Booth_LPOE_DG_Excerpt.pdf
PDF 399 KB Posted
- Attached to
- Port upgrades Federal contract opportunity
- Solicitation number
- 47PJ0019R0087
About this file
Booth design guide excerpt
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RESPONSE_TO_QUESTIONS_5_23_19.pdf | ||
| RESPONSE_TO_QUESTIONS_5_16_19.pdf | ||
| Amendment_0002.pdf | ||
| RESONSE_TO_QUESTIONS_5_13_19.pdf | ||
| Amendment_0001.pdf | ||
| RESPONSE_TO_QUESTIONS.pdf | ||
| CAVSS_DESIGN_GUIDE_STANDARDS_Final_2014.pdf | ||
| solicitation-PembinaLPOE.pdf | ||
| Reference_Form.pdf | ||
| St_John_Door_Location.pdf | ||
| USR_v21_6_8_18.pdf | ||
| Interview_Room_DG_Excerpt.pdf | ||
| SBU_Information_Request_Form.pdf | ||
| Pembina_-_Port_Upgrades_SOW.pdf | ||
| ND26_3_15_19.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUTBOUND INSPECTION
Land Port of Entry Design Standard
September 2014
FOR OFFICIAL USE ONLY
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C. § 552). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
For Official Use Only
09-12 OUTBOUND INSPECTION
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C. § 552). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
Canopies and Sun Shades Canopies perform the essential function of sheltering inspection activities and booths. The canopies provide shade, as well as protection from precipitation and wind. The amount of overhang required to provide protection from the elements will depend on the location and orientation of the canopy and sun shade.
Locations with extreme precipitation or sun shall incorporate vertical enclosures or screening in addition to the horizontal canopy. All power and data to the primary inspection area shall be mounted and protected within the canopy for ease of tie-ins. The canopy shall also accommodate wireless access points for the use of mobile inspection technologies by the Officers in the outbound inspection areas.
9.5.4 Booth Islands and Paving
All booths must be placed on raised islands to protect them from water runoff. However, at the booth side (sliding) door there shall not be a difference in grade between roadway and booth floor. This may be achieved by elevating the lane rather than depressing the island and booth.
Islands must extend in front of the booth a sufficient distance to channel traffic around the booth and guard against possible contact with vehicles making tight corners.
In areas exposed to snow and ice, pavement heating shall be provided around the booth to prevent the buildup of snow and ice.
9.5.5 Booths
Booths make up a key component of the Outbound LPOE inspection: CBP Officers use them to perform examinations and they are the main point of interaction with CBP for most travelers through the facility.
Booths provide protection for CBP Officers and a location for the monitors and other equipment needed to perform primary inspections. All booths shall be bullet resistant, with glazing, walls, and door panels meeting or exceeding UL–752-95 Level 3 for bullet resistance and ASTM F1233 Class 3 Level lll for forced entry resistance.
In areas exposed to road salt and other corrosive materials, the exterior finish of the booth and surrounding materials shall be corrosive resistant.
CBP has included Non-Commercial and Commercial Primary Inspection Booths as one of its standard components, allowing for easier, more consistent construction.
Booths shall be installed under the Primary Inspection canopy and configured to allow CBP Officers to perform Primary Inspections for each inspection lane. In vehicular inspection locations Primary Podiums will be protected by M-rated barriers, jersey barriers or similar to provide Officers protection from errant vehicles. Podiums will be secured to the pavement and will have connectivity to power and data as well as duress communications. An overhead fan shall be provided above the podium area to aid cooling and ventilation. The work area shall be suitable for using a laptop computer. A video camera and sound recording system will be provided at each podium area to record the interaction between the Officer and vehicle operator. At least one eye wash and hand washing sink shall be provided for officer use close to the Outbound Support Building. Statutory signage will also be provided in the area of the podium. The Primary Inspection Podium shall meet the design and product requirements described in Appendix D.
JohnFGerberding Highlight
OUTBOUND INSPECTION 09-19
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C. § 552). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
Individuals from those vehicles diverted into the Secondary Area may be referred to the pedestrian Secondary Inspection Area inside the Outbound Support Building. The Secondary Area is a law enforcement zone with public access. The design must allow staff to retain control of the area without unnerving travelers.
9.5.8 Hard Secondary
The design shall designate a “hard secondary area” within the Secondary Inspection Area (under the Secondary Canopy) or a separate secondary building. It is expected that only Tier 1 and very few Tier 2 Outbound LPOEs will provide independent and dedicated Outbound Hard Secondary Inspection Areas and only Tier 1 may provide a garage. When the Hard Secondary and/or secondary building are absent, violators will be directed to share Inbound Hard Secondary.
The Hard Secondary Area shall provide vehicle bays screened from public view where CBP Officers can perform intensive inspection. The Hard Secondary bay(s) shall be designed with medium level force-resistant wall construction separating it from other Secondary Areas. A secure gate must be provided at the entrance to further screen views of activities within the Hard Secondary Area. An emergency eyewash station and deluge shower shall be provided in the bay.
9.5.9 Agriculture Inspection Office
In most cases, Agriculture Inspection if needed in outbound inspection will be performed in the Inbound Inspection Areas.
9.5.10 Secondary Booths
In Tier 1 small booths may be located in the Secondary Area for use by all agencies operating in the Secondary Area. These booths provide the agencies with space to complete paperwork and access computer terminals in Secondary Areas without secondary buildings.
