Attmt_II_Vendor_Price_Sheet.xls
XLS spreadsheet 71 KB Posted
- Attached to
- TS FREEDOM STAR FY18 REPAIR PACKAGE
- Solicitation number
- 6933A218Q000020
About this file
Attachment II Vendor Price Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Diesel_Oil_Pump_Motor.pdf | ||
| Liferaft_Certificates_2017.pdf | ||
| Jacket_Water_Heaters.docx | DOCX document | |
| Tees_Gill_Parts_List.pdf | ||
| 6933A218Q000020_combined_synp_sol.pdf | ||
| FY_18_TSFS_WD_Pier_Side_Repairs.pdf | ||
| 2017_Annual_Firefighting_Equipment.pdf | ||
| Data-Sheet-CSM-DS-CSM-E.pdf | ||
| SCBAs_Parts_List.pdf | ||
| Safety_Radio_Parts_List.pdf | ||
| 1427-555,_Rev_-,_TV_FREEDOM_STAR,_FIRE_AND_SAFETY_PLAN.pdf | ||
| Diesel_Oil_Pump.pdf | ||
| Attmt_I_SOW_TSFS_2018_Fall_Items.docx | DOCX document | |
| Mooring_Line_Parts_List.pdf | ||
| Freedom_Star_Imm_Suit_Inv_2018.docx | DOCX document | |
| Tach_Installation_Manual.pdf | ||
| 10-2017_Radio_Survey.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Availabilty Summary Estimate
| Freedom Star Vendor Price Sheet Attachment II | |||||
| Item No. | Title / Description | Material, Misc & Other Costs | |||
| Total Labor Cost | Total Cost estimate | ||||
| SECTION 200: WORK ITEMS | |||||
| 1 | Stern Thruster Parts, Procure | $ - 0 | |||
| 2 | SCBA's, Procure | $ - 0 | |||
| 3 | Motorola Walkie Talkie Radios; Procure | $ - 0 | |||
| 4 | Jacket Water Heaters on Main Engines, Install | $ - 0 | |||
| 5 | Liferaft Annual Service and Recertification | $ - 0 | |||
| 6 | Annual Firefighting Equipment Inspection/Service | $ - 0 | |||
| 7 | Annual Ship Safty Radio Survey | $ - 0 | |||
| 8 | Immersion Suit Servicing and Pressure Testing | $ - 0 | |||
| 9 | Mooring Lines, Procure | $ - 0 | |||
| 10 | #1 Diesel Oil Transfer Pump, Rebuild | $ - 0 | |||
| 11 | Digital Tachometers and Hour Meters, Install | $ - 0 | |||
| 12 | Supplemental Labor | $ - 0 | |||
| 13 | Supplemental Materials | $ - 0 | |||
| Total | $ - 0 |
Individual Item Estimates
| Job Title: | Item 1 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | $0.00 | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 2 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 3 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 4 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | 100.0 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 100.0 | ||||
| Job Title: | Item 4 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | 0.0 | $0.00 | ||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 5 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | 107.7 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 107.7 | ||||
| Job Title: | Item 6 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | $0.00 | |||
| Engineering Services | 107.7 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 107.7 | ||||
| Job Title: | Item 7 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | 33.3 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 33.3 | ||||
| Job Title: | Item 8 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | $0.00 | |||
| Engineering Services | 107.7 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 107.7 | ||||
| Job Title: | Item 9 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | 0.0 | $0.00 | ||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 10 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | 68.2 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 68.2 | ||||
| Job Title: | Item 11 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | 124.5 | Tech Rep | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 124.5 | ||||
| Job Title: | Item 12 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | $0.00 | |||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 13 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | $0.00 | |||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 |
File details come from the government source that posted it.