AMENDMENT 0004 J-11 Deliverables.xlsx

XLSX spreadsheet 52 KB Posted

Attached to
Ready Reserve Force (RRF) Ship Management Services Federal contract opportunity
Solicitation number
693JF722R000009
Issued by
Department of Transportation Maritime Administration

View the file

Other files for this federal contract opportunity

Other files attached to Ready Reserve Force (RRF) Ship Management Services, newest first.
File Type Posted
693JF722R000009-0010 2023 Solicitation for Ship Management Services Amendment No. 0010.pdf PDF
693JF722R000009-0009 2023 Solicitation for Ship Management Services Amendment No. 0009.pdf PDF
Amendment 0008 J-12 Pricing Data - Amend. No. 0008.xlsx XLSX spreadsheet
Amendment 0008 SF30 693JF722R000009 Sections C-M.pdf PDF
693JF722R000009-0007 2023 Solicitation for Ship Management Services Amendment No. 0007.pdf PDF
Amendment 0006 SF30 693JF722R000009-0004 2023 Solicitation for Ship Management Services.pdf PDF
Amendment 0005 693JF722R000009-0005 2023 Solicitation for Ship Management Services .pdf PDF
Amendment 0005 J-11 Deliverables .xlsx XLSX spreadsheet
Amendment 0005 TE-06 MARAD NSE Business Protocol Guidance (Rev 13).pdf PDF
Amendment 0005 J-01 Required Crewing for FOS and ROS.xlsx XLSX spreadsheet
Amendment 0005 J-04 Cost Reimbursable Items.pdf PDF
Amendment 0005 J-15 Projected Cost Reimbursable Amounts for FY24 to FY33.pdf PDF
Amendment 0005 Q and A Responses.pdf PDF
Amendment 0005 J-12 Pricing Data .xlsx XLSX spreadsheet
AMENDMENT 0004 J-06 Wage Determination 1998-0298 Rev 31 with MARAD SUPP INFO - Amend. No. 0004.pdf PDF
AMENDMENT 0004 SF30 for 693JF722R000009-0004 2023 Solicitation for Ship Management Services.pdf PDF
AMENDMENT 0004 J-12 Pricing Data.xlsx XLSX spreadsheet
AMENDMENT 0004 Q and A Responses.pdf PDF
AMENDMENT 0004 J-01 Required Crewing for FOS and ROS .xlsx XLSX spreadsheet
AMENDMENT 0003 693JF722R000009-0003 2023 Solicitation for Ship Management Services.pdf PDF
AMENDMENT 0003 J-04 Cost Reimbursable Items.pdf PDF
AMENDMENT 0003 J-12 Pricing Data Final.xlsx XLSX spreadsheet
AMENDMENT 0003 Q and A Responses Final.pdf PDF
AMENDMENT 0003 J-14 Past Performance Information Data.pdf PDF
AMENDMENT 0002 SMC - NEXT Pre-Proposal Conference Briefing 2Feb2023.pdf PDF
AMENDMENT 0002 - 693JF722R000009-0002 2023 Solicitation for Ship Management Services .pdf PDF
AMENDMENT 0002 - TEs Conformed for Amend 0002.zip ZIP file
AMENDMENT 0001 693JF722R000009-0001 2023 Solicitation for Ship Management Services Amendment No. 0001.pdf PDF
AMENDMENT 0001 J-12 Pricing Data .xlsx XLSX spreadsheet
AMENDMENT 0001 J-01 Required Crewing for FOS and ROS.xlsx XLSX spreadsheet
693JF722R000009 Sections C-M.pdf PDF
693JF722R000009.pdf PDF
TE-01 Acronyms and Definitions.pdf PDF
Corrected 693JF722R000009 J Attachments.zip ZIP file
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Deliverables

