This Stage II Invitation to Bid solicitation document is issued by the State of Utah Division of Facilities Construction and Management (DFCM) for electrical construction services at Davis Technical College. The project involves the replacement and relocation of selected transformers and electrical panels throughout the main building at Davis Technical College, identified as Project #27048220. Only contractors who have been prequalified under the Stage I Prequalification for Contractors process and appear on the current DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The construction cost estimate for this project is $300,000.00.

The solicitation imposes a Stage II restriction limiting participation to prequalified contractors, which serves as a significant eligibility requirement and set-aside provision. No specific information regarding response dates, due dates, site visits, bidder conferences, award dates, or contract terms is provided in the available documentation. Contractors should refer to the complete solicitation document for detailed bidding requirements, technical specifications, pricing submission instructions, and all other pertinent conditions governing the bid process and contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor

Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270

Stage II Invitation to Bid for Stage I Prequalified Electrical Contractors Low Bid Procurement for Construction Services

Project budgets up to $3.5M

September 28, 2026

Electrical Transformer and Panel Replacement - Phase 1 Davis Technical College

Kaysville, Utah

DFCM Project #27048220 U3P Reference # CS27019

Project design provided by Lynk Engineers, LLC

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 2

Solicitation Summary The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Electrical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

Electrical Transformer and Panel Replacement - Phase 1 Davis Technical College Kaysville, Utah DFCM Project #27048220 | U3P Reference # CS27019 | Project Manager: Mike Smith Communication during the selection process shall be directed to the DFCM Procurement Team via email at dfcmcontracts@utah.gov.

Brief Project Description: Replacement and/ relocation of selected transformers and electrical panels throughout the main building.

Substantial Completion Date: March 1, 2027 Liquidated Damages: $500.00 per day Construction Budget: $300,000.00 Tax Exempt: Yes ☒ No ☐ Energy Incentives: Yes ☐ No ☒

Solicitation Schedule Event Date Time Location

Solicitation Posting Monday, September 28, 2026 3:00 PM U3P

Mandatory Meeting Thursday, October 8, 2026 1:00 PM

☒In person:

Davis Technical College, RM 1039-B, 550 E 300 S

Kaysville, Utah 84037 ☐Virtual:

Questions Deadline Tuesday, October 20, 2026 3:00 PM U3P

Addendum Deadline Thursday, October 22, 2026 3:00 PM U3P

Bid and Bid Bond Deadline Thursday, October 29, 2026 3:00 PM U3P

Subcontractor Lists Deadline Friday, October 30, 2026 3:00 PM Email to:

dfcmcontracts@utah.gov mailto:dfcmcontracts@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcmcontracts@utah.gov

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 3

Project Details Detailed Project Description/Base Bid:

Davis Technical College is looking to replace selected branch panels and transformers throughout the facility that are approaching their end of useful life. Some equipment will be direct replacements while others are selected for relocation as well as replacement.

Because this campus does not have large vacancies in their classroom schedule(s), all rough in work should be completed and planned so that the changeover to the new panels and transformers can happen overnight or on weekends. This is intended to minimize electrical shutdowns that could affect class and staff schedules.

Additive Alternates:

ADD ALT 01 - DEMOLISH AND REPLACE EXISTING “MDP-1”, SEE 1-LINES AND PLAN VIEWS FOR MORE SPECIFICS.

ADD ALT 02 - DEMOLISH AND REPLACE EXISTING “MDP-2”, SEE 1-LINES AND PLAN VIEWS FOR MORE SPECIFICS.

Mandatory Bidder Qualification Requirements (if applicable):

N/A

Project Requirements:

- DFCM Approved Fabricator List

- DFCM Design Management Documents

- DFCM Roofing Design Requirements

- State of Utah High Performance Building Standard and all appendixes https://dfcm.utah.gov/construction-management/building-official/inspections-and-testing/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/roofing-program/ https://dfcm.utah.gov/construction-management/high-performance-building-program/

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 4

Solicitation Documents The solicitation documents consist of all documents listed below and referenced within this solicitation.

Solicitation Documents and Forms The following project specific documents and forms can be accessed in the U3P project for this solicitation.

