Attachment I SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Diesel_Oil_Pump_Motor.pdf | ||
| Liferaft_Certificates_2017.pdf | ||
| Jacket_Water_Heaters.docx | DOCX document | |
| Tees_Gill_Parts_List.pdf | ||
| 6933A218Q000020_combined_synp_sol.pdf | ||
| FY_18_TSFS_WD_Pier_Side_Repairs.pdf | ||
| 2017_Annual_Firefighting_Equipment.pdf | ||
| Data-Sheet-CSM-DS-CSM-E.pdf | ||
| SCBAs_Parts_List.pdf | ||
| Safety_Radio_Parts_List.pdf | ||
| 1427-555,_Rev_-,_TV_FREEDOM_STAR,_FIRE_AND_SAFETY_PLAN.pdf | ||
| Attmt_II_Vendor_Price_Sheet.xls | XLS spreadsheet | |
| Diesel_Oil_Pump.pdf | ||
| Mooring_Line_Parts_List.pdf | ||
| Freedom_Star_Imm_Suit_Inv_2018.docx | DOCX document | |
| Tach_Installation_Manual.pdf | ||
| 10-2017_Radio_Survey.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment I Training Ship FREEDOM STAR
2018 Fall Items SOW
TABLE OF CONTENTS
Vessel Info
Vessel Particulars
Synopsis
Work Items
Item # 1 STERN THRUSTER PARTS, PROCURE
| Item # 2 | SCBAs, PROCURE | |
| Item # 3 | MOTOROLA WALKIE TALKIE RADIOs, PROCURE | |
| Item # 4 | JACKET WATER HEATERS ON MAIN ENGINES, INSTALL | |
| Item # 5 | LIFE RAFT ANNUAL SERVICE AND RECERTIFICATION | |
| Item # 6 | ANNUAL FIRE FIGHTING EQUIPMENT INSPECTIONS/SERVICE | |
| Item # 7 | ANNUAL SHIP SAFETY RADIO SURVEY | |
| Item # 8 | IMMERSION SUIT SERVICING and PRESSURE TESTING | |
| Item #9 | MOORING LINES, PROCURE | |
| Item # 10 | #1 DIESEL OIL TRANSFER PUMP AND MOTOR, REBUILD | |
| Item #11 | NEW DIGITAL TACHOMETERS AND HOUR METERS, INSTALL | |
| Item #12 | SUPPLEMENTAL LABOR | |
| Item #13 | SUPPLEMENTAL MATERIALS |
VESSEL INFO
MARITIME ADMINISTRATION
The Maritime Administration is the agency within the U.S. Department of Transportation dealing with waterborne transportation. Its programs promote the use of waterborne transportation and its seamless integration with other segments of the transportation system, and the viability of the U.S. merchant marine. The Maritime Administration works in many areas involving ships and shipping, shipbuilding, port operations, vessel operations, national security, environment, and safety. The Maritime Administration is also charged with maintaining the health of the merchant marine, since commercial mariners, vessels, and intermodal facilities are vital for supporting national security, and so the agency provides support and information for current mariners, extensive support for educating future mariners, and programs to educate America’s young people about the vital role the maritime industry plays in the lives of all Americans.
The Maritime Administration also maintains a fleet of cargo ships in reserve to provide surge sea-lift during war and national emergencies, and is responsible for disposing of ships in that fleet, as well as other non-combatant Government ships, as they become obsolete.
The Maritime Administration recently realigned many of its functions, to revitalize its role as an industry facilitator, and to bring greater focus to the areas of environment and safety.
TRAINING SHIP FREEDOM STAR
The vessel serves as a back-up and supplementary training ship for the United States Merchant Marine Academy and the six state maritime academies. The vessel is normally berthed at the Seafarers Harry Lundeberg School of Seamanship (SHLSS). Located in Piney Point, MD, the SHLSS is a vocational school dedicated to preparing students for successful careers as U.S. merchant mariners.
Before being redesigned to serve as a training vessel for students, the Freedom Star served as a solid rocket booster recovery vessel for the National Aeronautics and Space Administration (NASA), retrieving solid rocket boosters following space shuttle launches.
