RESPONSE_TO_QUESTIONS_5_23_19.pdf

PDF 318 KB Posted

Attached to
Port upgrades Federal contract opportunity
Solicitation number
47PJ0019R0087
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Response to Questions 5 23 19

View the file

Other files for this federal contract opportunity

Other files attached to Port upgrades, newest first.
File Type Posted
RESPONSE_TO_QUESTIONS_5_16_19.pdf PDF
Amendment_0002.pdf PDF
RESONSE_TO_QUESTIONS_5_13_19.pdf PDF
Amendment_0001.pdf PDF
RESPONSE_TO_QUESTIONS.pdf PDF
CAVSS_DESIGN_GUIDE_STANDARDS_Final_2014.pdf PDF
SBU_Information_Request_Form.pdf PDF
Pembina_-_Port_Upgrades_SOW.pdf PDF
ND26_3_15_19.pdf PDF
solicitation-PembinaLPOE.pdf PDF
Reference_Form.pdf PDF
St_John_Door_Location.pdf PDF
USR_v21_6_8_18.pdf PDF
Interview_Room_DG_Excerpt.pdf PDF
Booth_LPOE_DG_Excerpt.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSE TO QUESTIONS

5/23/19

Q17: The booth cannot be manufactured and delivered within the 90 days specified. Can the period of performance be changed for the booth?

A17: The Period of Performance will be adjusted based on the lead time of the booth once the shop drawings/design for the booth have been approved and a lead time has been established. Note:

The extended period of performance will only be for work items related to the delivery and installation of the booth. All other work items will need to be completed within the established 90 day performance period for construction.

Q18: There are also issues with mounting items to ballistic materials of the booth. Would there be an alternative that is acceptable for window heating units, or can this be removed from the requirements of the booth?

A18: Contractor shall incorporate into the design means of mounting equipment to the exterior walls of the booth that do not require drilling into ballistic rated material. If necessary, the contractor shall include an Engineer specializing in ballistics as part of the Design team for the booth to determine means and methods of mounting equipment to walls with ballistic ratings. Contractor shall assume that any items called for in the SOW will be mounted to the booth.

Q19: Upon further review of the amendment 002 information for the Port Upgrades project, we noticed that CLIN 0006 is for Exit Control Gate Design. The exit control system is stated in the scope of work under section 7 which is supposed to be the construction only section. This is causing some confusion as to whether or not the exit control system is to be designed, or if it is to be construction only. There is not much direction or specifications to cover the exit control system and Amano McGann is having difficulties with pricing this work out for us as they are having a hard time figuring out if they have capabilities to intercom all the way from the exit to the cargo lobby seeing as it is a pretty sizeable distance. If this section is in the construction only section, are there any additional details that can be provided to assist in pricing this work out? Or are we to assume that we need to include design costs for the exit control system as a part of section 6 in the design build section and figure out the needs for this system on our end through Amano McGann and our engineers?

A19: GSA is not requiring a traditional Design or AE involvement for this work item; however, the subcontractor should incorporate any costs related to resolving engineering related issues in their cost proposal.