Project specific documents:

- Invitation to Bid Solicitation

- Approved Plans

- Approved Specifications

Standard documents and forms:

- DFCM General Conditions

- DFCM Subcontractor List Form & Instructions

- Health Insurance Statement of Compliance

DFCM Construction Management Standard Reference Documents All DFCM standard documents referenced in this solicitation can be accessed by visiting the DFCM Construction Management – Standard Documents page of the DFCM website.

DFCM General Conditions The DFCM General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to as General Conditions”) are available on the DFCM Construction Management – Standard Documents page of the DFCM website and made part of this solicitation by reference.

https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.dfcm.utah.gov/ http://www.dfcm.utah.gov/

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 5

Procurement Process

• ONLY Contractors prequalified through the Stage I Request for Statement of Qualifications are allowed to bid on this Stage II Invitation to Bid.

• Prequalified Contractors are ONLY authorized to bid on Stage II Prequalified projects within the discipline that they are prequalified under.

The current lists of Stage I Prequalified Contractors can be found on the DFCM website.

For questions regarding prequalification or eligibility, please email dfcm_vbs@utah.gov.

1. Mandatory Meeting A mandatory meeting will be held on the date and time and at the location specified on the Solicitation Schedule. All prime Contractors wishing to bid on this project must attend and sign in. Contractors not in attendance at this meeting are ineligible to bid on this project. Subcontractors and suppliers are invited to attend this meeting, but it is not mandatory.

During the mandatory meeting, a presentation will be made describing the overall scope of work and intended project schedule. Interested Contractors may ask questions and request clarification about the project and the procurement process.

2. Requests for Information, Questions and Addendum All project related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s proposal and/or bid.

a) Interpretation of Drawings and Specifications If any person or entity contemplating submitting a proposal or bid is in doubt as to the meaning of any part of the drawings, specifications or other contract documents, such person shall submit a request for an interpretation to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. Any interpretation of the proposed documents will be made only by addenda posted on the U3P website. Neither DFCM nor A/E will be responsible for any other explanations or interpretations of the proposed documents. The A/E is deemed to be the architect or engineer hired by DFCM as the A/E or Consultant for the project.

b) Product Approvals Where reference is made to one or more proprietary products in the contract documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the contract documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to the written approval of the A/E. Such written approval must occur prior to the time and date specified on the Solicitation Schedule for the final addendum. The A/E’s written approval will be issued in an addendum. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by the A/E.

3. Bidding, Bid Deadline, and Bid Bonds Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule.

Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project. It is the sole responsibility of the Contractor to confirm their bid is successfully submitted into U3P prior to the bid deadline. Technical questions related to bidding in U3P should be directed to u3padmin@utah.gov.

After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

http://www.dfcm.utah.gov/ mailto:dfcm_vbs@utah.gov https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 6

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation. If the Contractor observes that portions of the Contract Documents are at variance with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the DFCM Project Manager, and the necessary changes shall be accomplished by addendum.

By submitting a bid, in any format, the Bidder / Offeror / Vendor certifies that: (1) no product to be supplied by the Bidder / Offeror / Vendor in connection with this Solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and (2) to the extent, if any, that this Solicitation involves technology, or technology services, networks or systems, the Bidder / Offeror / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a-121.

a) Bid Bonds A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of 5% of the bid, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

The bid bond must be submitted on the AIA document A310 – 2010 Bid Bond Form, or equivalent, to be accepted unless only one bid is received by DFCM, or the failure to comply with the bid bond requirements is determined by the Director of DFCM to be immaterial based on the following:

1. the bid bond is submitted on a form other than the AIA Document A310 – 2010 Bid Bond form, or equivalent, and the bid bond meets all other requirements including being issued by a surety firm authorized to do business in the State of Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this requirement; and

2. the Contractor provides a bid bond properly signed by a qualified surety and on the AIA Document A310 – 2010 Bid Bond form, or equivalent, by the close of business of the next business day after DFCM notifies the Contractor of the defective bid bond.

4. Termination and Debarment By submitting a bid, the Contractor certifies that neither it nor its principals, including project nor site managers, have been, or are under consideration for, debarment or suspension, or any action that would exclude such from participation in a construction Contract by any governmental department or agency. If the Contractor cannot certify this statement, provide a detailed written explanation to dfcmcontracts@utah.gov by the time and date specified as the bid deadline on the Solicitation Schedule. DFCM reserves the right to reject the Contractor’s explanation and disqualify them from the selection process.