The vessel was transferred to MARAD at the end of the space shuttle program and is berthed at the SHLSS under a Memorandum of Agreement that maintains vessel readiness for MARAD missions at a reduced cost to the government, while also supporting entry-level training for individuals who wish to begin a seafaring career.
VESSEL PARTICULARS
| NAME: | T.S. FREEDOM STAR | ||||
| TYPE: | Twin-screw Diesel CPP | ||||
| OFFICIAL REGISTRY NUMBER: | 629627 | ||||
| IMO Number | 7925314 | ||||
| RADIO CALL SIGN: | KRFB | ||||
| CLASSIFICATION: | ABS | ||||
| BUILDER: | Atlantic Marine Inc., Ft. George Island, FL. | ||||
| DELIVERED: | 01 September 1981 | ||||
| LENGTH OVERALL: | 176’ 00” | ||||
| LENGTH BETWEEN PERP. | 166” 00” | ||||
| BEAM: | 37’ 01.5” | ||||
| Depth Molded : | 15’ 00” | ||||
| DESIGN DRAFT: | 12’ 00” | ||||
| Docking Displacement: | 725 Long Tons (ESTIMATED) | ||||
| Lightship Weight; | 633.91 Long Tons | ||||
| VCG: | 15.08 Ft. ABL | ||||
| LCG: | 3.08 Ft. Aft of amidships | ||||
| USCG GROSS TONNAGE: | 484 tons | ||||
| USCG NET TONNAGE: | 329 tons | ||||
| CRUISING SPEED: | 12 knots | ||||
| COMPLEMENT: | 24 | ||||
| USCG CERTIFICATION: | Public Nautical School ship | ||||
| ABS CLASSIFICATION: | †A1;†AMS;†DPS-O | ||||
| MAIN ENGINES: | Two (2) GM-EMD 12-645E6A | ||||
| MAIN GENERATORS: | Two Kato 166 kW, 440 VAC, 3 Phase | ||||
| BOW THRUSTER: | Verharr Omega OCP 400 | ||||
| STERN THRUSTER; | Tees White Gill KAZ 906858 360 Degree Water Jet | ||||
| DIESEL FUEL CAPACITY: | 46,781 U.S gallons | ||||
| WATER BALLAST CAPACITY: | 30,904 U.S. gallons | ||||
| FRESH WATER CAPACITY: | 5,128 U.S. gallons | ||||
| WASH WATER CAPACITY: | 17,160 U.S. gallons |
SYNOPSIS: TV FREEDOM STAR – FY18 REPAIR PACKAGE
Intent: It is the intent of the Maritime Administration to solicit Industrial Support to accomplish repairs and purchase required equipment including installing digital tachometers and hour meters for the SSDGs, rebuilding the #1 Diesel Oil Transfer Pump, Installing jacket water heaters for the main engines, procuring bow thruster parts, performing annual lifesaving and firefighting equipment services in conjunction with USCG, procuring SCBAs, Firefighting Radios and a Portable Gangway.
Background: The TS FREEDOM STAR is a U.S. Government owned training ship provided to the Harry Lundeberg School of Seamanship for the purpose of training young men and women for a career in the U.S. Maritime Industry. The ship is part of the National Defense Reserve Fleet (NDRF) and maintains a U.S. Coast Guard Certificate of Inspection (COI) and American Bureau of Shipping (ABS) Classification.
As a Public Nautical School Ship and Cargo Ship (non-tanker), the regulations of 46 CFR 167, in addition to ABS Rules and SOLAS Regulations for a Cargo Ship (non-tanker), govern all work performed aboard.
Period of Performance: The overall period of performance for this SOW shall be from September 10, 2018 through December 21, 2018. The vessel has scheduled monthly cruises that will have to be worked around, these are three days total in duration.
| 08/15 – 08/17 | Site Inspection is scheduled for 08/14 |
| 09/05 – 09/07 | Period of Performance begins September 10th |
| 10/10 – 10/12 | The Liferafts and Immersion suits should be sent ashore, annual firefighting and radio inspections/service should be scheduled for week of October 15th. |
| 11/13 – 11/15 | USCG COI scheduled for November 5th |
Location: The TS FREEDOM STAR is moored alongside her pier at the Seafarer’s Harry Lundeberg School of Seamanship located at 45353 Saint Georges Avenue, Piney Point, Maryland 20674-0075. Site Inspection Scheduled for August 14th, 2018.
