This is Addendum No. 1 to an Invitation for Bid issued by the Maryland Department of Transportation State Highway Administration (MDOT SHA) for general handyman services at the Glen Burnie Maintenance Shop located at 910 Stewart Ave, Glen Burnie, MD 21061. The contractor will provide supervision, labor, tools, equipment, and materials necessary to perform general facility maintenance on an as-needed basis, including minor carpentry, plumbing, electrical, painting, flooring, hardware installation, and exterior repairs. The scope of work is estimated at 150 routine hours and 30 emergency hours per labor class for the full two-year contract term. A scheduled site visit was held on July 21, 2026, from 10:00 AM to 11:00 AM, with questions due by 3:00 PM that same day. Bids were due on July 24, 2026, at 10:00 AM, with public bid opening scheduled for 1:00 PM at the Glen Burnie facility and via Microsoft Teams. Routine work is anticipated during standard business hours of 7:30 AM to 4:00 PM, Monday through Friday, with after-hours and weekend work limited to emergencies only.
The addendum clarifies that hour quantities in Attachment B represent estimates for the full two-year contract term, with each labor class compensated at its applicable hourly rate. Contractors are required to determine appropriate crew size based on individual work order scope and safety requirements, with no predetermined minimum crew size mandated by MDOT SHA. All worksheets must be signed off by the Facility Manager, and contractors must sign in and out at each facility to document work completion and avoid payment delays. The Facility Technician must verify work completion against specifications on preventive maintenance checklists and work orders. An overall Minority Business Enterprise (MBE) or Disadvantaged Business Enterprise (DBE) subcontracting goal of zero percent and a Veteran-Owned Small Business (VSBE) participation goal of zero percent have been established. All addenda acknowledgement forms must be completed and submitted with bids; failure to do so may result in the bid being declared non-responsive.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52HNDY28SB.docx | DOCX document | |
| Addendum No. 1 Acknowledgement 52HNDY28SB .pdf | ||
| Addendum No. 2 Acknowledgement 52HNDY28SB .pdf | ||
| 52HNDY28SB.pdf | ||
| 52HNDY28SB ADDENDUM 2.pdf | ||
| Attachment-B.-Price-Form for 52HNDY28SB.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 North Calvert St., Baltimore, MD 21202 | 410.545.0300 | 1.800.323.6742 | Maryland Relay TTY 800.735.2258 | roads.maryland.gov
ADDENDUM NO. 1
TO: ALL BIDDERS
FROM: RESDIENT MAINTENANCE ENGINEER, DISTRICT 5 – MAINTENANCE,
TONY OCTAVIEN
SUBJECT: CONTRACT NO.: 52HNDY28SB
DESCRIPTION: To provide general handyman services for the Glen Burnie Facility
DATE: July 24, 2026
Bids Due for this project are scheduled for July 24, 2026.
The attention of prospective bidders is directed to the following: revisions, additions, and/or deletions to the Invitation for Bid.
Section IX. Scope of Contractor Services
Page Description
1.1 Background and Purpose.
Location of Services: The Maryland Department of Transportation State Highway Administration (MDOT SHA) requires the services of a qualified contractor to provide general handyman services for Glen Burnie Maintenance Shop, located at 910 Stewart Ave in Glen Burnie, MD 21061.
1. Contractor Responsibilities and Tasks
The successful Contractor shall furnish all supervision, labor, tools, shoring, transportation, equipment, and materials necessary to perform the scope of work and achieve MDOT SHA’s satisfaction. All work must be executed in a safe manner, adhering strictly to all OSHA, MOSH, codes/regulations, and established contraction industry best practices.
General Notes
➢ All worksheets for services completed need to be signed off by the Facility Manager.
➢ Contractor must sign in and out at each facility – If not, payment may be delayed. Signing in and out at each facility serves as proof of work done for a specified date and time.
➢ Facility Technician needs to sign off on PM checklists and/or work order to confirm work completed according to specs.
Addendum Attachments
➢ Contract Bid Form (required with bid submittal)
Contractor Questions
Included in this response are contractor questions received as of 07/16/2026 at 6:03 pm, and 07/22/2026 at 4:05 pm.
Q1: Are the Attachment B hour quantities (150 routine / 30 emergency per labor class) estimates for the full two-year term or per contract year?
A1: The hour quantities listed in Attachment B (150 routine / 30 emergency per labor class) are estimates for the full two-year contract term. Each labor class is paid at its applicable hourly rate.
Q2: What are the facility's normal working hours for routine work orders, and is after-hours or weekend work anticipated outside of emergencies?
A2: Routine working hours are 7:30 AM to 4:00 PM, Monday through Friday. Afterhours or weekend work is not anticipated unless an emergency occurs.
Q3: Approximately how many work orders per month does the facility currently generate?
A3: The number of work orders varies and is generated on an as-needed basis.
Q4: Could you please provide more details on the type of repairs you will be needing assistance with?
A4: The handyman service contract will support general facility maintenance on an as-needed basis.
Typical repairs may include:
• Minor carpentry work (doors, frames, cabinets, trim, drywall patching)
• Basic plumbing repairs (leaks, fixture replacement, unclogging)
• Electrical troubleshooting and minor fixes (outlet/switch replacement, lighting repairs)
• Painting and surface restoration
• Flooring repairs (tile, VCT, laminate patching)
• Hardware installation or replacement (locks, hinges, handles)
• Minor exterior repairs (small masonry patching, caulking, weatherproofing)
Work orders will vary depending on operational needs, but all tasks will fall within general handyman-level maintenance—not specialty trades requiring licensed professionals unless otherwise specified.
Q5: Could you please confirm the minimum number of crew members required for the work?
A5: Minimum Number of Crew Members Required
The minimum number of crew members is not predetermined by MDOT. Contractors should determine the appropriate crew size based on the scope of each work order and the resources needed to complete the task safely and efficiently. You may assign the number of personnel you feel is necessary for each job.
All questions concerning this contract should be submitted preferably in Word format to:
Toctavien@mdot.maryland.gov.
Tony Ocatavien
Program Manager, District 5 – Glen Burnie Facility Maintenance
This Addendum is issued to clarify, add to, delete from, correct and/or change the bid documents to the extent indicated and is hereby made part of the said bid documents on which the contract will be based. COMAR 21.05.02.08 requires that all addenda issued be acknowledged prior to submitting your bid. Failure to submit a completed addenda acknowledgement/ verification form for all addenda may result in the bid being declared non-responsive.
mailto:Toctavien@mdot.maryland.gov
File details come from the government source that posted it. Updated .