J-11 Deliverables
DeliverableReferenceRequired byDelivery MethodFormatFrequencyDistributionStandard Job #Ref Verified
QAM8.1.2Within 90 days of NTPEmailElectronicOne Time/When RevisedCOR
QMS/QAM changes8.1.4Within 5 days of implementationEmailElectronicAs requiredCOR
Third-party audits8.1.6Within 7 days of receiptEmail/NSEElectronicAs requiredCOR
Initial Life Cycle Management Plan8.2.1Wthin 90 days of NTPEmail/NSEElectronicOnceCOR
Preservation Plan8.2.1.1Annually from NTPEmailElectronicAnnuallyNTN
Initial Business Plan (IBP)8.3.2Annually IAW business plan guidance (o/a mid-April)Email work orders numbers and attach documents to NSEElectronicAnnuallyCOR
Final Business Plan (FBP)8.3.3Annually IAW business plan guidance (o/a July 1)Email work orders numbers and attach documents to NSEElectronicAnnuallyCOR
Approved Baseline Business Plan8.3.4Annually IAW business plan guidance mid SeptemberEmail work orders numbers and attach documents to NSEElectronicAnnuallyCOR
ABBP Execution and Evaluation Report (Status Report - Special)8.3.11.1Required within 5 working days of each fiscal quarter (Third quarter Report NLT July 31st)
Email work orders numbers and attach documents to NSEElectronicQuarterlyCOR
Notify the COR of identification of any inconsistencies and upon resolution8.4.5.2Within 5 business days of identificationEmailElectronicAs identifiedCOR
Notify the COR in writing justifying an exception where the Contractor determines the ship cannot maintain the Planned Maintenance/Condition Monitoring (PM/CM)8.4.6Upon determinationEmailElectronicAs determinedCOR
Business case analysis8.4.10.1At conclusion of Hull SurveyEmailElectronicAs requiredCOR
Ship Manager Weekly Report8.5.2.11;

8.5.2.19.1;

8.5.13.6;

9.2.2.5;