Contracting Office Address: Office of Acquisition 7737 Hampton Boulevard, Building 19, Suite 300 Norfolk, Virginia 23505 United States Primary Point of Contact:
Secondary Point of Contact:
Milton G Spears,
| Monique Leake |
| Milton G Spears, |
Contracting Officer
Contracts Specialist
Monique. leake@dot.gov glen.spears.ctr@dot.gov
Phone: (757) 322-5820
Phone: (757) 593-3540
WORK ITEMS:
| ITEM 01 | STERN THRUSTER PARTS, PROCURE |
| 1 | ABSTRACT: |
| The Intent of this work scope is for the contractor to procure the remaining parts necessary to rebuild / overhaul the stern thruster. The list of parts has been derived from what the OEM Tees White Gill Thrusters in the UK said we needed subtracting what we already have in the Cheatham Annex warehouse. |
| 2 | REFERENCES/ENCLOSURES: |
| Parts List Enquiry No. 18303 Rev 1 |
| 3 | ITEM LOCATION |
| Stern thruster Space. |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| NA |
| 5 | STATEMENT OF WORK: |
| The Contractor is to procure the list of parts in the attached reference from the OEM and deliver them to the MARAD warehouse in Cheatham Annex, VA. |
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job, a copy of the parts list provided is to be emailed to the COR in electronic format documenting the work that was accomplished on this item. |
7 NOTES:
Questions are to be addressed to the vessel’s COR:
Tim McGeein, Marine Surveyor Phone: (757) 322-5811 Blackberry: (202) 617-6912 Timothy.mcgeein@dot.gov
ITEM 02 SCBAs, PROCURE
| 1 | ABSTRACT: |
| Provide all labor and material to procure and deliver two new MSA G-1 SCBA Complete Sets and two new MSA Cylinder Assemblies. |
| 2 | REFERENCES/ENCLOSURES: |
| MSA Government Parts Template. |
| 3 | ITEM LOCATION |
| Forecastle Deck, Port Side, Approximately Frame 35. |
4 OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: na
| 5 | STATEMENT OF WORK: |
| Provide two each of all the MSA equipment detailed below: |
Qty Material No Description
| 2 ea. | A-G1FS | Configuration Options: |
| 441MA1C1LCR | SYSTEM_PRESSURE: 4 4500 PSIG |
CYLINDER_CONNECTION: 4 CGA Quick Connect Remote Con HARNESS: 1 Standard without Chest Strap CRADLE_TYPE: M Metal Band LUMBAR_TYPE: A Adjustable Swivel Lumbar Pad REGULATOR_TYPE: 1 Purge Cover Left Shd.
REGULATOR_HOSE_TYPE: C Continuous EMERGENCY_BREATHING_SUPPORT: 1 Remote Quick Fill SPEAKER_MODULE: L Left Chest PASS: C PASS Telemetry Right Shd BATTERY_TYPE: R Rechargeable
2 ea. 10156459 Medium G1 Facepiece with 4pt Harness and Medium Nose Cup
2 ea. 10158402 Kit, Retainer, Cyl Valve, Type 5
2 ea. 10149702-SP Adapter, Quick Connect, 4500/5500
2 ea. 10158385 MSA G1 Smart Charger
2 ea. 10156426-SP Cyl. Assy, G1, RC, 4500 psig, 60min, Pkgd
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| All associated certifications, owner’s and user’s manuals. All deliveries to be sent to the SHLSS, attention of the Chief Engineer. |
7 NOTES: NA
ITEM 03 MOTOROLA RADIOS, PROCURE
| 1 | ABSTRACT: |
| Provide all labor and material to procure and deliver four new Motorola APX 4000 UHF Radios with all the associated upgrades and equipment detailed. |
| 2 | REFERENCES/ENCLOSURES: |
| Tidewater Communications Parts List |
| 3 | ITEM LOCATION |
| Forecastle Deck, Port Side, Approximately Frame 35; and Bridge |
4 OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: na
| 5 | STATEMENT OF WORK: |
| Provide four each of all the Motorola equipment detailed below: |
Qty MPN Description
4 ea. H51QDF9PW61NA APX 4000 UHFR1 MHZ MODEL 2 PORTABLE
4 ea. QA04865 ADD: TWO KNOB CONFIGURATION
4 ea. QA02829 ENH: ANALOG CONVENTIONAL
4 ea. H499 ENH: SUBMERSIBLE (DELTA T)
4 ea. QA04934 ALT: IMPRES LI-ION 2500MAH RUGGED UL
