EXH_J-20.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Operation and Management Services for the Lafayette Building
Solicitation number
47PM0818R0005
Issued by

About this file

EXH J-20

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP 1 - June 2015 National Capital Region (NCR) Systems and /or Hardware Components MichaelMargolis: NCR HARD-SOFT Systems Matrix

Purpose - The purpose of the matrix is identify and convey systems and components found within each asset (building) grouping.

Objectives - The objectives include:

1. Identify required contractor operational support as part of core contract deliverables.

2. Coordination of third party tasks and building services program support activiites.

3. Coordination of non GSA owned hardware and ancillary services.

3. Provide framework for on-going contract and services management.

LEGEND

YES = Systems and components within asset are the reponsilbility of the contractor NO = Systems and components within asset are maintained by the Government.

NA = System and/or component Not Applicable to asset.

TBD = Status To Be Determined

Notes:

1. Table hierarchy consistent with CSI MasterFormat 2004.

2. Detailed building equipment inventory maintained in Government CMMS.

GSA Bldg # / Asset Name MichaelMargolis:

NCR HARD-SOFT Systems Matrix

Purpose - The purpose of the matrix is identify and convey systems and components found within each asset (building) grouping.

Objectives - The objectives include:

1. Identify required contractor operational support as part of core contract deliverables.

2. Coordination of third party tasks and building services program support activiites.

3. Coordination of non GSA owned hardware and ancillary services.

3. Provide framework for on-going contract and services management.

LEGEND

YES = Systems and components within asset are the reponsilbility of the contractor NO = Systems and components within asset are maintained by the Government.

NA = System and/or component Not Applicable to asset.

TBD = Status To Be Determined

Notes:

1. Table hierarchy consistent with CSI MasterFormat 2004.

2. Detailed building equipment inventory maintained in Government CMMS.

Group 1 - Southwest CorridorYES = Contractor ResponsibilityDC0010DC0033DC0034DC0083DC0084
NO = GSA Service Provider(s) and / or Not Applicable to AssetLBJMary SwitzerCohenOrville WrightWilbur Wright
NA - Not Applicable to AssetFOB 10AFOB 10B
Division 1 - General Requirements See user Info./ NotesProject Management and Program SupportYesYesYesYesYes
01210000AllowancesAllowancesNoNoNoNoNo
01310000Project Management & CoordinationProject Management and Soft Systems CoordinationYesYesYesYesYes
Computerized Maintenance and Management (CMMS)

MichaelMargolis: CMMS is a GOV furnished database and application software package that tracks inventory, schedules, service work orders, and documents maintenance and repair recordkeeping requirements.

Computerized Maintenance and Management (CMMS) MichaelMargolis: CMMS is a GOV furnished database and application software package that tracks inventory, schedules, service work orders, and documents maintenance and repair recordkeeping requirements.

YesYesYesYesYes
National Call Center (NCC)
MichaelMargolis: GSA National Call Center supporting customer service requests and work order managementNational Call Center (NCC)
MichaelMargolis: GSA National Call Center supporting customer service requests and work order managementNoNoNoNoNo
GSALink
MichaelMargolis: Assets currently utilizing GSALink. GSAlink uses software-tagging strategy and automated analytics to detect irregularities. The program monitors millions of data points per day from heating, ventilation, air-conditioning and lighting systems to identify small, but potentially costly irregularities. Once GSAlink detects an irregularity, it automatically notifies the property management team. In turn, the management team consults subject-matter experts to determine whether the fault is real and worthy of further attention.GSALink
MichaelMargolis: Assets currently utilizing GSALink. GSAlink uses software-tagging strategy and automated analytics to detect irregularities. The program monitors millions of data points per day from heating, ventilation, air-conditioning and lighting systems to identify small, but potentially costly irregularities. Once GSAlink detects an irregularity, it automatically notifies the property management team. In turn, the management team consults subject-matter experts to determine whether the fault is real and worthy of further attention.NoNoNoYesYes
LEED-EBOM
MichaelMargolis: Assets currently with EBOM certification and renewal support requirements.LEED-EBOM
MichaelMargolis: Assets currently with EBOM certification and renewal support requirements.YesNoNoNoNo
Physical Condition Survey (PCS)
MichaelMargolis: Assets requiring bi-annual support of GSA PCS process.Physical Condition Survey (PCS)
MichaelMargolis: Assets requiring bi-annual support of GSA PCS process.YesYesYesYesYes
01359100Historic Treatment ProceduresHistoric Building PreservationYesYesYesYesYes
01400000Quality RequirementsQuality Control Program(s)YesYesYesYesYes
01783900Project Record DocumentsGOV furnished Cloud and Secure Data Management
MichaelMargolis: GOV furnished cloud and shared drive access provided for contract team for program records management.YesYesYesYesYes
01782300Operation and Maintenance DataBuilding Services, Operations, and Maintenance DeliverablesYesYesYesYesYes
23080000Commissioning/Recommissioning of HVACFormal Commissioning / Recommissioning Program
MichaelMargolis: This line item represents recommissioning services.NoNoNoNoNo
01790000Demonstration and TrainingHardware Training / Safety Training/ Technical Training