11.4.1.1Every week from NTPEmail and NSEElectronicWeeklyCOR/SMS/Type desk
Crew Shortage Report8.5.2.14For every incidenceEmailElectronicAs requiredCOR/MCC
Crew Overlap Recommendation8.5.8.4Upon determinationEmailElectronicAs determinedCOR
No-Sail request Notification8.5.8.10Upon determinationEmailElectronicAs determinedCOR
Submit a proposal with an explanation of how PE Services will be maintained8.5.11.2.6Within 5 days of PE absenceEmailElectronicAs requiredCOR
Provide the name, position and contact information for shore-side staff and update as changes occur to MARAD8.5.11.4Quarterly from NTPEmail/ExcelElectronicAs requiredMARAD
Expired Certificates of training requirement list8.5.13.230 days before it expiresEmailElectronicAs requiredCOR
Quarterly report for Task Order obligations and expenditures8.6.1.2Quarterly, NLT last business day of quarterEmailElectronicQuarterly, NLT last business day of quarterACO/COR
Notification of 75% obligations8.6.1.3As occuranceEmailElectronicAs requiredACO/COR
Fixed fees invoice8.6.1.4.1For fixed per diem/servicesDelphi eInvoicing portalElectronicMonthlyCOR/ACO
Invoice supporting documentation (J-07a, J-07b, J-07c)8.6.1.4.3For cost reimbursables as approvedDelphi eInvoicing portalElectronicAs requiredCOR/ACO
Activation Invoicing8.6.2.1Only Activation CostsDelphi eInvoicing portalElectronicAs RequiredCOR/ACO
Operation Invoicing8.6.2.1.1Only Operation CostsDelphi eInvoicing portalElectronicAs requiredCOR/ACO
Deactivation Invoicing8.6.2.2Only Deactivation CostsDelphi eInvoicing portalElectronicAs RequiredCOR/ACO
Medical Claims package8.7.1All Medical Claims in accordance with J-09EmailElectronicAs requiredCOR/MAR-610 business manager
Medical Claims Review Contract Agreement8.7.2Within 60 days of NTPEmailElectronicOnce/As UpdatedACO
Third Party Claims package IAW SMC TM, J-09b8.7.3.1Incidents Involving Third-Party Personal Injury/Illness and Third-Party Property Damanage/LossEmailElectronicAs requiredACO
Written notice of ClaimsG.7.5.1.1Immediately, as soon as practicableEmailElectronicAs requiredACO/COR
Quarterly Claims report (TE-07)8.7.4
G.8.3Within 30 days following the close of the calendar quarterEmailElectronicQuarterlyACO/COR/MAR-610/MAR-770
Excess funding de-obligation8.7.5
G.8.4NLT July 30thEmailElectronicAnnualyCOR/SSS
Capitalized Assets Inventory8.9.2Quarterly from NTPNSEElectronicQuarterlyNSE Standard Job (SJ)
Property Control Systems8.9.2.1Within 60 days of NTP and throughout the period of performanceEmailElectronicOnce/As UpdatedACO, COR, and Logistic Management Specialist (LMS)
Critical Spares Inventory8.9.4.1
8.9.7.190 days after NTP from NTPNSEElectronicOnce/As UpdatedNSE SJ
ABS class recommended spares8.9.4.1At all timesStandard JobElectronicAnnually/As requiredCOR, LMS, NSE SJ
Accountable Property Inventory8.9.4.5Within 5 days of transaction from NTPNSEElectronicOnce per year and after activationCOR and LMS
USCG 2692's8.12.1.1Within 5 days of the incident eventEmailElectronicAs requiredCORAdd this when we do the line/line in section about incident reporting
Mishap/Incident Notification8.12.1.2Within 24 hours of occurrence of the mishap, incident, flooding or fireEmailElectronicSOMO/CO
Formal Incident Report8.12.1.3Within 48 hours of occurrence of the mishap, incident, flood, or fireEmailElectronicAs requiredCOR/ACO
RCA8.12.2Following any safety, security, and environmental mishaps or incidents and all machinery failures which result in a reduction in readiness statusEmailElectronicAs requiredSJ, COR
Incident involving Third-Party Cost Estimate and Report8.12.3Within 24 hours of occurrence of damage or injury caused by a third-partyEmailElectronicAs requiredCOR
RCA for Damages to a Third-Party8.12.4Following any safety, security, and environmental mishaps or incidents and all machinery failures which result in a reduction in readiness statusEmailElectronicAs requiredSJ, COR
ISO 14001:2015 or ABS HSQEEn certificate8.13.2Annually from NTPNSE uploadElectronicAnnuallyNSE standard job