4 ea. PMPN4174 CHRGR DESKTOP SINGLE UNIT IMPRES
8 ea. NNTN8560 BATT IMPRES LIION TIA4950 IP67 2500T
4 ea. PMMN4062 ASSY, ACCESSORY, MICROPHONE, PLUS RSM
Program Radios with the following pre-programmed frequencies:
Simplex Channels 1-8 : 457.5250 MHz – CH 1
457.5500 MHz – CH 2
457.5750 MHz – CH 3
457.6000 MHz – CH 4
467.7500 MHz – CH 5
467.7750 MHz – CH 6
467.8000 MHz – CH 7
467.8250 MHz – CH 8
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Radios to be pre- programmed with desired channels. Provide all associated certifications, owner’s and user’s manuals. All deliveries to be sent to the SHLSS, attention of the Chief Engineer. |
7 NOTES: Eight total batteries so there is a spare for each radio.
ITEM 04 INSTALL JACKET WATER HEATERS ON MAIN ENGINES
| 1 | ABSTRACT: |
| The Intent of this work scope is to install two new jacket water heaters on the port and starboard main propulsion engines. |
| 2 | REFERENCES/ENCLOSURES: |
| Data-Sheet-CSM-DS-CSM-E.pdf, Pictures of water heater and marine controllers |
| 3 | ITEM LOCATION |
| Engine Room |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| Two HOTSTART 12000w 480v 60 hz, 3 PH, jacket water heaters |
| 5 | STATEMENT OF WORK: |
| The Contractor is to provide labor and materials to install two government furnished Hotstart’s CSM Hotflow heating system jacket water heaters. Model # CSM31204-000, CSM Style B with flange pump. 12000w 480v 60 hz, 3 PH. One on the port main engine and one on the starboard. Contractor must build bracket for each heater to mount to angle iron in deck in front of main engines. It may be necessary to cut the deck plating and weld in new braces for support. Heaters need to be mounted to newly manufactured bracket. New disconnect boxes to be wired in place of old ones and wires run from boxes to heaters. There is wire already run from the main panel to the electrical boxes that is to be replaced. There are 2 engine drains in front of the engine that will be used to connect the plumbing to each of the heaters. |
The following are the estimated minimum (not all inclusive) parts required to be provided by contractor:
Stainless:
4- 1 1/4 inch x 1 inch reducers 4- 1 inch street elbow 8- 1 inch nipples 4- 1 inch tees 4- 1 inch ball valves 4- 1 inch plugs 8- 1 inch JIC x 1 inch NPT male both ends
Steal braided hoses 4- JIC female 1 inch hoses both ends 2- 3 feet in length 2- 4 feet in length
2 Motor Controller Disconnect electrical boxes to supply power to heaters 150 ft. of wire
Stand for heater 2- steel plates 10 inches x 5 inches 1/4 inch thick 10 feet of angle iron
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job a full report is to be issued and emailed to the COR in electronic format documenting the work that was accomplished on this item. Proper operation will be demonstrated to the Chief Engineer. |
7 NOTES: na
ITEM 05 LIFE RAFT ANNUAL SERVICE AND RECERTIFICATION
| 1 | ABSTRACT: |
| The Intent of this work scope is to accomplish annual ABS / USCG servicing service and recertification of four (4) VIKING Model 25DK+ life rafts. |
| 2 | REFERENCES/ENCLOSURES: |
| 2017 Certificates of Reinspection |
| 3 | ITEM LOCATION |
| Forecastle Deck, Frame 32, port and starboard. |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| na |
| 5 | STATEMENT OF WORK: |
| The Contractor is to provide labor and materials to remove from vessel, pick up and transport the life rafts to a USCG approved life raft inspection/repair facility. |
The Contractor is to conduct all annual tests and inspections required by USCG CFR 160.051-6 and SOLAS 96 regulations. This shall include the upper/lower pressure test, stretch test, inner / outer light test, NAP test, and floor strength test.