9.5.11 Special Requirements and Considerations
Inspection Booths To assure CBP Officer safety, the booth exterior facade, including the skin, glazing, doors, louvers and other components, shall be shall be constructed to meet or exceed UL 752-95 Level 3 for bullet resistance and ASTM F1233 Class 3 Level III forced entry resistance.
Inspection duties require booth doors to be opened frequently. In both hot and cold climatic conditions, special attention must be given to mitigate extremes in temperature within the booth. Heated floor mats for northern locations have proven to increase CBP Officer comfort in winter months.
Maintaining reasonable air quality is also important to the well-being of CBP Officers. Fresh air intake and positive pressure inside the booth helps prevent a build-up of vehicle fumes.
Outbound Canopies Canopies provide shelter from the elements for the CBP Officers. The Design Standard prescribes minimum dimensions; however individual locations may require additional coverage. Sunscreens and windscreens may be required at the open ends to mitigate low sun and high prevailing winds. Wind-driven rain, snow or ice build-up may also necessitate canopy extensions or modifications to protect CBP Officers.
The hi-low inspection booth is used to conduct primary inspections of vehicles in the Primary Inspection Area of the Port. The split level inspection booth is a pre-fabricated metal enclosure on a concrete platform with a wide-angle view and bullet resistant enclosure, typically located under the primary inspection canopy. Booth exterior walls and glazing shall be constructed to meet or exceed UL-752-95 Level 3 for bullet resistance and ASTM F1233 Class 3 Level lll for forced entry resistance. This booth type is able to service noncommercial vehicles in the at-grade portion of the booth and commercial traffic in the upper level of the booth. Northern Border: May be attached to Main Building . Standard details for the booth can be found in Appendix C. One per input (This also implies that one LPR and one truck/bus RPM will be added per lane).
2.2 PRIMARY INSPECTION - BOOTHS & CANOPIES
Sprinkler Head Type:
N/A
Door Type: SL-01 Sliding (integral with Inspection Booth)
Door Frame: HM-5 HM as included with pre-fabricated building
Exterior Windows:
Exterior Window / Door Glazing:
GL-03 Bullet Resistant Glazing, UL–752-95 Level 3 & ASTM F1233 Class 3 Level lll
Special Requirements:
C-1 Lockset and BMAS for rear door. See Appendix for prefabricated booth requirements.
Fire Special Requirements:
Portable fire extinguisher installed in accordance with the requirements in the ICC-IFC.
Fixtures and Fittings 1:
NA
Fixtures and Fittings 2:
Fixtures and FIttings 3:
Fixtures and Fittings 4:
Fixtures and Fittings 5:
Fixtures and Fittings 6:
Fixtures and Fittings 7:
Plumbing Special
Acoustic Separation:
N/A
Floor Finish: FF-14 Rubber Mat
Base: N/A
Wall Construction:
Wall-13 Insulated metal panels with steel roll frames, Level 3 bullet resistant
Wall Finish: WF-11 Prefinished Metal Panels
Ceiling Remark:
Ceiling Const. / Finish:
CF-11 Prefinished Metal Panels
Ceiling Height: 9'-0" Min
Alternate Construction:
Ceiling 5/8" gyp board
Const Special Requirements:
Slope floor of booth 1/8”/1’-0" to door. See Appendix for specific security requirements.
Supply Register: S-2: Square Ceiling Diffuser Return Register: RR-2: Return Grille Temp Summer 85° (max) Temp Winter 55° (min) Temp Control: Room: Dedicated Room Temperature control Humidity Range: N/A Special Security:
Mech Special Requirements:
Locate air intake above canopy. Ruggedized thermostat: temp only control. NB: Provide radiant floor heating, over door unit & heated floor mat.
Fixed Equipment 1:
Fixed Equipment 2:
Receptacles: R-6: Receptacle, Standard GFCI
Electrical Special
(4) duplex GFCI receptacles per position (hi and low) Provide local UPS plugin module for computer.
Lighting Fixture: L-1: Lighting Fixture, Direct/Indirect, Recessed 2x2 or 2x4, 80+ CRI Lamp
Fixture Types Optional/Special:
L-15: Lighting Fixture, Surface Mounted Task Light
Lighting Control: LC-5: Combination Wall Switch with Occupancy Sensor & Dimmer
Lighting Special Provide 50 FC at working surface. Task light shall have three settings: white/red/off.
DIV 08 - DOORS AND WINDOWS Chapter 14
ROOM OCCUPANCY
1 or 2 Officers
ROOM SIZE:
131 SF
DIV 22 - PLUMBING Chapter 17
DIV 23 - MECHANICAL Chapter 18DIV 09 - CONSTRUCTION AND FINISHES Chapter 14
DIV 10 - FIXED EQUIPMENT Chapter 14
DIV 27 - LIGHTING
DIV 26 - ELECTRICAL
Door Lockset Group:
F Deadbolt / Deadlatch
Door Hardware Cylinder:
A-1: Cylinder, keyed individually under a CBP Master
Door Hardware Group:
W Full weatherstriping
Interior Window: N/A
Other Electrical Receptacles:
Cruise
Express
Cargo
Airport
LPOE
Fixed Equipment 3:
40" high X 30" deep stainless steel counter with 2 grommet holes at high and low position
Office
Room Code:
PRI-010
Chapter 19
Chapter 19
DIV 21 - FIRE SUPPRESSION Chapter 16
[Booth #]
ROOM SIGN 10/2/2014
12:14 PM
High-Low Inspection Booth
ROOM FUNCTION
COMMON DESIGN STANDARD ROOM DATA SHEETS
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C.522). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
22 - 169
JohnFGerberding Highlight
JohnFGerberding Highlight
Security Special Requirements:
Number and location of cameras to be determined by CBP. Cameras and microphones shall capture full interaction of Officer and Driver.
