6-Score Sheet - Informational Only.xls

XLS spreadsheet 74 KB Posted

Attached to
AS27-7 Nuclear Lifecycle Innovation Host Agreement Preparation
Solicitation number
AS27-7
Issued by
Utah

About this file

This is a scoring sheet for an RFP issued by the State of Utah Division of Purchasing and conducted by the State of Utah Office of Energy Development for the AS27-7 Nuclear Lifecycle Innovation Host Agreement Preparation project. The procurement seeks a vendor to facilitate, draft, and finalize a comprehensive Host Agreement. The RFP operates on an expedited timeline due to project requirements outlined in Attachment B, with a completion deadline of September 30, 2026. Award will be made to the responsive and responsible vendor achieving the highest score in accordance with Utah procurement code. The purchase order structure has been selected to accommodate the compressed timeframe for this engagement.

The vendor must guarantee fixed pricing through project completion on September 30, 2026. The scoring sheet itself serves as an informational evaluation tool for assessing bidder proposals, though specific scoring criteria, weighting, and point allocations are contained within the referenced attachment. No information regarding set-asides, incumbents, or specific funding amounts and sources is detailed in this scoring document.

View the file

Other files

File Type Posted
5-Attachment C Technical Criteria.docx DOCX document
7-Attachment D Cost sheet.xlsx XLSX spreadsheet
3-Att.-A-PO-Terms-and-Conditions (6).docx DOCX document
1-Claim of Business Confidentiality Updated.pdf.pdf PDF
4-Attachment B Scope of Work.docx DOCX document
2-Vendor Prerequisites - RFP Agency.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Score Sheet

Nuclear Lifecycle Innovation Host Agreement Preparatoin
SOLICITATION # AS27-7
RFP EVALUATION SCORESHEET
Evaluator:Score will be assigned as follows:
0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information
Date:1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner
3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them
5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP
Vendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HVendor IVendor J
Minimum Mandatory RequirementsRFP SectionEvaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)Evaluation (Pass/Fail)
1Vendor MUST upload their response to the Technical Criteria
2Page limit: Not to exceed 15 pages.
0
Vendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HVendor IVendor J
Scoreable Technical CriteriaRFP SectionCriteria Weight% of Tech CriteriaPoints PossibleEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points
EarnedEvaluator Score (0-5)Points

Earned

1Nuclear Regulatory & Fuel Cycle Compliance6033.3%300.000.000.000.000.000.000.000.000.000.000.00
2Intergovernmental Legal & Regulatory Governance6033.3%300.000.000.000.000.000.000.000.000.000.000.00
3Public-Private Partnership (P3) Transactional Structuring3016.7%150.000.000.000.000.000.000.000.000.000.000.00
4Infrastructure Financial Engineering & Capital Modeling3016.7%150.000.000.000.000.000.000.000.000.000.000.00
130.0%0.000.000.000.000.000.000.000.000.000.00
140.0%0.000.000.000.000.000.000.000.000.000.00
150.0%0.000.000.000.000.000.000.000.000.000.00
160.0%0.000.000.000.000.000.000.000.000.000.00
170.0%0.000.000.000.000.000.000.000.000.000.00
180.0%0.000.000.000.000.000.000.000.000.000.00
190.0%0.000.000.000.000.000.000.000.000.000.00
200.0%0.000.000.000.000.000.000.000.000.000.00
210.0%0.000.000.000.000.000.000.000.000.000.00
220.0%0.000.000.000.000.000.000.000.000.000.00
230.0%0.000.000.000.000.000.000.000.000.000.00
900.000.000.000.000.000.000.000.000.000.000.00
Required Technical Point ThresholdRFP SectionMin PercentMin Points Required
70%630.0
* Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price).
Total Evaluation PointsPoints Possible
Total Technical Evaluation Points900.0
Total Cost Evaluation Points100.0
Total Evaluation Points1,000.0

Scoresheet Summary

AS27-7 Nuclear Lifecycle Innovation Host Agreement Preparation
Signatures:Date:
Evaluator 1__________________
Evaluator 2__________________
Evaluator 3__________________
Evaluator 4__________________
Evaluator 5__________________
Minimum Mandatory RequirementsVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
1Vendor MUST upload their response to the Technical Criteria
2Page Limit - not to exceed 15 pages total.
WeightTechnical ScoresVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Criteria #1 - Nuclear Regulatory & Fuel Cycle Compliance
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
60.0Criteria #1 - Total Points (Total Possible Points = 300)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2 - Intergovernmental Legal & Regulatory Governance
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
60.0Criteria #2 - Total Points (Total Possible Points = 300)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3 - Public-Private Partnership (P3) Transactional Structuring
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
30.0Criteria #3 - Total Points (Total Possible Points = 150)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4 - Intergovernmental Legal & Regulatory Governance
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
30.0Criteria #4 - Total Points (Total Possible Points = 150)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Technical Points (Total Possible Points = 900) Minimum Threshold = 6300.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost PointsCost ScoresVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Cost
100.0Cost Points0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Score SummaryVendor AVendor BVendor CVendor DVendor EVendor FVendor GVendor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Total Technical Points (Total Possible = 900)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost Points (Total Possible = 100)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Grand Total Points (Total Possible = 1000)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00

File details come from the government source that posted it. Updated .