ARSR4 RF Transfer Switch Form Fit Functional (FFF)

Closed Solicitation Posted

Solicitation number
6973GH-21-Q-00046
Agency
Franchise Acquisition Servies Federal Aviation Administration, Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
5840 Radar Equipment, Except Airborne
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Aviation Administration is seeking to procure the design and production of a form fit functional replacement for the ARSR4 RF Transfer Switch. The contractor shall furnish all necessary labor, facilities, parts, materials, equipment, and technical expertise to design and produce a minimum of two first article units and fourteen production units in accordance with FAA specifications. Key requirements include vibration stress testing on all units, providing repair instructions and manuals for approval, and demonstrating EMI/RFI suppression technology. Quotes are due by May 21, 2021.

There is no set-aside designation for this procurement. The NAICS code is 541715 and PSC code is J063. The incumbent contractor is unknown. The contractor must deliver the first article units within 105 days of award and the remaining production units within 265 days. The place of performance is within the United States. Evaluation criteria include technical approach, past performance, and price.

Notice text

5 versions

Update #5 · Latest ·

Amendment 0002:

The purpose of this amendment is to incorporate Final Questions and Answers and to extend the RFQ close

date as follows;

FIRST: Final Questions and Answers (Round 2 and 3) dated 12 May 21 are hereby incorporated.

SECOND: The RFQ close date is hereby extended to 21 May 21 NLT 1600 CT.

THIRD: This is the final RFQ extension. No other questions or extensions will be entertained.

FOURTH: No other changes or revisions are incorporated.

NOTICE:

The purpose of this notice is to incorporate Questions and Answers Round Two as follows;

FIRST: Questions and Answers dated 12 May 21 are hereby incorporated.

SECOND: The RFQ close date remains unchanged; 14 May 21 NLT 1600 CT

THIRD: No other changes or revisions are incorporated.

Amendment 0001:

The purpose of this amendment is to incorporate Questions and Answers and to extend the RFQ close date as

follows;

FIRST: Questions and Answers dated 27 Apr 21 are hereby incorporated.

SECOND: The RFQ close date is hereby extended to 14 May 21 NLT 1600 CT

THIRD: No other changes or revisions are incorporated.

Quotes due date has been changed from 09 Apr 2021 to 30 Apr 2021.

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design/redesign of a F3 replacement RF Transfer Switch.in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 8.1) and all other terms, conditions and provisions. This SOW will cover all R&D cost and labor necessary to furnish a minimum of two (2) first article unit and fourteen (14) production units.

Update #4 ·

NOTICE:

The purpose of this notice is to incorporate Questions and Answers Round Two as follows;

FIRST: Questions and Answers dated 12 May 21 are hereby incorporated.

SECOND: The RFQ close date remains unchanged; 14 May 21 NLT 1600 CT

THIRD: No other changes or revisions are incorporated.

Amendment 0001:

The purpose of this amendment is to incorporate Questions and Answers and to extend the RFQ close date as

follows;

FIRST: Questions and Answers dated 27 Apr 21 are hereby incorporated.

SECOND: The RFQ close date is hereby extended to 14 May 21 NLT 1600 CT

THIRD: No other changes or revisions are incorporated.

Quotes due date has been changed from 09 Apr 2021 to 30 Apr 2021.

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design/redesign of a F3 replacement RF Transfer Switch.in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 8.1) and all other terms, conditions and provisions. This SOW will cover all R&D cost and labor necessary to furnish a minimum of two (2) first article unit and fourteen (14) production units.

Update #3 ·

Amendment 0001:

The purpose of this amendment is to incorporate Questions and Answers and to extend the RFQ close date as

follows;

FIRST: Questions and Answers dated 27 Apr 21 are hereby incorporated.

SECOND: The RFQ close date is hereby extended to 14 May 21 NLT 1600 CT

THIRD: No other changes or revisions are incorporated.

Quotes due date has been changed from 09 Apr 2021 to 30 Apr 2021.

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design/redesign of a F3 replacement RF Transfer Switch.in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 8.1) and all other terms, conditions and provisions. This SOW will cover all R&D cost and labor necessary to furnish a minimum of two (2) first article unit and fourteen (14) production units.

Update #2 ·

Quotes due date has been changed from 09 Apr 2021 to 30 Apr 2021.

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design/redesign of a F3 replacement RF Transfer Switch.in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 8.1) and all other terms, conditions and provisions. This SOW will cover all R&D cost and labor necessary to furnish a minimum of two (2) first article unit and fourteen (14) production units.

Update #1 ·

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design/redesign of a F3 replacement RF Transfer Switch.in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 8.1) and all other terms, conditions and provisions. This SOW will cover all R&D cost and labor necessary to furnish a minimum of two (2) first article unit and fourteen (14) production units.

Attachments

Files attached to this notice, newest first
File Type Posted
09 6973GH-21-Q-00046-0002_QA FINAL.pdf PDF
09 6973GH-21-Q-00046-0002.pdf PDF
09 6973GH-21-Q-00046-0002_QA.pdf PDF
09 6973GH-21-Q-00046-0001_QA.pdf PDF
09 6973GH-21-Q-00046-0001.pdf PDF
09 Attachment 01 SOW.pdf PDF
09 Attachment 02 Provision 61 REV D-08-2019.pdf PDF
09 6973GH-21-Q-00046.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity