This solicitation is for a construction contract to demolish four existing guyed antenna towers and construct four new free-standing antenna towers at the Columbia Metropolitan Airport in West Columbia, South Carolina. The Federal Aviation Administration requires furnishing all materials, equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision to perform the work according to the attached specifications, drawings, and other documents. Questions are due by May 7, 2021 and proposals must be received by May 14, 2021 to be considered for the anticipated firm-fixed-price construction contract. Offerors must be registered in the System for Award Management by the proposal due date. The solicitation number is 6973GH-21-R-00072.

View the file

Other files for this federal contract opportunity

Other files attached to West Columbia, SC CAE RCAG Tower Replacement, newest first.
File Type Posted
6973GH-21-R-00072 Amendment 0004.pdf PDF
cae-1700951-e002 signed.pdf PDF
cae-1700951-c004 signed.pdf PDF
cae-1700951-c003 signed.pdf PDF
cae-1700951-e007 signed.pdf PDF
cae-1700951-g001 signed.pdf PDF
cae-1700951-s001 signed.pdf PDF
Columbia Amendment 00003 - Revised Drawings.pdf PDF
Amendment 00002-extension.pdf PDF
Amendment 00001-revised specs and extension.pdf PDF
13 10 00 Antenna Towers Revision A.pdf PDF
SOW Tower Replacement CAE RCAG Columbia SC.doc DOC document
COVID Special Contract Requirement.pdf PDF
Contractor Release Form DOT F 4220.4.pdf PDF
6973GH-21-R-00072.pdf PDF
Specifications CAE RCAG Tower Replacement Columbia SC.pdf PDF
Experience Information Form.pdf PDF
Payment Bonds.doc DOC document
Performance Bond.pdf PDF
Wage Determination SC20210028.pdf PDF
Drawings to Replace (4) 50ft Guyed Towers with (4) 60ft Free Standing Towers.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

c a e -1

-e

.d g n

/1

/2

:4

:2

A

M O c ta w n C a rt e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

NOTES

B

E001

CABLES

HELIAX

(4) 7/8"

CABLES

HELIAX

(4) 7/8"

CABLES

HELIAX

(4) 7/8"

1-1/4" PVC 1-1/4" PVC

ON FABRIC

3" GRAVEL

JUNCTION BOX

FIBERGLASS

30"x 24"x 10"

J-BOX

SEE NOTE 12

COUPLINGS (TYP)

EXPANSION

TOWER WITH BEAM CLAMPS

1-5/8"x 1-5/8" ATTACH TO

STAINLESS STEEL STRUT

3' FROM EACH BOX

EVERY 10' AND AT

SUPPORTED CONDUITS

4" PVC SCH 40

MOUNT (TYP)

ANTENNA

G R

A T

IN

G

H A

T C

H A

C C

E S

S

L A

D D

E R

TO RCAG SHELTER

4 EA - 4" DIA PVC

PURPOSES.

INSTALL 4-4 IN PVC CONDUITS, NUMBER OF CONDUITS SHOWN HERE ARE FOR ILLUSTRATION13.

SILICON BUT DO NOT GLUE IT TO THE BOX CONDUIT FITTINGS.

INSTALL BELLS ON TOP OF THE JUNCTION BOX AT THE BOTTOM OF THE TOWER, SEAL WITH12.

OF THE TOWER AND BELOW THE JUNCTION BOX AT THE TOP OF THE TOWER.

INSTALL EXPANSION COUPLINGS ON EACH CONDUIT ABOVE THE JUNCTION BOX IN THE BOTTOM 11.

ALL UNDERGROUND PVC SHALL BE SCHEDULE 80, ABOVE GROUND PVC SCHEDULE 40.10.

TO TOWER LEG ON OPPOSING LEGS.

FOR EACH TOWER INSTALL 2-#4/0 FROM COUNTERPOISE THROUGH 1 1/4" PVC AND CAD WELD 9.

FOR USE BY OTHERS.

JUNCTION BOXES FOR GROUNDING BY OTHERS. THREE FEET OF WIRE COILED IN EACH BOX

INSTALL 2- #4/0 GROUND WIRES THROUGH 1 1/4" PVC INTO EACH OF THE BOTTOM 8.

HELIAX (GFM), SEE DETAIL 5/E001.

PIPE CLAMPS. ALL MOUNTING HARDWARE SHALL BE STAINLESS STEEL. INSTALL 7/8"

3 EACH 4" CONDUITS ARE THEN FASTENED TO THE UNISTRUT WITH STAINLESS STEEL

THE ANTENNA TOWER AT THE PREFABRICATED ANTENNA TOWER HORIZONTAL ANGLES. THE

FURNISH AND INSTALL 1 5/8"x 1 5/8" STAINLESS STEEL UNISTRUT 24" IN LENGTH TO 7.