The Contractor is to use the provided list for each vessel to quote those items that would be required given the information provided.
For bidding purposes the Contractor is to provide unit pricing for new 2-year disposable hydrostatic releases. The Contractor is to replace hydrostatic releases that are either due or damaged which will be subject to additional costs and a change order.
The Contractor is to plan for renewal of all bands, clips, and annual container straps in his quoted inspection price.
The Contractor is to provide unit pricing for the 5 year testing inclusive of cylinder hydro, refilling and cutting disc.
Contractor to include in the bid the cost of replacing all annually required items including but not limited to, food, water, cement, batteries and sea cells. Any additional replacements (other than those listed above) shall be completed through a modification to the purchase order.
Upon completion of the certification the life rafts are to be delivered to the vessel and installed onboard. All certificates are to be delivered prior to installation of the life rafts and hydrostatic releases.
The Contractor is to provide a written list to the port engineer of all items requiring replacement which are not included in this quote and will be done under a change order.
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job a full report is to be issued and emailed to the COR in electronic format documenting the work that was accomplished on this item. |
7 NOTES:
The contractor is to complete item as soon as possible as this is a readiness issue.
Deviation from this schedule is allowable only with written consent from vessel COR.
ITEM 06 ANNUAL FIRE FIGHTING EQUIP. INSPECTIONS/SERVICE
| 1 | ABSTRACT: |
| The intent of this work scope is to provide all materials and labor to accomplish Annual Fire Fighting and Safety Equipment inspections with resultant certifications as specified in accordance with USCG and ABS regulations. All inspections, servicing, repairs and tests shall be conducted by an ABS & USCG certified Fire Fighting & Safety Equipment Service Company. |
2.0 REFERENCES/ENCLOSURES:
2.1 Vessel Fire Plan- Drawing 1427-555
2.2 Manual for systems not included in Ref 2.3- see Chief Engineer.
2.3 Code of Federal Regulations 46 CFR 176.810 fire protection by reference-not attached
2.4 2017 Annual Firefighting Equipment Inspection Report
| 3 | ITEM LOCATION / DESCRIPTION |
| All work shall be performed aboard the Training Ship Freedom Star which is moored alongside her pier at 45353 St Georges Ave, Piney Point, MD 20674 |
3.1 LOCATION: Throughout the vessel’s working, cargo and habitation spaces, excluding the inside of enclosed tanks, voids cofferdams or sumps.
3.2 DESCRIPTION: Regulatory Required Inspections, servicing, tests and selected repairs for the following systems. Repairs as noted
3.2.1 Portable Fire extinguishers
3.2.2 Fixed Halon and FM 200 Fire Fighting Systems
3.2.3 Fireboy-Xintex Fire Detection System
3.2.4 General Alarm Systems
3.2.5 SCBA Systems
3.2.6 Fire stations to extent defined
4 OWNER FURNISHED EQUIPMENT / MATERIAL / SERVICES:
4.1 Operating Engineers to support cycling of equipment - starting and securing same as needed to support surveys. Contractor shall coordinate 24 hours in advance any operation requiring crew involvement
