USMMA FACILITIES PAINTING ATTACHMENT C PRICING SHEET BOTH BUILDINGS xlsx.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- DORMITORY BUILDINGS INTERIOR REPAINTING
- Solicitation number
- 693JF724Q000002
About this file
This document contains an attachment pricing sheet and details of a federal contract opportunity for dormitory building interior repainting. The attachment pricing sheet provides approximate square footage for two dormitory buildings totaling around 100,500 square feet, with pricing required per square foot for interior repainting of individual buildings and decks. The related federal contract opportunity is seeking offers for re-painting of the same two dormitory buildings, totaling approximately 109,000 square feet of interior space, including dorm rooms, hallways, stairwells, and bathrooms. The requirement must be completed within 19 days of notice to proceed. The soliciting agency is the Department of Transportation Maritime Administration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BARRACKS APPROX SFT
| ATTACHMENT C PRICING SHEET | ||||
| USMMA- FACILITIES PAINTING | BUILDING SCHEDULE- BARRACKS | |||
| BUILDING | DECK | SFT | Per SFT RATE | Total |
| BARRY | ZERO | 0 | $ | $ |
| 1 | 19133 | $ | $ | |
| 2 | 19133 | $ | $ | |
| 3 | 19134 | $ | $ | |
| Approx. SFT + Includes labor, material, transportation, tools, equipment and supervision to re-paint the interior of the facilities | 57400 | $ | $ | |
| $ | $ | |||
| JONES | 0 | 0 | $ | $ |
| 1 | 14367 | $ | $ | |
| 2 | 14367 | $ | $ | |
| 3 | 14366 | $ | $ | |
| Approx. SFT +labor, material, transportation, tools, equipment and supervision to re-paint the interior of the facilities | 43100 | $ | $ | |
| $ | $ | |||
| TOTAL APPROX SFT- BARRY/JONES ONLY+ OTHER EXPENSES | 100,500 | $ | Grand Total $ |
| NOTE: |
| All square footage are an approximate. This requirement must be completed within 19 days after notice to proceed. |
Contractor is responsible for verifying all building/room sizes.
Any buildings noted that do not have drawings, must have square footage verfied by the contractor and confirmed by USMMA.
File details come from the government source that posted it. Updated .