MichaelMargolis: Demonstration and support of new modernization and equipment installed during contract.

YesYesYesYesYes
ESPC ContractESPC Contract Vehicle in ForceNoNoNoNoYes
Division 3 - ConcreteSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 4 - MasonrySpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 5 - MetalsSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 6 - Wood and PlasticsSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 7 - Thermal and Moisture ProtectionSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 8 - Doors and WindowsDoors and Fenestration Hardware SupportYesYesYesYesYes
Division 9 - FinishesSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 10 - SpecialtiesRestroom and Fire Protection SpecialtiesYesYesYesYesYes
Toilet CompartmentsMaintenance and Repair of Existing HardwareYesYesYesYesYes
Louvers and VentsMaintenance and Repair of Existing HardwareYesYesYesYesYes
Fire Protection SpecialtiesMaintenance of Fire Extinguishers and CabinetsYesYesYesYesYes
Toilet, Bath, and Laundry AccessoriesMaintenance of bathroom hardware accessoriesYesYesYesYesYes
Firing RangeMaintain Law enforcement grade firing range
Division 11 - EquipmentMisc Equipment - Parking, Loading Dock, Food Service, DaycareYesYesYesYesYes
Parking Control EquipmentParking Control Systems and Hardware (Note: Gate Arm @ LBJ).Yes

MichaelMargolis: Gate Arm at LBJ

NoNoNoNo
Loading Dock EquipmentLoading Dock HardwareYesYesYesYesYes
Food Service EquipmentNote: GSA Service ProviderNoNoNoNoNo
Gymnasium / Fitness EquipmentPlayground EquipmentNoNoNoNo

MichaelMargolis: Daycare - Playground Equipment

No
Division 12 - FurnishingsSpecial and /or Supplemental Asset RequirementsNoNoNoNoNo
Division 13 - Special ConstructionLife-Safety, Security, and Access Control SystemsYesYesYesYesYes
Lightning ProtectionLightning Protection SystemsNoNoNoNoNo
Photovoltaic Energy EquipmentPV Systems, Arrays, Invertors, etc…NoYesNoNoNo
Perimeter Security SystemsPerimeter Access Control Systems (Gate Arm @ LBJ).YesNoNoNoNo
Access ControlAccess Control Systems and hardwareNoNoNoNoNo
Video SurveillanceVideo Surveillance Systems and hardwareNoNoNoNoNo
Network Lighting ControlsCentral / Network lighting control systemsYesYesYesYesYes
Lighting Control PanelboardsLighting Control PanelboardsYesYesYesYesYes
Digital, Addressible Fire Alarm SystemFire Alarm Systems and Hardware Note: GSA Life Safety Service ProviderNo

MichaelMargolis: GSA FIRE ALARM SHOP No MichaelMargolis: GSA FIRE ALARM SHOP No MichaelMargolis: GSA FIRE ALARM SHOP No MichaelMargolis: GSA FIRE ALARM SHOP No MichaelMargolis: GSA FIRE ALARM SHOP

Fire PumpsFire Pump Systesm and ComponentsYesYesYesYesYes
Wet-Pipe Sprinkler SystemExcept for LBJ, YES. Will Fire Alarm Shop continue to maintain? Need specific requirements.YesYesYesYesYes
Dry-Pipe Sprinkler SystemExcept for LBJ, YES. Will Fire Alarm Shop continue to maintain? Need specific requirements.YesYesYesYesYes
Fire Extinguishing SystemsExcept for LBJ, YES. Will Fire Alarm Shop continue to maintain? Need specific requirements.YesYesYesYesYes
Energy savings and demand response.Energy savings and demand response. Participates in demand response and curtailment programs.yesyesyesyesyes
Fire Suppression StandpipesExcept for LBJ, YES. Will Fire Alarm Shop continue to maintain? Need specific requirements.YesYesYesYesYes
Division 14 - Conveying SystemsVertical and Horizontal Transporation SystemsNoNoNoNoNo
DumbwaitersNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Electric Traction ElevatorsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Electric Traction Freight ElevatorsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Hydraulic ElevatorsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Hydraulic Freight ElevatorsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
EscalatorsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Moving WalksNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Stairwell ChairliftsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Wheelchair LiftsNote: GSA DC Service Center Areawide ContractNoNoNoNoNo
Division 15 - MechanicalMechanical, HVAC, and Plumbing SystemsYesYesYesYesYes
Hydronic PumpsHydronic Pumping SystemsYesYesYesYesYes
Steam Condensate PumpsSteam Distriubution and Condensate SystemsYesYesYesYesYes
HVAC Water TreatmentWater Treatment Systems for Open and Closed SystemsYesYesYesYesYes
Plumbing ComponentsPlumbing Systems and ComponentsYesYesYesYesYes
Emergency Plumbing FixturesEmergency Plumbing FixturesYesYesYesYesYes
Commerical Water ClosetsCommerical Water ClosetsYesYesYesYesYes
Commercial LavatoriesCommercial LavatoriesYesYesYesYesYes
Commerical SinksCommerical SinksYesYesYesYesYes
Commerical Showers, Receptors, BasinsCommerical Showers, Receptors, BasinsYesYesYesYesYes
Drinking FountainsDrinking FountainsYesYesYesYesYes
Domestic Water Packaged Booster Pump SystemsDomestic Water Packaged Booster Pump SystemsYesYesYesYesYes
Sanitary Sewage PumpsSanitary Sewage PumpsYesYesYesYesYes
Sump PumpsSump PumpsYesYesYesYesYes
Indoor Potable Water Storage TanksIndoor Potable Water Storage TanksYesYesYesYesYes
Domestic Water SoftenersDomestic Water SoftenersYesYesYesYesYes
Domestic Water Filtration SystemsDomestic Water Filtration SystemsYesYesYesYesYes
Electric - Domestic Water Heaters (Base building - steam heated HW)Electric - Domestic Water Heaters (Base building - steam heated HW)NoNoNoNoNo
Fuel Fired - Domestic Water HeatersFuel Fired - Domestic Water HeatersNoNoNoNoNo
Domestic - Water Heat ExchangersDomestic - Water Heat ExchangersYesYesYesYes
MichaelMargolis: SOLAR DOMESTIC WATER H/X SystemYes

MichaelMargolis: SOLAR DOMESTIC WATER H/X System

Boilers, Furnaces, H&VHeating Plants and Primary Heat Exchange ComponentsYesYesYesYesYes
Heating BoilersHeating Boilers

MichaelMargolis: HOTD - District Steam Service to Asset

No
MichaelMargolis: HOTD - DISTRICT STEAM SYSTEM IN USENoNoNoNo
Cast Iron BoilersCast Iron BoilersNoNoNoNoNo
Condensing BoilersCondensing BoilersNoNoNoNoNo
Water-Tube BoilersWater-Tube BoilersNoNoNoNoNo
Fire-Tube BoilersFire-Tube BoilersNoNoNoNoNo
Boiler Feedwater PumpsBoiler Feedwater PumpsNoNoNoNoNo
DeareatorsDeareatorsNoNoNoNoNo
Shell & Tube Heat ExchangersShell & Tube Heat ExchangersYesYesYesYesYes
FurnacesFurnacesNoNoNoNoNo
Fuel Fired Duct HeatersFuel Fired Duct HeatersNoNoNoNoNo
Gas Fired Radiant HeatersGas Fired Radiant HeatersNoNoNoNoNo
Fuel Fired Unit HeatersFuel Fired Unit HeatersNoNoNoNoNo
Draft Control DevicesDraft Control DevicesNoNoNoNoNo
Direct Fired H&V UnitsDirect Fired H&V UnitsNoNoNoNoNo
Indirect Fired H&V UnitsIndirect Fired H&V UnitsNoNoNoNoNo
Chiller PlantsChilled Water Plants and Primary Heat Exchange ComponentsYesNoYesNoYes
Absorption Water ChillersAbsorption Water ChillersNoNoNoNoNo
Centrifugal Water ChillersCentrifugal Water ChillersYesNoYesNoYes
Rotary Screw Water ChillersRotary Screw Water ChillersNoNoNoNoNo
Reciprocating Water ChillersReciprocating Water ChillersNoNoNoNoNo
Scroll Water ChillersScroll Water ChillersNoYesNoNoNo
Plate & Frame Heat ExchangersPlate & Frame Heat ExchangersYesNoYesNoYes
Refrigerant Detection and Alarm SystemsRefrigerant Detection and Alarm SystemsYesNoYesNoYes
Cooling Tower and Condenser SystemsCooling Towers and Condenser SystemsYesNoYesNoYes
Cooling TowersCooling TowersYesNoYesNoYes
Heat Tracing for Cooling Tower Make-UpHeat Tracing for Cooling Tower Make-UpNoNoNoNoNo
Heat Tracing for Cooling TowersHeat Tracing for Cooling TowersYesNoYesNoYes
Evaporative CondensersEvaporative CondensersNoNoNoNoNo
Packaged Condenser UnitsPackaged Condenser UnitsYes

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

YesNoNoNo
Air Cooled CondensersAir Cooled CondensersNo

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

Air Handling and Terminal Unit SystemsAir Handling and Terminal Unit SystemsYesYesYesYesYes
Indoor Central Station Air Handling UnitsAir Handling Units - Modular and Built-Up CasingsYesYesYesYesYes
Packaged Terminal Air ConditionersPackages Terminal Air Conditioning Units (PTACs)YesYesYesYesYes
Outdoor Central Station Air Handling UnitsRoof Top Units (RTUs), Exterior Air Handling Unit SystemsNoNoNoNoNo
Dedicated Outdoor Air UnitsDedicated Outside Air Unit (DOAU)NoNoNoNoNo
Computer Room Air Conditioners(CRAC) - Tenant managed unless otherwise notedNo

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

Yes MichaelMargolis: Tenant hardware - INCLUDE IN BASE CONTRACT Yes MichaelMargolis: INCLUDE IN BASE CONTRACT

Self Contained Air ConditionersWindow shaker / Guard stationYesYesYesYesYes
Split System Air ConditionersSplit A/C - Tenant managed unless otherwise notedNo

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

No MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

Yes MichaelMargolis: INCLUDE IN BASE CONTRACT Yes MichaelMargolis: INCLUDE IN BASE CONTRACT

Water Source Unitary Heat Pumps Water Source and/or Groundwater Heat Pump Systems No Yes MichaelMargolis: Water Source Chilled Water System (Chiller) Ground Closed Loop Piping system.

MichaelMargolis: INCLUDE IN BASE CONTRACT

MichaelMargolis: INCLUDE IN BASE CONTRACT

MichaelMargolis: NCR HARD-SOFT Systems Matrix

Purpose - The purpose of the matrix is identify and convey systems and components found within each asset (building) grouping.

Objectives - The objectives include:

1. Identify required contractor operational support as part of core contract deliverables.

2. Coordination of third party tasks and building services program support activiites.

3. Coordination of non GSA owned hardware and ancillary services.

3. Provide framework for on-going contract and services management.

LEGEND

YES = Systems and components within asset are the reponsilbility of the contractor NO = Systems and components within asset are maintained by the Government.

NA = System and/or component Not Applicable to asset.

TBD = Status To Be Determined

Notes:

1. Table hierarchy consistent with CSI MasterFormat 2004.

2. Detailed building equipment inventory maintained in Government CMMS.

MichaelMargolis:

NCR HARD-SOFT Systems Matrix

Purpose - The purpose of the matrix is identify and convey systems and components found within each asset (building) grouping.

Objectives - The objectives include:

1. Identify required contractor operational support as part of core contract deliverables.

2. Coordination of third party tasks and building services program support activiites.

3. Coordination of non GSA owned hardware and ancillary services.

3. Provide framework for on-going contract and services management.

LEGEND

YES = Systems and components within asset are the reponsilbility of the contractor NO = Systems and components within asset are maintained by the Government.

NA = System and/or component Not Applicable to asset.

TBD = Status To Be Determined

Notes:

1. Table hierarchy consistent with CSI MasterFormat 2004.

2. Detailed building equipment inventory maintained in Government CMMS.

MichaelMargolis: CMMS is a GOV furnished database and application software package that tracks inventory, schedules, service work orders, and documents maintenance and repair recordkeeping requirements.

MichaelMargolis: CMMS is a GOV furnished database and application software package that tracks inventory, schedules, service work orders, and documents maintenance and repair recordkeeping requirements.

MichaelMargolis: GSA National Call Center supporting customer service requests and work order management MichaelMargolis: GSA National Call Center supporting customer service requests and work order management MichaelMargolis: Assets currently utilizing GSALink. GSAlink uses software-tagging strategy and automated analytics to detect irregularities. The program monitors millions of data points per day from heating, ventilation, air-conditioning and lighting systems to identify small, but potentially costly irregularities. Once GSAlink detects an irregularity, it automatically notifies the property management team. In turn, the management team consults subject-matter experts to determine whether the fault is real and worthy of further attention.

MichaelMargolis: Assets currently utilizing GSALink. GSAlink uses software-tagging strategy and automated analytics to detect irregularities. The program monitors millions of data points per day from heating, ventilation, air-conditioning and lighting systems to identify small, but potentially costly irregularities. Once GSAlink detects an irregularity, it automatically notifies the property management team. In turn, the management team consults subject-matter experts to determine whether the fault is real and worthy of further attention.

MichaelMargolis: Assets currently with EBOM certification and renewal support requirements.

MichaelMargolis: Assets currently with EBOM certification and renewal support requirements.

MichaelMargolis: Assets requiring bi-annual support of GSA PCS process.

MichaelMargolis: Assets requiring bi-annual support of GSA PCS process.NoNoNo
HumidifiersHumidification SystemsNoNoNoNoNo
Mechanical Dehumidification UnitsEnthalpy Wheels, Desicant DehumidifcaitonNoNoNoNoNo
Air CoilsHVAC CoilsYesYesYesYesYes
Unit HeatersUnit HeatersYesYesYesYesYes
Fan Coil UnitsFan Coil UnitsYesYesYesYesYes
ConvectorsConvectors, Finned Tube Radiation (FTR), etc…YesYesYesNoNo
Chilled BeamsChilled BeamNoNoNoNoNo
Unit VentilatorsUnit VentilatorsNoNoNoNoNo
Air-to-Air Energy Recovery EquipmentNote: Glycol Heat Recovery in AHUsYesYesNoNoNo
Air Conveyance (Duct) SystemsHard and Flexible Duct Systems and componentsYesYesYesYesYes
Air CurtainsAir CurtainsYesYesYesNoYes
Axial HVAC FansAxial Fans, Garage Prop Fans, etc…YesYesYesYesYes
Centrifugal HVAC FansCentrifugal Fans, Supply, Return, Exhaust AirYesYesYesYesYes
HVAC Power VentilatorsExhaust VentilatorsYesYesYesYesYes
Air Terminal UnitsVAV Boxes, FPVAV, series/ parallelYesYesYesYesYes
Air FiltrationAir FiltersYesYesYesYesYes
Electronic Fiiltration SystemsElectronic Fiiltration SystemsNoNoNoNoNo
UVGI SystemsUVGI SystemsNoYesNoNoNo
Commerical Kitchen HoodsCommerical Hood Testing and Cleaning

MichaelMargolis: Note: GSA coordination for Hood Testing and Ductwork cleaning associated with Food Services

MichaelMargolis: GOV furnished cloud and shared drive access provided for contract team for program records management.

MichaelMargolis: This line item represents recommissioning services.

MichaelMargolis: Demonstration and support of new modernization and equipment installed during contract.

NoNoNoNoNo
Instrumentation and Control for HVAC See notes #4Building Automation, Pneumatic, & DDC SystemsYesYesYesYesYes
HoneywellHoneywellYes
KMCKMCYes
SiemensSiemensYes
Johnson ControlsJohnson ControlsYes
AlertonAlertonYes
Division 16 - ElectricalElectrical, Lighting, and Power SystemsYesYesYesYesYes
Grounding SystemsYesYesYesYesYes
Low Voltage Power Conductors and CablesYesYesYesYesYes
Control-Voltage Power CablesYesYesYesYesYes
Medium Voltage CablesHardware > 600VNoNoNoNoNo
Underfloor Raceway Systems

AjayKBhatt: AjayKBhatt:

Rick - Should all be yeses because he doesn’t have themShould all be YesNoNoNoYesNo
Lighting Control DevicesSwitches, Occpancy Sensors, etc…YesYesYesYesYes
Electricity Metering (submetering only)NoNoNoNoNo
Electrical Power Monitoring and ControlSmart Metering (Schneider EEM)

MichaelMargolis: Smart Metering - GSA supported monitoring systems. Contractor monitoring access and GSA national contract for repair.

MichaelMargolis: Gate Arm at LBJ

MichaelMargolis: Daycare - Playground Equipment

NoNoNoNoNo
Engine GeneratorsEmergency GeneratorsYesYesYesYesYes
AGSTsAboveground storage tanksNoYesYesNoNo
UGST'sUnderground fuel storage.YesNoNoNoYes
Static Uniterruptible Power Systems (UPS)UPS Systems - Tenant managed unless otherewise notedNoNoNoNoNo
Central Battery EquipmentSwitchgear, Generators, etc... UPS is agency resp. Switchgear shop responsible where it exists - "No"NoNANoNANo
Variable Frequency Motor ControllersVariable Frequency Drives (throughout)YesYesYesYesYes
Medium Voltage TransformersHardware > 600VNoNoNoNoNo
Power Factor Correction EquipmentTesting on individual equipmentNoNoNoNoNo
TVSS for Low Voltage PowersHardware < 600VNoNoNoNoNo
Medium Voltage SwitchgearHardware > 600VNoNoNoNoNo
Enclosed Switches and Circuit BreakersHardware < 600VYesYesYesYesYes
Transfer SwitchesHardware < 600VYesYesYesYesYes
Low Voltage SwitchgearNote: GSA Switchgear Shop is service provider

MichaelMargolis: GSA Switchgear Shop service provider

NoNoNoNoNo
SwitchboardsNote: GSA Switchgear Shop is service provider

MichaelMargolis: GSA Switchgear Shop service provider

NoNoNoNoNo
PanelboardsHardware < 600VYesYesYesYesYes
Motor Control CentersHardware < 600VYesYesYesYesYes
Enclosed Bus AssembliesNote: GSA Switchgear Shop is service provider