5. Listing of Subcontractors All Contractors are required to submit their DFCM Subcontractors List Form to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. The DFCM Subcontractors List Form & Instructions can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.

If the DFCM Subcontractors List Form is not provided by the time and date specified on the Solicitation Schedule, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

DFCM retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors. Any Contractor who is found incompliant with these requirements is subject to a debarment hearing and may be debarred from consideration for award of DFCM contracts for a period not to exceed three years.

6. Withdrawal of Bids Bids may be withdrawn on written request received from bidder prior to the time fixed for opening. Negligence on the part of the bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened.

https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:dfcmcontracts@utah.gov mailto:dfcmcontracts@utah.gov

DFCM Stage II Invitation to Bid for Stage I Prequalified Contractors, 9.3.2026 7

7. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all proposals or bids or to waive any formality or technicality in any proposal or bid in the best interest of the State.

8. Contract DFCM intends to enter into a Construction Contract with the Contractor submitting the lowest responsive and responsible bid. A copy of the Construction Contract can be found on the DFCM website – Construction Management - Standard Documents page.

9. Health Insurance Statement of Compliance Form The Health Insurance Statement of Compliance Form applies to: (i) a prime Contractor (and design professional) if the prime contract (or design professional contract) is in the aggregate amount of $2,000,000 or greater; and (ii) applies to a subcontractor (and subconsultant of design professional) if the subcontract is in the aggregate amount of $1,000,000 or greater. For benchmark information, please visit Health Insurance Statement of Compliance Benchmark Information.

If applicable to this project, the awarded Contractor must submit the Health Insurance Statement of Compliance Form to DFCM via email at dfcmcontracts@utah.gov before the Construction Contract Notice to Proceed will be issued. The form can be found on the DFCM website – Construction Management - Standard Documents page and is also posted in U3P.

10. Licensure The Contractor shall comply with and require all subcontractors to comply with the license laws as required by the State of Utah.

11. Permits In concurrence with the requirements for permitting in the General Conditions, it is the responsibility of the Contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP requirements from the Utah Department of Environmental Quality, submit the completed forms, and pay any permit fee that may be required for this specific project. Failure to obtain the required permit may result in Work stoppage and fines from the regulating authority that will be the sole responsibility of the Contractor. Any delay to the project because of failure to obtain the permit, or noncompliance with the permit, shall not be eligible for extension in the Contract Time.

12. Financial Responsibility of Contractors, Subcontractors and Sub-subcontractors Contractors shall respond promptly to any inquiry in writing by DFCM to any concern of financial responsibility of the Contractor, Subcontractor or Sub-subcontractor.

13. DFCM Contractor Performance Rating and Retaining Prequalified Status At the completion of each project, DFCM will evaluate Contractor’s performance on the project. The performance rating the Contractor receives on this project may affect their prequalified status and their ability to obtain future Contracts with DFCM. Contractors retain their prequalified status provided the following:

(a) They receive an overall performance rating of 4.0 or greater on each DFCM project. Contractors that receive an overall rating of less than 4.0 on any single project may be removed from the Prequalified Contractors list for a period of at least one year before they are eligible to reapply. Contractors receiving a performance rating of less than 4.0 may be given the opportunity to meet with DFCM to develop a performance improvement plan for requalification that would require successful completion before the Contractor is placed back on to the prequalified list;

(b) They are not suspended for failure to comply with requirements of their contract;

(c) The Contractor has not undergone a significant reorganization involving the loss of key personnel (site superintendents, project managers, owners, etc.) to a degree such that the Contractor no longer meets the prequalification requirements outlined in Stage I;

(d) The financial viability of the Contractor has not significantly changed, and

(e) The Contractor is not otherwise disqualified by DFCM.

https://dfcm.utah.gov/construction-management/standard-documents/ https://dfcm.utah.gov/construction-management/standard-documents/ http://www.health.utah.gov/chip/PDF/2016Benchmark.pdf mailto:dfcmcontracts@utah.gov https://dfcm.utah.gov/construction-management/standard-documents/

File details come from the government source that posted it. Updated .