4.2 Crane service to upload equipment to Main Deck Aft. This will include Crane operator and spotters only.
4.3 Free access to locations as needed throughout the vessel.
4.4 The Ship’s crew will assist contractor hydro testing of fire hoses and inspection of fire stations.
5 STATEMENT OF WORK:
| 1. | Perform Annual Inspection, Maintenance & Testing of All Portable Fire Extinguishers |
| 1.1. | Intent & Description: It is the intent of this line item for the Contractor to provide all labor and materials necessary to accomplish all required inspections, maintenance and testing the portable extinguishers listed below. The maintenance required to be performed is determined by the manufactured (Mfg.) date and/or last 6 year hydrostatic (Hydro) test date or recharge (rch.) date. Estimate thirty (30) fifteen pound CO2, one 9 pound halon, and one 5 pound halon. One each 2.5#, 5#, and 10# ABC dry chemical fire extinguishers. |
| 2. | Perform Annual Inspection, Maintenance & Testing of All Halon and FM 200 Systems: |
| 2.1. | Intent & Description: It is the intent of this line item for the Contractor to provide all labor and materials necessary to accomplish all required inspections, maintenance and testing of the fixed extinguishing systems. At a minimum, this testing will include the weighing and inspection of all cylinders, the testing of all pull boxes and cables, timers, shutdown switches, sirens, and the inspection of all hoses, piping and nozzles. The Contractor is responsible to demonstrate the satisfactory operation of all fixed extinguishing systems to the attending USCG inspector. One 682# Halon, One 80# FM 200 and one 45# FM 200 system. |
| 2.1.1. | The Contractor shall hydrostatically test and cylinder hoses as needed and identified by the COR. |
| 2.1.2. | The ship’s crew will be available to start and reset all ventilation fans, pumps and generators, as necessary, for the demonstration of their required shutdowns. |
| 2.1.3. | The Contractor shall provide 3 copies of all inspections, maintenance and testing records to the COR on the appropriate NFPA forms. |
| 3. | Perform Annual Inspection, Maintenance & Testing of The Fireboy-Xintex Elite RSM Fire Detection System: |
| 3.1. | Intent & Description: It is the intent of this line item for the Contractor to provide all labor and materials necessary to accomplish the annual inspection, maintenance and testing of the Fire Detection system. Contractor shall be responsible to demonstrate the satisfactory operation of this system to the attending USCG inspector. |
| 3.1.1. | The Contractor shall test each of the sensors, as identified on the vessel fire plan, for proper operation. |
| 3.1.2 | The Contractor shall inspect and clean the internals of the indicator panel. |
| 3.1.3 | The Contractor shall provide 3 copies of all inspections, maintenance and testing records to the COR on the appropriate NFPA forms. |
| 4 | General Alarm Systems: |
| 4.1 | Intent & Description: It is the intent of this line item for the Contractor to provide all labor and materials necessary to accomplish the annual inspection, maintenance and testing of the General Alarm Systems to include the testing of all fire alarm stations, bells and pulls. |
| 4.1.2 | Contractor shall be responsible to demonstrate the satisfactory operation of this system to the attending USCG inspector. |
| 5 | Inspect and Service SCBAs |
| 5.1 | Intent & Description: It is the intent of this item for a Contractor, certified by MSA in the maintenance and repair of the MSA Firehawk model SCBAS, to inspect and service, two SCBAs in accordance with the requirements of 49 CFR 180.205, the NFPA and the original equipment manufacturer (MSA). That servicing shall include, at a minimum, the following: Annual service, cleaning, flow test and bench test of SCBAs. Hydrostatic test of needed cylinders. |
Perform VIP inspection of two cylinders The cylinders and packs shall be made available to the Contractor for pick up on the pier. The Contractor shall transport the SCBAs to his facility for testing and repairs, and return them pier-side upon the completion of all work.
The Contractor shall provide the COR with a Condition Report and repair quote for any needed repairs or replacements required beyond normal servicing.
| 6 | Fire Stations |
| 6.1 | Intent & Description: It is the intent of this line item for the Contractor to provide all labor and materials necessary to accomplish all required inspections, maintenance and testing of the ten fire stations. At a minimum, this testing will include the hydro testing the fire hoses, the testing of all nozzles, piping, valves and cut offs. |
7 The Contractor shall provide 3 copies of all inspections, maintenance and testing records to the COR on the appropriate NFPA forms.
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| The standard working hours are dayshift only Monday thru Friday between the hours of 0800 to 1600 excluding holidays. For safety reasons any contractor wishing to perform work outside of these hours is to make arrangements with the Shore Staff in advance. |
Any growth work that is accomplished without written approval from the Contracting Officer’s Representative (COR) is done so at the Contractor’s risk.
Any deficiencies found during the duration of this item are to be documented in electronic format and submitted to the COR in a timely manner.
Upon completion of this job a full report is to be issued and emailed to the Port Engineer in electronic format documenting the work that was accomplished on this item.