CBP Equipment
Computer(s), RFID card reader, Telephone
CBP Equipment
OBIM equipment, document reader, black light, and fingerprint/biometric systems
CBP Equipment
POV and Cargo technology equipment
Phone Outlets: Phone 02: Double RJ-11 phone port
Data Outlets: Data 03: Quad data port
Communications Special
Intercom system required. Double phone port and quad data port per position (hi and low)
CCTV Camera: Fixed CCTV wide-angle lens camera and microphone, monitored/recorded at the CCC.
IDS: IDS included if Booth is part of building perimeter
Access Control: N/A
Duress System Duress button on Booth interior and exterior
Mech: No through-the-wall units. Roof-mounted package direct expansion (DX) or split system heat pump incorporated with booth (allow efficient switch-out if equipment fails). Provide Air blowers (cont 200 CFM) outside the booth to provide untreated positive air pressure to mitigate pathogen transmission.
Electrical: Locate Controls for lane equipment, canopy lighting and traffic control devices within Booth. Provide two 240/120V, single phase, 100A, and 24 pole panelboards with main circuit breaker. One panel board shall be located inside and one outside the Booth in a NEMA-3R box.
Protection: Provide bollards at each exposed corner of booth. Provide a 3’ high concrete vehicle barrier at the front of the booth. Provide 1 bollard to the side of the sliding door. Electrical: Controls for lane equipment.
Provide one (min) spare 2" conduit to booth for each type of conduit required.
Provide Mechoshade or similar for shading.
DIV 10 - CBP PROVIDED EQUIPMENT Chapter 14
OTHER REQUIREMENTS DIV 28 - SECURITY Chapter 21
DIV 27 - COMMUNICATIONS Chapter 20
SCHEMATIC PLAN High-Low Inspection Booth PRI-010
COMMON DESIGN STANDARD ROOM DATA SHEETS
WARNING: This document is FOR OFFICIAL USE ONLY (FOUO). It contains information that may be exempt from public release under the Freedom of Information Act (5 U.S.C.522). It is to be controlled, stored, handled, transmitted, distributed, and disposed of in accordance with DHS policy relating to FOUO information and is not to be released to the public or other personnel who do not have a valid “need-to-know” without prior approval of an authorized DHS official.
22 - 170
| Cover |
| Preface |
| Table of Contents |
| 01 Introduction |
| 1.1 BACKGROUND |
| 1.2 APPLICATION AND USE OF THE DESIGN STANDARD |
| 1.3 CBP ORGANIZATION |
| 1.4 CBP INSPECTION TECHNOLOGIES AND PROGRAMS |
| 1.5 AUTHORITY |
| 1.6 AUTHORITY FOR PROJECTS MANAGED BY CBP |
| 1.7 AUTHORITY FOR PROJECTS MANAGED BY GSA |
| 1.8 ADDITIONAL DOCUMENTS |
| 1.9 FACILITY PLANNING AND DESIGN CONTACTS |
| 02 Facilities Planning and Programming |
| 2.1 PROJECT IMPLEMENTATION PROCESS |
| 2.2 PROJECT PLANNING AND PROGRAMMING |
| 03 Energy and Sustainability |
| 3.1 INTRODUCTION |
| 3.2 SUSTAINABLE BUILDING GUIDING PRINCIPLES |
| 3.3 OVERVIEW OF SUSTAINABLE PRINCIPLES |
| 3.4 VERIFICATION OF COMPLIANCE TO SUSTAINABLE PRACTICES |
| 3.5 SUSTAINABLE PRACTICES AFTER PROJECT COMPLETION |
| Table 3-1 Federal Leadership in High Performance and Sustainable Buildings Guiding Principles for NewConstruction and Major Renovations |
| Table 3-2 LPOE New Construction/Major Renovations Sustainability Scorecard |
| 04 LPOE Site and Facilities Layout |
| 4.1 INTRODUCTION |
| 4.2 SITE SELECTION AND PLANNING |
| 4.3 PAVING AND ROADWAYS PLANNING |
| 4.4 LANDSCAPE PLANNING |
| 4.5 HARSH WEATHER CONDITIONS |
| 4.5.1 Northern Border |
| 4.5.2 Southern Border |
| 4.6 PORT COMPONENTS |
