RESPONSE_TO_QUESTIONS_5_16_19.pdf

PDF 180 KB Posted

Attached to
Port upgrades Federal contract opportunity
Solicitation number
47PJ0019R0087
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Response to Questions 5/16/19

View the file

Other files for this federal contract opportunity

Other files attached to Port upgrades, newest first.
File Type Posted
RESPONSE_TO_QUESTIONS_5_23_19.pdf PDF
Amendment_0002.pdf PDF
RESONSE_TO_QUESTIONS_5_13_19.pdf PDF
Amendment_0001.pdf PDF
RESPONSE_TO_QUESTIONS.pdf PDF
CAVSS_DESIGN_GUIDE_STANDARDS_Final_2014.pdf PDF
SBU_Information_Request_Form.pdf PDF
solicitation-PembinaLPOE.pdf PDF
Reference_Form.pdf PDF
St_John_Door_Location.pdf PDF
USR_v21_6_8_18.pdf PDF
Interview_Room_DG_Excerpt.pdf PDF
Booth_LPOE_DG_Excerpt.pdf PDF
Pembina_-_Port_Upgrades_SOW.pdf PDF
ND26_3_15_19.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSE TO QUESTIONS

5/16/19

Q13: Can we receive a DID (design intent drawing) for the new detention suite area? Is there a sketch of what is the desired layout to know what exactly is intended for this area?

A13: DID was included as a supporting document to the SOW after completion of SBU request.

Q14: Is there a current company performing the BAS (building automatization system) work that would need to be used to integrate with the current control system? Who installed the current BAS?

Typically, the BAS requires use of a similar, if not the same, subcontractor as the original installer in order to properly and most simply integrate the newly added equipment to the existing system.

A14: GSA BAS utilizes BACnet compatible devices that are non-proprietary.

Q15: Option 1 and Option 2 appear to fall under section 6 which would make those areas design build, not just construction phase items. Is this interpretation correct, or do those items not require design with stamped engineer drawings, stamped as-builts, etc.?

A15: Options 1 and 2 will require Design.

Q16: Can the engineering team anticipate to receive current updated CAD files for all areas of the project requiring design work and final as-built plans to be created for? If not, the engineers will need to plan for additional design work recreating the plans themselves.

A15: As-builts from the most recent major renovation will be provided; however, contractor shall anticipate that the drawings will not be entirely accurate. It is likely that multiple smaller projects have occurred and the as-builts have not been fully updated.

Q16: I am checking to see if it would be possible to use NVRs and cameras from Avigilon?

A16: Vicon is the only approved CBP vendor.