EMS/EMP8.13.3.1Within 90 Days from NTPNSE uploadElectronicOnce/As UpdatedNSE standard job
EMS/EMP Changes8.13.3.2Within 7 days of ImplementationNSE uploadElectronicAs requiredNSE standard job
Updated Environmental Management Plan8.13.3As requiredNSEElectronicWith initial submission 15 days after Shipyard (for Upgrade) Contract AwardCOR
Notification of third-party ISO 14001:2015 audit8.13.4At least 10 days prior to the start of the auditNSE uploadElectronicAs requiredNSE standard job
Copy of ISO 14001:2015 third-party audit8.13.4.2Within 7 days of receiptEmail/NSEElectronicAs requiredCOR
Copy of any regulatory inspection reports8.13.6Within 24 hours prior to the inspectionsEmail/NSEElectronicAs requiredCOR
Copy of regulatory inspection reports and notification of Violations/Citations8.13.6.1Within 7 days of the Regulatory Inspection ReportEmail/NSEElectronicAs requiredCOR
Hazardous Materials Management Plan and Waste Management Plan8.13.7Within 60 days of NTPNSE uploadElectronicOnce and Updated AnnualllyCOR
SOPEP/VRP incident notifications8.13.8.3IAW SOPEPNSE uploadElectronicOnce and Updated AnnualllyCOR
Report violations of Federal, State, Local, and foreign hazardous material (HAZMAT)law(s)8.13.9.3Within 24 hours of violationEmailElectronicAs requiredCOR, ACO
Failed environmental inspections, discrepancies, notification of judgments, fines, or penalties received by their company8.13.10Within 24 hours of any failed enviuronmental inspectionEmailElectronicAs requiredCOR, ACO
Report fuel and fuel type consumed for each month8.13.12.1Monthly from NTP, End of Month ReportEmail/NSEElectronicMonthlyCOR, MAR-611
Detailed Energy Consumption Report8.13.12.2Annually from NTPEmail/NSEElectronicAnnualCOR, MAR-611
Ship Individual Potable Water Meter Readings8.13.15.2Monthly from NTP, End of Month ReportEmail/NSEElectronicMonthlyCOR, MAR-611
Annual HAZMAT Inventory8.13.22NLT 60 days from NTPEmail into NSEElectronicAnnually after first submission on same dateCOR
Copies of all required EPA identification numbers, uniform hazardous waste manifests, permits and/or licenses and/or state/local equivalent8.13.27.1Upon request from NTPNSEElectronicUpon requestSJ
Copies of all documentation of work performed8.13.27.3As required from NTPNSEElectronicAs requiredSJ
VSQG exceeded threshold notification8.13.29Upon identification of expected exceeded thresholdEmailElectronicAs identifiedCOR
MARAD RRF Annual Safety Survey Checklist8.14.2
8.14.4An required from NTPEmail NSEElectronicAnnuallyCOR
Provide copy of ISM system8.14.8Within 90 days from NTP and when updates occur from NTPEmailElectronic or read only accessWithin 90 days from NTP and when updates occurCOR
ISM8.14.8Within 90 days from NTP and when updates occur from NTPEmailElectonic or read only accessWithin 90 days from NTP and when updates occurCOR
Provide ISM briefing material8.14.8.1As required from NTPEmailElectronicAs requiredCOR
Provide advance notice and copy of all ISM external audit results8.14.910 days prior to auditEmailElectronicAs requiredCOR
Ship’s SMC or company’s DOC suspended for any reason8.14.9.3Within 24 hoursEmailElectronicAs requiredCOR
Monthly Safety Meeting Minutes8.14.14After each meetingNSEElectronicMonthlyCOR
VSP Approval Letter8.15.4Within 24 hours of receiving in NSEEmail (Password Protected)/NSEElectronicAs requiredCOR and MAR-612
Annual Security Audit8.15.4.3.1NTP AnniversaryEmail/NSEElectronicAnnuallyCOR
Security Risk Assessment Results report8.15.4.4.1NTP AnniversaryEmail/NSEElectronicAs requiredCOR
Schedule of all assessments and drills8.15.10Annually from NTPEmailElectronicAnnual scheduleCOR
ROS security incident notification8.15.17.2Within 24 hoursPhonePhoneAs identifiedCOR, SOMO
ROS follow-up security incident report8.15.17.2Within 2 working days of incident from NTPEmailElectronicAs identifiedCOR, SOMO
VSP revisions for change in the SMC8.16.1.2.5During Transition-InEmailElectronicAs neededCOR
Notification of management change8.16.1.2.6During Transition-InEmailElectronicOnce during Transition-InCOR
Dock Trial Report8.16.1.4.1