| 4.7 SEQUENCE OF INSPECTION OPERATIONS |
| 4.8 GENERAL PORT LAYOUTS |
| 4.8.1 Crossing Points |
| 4.8.2 Relationships with Border |
| 4.8.3 Efficient Layout and Flow |
| 4.8.4 Clarity of Movement |
| 4.8.5 Sight Lines |
| 4.8.6 Typical Port |
| 4.8.7 Port with Two Points of Entry |
| 4.9 INSPECTION SEQUENCE |
| 4.10 PORT RUNNER CONTROLS |
| 4.11 TRAFFIC TYPES |
| 4.11.1 Pedestrian |
| 4.11.2 Bicycles |
| 4.11.3 Non-Commercial Vehicle |
| 4.11.4 Bus |
| 4.11.5 Commercial Vehicle |
| 4.11.6 Trains |
| 4.12 NON-PEAK OPERATIONS ACCOMMODATIONS |
| 4.13 ALTERNATE BOOTH LAYOUTS |
| 4.13.1 Use of High-Low Level Booths |
| 4.13.2 Use of Stacked Booths |
| 4.13.3 Tandem Booths |
| 05 LPOE Main Port Building |
| 5.1 INTRODUCTION |
| 5.2 DESIGN CONSIDERATIONS |
| 5.3 SITE PLANNING |
| 5.4 BUILDING PLANNING |
| 5.5 SPACE REQUIREMENTS MATRIX |
| 5.6 FUNCTIONAL AREAS PLANNING |
| 5.6.1 Administrative and Staff Support Spaces |
| 5.6.2 Administration |
| 5.6.3 Trusted Traveler (NEXUS/SENTRI) Enrollment collocated |
| 5.6.4 Fines, Penalties, and Forfeitures |
| 5.6.5 Anti-Terrorism Contraband Enforcement Team |
| 5.6.6 Training |
| 5.6.7 Staff Services |
| 5.6.8 Staff Services |
| 5.6.9 Processing, Inspection and Enforcement Areas |
| 5.6.10 Violator Processing and Enforcement Spaces |
| 5.6.11 CBP Agriculture Space |
| 5.7 BUILDING SUPPORT SPACES |
| 5.8 OTHER |
| 5.8.1 Trusted Traveler Enrollment (may be in a Separate Building) |
| 06 Non-Commercial Vehicle Inspection |
| 6.1 INTRODUCTION |
| 6.2 DESIGN CONSIDERATIONS |
| 6.3 SITE PLANNING |
| 6.3.1 Roadway Planning |
| 6.3.2 Booth and Canopy Site Planning |
| 6.4 SITE AND BUILDING PLANNING |
| 6.4.1 Broad Functional Areas |
| 6.4.2 Site and Building Planning and Functional Relationships |
| 6.4.3 Primary Inspection Lane Components |
| 6.4.4 Booth Islands and Paving |
| 6.4.5 Booths |
| 6.4.6 Headhouse |
| 6.4.7 Secondary Inspection Area |
| 6.4.8 Hard Secondary |
| 6.4.9 Agriculture Inspection Office |
| 6.4.10 Secondary Booths |
| 6.4.11 Secondary Lane Enforcement and Exit Control (SLEEC) Booths |
| 6.4.12 Special Requirements and Considerations |
| 6.5 TABLE OF SPACE REQUIREMENTS |
| 6.6 FUNCTIONAL AREAS PLANNING |
| 6.6.1 Primary Inspection |
| 6.6.2 Primary Non-Commercial Inspection Booth |
| 6.6.3 Hi-Low Inspection Booth |
| 6.6.4 Primary Non-Commercial Canopy |
| 6.6.5 Bus Plaza Canopy |
| 6.6.6 Primary Non-Commercial Inspection Lane |
| 6.6.7 Secondary Inspection |
| 6.6.8 Secondary Non-Commercial Super Booth |
| 6.6.9 Secondary Non-Commercial Canopy |
| 6.6.10 Exit Control |
| 6.6.11 Hard Secondary Inspection Bays |
| 6.6.12 Enclosed Hard Secondary Inspection Bay (Northern Border Only) |
| 6.6.13 TECS/Communications Workstation |
| 6.6.14 Screened Hard Secondary Inspection Bay (Southern Border Only) |
| 6.6.15 Air Compressor |
| 6.6.16 Tool Storage |
| 6.6.17 Government Enclosed Parking Space (Northern Border Only) |
| 6.7 HEADHOUSE - SUPERVISORY AND OFFICER SUPPORT SPACES |
| 6.7.1 CBP Command Center |
| 6.7.2 CBP Officer Supervisor |
| 6.7.3 CBP Officer Work Area |
| 6.7.4 Files and Storage |
| 6.7.5 CBP Agriculture Office |
| 6.7.6 CBP Agriculture Laboratory |
| 6.8 STAFF SERVICES |
| 6.8.1 LAN/Telco Room |
| 6.9 STAFF SUPPORT |
| 6.9.1 Staff Restroom (Men) |
| 6.9.2 Staff Restroom (Women) |
| 6.9.3 Break Room |
| 6.10 HEADHOUSE- PROCESSING, INSPECTION AND ENFORCEMENT AREAS |
| 6.10.1 Public Processing Areas |
| 6.10.2 Public Waiting Area |
| 6.10.3 Counter Positions |
| 6.10.4 Cashier Station/Office |
| 6.10.5 Public Restroom (Men) |
| 6.10.6 Public Restroom (Women) |
| 6.11 HEADHOUSE VIOLATOR PROCESSING AND ENFORCEMENT SPACES |
| 6.11.1 Violator Processing Area |
| 6.11.2 Violator Waiting Area |
| 6.11.3 IDENT/Identification |
| 6.11.4 Interview Room |
| 6.11.5 Search Room |
| 6.11.6 Hold Room (Male) |
| 6.11.7 Hold Room (Female) |
| 6.11.8 Violator Personal Property Storage |
| 6.11.9 Temporary Seized Property Storage Vault |
| 6.11.10 Seizure Processing Area |
| 6.11.11 Document Handling Room |
| 6.12 BUILDING SUPPORT SPACES |
| 6.12.1 Mechanical Room |
| 6.12.2 Main Electrical Room |
| 6.12.3 Electrical Room |
| 6.12.4 Janitor Closet |
| 07 Commercial Vehicle Inspection |
| 7.1 INTRODUCTION |
| 7.2 DESIGN CONSIDERATIONS |
| 7.3 SITE PLANNING |
| 7.4 SITE AND BUILDING PLANNING |
| 7.4.1 Broad Functional Areas |
| 7.5 BUILDING PLANNING |
| 7.5.1 Broad Functional Areas – Commercial Inspection |
| 7.6 COMMERCIAL INSPECTION DOCK |
| 7.7 COMMERCIAL DOCK |
| 7.7.1 Commercial Dock Spacing |
| 7.7.2 CBP Dock Components |
| 7.7.3 Commercial Dock Construction |
| 7.7.4 Commercial Dock Special Requirements |
| 7.8 SPACE REQUIREMENTS MATRIX |
| 7.9 PRIMARY INSPECTION |
| 7.9.1 Primary Commercial Inspection Booth |
| 7.9.2 Primary Commercial Canopy |
| 7.10 SECONDARY INSPECTION |
| 7.10.1 Commercial Unloading Dock |
| 7.10.2 Enclosed Commercial Vehicle Inspection Area (Northern Border Only) |
| 7.10.3 Dock Scale |
| 7.10.4 Dock Booth |
| 7.10.5 Driver Waiting Room |
| 7.10.6 Stevedore Break Area |
| 7.11 COMMERCIAL INSPECTION LOT |
| 7.11.1 Seized Property Vault |
| 7.11.2 Impoundment Lot |
| 7.11.3 Bulk Cargo Bins |
| 7.11.4 Hazardous Materials |
| 7.11.5 Empty Truck Inspection |
| 7.11.6 NII Operations |
| 7.11.7 NII Driver Waiting |
| 7.11.8 NII Control Room (Super Booth) |
| 7.11.9 Fixed NII Control Booth |
| 7.11.10 Commercial Lot Exit Booth Canopy |
| 7.11.11 Commercial Lot Exit Control Booth |
| 7.11.12 Storage Building (Northern Border Only) |
| 7.11.13 Truck Inspection –Staging (Parking) lot |
| 7.12 COMMERCIAL BUILDING - CBP ADMINISTRATION |
| 7.12.1 Assistant Port Director |
| 7.12.2 Chief CBP Officer |
| 7.12.3 Support Staff |
| 7.12.4 Conference Room/Muster Area/Training Room |
| 7.12.5 Broker Pick-up and Drop-off Boxes |
| 7.12.6 Public Waiting |
| 7.13 COMMERCIAL BUILDING - CARGO PROCESSING |
| 7.13.1 CBP Officer Supervisor |
| 7.13.2 CBP Officer Work Area |
| 7.13.3 Cashier Station |
| 7.13.4 Counter/Queue |
| 7.13.5 Distribution Room |
| 7.13.6 Files and Storage |
| 7.13.7 Document Handling Room |
| 7.13.8 Public Area |
| 7.14 COMMERCIAL BUILDING - ENTRY |
| 7.14.1 Entry Specialist Supervisor |
| 7.14.2 Entry Specialist |
| 7.14.3 Files and Storage |
| 7.14.4 Document Handling Room |
| 7.14.5 Cashier Station/Office |
| 7.14.6 Work Area |
| 7.14.7 Public Area |
| 7.15 COMMERCIAL BUILDING - TRADE COMPLIANCE IMPORT SPECIALIST |
| 7.15.1 Import Specialist Supervisor |
| 7.15.2 Import Specialist Work Area |
| 7.15.3 File Storage Room |
| 7.15.4 Document Handling Room |
| 7.16 COMMERCIAL BUILDING - WAREHOUSE |
| 7.16.1 Cargo Storage |
| 7.17 COMMERCIAL BUILDING - ANTI-TERRORISM CONTRABAND ENFORCEMENT TEAM |
| 7.17.1 ATCET Officer Supervisor |
| 7.17.2 ATCET Chief Officers’ Work Area |
| 7.17.3 ATCET Officer Work Area |
| 7.17.4 Secure Storage |
| 7.17.5 Public Area |
| 7.18 COMMERCIAL BUILDING - SECURE AND VIOLATOR PROCESSING AREA |
| 7.18.1 Violator Waiting Area |
| 7.18.2 Search Room |
| 7.18.3 Holding Room |
| 7.18.4 Interview Room |
