cae-1700951-e007 signed.pdf
PDF 274 KB Posted
- Attached to
- West Columbia, SC CAE RCAG Tower Replacement Federal contract opportunity
- Solicitation number
- 6973GH-21-R-00072
About this file
This solicitation requests proposals for the demolition of four existing guyed antenna towers and construction of four new free-standing antenna towers at the Columbia Metropolitan Airport in West Columbia, South Carolina. Contractors must furnish all materials, equipment, labor, transportation, insurance, licenses, permits, and supervision necessary to complete the work according to the attached specifications, drawings, and other contract documents. Proposals are due by May 14, 2021 and must be submitted electronically to michelle.ctr.abraham@faa.gov with the subject line "6973GH-21-R-00072". The Federal Aviation Administration intends to award a firm-fixed-price construction contract and reserves the right to communicate with offerors during the solicitation process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| cae-1700951-e002 signed.pdf | ||
| 6973GH-21-R-00072 Amendment 0004.pdf | ||
| cae-1700951-c004 signed.pdf | ||
| cae-1700951-c003 signed.pdf | ||
| cae-1700951-s001 signed.pdf | ||
| cae-1700951-g001 signed.pdf | ||
| cae-1700951-e001 signed.pdf | ||
| Columbia Amendment 00003 - Revised Drawings.pdf | ||
| Amendment 00002-extension.pdf | ||
| Amendment 00001-revised specs and extension.pdf | ||
| 13 10 00 Antenna Towers Revision A.pdf | ||
| SOW Tower Replacement CAE RCAG Columbia SC.doc | DOC document | |
| COVID Special Contract Requirement.pdf | ||
| Contractor Release Form DOT F 4220.4.pdf | ||
| Drawings to Replace (4) 50ft Guyed Towers with (4) 60ft Free Standing Towers.pdf | ||
| Performance Bond.pdf | ||
| Wage Determination SC20210028.pdf | ||
| 6973GH-21-R-00072.pdf | ||
| Specifications CAE RCAG Tower Replacement Columbia SC.pdf | ||
| Experience Information Form.pdf | ||
| Payment Bonds.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
c a e -1
-e
.d g n
/1
/2
:5
:5
A
M O c ta w n C a rt e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
E D
M
IS
S
U E
D F
O R
ENGINEERING SERVICES
COMMUNICATIONS
RCAG
JUNCTION BOX LAYOUT
TOWER REPLACEMENT
SCCOLUMBIA METROPOLITAN AIRPORTCOLUMBIA
Stacey L. RainesFrancisco J. Cortes
RC
FC
PROJECT ENGINEER MGR: ENGINEERING - CENTER A
05/29/2020 1700951
CAE-1700951-E007 A
05/07/20211700951CONSTRUCTION(J.CORTES) DS05/07/2021A
c a e -1
-e
.d g n
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
NOT TO SCALEE007
TOP OF TOWER JUNCTION BOX FRONT VIEW
NOT TO SCALEE007
TOP OF TOWER JUNCTION BOX BOTTOM VIEW
NOT TO SCALEE007
BOTTOM OF TOWER JUNCTION BOX FRONT VIEW 4
NOT TO SCALEE007
BOTTOM OF TOWER JUNCTION BOX BOTTOM VIEW 5
NOT TO SCALEE007
BOTTOM OF TOWER JUNCTION BOX TOP VIEW
NOT TO SCALEE007
BOX ON SHELTER (SITE BOX) FRONT VIEW 7
NOT TO SCALEE007
BOX ON SHELTER (SITE BOX) BOTTOM VIEW
NOTES
FACING DOWN, AND SHALL NOT BE GLUED TO THE BOX.
ALL CONDUITS GOING UP THE TOWER ARE TO HAVE THE BELLS 3.
CONTRACTOR SHALL VERIFY ALL PENETRATIONS WITH RE2.
JUNCTION BOXES, AND BUILDINGS.
CONTRACTOR SHALL INSTALL ALL PENETRATIONS THROUGH 1.
36" x 30" x 10"
TOP BOX
TO COUNTERPOISE
4/0 AWG
THROUGH BUILDING WALL
4" PVC PENETRATED
(ALTERNATIVE LOCATION)
THROUGH BUILDING WALL
4" PVC LB PENETRATED
48" x 36" x 12"
(ON SHELTER)
SITE BOX
TOWERS
TO
TO COUNTERPOISE
4/0 AWG
TO COUNTERPOISE
4/0 AWG
STRAIN RELIEF
THROUGH 3/4"
THOMPSON 28R
3/4" STRAIN RELIEF
LMR-400 THROUGH
BOX, NOT GLUED
WITH SILICONE TO THE
JUNCTION BOX SEALED
DIRECTLY ON BOTTOM
DOWN. BOTTOM BELL
BELLS OF PIPE FACING
FOR LMR-400
(8) 3/4" STRAIN RELIEF
TO GROUNDING RING
W/ THOMPSON 28R
3/4" STRAIN RELIEF
TO GROUNDING RING
W/ THOMPSON 28R
3/4" STRAIN RELIEF
FOR LMR-400
(8) 3/4" STRAIN RELIEF
(TYP)
COUPLINGS
EXPANSION
(TYP)
COUPLINGS
EXPANSION
30" x 24" x 10"
BOTTOM BOX
TO SITE BOX
TO TOP BOX
ORIGINAL SIGNED BY: ORIGINAL SIGNED BY:
| 2021-05-19T08:39:24-0400 | |
| Francisco Javier Cortes |
File details come from the government source that posted it. Updated .