11.2.2

14.15.5NLT 6 weeks after completion of the Dock Trial from NTPEmail/NSEElectronicOnce during Transition-InCOR/SJ
Material Condition Inspection Plan (MA-58)8.16.1.5.1NLT 2 business days prior to the scheduled inspection from NTPEmail/NSEElectronicOnce during Transition-In/Priot to every scheduled inspectionCOR/SJ
Regulatory files and certificate discrepancies8.16.1.6.3Upon Contract Award (incoming contractor)EmailElectronicAs identified during Transition-In review of regulatory files and certificatesCOR
Non-functioning alarm notification8.16.1.8.1During Transition-InEmailElectronicAs identifiedCOR
Transition Phase-out Plan8.16.2.315 days prior to contract completionEmailElectronicOnceCOR
Material Condition Report (MA-58)8.16.2.315 days prior to contract completionEmail/NSEElectronicOnceCOR/SJ
Regulatory files and certificates discrepencies8.16.2.8.3Upon contract award (outgoing contractor)Email/NSEElectronicUpdated as they occurCOR
Report of open, overdue, or deferred SJs to incoming Contractor8.16.2.9During Transition-OutEmail/NSEElectronicAs identifiedCOR
Interim Readiness Report9.2.2.1Required whenever readiness changes to C-3 or C-4EmailElectronicAs requiredCOR
Activation Plan and Checklist10.1.1.1NLT 30 days after contract award and Annually from NTP?NSEElectronicAnnuallyCOR
Activation Plan Updates and Revision10.1.1.230 days after the After-Action Report from NTP?NSEElectronic30 days after the After-Action ReportCOR
Emergent Repair Notification10.1.2.3ASAP as identifiedEmailElectronicAs identified for an activation planningCOR
Business Plan Activation Estimates10.1.3.1For mission specific requirementsNSEElectronicAnnually in the Business Plan and updates as requested by MARADCOR
Anticipated cost(s) to exceed ABBP estimates notification10.1.3.1.1Within 24 hoursEmailElectronicAs identified for an activationAD SOMO
Crew Composition Changes (Move to 8.6.9.7)10.1.3.2When the Contractor feels a change of crew composition is necessaryEmailElectronicAs neededCOR/ACO
Activation Schedule/Agenda (Maintenance Activation)10.1.4.4/ 10.1.5.4Prior to a Maintenance Activation from NTPEmailElectronicEvery Maintenance Activation send a draft a day before pre-trial conferenceCOR/Sea trial leader
Sea Trial Failure Notification10.1.4.7/10.1.5.9Upon failure of a Sea TrialEmail and PhoneElectronicASAP upon identification of failureSOMO/MARAD 611
Activation Agenda (Notice Activation)10.1.5.4Pre-Sea trial conference NLT day prior Ready ProceedPresent in conference or emailverbally/emailEvery Notice ActivationCOR
Activation Agenda (No-Notice Mission Activation)10.1.6.3Pre-Sea trial conference NLT day prior Ready ProceedPresent in conference or emailverbally/emailEvery No-Notice Mission ActivationCOR
Activation Agenda (No-Notice Turbo Activation)10.1.7.5Pre-Sea trial conference NLT day prior Ready ProceedPresent in conference or emailverbally/emailEvery No-Notice Turbo ActivationCOR/Sea trial leader
CBP Form 41810.1.8.2Prior to departureEmailElectronicEvery activationCOR/MCC
Notify the designated Sea Trial Team leader of any changes to the Agenda10.2.9ASAPPresent in conference or emailverbally/emailEvery activationCOR/Sea trial leader
Abort Operations Notification10.3.2.1.2Upon exercising abort authorityNaval MessageElectronicUpon any aborted activityAD Ops Center/MCC
Abort Operations Report10.3.2.1.3NLT 5 working days of mission aborting action w/o prior approval of OPCONMost expediant method availableVoice or ElectronicUpon any aborted activitySOMO/OPCON
Navy Small Arms Asset Verification List10.3.3.4Upon the issuance of weapons/ ammunition from NTPEmailElectonicUpon the issuance of weapons/ammunitionAD Ops Center/MCC
Ammunition Transaction Report10.3.3.4Upon the issuance of weapons/ ammunition from NTPEmailElectronicUpon the issuance of weapons/ammunitionAD Ops Center/MCC
Observed unsafe practice by military or contracted stevedores10.3.8.2ImmediatelyMost expediant method availableVoice or ElectronicUpon observationSenior Military Official Present/AD Ops Center
Incident or Near-Misses Report10.3.8.3Withing 24 hours of occurrence from NTPEmailElectronicFor any incident or near-misses involved non-crew members curing cargo operationsCOR/AD Ops Center/MCC
