6-Score Sheet - Informational Only.xls
XLS spreadsheet 74 KB Posted
- Solicitation number
- AS27-7
- Issued by
- Utah
About this file
This is a scoring sheet for an RFP issued by the State of Utah Division of Purchasing and conducted by the State of Utah Office of Energy Development for the AS27-7 Nuclear Lifecycle Innovation Host Agreement Preparation project. The procurement seeks a vendor to facilitate, draft, and finalize a comprehensive Host Agreement. The RFP operates on an expedited timeline due to project requirements outlined in Attachment B, with a completion deadline of September 30, 2026. Award will be made to the responsive and responsible vendor achieving the highest score in accordance with Utah procurement code. The purchase order structure has been selected to accommodate the compressed timeframe for this engagement.
The vendor must guarantee fixed pricing through project completion on September 30, 2026. The scoring sheet itself serves as an informational evaluation tool for assessing bidder proposals, though specific scoring criteria, weighting, and point allocations are contained within the referenced attachment. No information regarding set-asides, incumbents, or specific funding amounts and sources is detailed in this scoring document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Attachment C Technical Criteria.docx | DOCX document | |
| 7-Attachment D Cost sheet.xlsx | XLSX spreadsheet | |
| 3-Att.-A-PO-Terms-and-Conditions (6).docx | DOCX document | |
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 4-Attachment B Scope of Work.docx | DOCX document | |
| 2-Vendor Prerequisites - RFP Agency.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Score Sheet
| Nuclear Lifecycle Innovation Host Agreement Preparatoin | ||||||||||||||||||||
| SOLICITATION # AS27-7 | ||||||||||||||||||||
| RFP EVALUATION SCORESHEET | ||||||||||||||||||||
| Evaluator: | Score will be assigned as follows: | |||||||||||||||||||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information | ||||||||||||||||||||
| Date: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | |||||||||||||||||||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | ||||||||||||||||||||
| 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | ||||||||||||||||||||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | ||||||||||||||||||||
| 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | ||||||||||||||||||||
| Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Vendor I | Vendor J | |||||||||||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | Evaluation (Pass/Fail) | |||||||||
| 1 | Vendor MUST upload their response to the Technical Criteria | |||||||||||||||||||
| 2 | Page limit: Not to exceed 15 pages. | |||||||||||||||||||
| 0 | ||||||||||||||||||||
| Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Vendor I | Vendor J | |||||||||||
| Scoreable Technical Criteria | RFP Section | Criteria Weight | % of Tech Criteria | Points Possible | Evaluator Score (0-5) | Points | ||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points | ||||||||||||||||||
| Earned | Evaluator Score (0-5) | Points |
Earned
| 1 | Nuclear Regulatory & Fuel Cycle Compliance | 60 | 33.3% | 300.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 2 | Intergovernmental Legal & Regulatory Governance | 60 | 33.3% | 300.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 3 | Public-Private Partnership (P3) Transactional Structuring | 30 | 16.7% | 150.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 4 | Infrastructure Financial Engineering & Capital Modeling | 30 | 16.7% | 150.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 13 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 14 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 15 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 16 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 17 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 18 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 19 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 20 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 21 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 22 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 23 | 0.0% | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 900.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| Required Technical Point Threshold | RFP Section | Min Percent | Min Points Required | ||||||||||||
| 70% | 630.0 | ||||||||||||||
| * Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. The formula to compute the points is: Cost Points x (Lowest Proposed Price/Proposed Price). | |||||||||||||||
| Total Evaluation Points | Points Possible | ||||||||||||||
| Total Technical Evaluation Points | 900.0 | ||||||||||||||
| Total Cost Evaluation Points | 100.0 | ||||||||||||||
| Total Evaluation Points | 1,000.0 |
Scoresheet Summary
| AS27-7 Nuclear Lifecycle Innovation Host Agreement Preparation | |||||||||||||||||||||
| Signatures: | Date: | ||||||||||||||||||||
| Evaluator 1 | __________________ | ||||||||||||||||||||
| Evaluator 2 | __________________ | ||||||||||||||||||||
| Evaluator 3 | __________________ | ||||||||||||||||||||
| Evaluator 4 | __________________ | ||||||||||||||||||||
| Evaluator 5 | __________________ | ||||||||||||||||||||
| Minimum Mandatory Requirements | Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| 1 | Vendor MUST upload their response to the Technical Criteria | ||||||||||||||||||||
| 2 | Page Limit - not to exceed 15 pages total. | ||||||||||||||||||||
| Weight | Technical Scores | Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Criteria #1 - Nuclear Regulatory & Fuel Cycle Compliance | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 60.0 | Criteria #1 - Total Points (Total Possible Points = 300) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #2 - Intergovernmental Legal & Regulatory Governance | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 60.0 | Criteria #2 - Total Points (Total Possible Points = 300) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #3 - Public-Private Partnership (P3) Transactional Structuring | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 30.0 | Criteria #3 - Total Points (Total Possible Points = 150) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Criteria #4 - Intergovernmental Legal & Regulatory Governance | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| 30.0 | Criteria #4 - Total Points (Total Possible Points = 150) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total Technical Points (Total Possible Points = 900) Minimum Threshold = 630 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points | Cost Scores | Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Cost | |||||||||||||||||||||
| 100.0 | Cost Points | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Score Summary | Vendor A | Vendor B | Vendor C | Vendor D | Vendor E | Vendor F | Vendor G | Vendor H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| Total Technical Points (Total Possible = 900) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Total Cost Points (Total Possible = 100) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| Grand Total Points (Total Possible = 1000) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |