09 6973GH-21-Q-00046-0002_QA FINAL.pdf

PDF 81 KB Posted

Attached to
ARSR4 RF Transfer Switch Form Fit Functional (FFF)
Solicitation number
6973GH-21-Q-00046
Issued by

About this file

This document contains questions and answers regarding a solicitation for the design of an ARSR4 RF Transfer Switch. The solicitation seeks a contractor to design a form fit functional replacement for the RF Transfer Switch in accordance with the Federal Aviation Administration's manufacturing and test specifications. The contractor must provide a minimum of two first article units and fourteen production units, covering all research and development costs and labor. Key requirements include the submission of repair instructions and manuals for approval, performing mechanical vibration stress testing on all units, and demonstrating electromagnetic interference and suppression technology for the unit. Spare subassemblies and piece parts will be procured separately. There is no page limit for the technical response. Reference drawings are provided but no fabrication drawings for the housing depicted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWERS DATED (ROUND 2 & 3) 5/12/2021 - FINAL

1. Sections 3.4.2.2 and 3.4.2.2.1 of the Statement of Work for the design of a Form Fit Functional Replacement ARSR4 RF Transfer Switch address the requirement for Repair Instructions to be supplied. These sections are reproduced below …

3.4.2.2 Repair Instructions: The Contractor shall provide a repair instruction manual containing the disassembly, testing, repair, and reassembly instructions for the RF Transfer Switch. These instructions shall list all of the tools, equipment, and materials needed to disassemble the unit, test each subassembly, repair or replace each subassembly, tune each subassembly, tune the overall assembly, and test the overall assembly. A Test Data Sheet (TDS) that has space to record every Factory Acceptance Test (FAT) measurement shall be included in the repair manual. Included in the repair instruction manual shall be a list of manufacturers and part numbers for each replaceable subassembly.

3.4.2.2.1 Repair Instruction Approval: The Contractor shall submit the repair instruction manual to the FAA for approval. If there are any changes needed to the manual, the changes shall be submitted to the FAA for approval.

1. Will the FAA consider designating the RF Transfer Switch assembly as a Line Replaceable Unit? i.e. Repairs to be carried out by the Contractor at the Contractors facility and returned to the FAA within a defined turnaround time.

a. FAA Response: The FAA prefers to leave at the subassembly level to acquire the proper documentation to allow troubleshooting down to the subassembly level at the FAA.

2. If it is essential for repairs to be carried out to subassembly level, will the FAA procure spare subassemblies under this Statement of Work or a separate contract?

a. FAA Response: The FAA will procure the subassembly/piece parts on a separate contract.

2. Can you have someone verify for me that Para. 3.1.1.2 mechanical stress is to be performed 100% on all units. It was originally to be done on First Articles only I thought. This is a costly test that is why I would like to verify it is on all units.

a. Yes mechanical vibration stress testing is to be performed 100% on all units

3. Drawing that is called out on page 18 of the SOW. The document we require is called out on note 1 – PDS24422. Could you please provide that for us or direct us to someone who can help.

a. PDS2422 is the Westinghouse part number for the RF Transfer Switch. In this SOW we reverse engineered all of the requirements for the RF Transfer Switch into the SOW document. We are confident all of the electrical and mechanical requirements have been captured in the SOW. Follow the requirements in the SOW.

4. 3.3.2 Electromagnetic Susceptibility and Interference: The unit shall be designed so that it is not susceptible to conducted or radiated emissions from the radar. The unit shall be designed so that it’s conducted or radiated emissions do not interfere with the operation of the radar.

In order for our unit to be designed to be compliant with this requirement, we would need to know the sensitivity of the ARSR-4 Radar. We respectfully request that the Government provide this information at its earliest convenience.

a. “This requirement is satisfied by demonstrating the EMI/RFI suppression technology that will be used in the RF Transfer Switch. The FAA is looking for EMI/RFI suppression technology that meets the MIL-STD-461F requirements for Air Force Ground equipment, namely tests CE102, CS101, CS114, CS115, CS116, RE102, and RS103. Performance of these tests (3.3.2) is not a required for the RF transfer switch, only the demonstration of the technology the Contractor intends to apply is required.”

5. Is there a page limitation for the technical response? The solicitation is not clear on this point, other than to say that “the offerors must provide a technical proposal demonstrating compliance with “ALL” factors in Exhibit 8.0 of the Statement of Work”.

a. No, there is no page limit

6. Second, Figure 1 in the TDP depicts a housing for the ARSR-4 RF Transfer Switch, are they FAB files or drawings for that housing?

a. No FAB drawings, reference to drawings at 8.2 Exhibit 2