Phase O ship non-report10.3.8.4ImmediatelyMost expediant method availableVoice or ElectronicAny ship that has no reported in at least once in 24 hoursSOMO
Significant event notification10.3.8.5Within 12 hours of significant eventEmailElectronicAll significant events which affect ship operations or in which the ship is involvedCOR/AD Ops Center/MCC
CASREPs10.3.8.6Unclass: While in Phase O upon occurrence of a casualty from NTP. Class: As requiredClassified Message Traffic. Class: email highside only classified naval messageElectronicAll mechnaical, structural, electrical, or equipment casualties. Class: As required under MSC OPCONAs per direction from OPCON/Copies to AD and MCC. Class: MCC Watch Analyst Highside
CASREP Updates10.3.8.6.1While in Phase O upon occurrence of a casualty as needed from NTPClassified Message TrafficElectronicFor all CASREPSAs per direction from OPCON/Copies to AD and MCC
C-3 and C-4 CASREPs10.3.9.1Equipment deficiencies that would lead to C-3 or C-4 CASREPTelephone, Daily updateElectronicImmediately, with daily updateSOMO/COR
Marine Casualties Report10.3.10.2All special incidents that result in damage to ship’s gear or cargo, injury to person(s) or loss of life from NTPClassified Message TrafficElectronicASAP following incidentAs per direction from OPCON/Copies to AD and MCC
Casualty or Ship Disabled Notification10.3.12.1When a ship suffers a casualty or becomes disabled at seaTelephoneElectronicImmediately following casualty or disablingCOMS/Local MSC Commander/COR/AD SOMO, MARAD AD Ops/MCC
Salvage or Rescue/Assistance Request10.3.13.1In the event of a rescue assistance situation from NTPMost expediant method availableVoice or ElectronicImmediately following identification of rescue or assistance needCOMS/Local MSC Commander/Copies to SOMO/AD/Ops Center/MCC
MSC Form 5880/110.3.15.1Upon identification of Government Stevedore damage from NTPOn-site/Emailverbally/emailUpon identification of Government Stevedore damageMSC Representative/CO/COR
Maintenance and repair work precludes or has the potential to preclude a ship from getting underway within any 24-hour period while in FOS10.3.18.1.2Per occurrenceSITREP and emailNavy Standard message and emailPer occurrenceCOR/SOMO and MCC
Small arms weapons/ammunition issue notification10.3.23.3Within 24 hours of issuePhone or Email (fastast means possible)ElectronicFor all small arms/weapons issuesDivision Ops Center/MCC
Emergency medical treatment and transportation of embarked personnel notification10.3.23.4Within 48 hours of occcurenceEmailElectronicFor all occurrences of medical treatment and/or transportation of embarked personnelCOR/AD Ops Center/MCC
SITREP In-port10.4.2Aligned to activation DTGemailElectronicDaily in-portAD readiness/activation coordinator and MCC watch analyst and RRF readiness inbox
Daily Activation SITREP10.4.2Daily by noon local time from NTPEmailDaily by noon local timeCOR/AD Ops Center
UNCLASSIFIED Noon Operational Report10.4.3Daily by 1300 local time from NTPNeed to look at this/noon slip vs. noon report?ElectronicDaily by 1300 local timeOPCON
Deactivation Plan and Checklist10.5.1.190 days after NTP and annually from NTPNSE/EmailElectronic90 days after NTP and annuallyCOR/SJ
Deactivation Plan Updates10.5.3.1
As required after each deactivation and upon receipt of new policy promulgated from MARAD pertaining to ship deactivationNSE/EmailElectronicAs required after each deactivation and as new policy dictatesCOR
After-Action Report (AAR)10.5.4At completion of de-activationEmailElectronicAt completion of each de- activationEmail SJ
Monthly Financial Reports10.6.6Monthly as directed by MARAD from NTPemailElectronicMonthly as directed by MARADemail SJ
Missile Defense Agency - Daily Activation SITREP10.6.7Daily by Noon local time from NTPemailElectronicDaily when activatingMARAD
Adverse Personnel Security Determinations10.7.7.1Immediately upon occurrenceEmailElectronicImmediatelyCO/COR/AD Ops Center/MCC
Report changes of location, condition, or quantity of ammunition on board10.7.10.2Within 24 hours of becoming aware of the change from NTPEmailElectronicFor all changes of location, condition or quanity of ammunition on boardEmail SJ
Inventory report10.7.11.2Initial and semi-annually from NTPEmail/NSEElectronicInitial and semi-annuallyCOR
