6-Trench Safety Act Requirement.docx

DOCX document 41 KB Posted

Attached to
Upper-Level Roadway Improvements, Phase 3 at FLL
Solicitation number
PNC2132347C1
Issued by
Broward County, Fort Lauderdale City, Florida

About this file

Trench Safety Act Requirement Form for Upper-Level Roadway Improvements, Phase 3 at Fort Lauderdale-Hollywood International Airport

This document is a Trench Safety Act Requirement form issued by Broward County, Florida, for the Upper-Level Roadway Improvements, Phase 3 project at Fort Lauderdale-Hollywood International Airport. The form must be completed and returned with the vendor's submittal, or submitted within three business days of the County's request; failure to comply with these timeframes may result in the vendor being deemed nonresponsive. The project involves essential bridge maintenance and structural repairs at the active airport facility, including the removal and replacement of bridge expansion joints, repair of concrete spalls, crack sealing, bridge jacking, and replacement of bridge bearings. Work is located along the upper and lower level roadway system in front of Terminals 2, 3, and 4, with critical requirements to maintain airport operations and ensure uninterrupted pedestrian and vehicular access throughout execution.

The Trench Safety Act, as incorporated into Florida Statutes (Sections 553.60–553.64), applies to any individual project with trenches exceeding 5 feet in depth and incorporates OSHA excavation safety standards (29 C.F.R. Section 1926.650). Vendors must affirm awareness of these requirements and identify the anticipated method and cost of compliance, including special shoring requirements if applicable. The form provides space for vendors to submit pricing and compliance methods using either an open-end contract format (with unit prices for linear feet of work and square feet of special shoring) or a fixed contract format (with quantity-based pricing). All costs and methods for achieving trench safety compliance are legally binding on the vendor, its employees, and all subcontractors involved in the project.

View the file

Other files

File Type Posted
3-Security Requirements.docx DOCX document
22-Pre-Bid Meeting Sign-in Sheet for Bid No. PNC2132347C1.pdf PDF
2-Subcontractors-Subconsultants-Suppliers Requirement.docx DOCX document
13-Airport Addtl Req BCF 170 - final (04-21-26).pdf PDF
4-Criminal History Screening Practices Certification.docx DOCX document
20-Bid Bonds, Performance and Payment Bonds, and Surety Qualification Requirements.pdf PDF
5-Lobbyist Registration Requirement Certification.docx DOCX document
8-Standard Instructions to Vendors (Construction BCF 170 Agreements Only).docx DOCX document
12-BCF 170.pdf PDF
19-Insurance Requirements PNC2132347C1.pdf PDF
17-OESBD - DBE Program (rev 2-24-26)(1216534.3).pdf PDF
18-Special Instructions to Vendors - PNC2132347C1.docx DOCX document
15-Wage Rate.pdf PDF
21-Addendum No.1.pdf PDF
10-Certifications for FAA Buy American (For AIP Funded).pdf PDF
9-Vendor Questionnaire - Quotes and Bids.docx DOCX document
14-Drawings PNC2132347C1.pdf PDF
24-Addendum No. 2.pdf PDF
1-Summary of Vendor Rights for Broward County Competitive Solicitations.docx DOCX document
11-Required FAA Notices for Airport Solicitations.pdf PDF
23-Site Visit Sign-in Sheet for Bid No. PNC2132347C1.pdf PDF
7-Litigation History.docx DOCX document
16-Specifications PNC2132347C1.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRENCH SAFETY ACT REQUIREMENT

The completed form should be returned with the Vendor’s submittal. If not provided with the submittal, Vendor must submit the form within three business days after County’s request. Vendor may be deemed nonresponsive for failure to fully comply with the stated timeframes.

Florida Trench Safety Act, Sections 553.60 through 553.64, Florida Statutes, incorporates the Occupational Safety & Health Administration (OSHA) excavation safety standards, 29 C.F.R. Section 1926.650, as Florida's own standards. The Trench Safety Act will apply to any individual project that has trenches in excess of 5 feet deep.

The Vendor, by virtue of the solicitation submission, affirms that the Vendor is aware of this Act, and will comply with all applicable trench safety standards, including any special shoring requirements, if applicable. Such assurance shall be legally binding on all persons employed by the Vendor and subcontractors.

The Vendor is also obligated to identify the anticipated method and cost of compliance with the applicable trench safety standards. The Vendor further identified the costs and methods summarized below: (fill in either the Open-end or the Fixed Contract section)

Open-end Contract:

Description
Unit of Measure
Unit Price
Method
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Click or tap here to enter text.Linear Feet
Click or tap here to enter text.
Special Shoring, if applicable
Square Feet
Click or tap here to enter text.

Fixed Contract:

Description
Unit of Measure
Quantity
Unit Price
Method

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Click or tap here to enter text. Linear Feet

Special Shoring, if applicable
Square Feet

Vendor Name: Click or tap here to enter text.

Form Date 9/9/24