| 7.18.5 Temporary Seized Property Storage Vault |
| 7.18.6 IDENT/Identification |
| 7.18.7 Seizure Processing Area |
| 7.19 CBP AGRICULTURE INSPECTION SPACE |
| 7.19.1 Agriculture Specialist Supervisor |
| 7.19.2 Agriculture Laboratory |
| 7.19.3 Files and Storage |
| 7.19.4 Agriculture Specialist Workstation |
| 7.19.5 Agriculture Technician |
| 7.19.6 Table at Dock |
| 7.19.7 Digital Imaging Equipment Room |
| 7.19.8 Agriculture Disposal Room (formerly: Steam Sterilizer or Cooker) |
| 7.20 COMMERCIAL BUILDING - STAFF SUPPORT SPACE |
| 7.20.1 Break Room |
| 7.20.2 Staff Restroom (Men) |
| 7.20.3 Staff Shower (Male) |
| 7.20.4 Locker Room (Male) |
| 7.20.5 Staff Restroom (Women) |
| 7.20.6 Staff Shower (Female) |
| 7.20.7 Locker Room (Female) |
| 7.20.8 Public Restroom (Driver) |
| 7.20.9 LAN/Telco Room |
| 7.20.10 Lactation Support Room |
| 7.21 COMMERCIAL BUILDING - BUILDING SUPPORT SPACE |
| 7.21.1 Janitor Room |
| 7.21.2 Emergency Generator |
| 7.21.3 Mechanical Room |
| 7.21.4 Electrical Switchgear Room |
| 7.21.5 Electrical Closet |
| 7.22 COMMERCIAL BUILDING - BUILDING SUPPORT SPACE (FWS) |
| 7.23 COMMERCIAL BUILDING - BUILDING SUPPORT SPACE (FDA) |
| 08 Canine Enforcement Spaces and Kennels |
| 8.1 INTRODUCTION |
| 8.2 SITE AND BUILDING PLANNING |
| 8.2.1 General |
| 8.2.2 Outdoor Spaces |
| 8.2.3 Lighting |
| 8.2.4 Parking |
| 8.2.5 Security |
| 8.2.6 Sewerage |
| 8.3 ROOM AND SPACE REQUIREMENTS |
| 8.3.1 Animal Processing |
| 8.3.2 Kennel Runs |
| 8.3.3 Laundry Room |
| 8.3.4 Food Preparation |
| 8.3.5 Canine Storage - Dry Food |
| 8.3.6 Canine Storage - Pseudo Narcotics Training |
| 8.3.7 Canine Storage - Hard Narcotics Training |
| 8.3.8 Canine Storage - Soft Narcotics Training |
| 8.3.9 Canine Storage - Agricultural Training |
| 8.3.10 Canine Storage - Currency Training |
| 8.3.11 Canine Storage - General |
| 8.3.12 Canine Storage - Blank Training Aid |
| 8.3.13 Canine Trainer/Supervisor Office |
| 8.3.14 Canine Officer Work Area |
| 8.3.15 Staff Restroom |
| 8.3.16 Janitor Closet |
| 8.3.17 Mechanical Room |
| 8.3.18 LAN/Telco Closet |
| 8.3.19 Electrical Closet |
| 09 Outbound Inspection |
| 9.1 INTRODUCTION |
| 9.2 PROGRAMMING |
| 9.3 DESIGN CONSIDERATIONS |
| 9.4 SITE PLANNING |
| 9.4.1 Roadway and Travel Path Planning |
| 9.4.2 Primary Inspection |
| 9.4.3 Inspection Areas and Canopy Planning |
| 9.5 SITE INSPECTION PROCESS AND PLANNING |
| 9.5.1 Broad Functional Inspection Zones |
| 9.5.2 Site, Outbound Support Building Planning, and Functional Relationships |
| 9.5.3 Primary Outbound Inspection Lane Components |
| 9.5.4 Booth Islands and Paving |
| 9.5.5 Booths |
| 9.5.6 Outbound Support Building |
| Outbound Support Building - Space Requirements Matrix |
| 9.5.7 Secondary Inspection Area |
| 9.5.8 Hard Secondary |
| 9.5.9 Agriculture Inspection Office |
| 9.5.10 Secondary Booths |
| 9.5.11 Special Requirements and Considerations |
| 10 Small Port Prototype |
| 10.1 INTRODUCTION |
| 10.2 DESIGN CRITERIA |
| 10.3 SITE DEVELOPMENT |
| 10.4 BUILDING DEVELOPMENT |
| 10.5 SPACE REQUIREMENTS MATRIX |
| 10.6 ADMINISTRATION |
| 10.7 PUBLIC AREA |
| 10.8 OPERATIONS AREAS |
| 10.9 ENFORCEMENT |
| 10.10 SUPPORT AREAS |
| 10.11 STAFF SERVICES |
| 10.12 BUILDING SUPPORT |
| 10.13 RELIEF OFFICER‘S QUARTERS |
| 10.14 PRIMARY INSPECTION BOOTH AND CANOPY |
| 10.15 NON-COMMERCIAL SECONDARY INSPECTION GARAGE |
| 10.16 OUTBOUND INSPECTION BOOTH AND CANOPY |
| 10.17 IMPOUNDMENT LOT |
| 10.18 COMMERCIAL INSPECTION AREA |