Small arms inventory – new and additional weapons10.7.11.8Within 48 hours of receipt of new or additional weapons from NTPEmailElectronicWithin 48 hours of receipt of new or additional weaponsCOR
Small arms inventory – transferring weapons off the ship10.7.11.8.1At least 48 hours prior to transfer from NTPEmail
ElectronicAt least 48 hours prior to transferCOR
Bunkering and Fuel Management Plan10.8.1Initial and Annually from NTPEmailElectronicInitial and AnnuallyCOR
Emergency Plans10.10.1Initial plus Annually from NTPEmail/NSEElectronicInitial plus AnnuallyCOR
VSP10.10.7Initial plus Annually from NTPEmail/NSEElectronicInitial plus AnnuallyCOR
SITREPS10.10.8As required from NTPEmailElectronicAs requiredCOR
Severe Weather Plan10.10.11.1Withing 24 hours of occurrence from NTPEmail/NSEElectronicAs directed/neededCOR
Request to Remain in Port10.10.11.2As required by the port from NTPNSEElectronicAs required by the portCOR
HWMP10.10.12.1Initial plus Annually from NTPNSEElectronicInitial plus AnnuallyCOR
Reimbursement Request10.10.12.3As needed from NTPNSEElectronicAs neededCOR
Tour, Promotion and Media Event Cost Estimate10.11.1As required from NTPNSEElectronicAs requiredCOR
Third-party Training and Exercise Cost Estimate10.11.2As required from NTPEmailElectronicAs requiredCOR
Exercise Cost Estimate10.11.7.2As required from NTPEmailElectronicAs requiredCOR
Incident Report10.11.7.7Initial plus Annually from NTPNSE as file attachmentsElectronicInitial plus AnnuallyCOR
Visitor Liability Forms10.11.8.1.4As required from NTPEmailElectronicAs requiredCOR
MCA Plan11.1.1.1Initially within 90 days of NTP from NTPEmailElectronicInitially within 90 days of NTPCOR
Monthly MS walk-around11.1.1.2Weekly from NTPEmailElectronicWeeklyCOR
MCA Tool11.1.1.3Within 6 weeks of completion of the Dock Trial from NTPEmailElectronicWithin 6 weeks of completion of the Dock TrialCOR
Estimated cost of voyage repairs exceeds remaining funding11.4.7.3As required from NTPEmailElectronicAs requiredCOR
CBP Form 226 submittal11.4.8.1As required from NTPEmailElectronicAs requiredCOR
Ad Valorem duties notification11.4.8.2As required from NTPEmailElectronicAs requiredCOR
Standard Jobs Review Results11.5.7.1As required from NTPEmailElectronicAs requiredCOR
SSMP Revisions11.5.8As required from NTPNSEElectronicAs requiredCOR
SSMP Monthly Analysis11.5.9Annually from NTPEmailElectronicAnnuallyCOR
Monthly SSMP Items Scheduled/Not Completed11.5.12.1As required from NTPEmailElectronicMonthlyCOR
ROS-4/5 to ROS-10 Transition Plan11.6.1As directed by MARAD from NTPEmailElectronicAs directed by MARADCOR
ABBP changes per Transition Plan11.6.2.1As required from NTPEmailElectronicAs requiredCOR
ROS-10 SSMP11.6.3As directed by MARAD from NTPEmailElectronicAs directed by MARADCOR
Vessel Downgrade Plan (VDP)12.1.2As required from NTPEmailElectroncAs requiredCOR
MA-496 Compliance Check Sheet12.1.2.3During downgrade and as required from NTPElectronicAs requiredSJ
VDP Progress and Cost Reports12.1.4.1During downgrade and as required from NTPEmailElectronicWeeklyCOR
Outport Layberth Deficiency Report13.1.4For all layberth deficiencesEmailElectronicAs requiredCOR/MAR-612
Layberth Guide13.2.2As directed by MARAD from NTPEmailElectronicQuarterly
Project Plan14.2.1As RequiredEmailElectronic14 days prior to executionCOR
Production Plan/Gantt Chart/ Progress Reports14.3.1Weekly from NTPemail/NSEElectronicWeeklyCOR
Production Reports14.3.2Weekly from NTPemail/NSEElectronicWeeklyCOR
Staffing plan to manage integration and modification of ship(s)14.4.1Within 30 days following notification of selection from NTPEmailElectronicWithin 30 days following notification of selectionCOR
Statement of Work and Cost Estimate14.2.5As requiredEmailElectronicAs requiredCOR
Design Modifications14.6.4As required from NTPEmailElectronicAs requiredCOR
Test Plan14.8.2.1As required from NTPAs requiredSJ
Results of Deadweight Survey and Inclining Experiment14.8.9As required from NTPAs requiredSJ
Delivery Orders (Contractor to Shipyard/Dockside Contractor)14.9.5Within 2 days of issuance from NTPEmailElectronicConclusion of that activationCOR/Dockside
Initial Test and Trial Plans14.9.630 days after Shipyard/Dockside Contract Award from NTPNSEElectronic30 days after Shipyard/Dockside Contract AwardCOR