MichaelMargolis: GSA Switchgear Shop service provider

MichaelMargolis: GSA FIRE ALARM SHOP

MichaelMargolis: GSA FIRE ALARM SHOP

MichaelMargolis: GSA FIRE ALARM SHOP

MichaelMargolis: GSA FIRE ALARM SHOP

MichaelMargolis: GSA FIRE ALARM SHOP

NoNoNoNoNo
Low Voltage TransformersHardware < 600VYesYesYesYesYes
Power Distribution Units (PDUs)Tenant Agency owned and managed where applicableNoNoNoNoNo
LightingLighting Hardware and SystemsYesYesYesYesYes
Interior Lighting Hardware, fixtures, lamps, etc...Interior Lighting Hardware, fixtures, lamps, etc...YesYesYesYesYes
Exterior Lighting Hardware, fixtures, lamps, etc...Exterior Lighting Hardware, fixtures, lamps, etc...YesYesYesYesYes
Lighting Control Systems, Central Lighting Control, etc..Lighting Control Systems, Central Lighting Control, etc..NoYesNoYesNo
Public Address and Antennae SystemsPublic Address and Notification SystemsNANANANANA
Public Address and Mass Notification SystemsPublic Address and Mass Notification SystemsNANANANANA
Sound Masking SystemsSound Masking SystemsNANANANANA
Master Antennae SystemsMaster Antennae SystemsNANANANANA
Fire PumpsFire Pump Systesm and ComponentsYesYesYesYesYes
Testing and InspectionNo -1

AjayKBhatt: AjayKBhatt:

Assist as needed No -1 No -1 No -1 No -1 AjayKBhatt: AjayKBhatt:

assist as needed

MichaelMargolis: HOTD - District Steam Service to Asset

MichaelMargolis: HOTD - DISTRICT STEAM SYSTEM IN USE MichaelMargolis: SOLAR DOMESTIC WATER H/X System MichaelMargolis: SOLAR DOMESTIC WATER H/X System MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

MichaelMargolis: Tenant hardware - INCLUDE IN BASE CONTRACT

MichaelMargolis: Tenant Agency owned hardware - INCLUDE IN BASE CONTRACT OR AS A TASK ITEM ?

RepairsYesYesYesYesYes
Wet-Pipe Sprinkler SystemTesting and InspectionYesYesYesYesYes
RepairsYesYesYesYesYes
Dry-Pipe Sprinkler SystemTesting and InspectionYesYesYesYesYes
RepairsYesYesYesYesYes
Fire Extinguishing SystemsTesting and InspectionYesYesYesYesYes
confirm -Chemical systems - Joe DauphinRepairsYesYesYesYesYes
Fire Suppression StandpipesTesting and InspectionYesYesYesYesYes

GSA Region 11 NCR

Group 1 - Southwest&"Arial,Bold"SAMPLE BUILDING SYSTEMS MATRIX
NOT FOR CONTRACT ESTIMATIONPage &P

GSA Region 11 NCR

Group 1 - Southwest&"Arial,Bold"SAMPLE BUILDING SYSTEMS MATRIX
NOT FOR CONTRACT ESTIMATIONPage &P

USER INFORMATION

NCR HARD-SOFT Systems Matrix

Purpose - The purpose of the matrix is identify and convey systems and components found within each asset (building) grouping.

Objectives - The objectives include:

1. Identify required contractor operational support as part of core contract deliverables.

2. Coordination of third party tasks and building services program support activiites.

3. Coordination of non GSA owned hardware and ancillary services.

3. Provide framework for on-going contract and services management.

LEGEND

YES = Systems and components within asset are the responsibility of the contractor NO = Systems and components within asset are maintained by the Government.

NA = System and/or component Not Applicable to asset.

TBD = Status To Be Determined

Notes:

1. Table hierarchy consistent with Master Format 2004.

2. Building equipment inventory maintained in Government CMMS.

3. Mechanical lifts / scissor type may be needed to maintain some aspects of the buildings systems.

4. Buildings will have a mix of proprietary BAS systems and may or may not be linked with a common user Frontend. All BAS systems are to be maintained to manufactures recommendations.

5. 10A/B. the Honeywell/Niagra system "sits on top of" the KMC platform at 10B, so the O&M user needs to access only the Honeywell system to monitor inputs/change setpoints at both 10A and 10B.

image1.jpeg

File details come from the government source that posted it.