| 10.19 DEVANNING AREA |
| 10.20 GOVERNMENT ENCLOSED PARKING |
| 10.21 BUS QUEUING AREA |
| 10.22 NII INSPECTION AREA |
| 11 Rail Cargo Inspection |
| 11.1 INTRODUCTION |
| 11.2 APPLICATION |
| 11.3 RAILROAD PROCESSING FACILITY LAYOUT |
| 11.4 PROGRAMMING INFORMATION FOR THE RAIL PROCESSING FACILITIES |
| 11.4.1 Primary Rail Processing Facility (Border Facility) |
| 11.4.2 Rail Inspection Facility - Secondary Processing Facility (Inland Facility) |
| 11.4.3 Rail Inspection Facility - Unified Processing Facility (Single Facility) |
| 11.5 SIGNAGE |
| 11.6 LIGHTING |
| 11.7 SECURITY |
| 11.8 VOICE AND DATA REQUIREMENTS |
| 11.9 ROOM DATA |
| 12 Preclearance Facility |
| 13 Civil and Landscape Requirements |
| 13.1 INTRODUCTION |
| 13.2 DESIGN AND PLANNING |
| 13.2.1 Overview |
| 13.2.2 Coordination with State and Local Authorities |
| 13.2.3 Environmental Policy and Regulations |
| 13.2.4 Sustainability |
| 13.2.5 Civil Layout |
| 13.2.6 Physical Security |
| 13.2.7 Landscape Design |
| 13.2.8 Weather Related Design Strategies |
| 13.2.9 Existing Conditions |
| 13.3 SYSTEMS AND MATERIALS |
| 13.3.1 Site Clearing |
| 13.3.2 Grading and Drainage |
| 13.3.3 Roadway and Paving |
| 13.3.4 Traffic Control |
| 13.3.5 Markings |
| 13.3.6 Site Utilities |
| 13.3.7 Site Improvements |
| 14 Architecture Requirements |
| 14.1 INTRODUCTION |
| 14.2 ARCHITECTURE - EXTERIOR CHARACTER AND ENVELOPE |
| 14.2.1 PLANNING AND DESIGN |
| 14.2.2 BUILDING ENVELOPE SYSTEMS AND MATERIALS |
| 14.3 INTERIOR DESIGN - CHARACTER AND MATERIALS |
| 14.3.1 PLANNING AND DESIGN |
| 14.3.2 SYSTEMS AND MATERIALS |
| 15 Structural Requirements |
| 15.1 INTRODUCTION |
| 15.2 PLANNING AND DESIGN |
| 15.2.1 Codes and Regulations |
| 15.2.2 Anti- Terrorism and Force Protection and Progressive Collapse |
| 15.2.3 Design Loads |
| 15.2.4 Seismic Design/Seismic Upgrading |
| 15.3 SYSTEMS AND MATERIALS |
| 15.3.1 Overview |
| 15.3.2 Structural Systems |
| 15.3.3 Geotechnical Considerations |
| 15.3.4 Building Materials |
| 15.3.5 Building Types |
| 16 Life Safety and Fire Protection |
| 16.1 INTRODUCTION |
| 16.2 LIFE SAFETY & SITE PLANNING AND DESIGN |
| 16.2.1 Overview |
| 16.2.2 Codes and Regulations |
| 16.2.3 Site Parameters |
| 16.2.4 Life Safety & Means of Egress |
| 16.2.5 Special Security |
| 16.3 FIRE PROTECTION & MASS NOTIFICATION/FIRE ALARM PLANNING AND DESIGN |
| 16.3.1 Overview |
| 16.3.2 Codes and Regulations |
| 16.3.3 Fire Protection System Water Supply |
| 16.3.4 Fire Protection Systems |
| 16.3.5 Mass Notification/Fire Alarm Systems |
| 16.4 SYSTEMS AND MATERIALS |
| 16.4.1 Water Supply for Fire Protection Systems |
| 16.4.2 Sprinkler Systems |
| 16.4.3 Mass Notification/Fire Alarm Systems |
16.5 COMMISSIONING LIFE SAFETY AND FIRE PROTECTION
| 17 Plumbing Requirements |
| 17.1 INTRODUCTION |
| 17.2 CODES AND REGULATIONS |
| 17.3 ENERGY EFFICIENCY AND SUSTAINABILITY |
| 17.4 SYSTEMS AND MATERIALS |
| 17.4.1 Water Systems |
| 17.4.2 Sanitary Systems |
| 17.4.3 Special Systems Requirements |
17.5 MATERIALS
18 Mechanical Requirements
| 18.1 INTRODUCTION |
| 18.2 CODES AND REGULATIONS |
| 18.3 DESIGN CRITERIA |
| 18.4 ENERGY EFFICIENCY AND SUSTAINABILITY |
| 18.5 SYSTEMS AND MATERIALS |
| 18.6 COMMISSIONING |
| 18.7 PRODUCTS |
| 18.7.1 Grilles, Diffusers, Registers, and Controls |
| 19 Electrical Requirements |
| 19.1 INTRODUCTION |
| 19.2 ELECTRICAL DISTRIBUTION |
| 19.3 EMERGENCY POWER SYSTEM |
| 19.4 UNINTERRUPTIBLE POWER SUPPLY |
| 19.5 FAULT CURRENT AND PROTECTIVE DEVICE COORDINATION STUDY |