BE COLD GALVANIZED.

ALL CUT EDGES ON METAL, CORNERS DRILLED HOLES AND OTHER ABRAIDED AREAS SHALL 6.

FROM THE TOWER LOOP.

INSTALL 2 EACH 3/4" DIA STRAIN RELIEF CONNECTOR (GFM) FOR THE THOMPSON 28R 5.

(T&B 2673) FOR CABLE INSTALLED BY OTHERS, IN THE BOTTOM OF THE JUNCTION BOX.

INSTALL 8 EACH SIDE 3/4" DIA WATER TIGHT STRAIN RELIEF CONNECTORS (GFM) 4.

AND STAINLESS STEEL BOLTS. VERIFY BOX LOCATION WITH FAA RESIDENT ENGINEER.

NEMA 4X, ATTACH TO TOWER USING A STAINLESS STEEL UNISTRUT FRAME

30"x 24"x 10" JUNCTION BOX ON BOTTOM OF THE TOWER (GFM) FIBER-GLASS, INSTALL A 36"x 30"x 10" JUNCTION BOX (GFM) ON TOP OF THE TOWER AND 3.

UP TO JUNCTION BOX. ALL CUT EDGES ON METAL SHALL BE COLD GALVANIZED.

CUT SECTION OF EXPANDED METAL GRATING AS REQUIRED TO ROUTE CONDUITS 2.

THE 7/8" HELIAX CABLE MUST NOT BE BENT CLOSER THAN A 12" RADIUS. 1.

A

E001

SWEEP 2'-6"

MIN (TYP)

4" PVC SCH 80

TOWER LEG

CAD WELDED TO

4/0 GROUND

1-1/4" PVC FOR

LADDER LEG

CAD WELDED TO

4/0 GROUND

1-1/4" PVC FOR

INTO JUNCTION BOX

2 EA 1-1/4" PVC FOR 4/0 GROUND

TOWER LEG

CAD WELDED TO

4/0 GROUND

1-1/4" PVC FOR

HELIAX CABLE

7/8" DIAMETER

SS PIPE CLAMP

PVC SCH 40

4" DIAMETER

SS UNISTRUT

AND NUTS

SS LOCKWASHERS

TOWER DIAGONAL

BEAM CLAMP

AND STRUT

SS CLAMPS

(TYP)

SCH 40

4" PVC

1-1/4" PVC

1-1/4" PVC

SHRINK GROUT

10K PSI NON

SEE NOTE 3

JUNCTION BOX,

SEE NOTE 2

REQUIRED

OFFSET

TYPICAL

CONDUITS

4" PVC

ASSEMBLY

AIR TERMINAL

SEE NOTE 4

JUNCTION BOX,

WORK AREA

64 SF MIN

PLATFORM

ASSEMBLY

AIR TERMINAL

8'-0" M

IN

(T

Y P

M

IN

T Y

P

INSIDE THE J-BOX (TYP)

LEAVE 3 FT EACH CABLE

SEE NOTE 3

JUNCTION BOX

FIBERGLASS

36"x 30"x 10"

UNISTRUT FRAME

STAINLESS STEEL

(TYP)

COUPLINGS

EXPANSION

SEE NOTES 2 & 6

NOT TO SCALEE001

JUNCTION BOX SECTION

NOT TO SCALEE001

PLATFORM PLAN VIEW

A

NOT TO SCALEE001

TOP JUNCTION BOX ELEVATION

NOT TO SCALEE001

BOTTOM JUNCTION BOX ELEVATION 4

NOT TO SCALEE001

BOTTOM JUNCTION BOX PLAN VIEW

B

NOT TO SCALEE001

CONDUIT SUPPORT SECTION

NOT TO SCALEE001

INTERMEDIATE CONDUIT SUPPORT

E D

M

IS

S

U E

D F

O R

ENGINEERING SERVICES

COMMUNICATIONS

RCAG

TOWER CABLE SECTIONS AND DETAILS

TOWER REPLACEMENT

SCCOLUMBIA METROPOLITAN AIRPORTCOLUMBIA

Stacey L. RainesFrancisco J. Cortes

RC

FC

PROJECT ENGINEER MGR: ENGINEERING - CENTER A

05/29/2020 1700951

CAE-1700951-E001 A

05/07/20211700951CONSTRUCTION (J.CORTES) DS05/07/2021A

c a e -1

-e

.d g n

THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

ORIGINAL SIGNED BY: ORIGINAL SIGNED BY:

SEE NOTE 13SEE NOTE 13

SEE NOTE 13

8'-0" MIN (TYP)

CABLES

HELIAX

(5) 7/8"