7 NOTES:
This work shall begin on a mutually agreed date between MARAD, the Contractor and the TS Freedom Star’s Chief Engineer. Questions are to be addressed to the vessel’s COR.
| ITEM 07 | ANNUAL RADIO SURVEY, PERFORM |
| 1 | ABSTRACT: |
| The intent of this item is to complete an Annual Ship Safety Radio Survey to satisfy all applicable Regulatory bodies. |
| 2 | REFERENCES/ENCLOSURES: |
| American Bureau of Shipping (ABS) Check Sheet on SOLAS Surveys - SLR/ GMDSS. |
American Bureau of Shipping (ABS) Check Sheet on SOLAS Surveys – “AIS” Radio Technician’s Survey.
American Bureau of Shipping (ABS) Check Sheet on SOLAS Surveys - SSAS.
2017 Radio Survey and Inspection Report
| 3 | ITEM LOCATION |
| Vessel’s Bridge and Radio Room. |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| na |
| 5 | STATEMENT OF WORK: |
| Contractor shall provide a qualified technician to visually inspect and test in operation Global Marine Distress Signaling System (GMDSS), Automatic Identification System (AIS), Ship Security Alert System (SAS), and the Emergency Position Indicating Radiobeacon (EPIRB), in order to verify that the equipment is satisfactory for obtaining an ABS issued Radio Safety Survey Certificate and USCG. References shall be used by the technician to perform inspections. All equipment listed on the references shall be inspected. Where adjustments can be readily made to the equipment, in order to achieve satisfactory operation, the technician shall make such adjustments as part of his inspections and tests. |
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| In addition to providing a service report noting all work performed, the technician shall fill out and submit references 2.1, 2.2, and 2.3 to the COTR for forwarding to ABS. |
7 NOTES:
Not Applicable
ITEM 08 IMMERSION SUIT SERVICING AND PRESSURE TESTING
| 1 | ABSTRACT: |
| The Intent of this work scope is to accomplish required ABS / USCG Immersion Suit Inspection, Maintenance and Air Pressure Testing on the 50 (fifty) suits presently onboard the vessel. |
| 2 | REFERENCES/ENCLOSURES: |
| Immersion Suit inventory. |
| 3 | ITEM LOCATION |
| Various Locations, port and starboard. |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| na |
| 5 | STATEMENT OF WORK: |
| The Contractor is to provide labor and materials to remove from vessel, pick up and transport the Immersion suits to a USCG approved Immersion life raft inspection/repair facility and return to the vessel upon completion. |
Immersion Suit Inspection, Maintenance and Testing Requirements. 46 CFR 28.140 requires the master or individual in charge of a commercial fishing vessel must ensure that each item of lifesaving equipment be maintained in good working order, ready for immediate use, and readily accessible before the vessel leaves port and at all times when the vessel is operated. This equipment must be maintained and inspected; (1) In accordance with table 28.140 (which in the case of Immersion Suits, requires them to be annually inspected, cleaned and repaired as necessary) – AND – (2) In accordance with manufacturer’s guidelines. Manufacturer’s Guidelines has confirmed to the Coast Guard that they require air pressure testing as part of their prescribed servicing and inspections. Immersion suit manufacturers recommend a complete inspection of your immersion suit by a certified inspection and repair facility at intervals not exceeding every 2 years. Immersion suits 5 years old should be inspected annually
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job a full report is to be issued and emailed to the COR in electronic format documenting the work that was accomplished on this item. |
7 NOTES:
The contractor is to complete item as soon as possible as this is a readiness issue.
Deviation from this schedule is allowable only with written consent from vessel COR.