| 19.6 LIGHTING |
| 19.7 GROUNDING |
| 19.8 LIGHTNING AND SURGE PROTECTION |
| 19.9 ELECTRICAL PRODUCTS |
| 20 Data and Voice Requirements |
| 20.1 INTRODUCTION |
| 20.2 RESPONSIBILITIES |
| 20.3 LAN/TELCO ROOM REQUIREMENTS |
| 20.4 LAN/TELCO CLOSETS |
| 20.5 INFRASTRUCTURE REQUIREMENTS |
| 21 Physical Security Requirements |
| 21.1 INTRODUCTION |
| 21.2 RESPONSIBILITIES |
| 21.3 PLANNING CONCEPTS |
| 21.4 SECURITY DESIGN FEATURES |
| 21.5 CBP COMMAND CENTER |
| 21.6 PHYSICAL SECURITY SYSTEM |
| 21.7 ELECTRONIC SECURITY SYSTEM(S) |
| 21.8 SYSTEM PERFORMANCE |
| 22 Room Data Sheets |
| 22.1 INTRODUCTION |
| 22.2 ROOM DATA SHEET GENERAL NOTES |
| ADMINISTRATION / OFFICES |
| ADMINISTRATION |
| OPERATIONS |
| SUPPORT |
| CONFERENCE AND TRAINING SPACES |
| PROCESSING AND INSPECTION |
| PUBLIC & PEDESTRIAN SPACES |
| PRIMARY INSPECTION - BOOTHS & CANOPIES |
| SECONDARY INSPECTION |
| INSPECTION SUPPORT |
| NII INSPECTION |
| OTHER INSPECTION & STORAGE |
| CBP SECONDARY AREA / OPERATIONS |
| VIOLATOR PROCESSING AND ENFORCEMENT |
| VIOLATOR ENFORCEMENT AREAS |
| VIOLATOR PROCESSING AREAS |
| AGRICULTURAL INSPECTION & LAB SPACES |
| STAFF SUPPORT |
| STAFF SERVICES |
| BUILDING SUPPORT SPACES |
| OTHER SPACES |
| RELIEF QUARTERS |
| CANINE ENFORCEMENT SPACES & KENNEL |
| A Acronyms and Glossary |
| A.1 ACRONYMS |
| A.2 GLOSSARY |
| B Signage Requirements |
| C LPOE Project Submittal Requirements |
| C.1 INTRODUCTION |
| C.2 DRAWINGS |
| C.3 SPECIFICATIONS |
| C.4 TURNOVER DOCUMENTS |
| C.5 DESIGN NARRATIVES AND CALCULATIONS |
| C.6 DESIGN QUALITY REVIEWS |
| C.7 ENERGY ANALYSIS |
| C.8 COST ESTIMATING |
| C.9 NEW CONSTRUCTION PROJECT SUBMITTALS |
| C.10 PROCESS DEFINITIONS – NEW CONSTRUCTION |
| C.11 ALTERATIONS PROJECT SUBMITTALS |
| D Booth and Lane Prototype |
| D.1 INTRODUCTION |
| D.2 POV BOOTH DRAWINGS |
| D.3 COMMERCIAL BOOTH DRAWINGS |
| D.4 HI-LOW BOOTH DRAWINGS |
| D.5 APPROVED TRENCH SYSTEM |
| D.6 PEDESTRIAN/BUS PASSENGER PROCESSING BOOTHS |
| E Non-Intrusive Inspection Criteria |
| E.1 RADIATION PORTAL MONITORS |
| E.2 EMPTY TRUCK PORTAL |
| E.3 HIGH ENERGY GANTRY |
| E.4 HIGH ENERGY MOBILE |
| E.5 LOW ENERGY FIXED SYSTEM FOR PASSENGER VEHICLES |
| E.6 LOW ENERGY FIXED SYSTEM FOR TRUCKS AND BUSES |
| F Veterinary Services Facilities Criteria |
| F.1 INTRODUCTION |
| F.2 GENERAL DESIGN |
| F.3 PARKING FOR LIVESTOCK TRANSPORT VEHICLE, STAFF AND SERVICE VEHICLES |
| F.4 OFFICE/SUPPORT AREA WITH STORAGE AND SUPPORT SPACE |
| F.5 LIVESTOCK INSPECTION AREA |
| F.6 MANURE MANAGEMENT AND TREATMENT SYSTEM |
| G LPOE Standard Components Requirements |
| G.1 INTRODUCTION |
| G.2 TRAFFIC CONTROL |
| G.3 SITE ELEMENTS |
| H Centralized Audio Video Surveillance System Requirements |
| H.1 SUMMARY |
| H.2 SYSTEM |
| H.3 Racks |
| H.4 Operator Console |
| H.5 Digital Video Recorders (DVR) |
| H.6 Network Video Recorders |
| H.7 RAIDs |
| H.8 Video Monitoring Workstations |
| H.9 Monitors |
| H.10 Uninterruptible Power Supply (UPS) |
| H.11 Network Switch |
| H.12 KVM Switch |
| H.13 Fiber Optic Cabling |
| H.14 Fiber Optic Transmission/Devices |
| H.15 Wireless |
| H.16 Signs |
| H.17 Cameras |
| H.18 Microphones and Audio |
| H.19 Typical Land Border Port Surveillance Coverage |
| I Non-Intrusive Inspection Building Prototype |
| I.1 INTRODUCTION |
| I.2 NII BUILDING DRAWINGS |
| J Secondary Inspection Building Prototype |
| J.1 INTRODUCTION |
| J.2 ENCLOSED SECONDARY BUILDING DRAWINGS |
File details come from the government source that posted it.