle.ctr.abraham@faa.gov with the subject line "6973GH-21-R-00072". The Federal Aviation Administration intends to award a firm-fixed-price construction contract and reserves the right to communicate with offerors during the solicitation process.

View the file

Other files for this federal contract opportunity

Other files attached to West Columbia, SC CAE RCAG Tower Replacement, newest first.
File Type Posted
cae-1700951-e002 signed.pdf PDF
6973GH-21-R-00072 Amendment 0004.pdf PDF
cae-1700951-c004 signed.pdf PDF
cae-1700951-c003 signed.pdf PDF
cae-1700951-s001 signed.pdf PDF
cae-1700951-g001 signed.pdf PDF
cae-1700951-e001 signed.pdf PDF
Columbia Amendment 00003 - Revised Drawings.pdf PDF
Amendment 00002-extension.pdf PDF
Amendment 00001-revised specs and extension.pdf PDF
13 10 00 Antenna Towers Revision A.pdf PDF
SOW Tower Replacement CAE RCAG Columbia SC.doc DOC document
COVID Special Contract Requirement.pdf PDF
Contractor Release Form DOT F 4220.4.pdf PDF
Drawings to Replace (4) 50ft Guyed Towers with (4) 60ft Free Standing Towers.pdf PDF
Performance Bond.pdf PDF
Wage Determination SC20210028.pdf PDF
6973GH-21-R-00072.pdf PDF
Specifications CAE RCAG Tower Replacement Columbia SC.pdf PDF
Experience Information Form.pdf PDF
Payment Bonds.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

c a e -1

-e

.d g n

/1

/2

:5

:5

A

M O c ta w n C a rt e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

E D

M

IS

S

U E

D F

O R

ENGINEERING SERVICES

COMMUNICATIONS

RCAG

JUNCTION BOX LAYOUT

TOWER REPLACEMENT

SCCOLUMBIA METROPOLITAN AIRPORTCOLUMBIA

Stacey L. RainesFrancisco J. Cortes

RC

FC

PROJECT ENGINEER MGR: ENGINEERING - CENTER A

05/29/2020 1700951

CAE-1700951-E007 A

05/07/20211700951CONSTRUCTION(J.CORTES) DS05/07/2021A

c a e -1

-e

.d g n

THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

NOT TO SCALEE007

TOP OF TOWER JUNCTION BOX FRONT VIEW

NOT TO SCALEE007

TOP OF TOWER JUNCTION BOX BOTTOM VIEW

NOT TO SCALEE007

BOTTOM OF TOWER JUNCTION BOX FRONT VIEW 4

NOT TO SCALEE007

BOTTOM OF TOWER JUNCTION BOX BOTTOM VIEW 5

NOT TO SCALEE007

BOTTOM OF TOWER JUNCTION BOX TOP VIEW

NOT TO SCALEE007

BOX ON SHELTER (SITE BOX) FRONT VIEW 7

NOT TO SCALEE007

BOX ON SHELTER (SITE BOX) BOTTOM VIEW

NOTES

FACING DOWN, AND SHALL NOT BE GLUED TO THE BOX.

ALL CONDUITS GOING UP THE TOWER ARE TO HAVE THE BELLS 3.

CONTRACTOR SHALL VERIFY ALL PENETRATIONS WITH RE2.

JUNCTION BOXES, AND BUILDINGS.

CONTRACTOR SHALL INSTALL ALL PENETRATIONS THROUGH 1.

36" x 30" x 10"

TOP BOX

TO COUNTERPOISE

4/0 AWG

THROUGH BUILDING WALL

4" PVC PENETRATED

(ALTERNATIVE LOCATION)

THROUGH BUILDING WALL

4" PVC LB PENETRATED

48" x 36" x 12"

(ON SHELTER)

SITE BOX

TOWERS

TO

TO COUNTERPOISE

4/0 AWG

TO COUNTERPOISE

4/0 AWG

STRAIN RELIEF

THROUGH 3/4"

THOMPSON 28R

3/4" STRAIN RELIEF

LMR-400 THROUGH

BOX, NOT GLUED

WITH SILICONE TO THE

JUNCTION BOX SEALED

DIRECTLY ON BOTTOM

DOWN. BOTTOM BELL

BELLS OF PIPE FACING

FOR LMR-400

(8) 3/4" STRAIN RELIEF

TO GROUNDING RING

W/ THOMPSON 28R

3/4" STRAIN RELIEF

TO GROUNDING RING

W/ THOMPSON 28R

3/4" STRAIN RELIEF

FOR LMR-400

(8) 3/4" STRAIN RELIEF

(TYP)

COUPLINGS

EXPANSION

(TYP)

COUPLINGS

EXPANSION

30" x 24" x 10"

BOTTOM BOX

TO SITE BOX

TO TOP BOX

ORIGINAL SIGNED BY: ORIGINAL SIGNED BY:

2021-05-19T08:39:24-0400
Francisco Javier Cortes

File details come from the government source that posted it. Updated .