| ITEM 09 | MOORING LINES, PROCURE |
| 1 | ABSTRACT: |
| The Intent of this work scope is for the contractor to provide all parts and labor to procure two mooring lines for the vessel and deliver them to the SHLSS. |
| 2 | REFERENCES/ENCLOSURES: |
| Rope Inc. Sheet |
| 3 | ITEM LOCATION |
| Forecastle |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| NA |
| 5 | STATEMENT OF WORK: |
| The Contractor is to procure two purple plasma 12 strand mooring lines that are 1.5” in Diameter and 200 feet long with 3 foot long Cordura covered eyes at each end. |
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job, the certificates of compliance for the mooring lines are to be delivered and a copy emailed to the COR in electronic format documenting the lines in this item. |
7 NOTES: NA
ITEM 10 OVERHAUL #1 DIESEL OIL TRANSFER PUMP AND MOTOR
| 1 | ABSTRACT: |
| The Intent of this work scope is to rebuild the #1 diesel oil transfer pump and motor. The pump is a Viking Model HL93 for Motor HL93IM |
| 2 | REFERENCES/ENCLOSURES: |
| Pump parts list and Motor Dwg # GV-897 |
| 3 | ITEM LOCATION |
| Lower Deck, Stbd Side, Approximately Frame 60 |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| na |
| 5 | STATEMENT OF WORK: |
| The Contractor is to provide all labor and materials to disassemble the pump and motor, rebuild, reinstall and test same. For the motor this will involve cleaning, dipping, baking and changing all gaskets, bearings and bushings. The pump shall be cleaned, and have new gaskets, bearings, seals, bushings and o-rings installed. Upon completion of the overhaul the motor and pumps are to be reinstalled and tested to the satisfaction of the Chief Engineer. |
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job a full report is to be issued and emailed to the COR in electronic format documenting the work that was accomplished on this item. |
7 NOTES:
The contractor is to complete item as soon as possible between training cruises as this is a readiness issue. Deviation from this schedule is allowable only with written consent from vessel COR.
ITEM 11 INSTALL NEW TACHOMETERS AND HOUR METERS
| 1 | ABSTRACT: |
| The Intent of this work scope is to install new digital tachometers on the port and starboard Ship’s Service Diesel Generators (SSDG) and the bow and stern thrusters. This will replace the analog tachometer gauge on the port SSDG and replace the missing gauges on the stbd generator, stern thruster and bow thruster. We also want three additional gauges mounted on the engine room main console that are repeaters of the port and starboard SSDGs and the stern thruster. This will enable the engineers to quickly see the RPM’s on these three pieces of machinery upon entering the engine room. The bow thruster already has a tachometer in the wheelhouse but needs one installed locally in the bow thruster space. |
| 2 | REFERENCES/ENCLOSURES: |
| Tachometer Installation and Operation Manual |
| 3 | ITEM LOCATION |
| Engine Room, Stern Thruster Space and Bow Thruster Space. |
| 4 | OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES: |
| na |
| 5 | STATEMENT OF WORK: |
| The Contractor is to provide labor and materials to install new digital tachometers on the port and starboard Ship’s Service Diesel Generators (SSDG) and the bow and stern thrusters. The tachometers are manufactured by Aetna Engineering and the following are the minimum (not all inclusive) amount of parts required: |
Four (4) each 8402 R-P-DS Need 3 to mount in engineers control console and one for a ship’s spare
Five (5) each 8402 R-P-H-DS Need 4 to mount locally to monitor RPMs and keep engine hours and one for a ship’s spare.
Four (4) each 8902 Sender Dual Output. Need 3, one each for the stbd SSDG, port SSDG and stern thruster engine and one for a ship’s spare. The Bow thruster already has one.
The installation will require the proper wiring and three holes being cut into the aluminum engineer’s console which is approximately 40 feet removed from the SSDGs and 50 feet from the stern thruster space. The stern thruster is separated from the engine room by a class A-0 bulkhead.
| 6 | PERFORMANCE CRITERIA/DELIVERABLES: |
| Upon completion of this job a full report is to be issued and emailed to the COR in electronic format documenting the work that was accomplished on this item. Proper operation will be demonstrated to the Chief Engineer. |
7 NOTES:
http://www.aetnaengineering.com/model-8402-led-tachometer/
ITEM : 12 SUPPLEMENTAL LABOR
Contractor shall furnish a unit price quote for 100 man-hours of supplemental labor. This shall be a fully burdened labor rate, and is applicable seven days a week (i.e. no overtime, penalty time or other escalations will apply). These hours will only be allocated for industrial labor. Supervision, management, QA, and other such labor is considered part of the rate burden.
Supplemental hours, if authorized, will be allocated by the COR via Delivery Orders.
ITEM : 13 SUPPLEMENTAL MATERIAL
Contractor shall provide an allowance for up to $8,000.00 in Supplemental Material charges. There shall be no burden on these charges for either subcontracted costs or material charges. If Supplemental Material is required, it will be allocated by the COTR via Delivery Orders.
Supplemental material, if authorized, will be allocated by the COR via Delivery Orders.
image1.jpeg image2.png image3.png