Test and Inspection reports to MARAD14.9.92 days after completion of action from NTPemail/NSEElectronic2 days after completion of actionCOR
Weight and Movement Report to MARAD14.9.105 days after completion of action from NTPemail/NSEElectronic5 days after completion of actionCOR
Initial Ship Shipyard/Dockside Modification Plan(s)14.9.11Within 4 weeks of ship delivery from NTPWithin 4 weeks of ship deliverySJ
Schedule of Testing and Inspections with initial submission14.9.1115 days after Shipyard/Dockside Contractor (for Modification) Contract Award from NTPEmailElectronic15 days after Shipyard/Dockside Contractor (for Modification) Contract AwardCOR/Dockside
Manual and drawing updates in NSE14.10.2For all upgrades from NTPFor all upgradesSJ
Two sets of operating manuals, technical manuals, and drawings per ship14.10.3Upon ship redelivery from NTPElectric/hardcopyUpon ship redeliverySJ
Manuals and drawings recommendation14.10.5As required from NTPEmailElectronicAs requiredSJ
Major machinery and electrical equipment drawings in PDF format uploaded and indexed in NSE14.10.6As required from NTPNSEElectronicAs requiredNSE SJ
Request approval in writing of proposed changes that could impact cost and schedule14.11.5As required from NTPEmailElectronicAs requiredCOR
ROS-5 status outfitting and consumables recommendation14.12.2.1As required from NTPAs requiredSJ
FOS status outfitting and consumables recommendation14.12.2.2As required from NTPAs requiredSJ
Integrated Logistics Support (ILS) program14.12.4As required from NTPAs requiredSJ
Recommended logistics support documentation14.12.4.1Upon ship redelivery from NTPEmailUpon ship redeliverySJ
Spare parts list in NSE14.12.5.1As required from NTPAs requiredSJ
ABS approved As-Built Plans14.12.6.7Within 6 weeks of completion of install from NTPEmailElectronicWithin 6 weeks of completion of installCOR
USCG/ABS Certificates14.12.6.8.1As required from NTPAs requiredSJ
Engineering Operating Manual14.12.7.1Within 90 days following AwardNSEElectronicWithin 90 days following awardCOR
Deck Operating Manual14.12.7.2Within 90 days following AwardEmailElectronicWithin 90 days following awardCOR
ABS PM/CM14.13.1Within 12 months of establishment of NSE equipment hierarchy from NTPEmail/NSEElectronicWithin 12 months of establishment of NSE equipment hierarchyCOR
SSMP14.13.1As required from NTPEmailElectronicAs requiredEmail SJ
SSMP in NSE14.13.4Within 90 days after award from NTPWithin 90 days after awardSJ
Equipment requiring maintenance list in NSE14.14.2As required from NTPAs requiredSJ
Electronic copies of all equipment operations technical manuals uploaded and indexed in NSE14.14.3As required from NTPNSEElectronicAs requiredNSE SJ
Validate CargoMax is operating properly preliminary as submitted to ABS14.15.414 days prior to scheduled vship upgrade Sea Trial from NTPemail/NSEverbally/email14 days prior to scheduled ship upgrade Sea TrialCOR
Sea Trial Schedule14.15.6NLT 14 days prior to ship upgrade Sea Trials from NTPemail/NSEElectronicNLT 14 days prior to ship upgrade Sea TrialsCOR
Sea Trial Report14.15.7Upon Completion of actionemail/NSEElectronic10 days after completion of actionCOR
Final Ship Shipyard/Dockside Modification Plan(s) to be delivered to MARAD14.15.8Within 6 weeks of ship delivery from NTPWithin 6 weeks of ship deliverySJ
VCM SOPEP14.16.1Upon ship redelivery from NTPemailUpon ship redeliverySJ
VSP14.16.3Upon ship redelivery from NTPUpon ship redeliverySJ
HWMP (home port(s)) VCM14.16.4withing 30 days from arrival at layberth6 months after shipyard (for upgrade) awardSJ
Survey and soundings of fuel oil/lube oil onboard ship(s) reports14.16.6As required from NTPAs requiredSJ
Written notice of ClaimsG.7.5.1.1Immediately, as soon as practicableEmailElectronicAs requiredACO/COR
Affidavit of United States CitizenshipH.9.bWithin 30 days of NTPEmailElectronicAs changes occurPCO
MCC Email Address: opcentr1.marad@dot.govSJ
MAR-610 Email Address: douglas.harrington@dot.govSJ

&F

&F

J-4 Deliverables

HQAM APR 03 2017

J-4 Deliverables

HQAM OCT 06 2016

&F

Prepared by: MARAD, Office of Ship Operations, MAR-610 Page &P of &N

Prepared by: MARAD, Office of Ship Operations, MAR-610 Page &P of &N

Prepared by: MARAD, Office of Ship Operations, MAR-610 Page &P of &N

File details come from the government source that posted it. Updated .