AMENDMENT 2 - Muskogee FA - RFI LOG .xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Fire Alarm System Replacement - Muskogee OK Federal contract opportunity
Solicitation number
47PH0621R0022
Issued by
General Services Administration Public Buildings Service Region 7

About this file

This document contains a request for information log and clarifications for a federal solicitation to replace the fire alarm system at a facility in Muskogee, Oklahoma. The General Services Administration Public Buildings Service Region 7 is seeking to replace the existing fire alarm system and install a new emergency voice communication fire alarm system and bidirectional amplifier system in compliance with NFPA 72 and PBS P-100 standards. The new system must meet intelligibility, audibility, and ADA requirements defined in NFPA 72. All existing fire alarm devices, control panels, power supplies, notification appliances, and cabling will be replaced. Surface-mounted conduit may only be used in pre-approved locations approved by the historical architect. Clarification was also provided that the design drawings incorrectly included fire phones, and the project will instead utilize a bidirectional amplifier system to improve radio communications as specified in the solicitation.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log__Fire Alarm

REQUEST FOR INFORMATION (RFI) LOG
Muskogee FA Replacement Project
RFI #Offeror RFI #RFP SectionRFI QuestionRFI Answer and Source
RFIs incorporated on Amendment 0002 — Dated 7/13/21
1What model number is the ceiling Tile?Model ID is: "1820A" and avaiable from Lowe's. GSA FPE, thru the building maintenance manager.
2Can the Gamewell-FCI E3 Series FACF with Emergency Evac be substituted for the specified Fire Alarm Control Panel?No. The Gamewell FCI is not an equial-substitution. Request denied. GSA FPE
3Can someone provide reflected ceiling drawings for the facility?Existing building reflected ceiling plans could not be located. For bidding purposes, the contractors will need to make their own assumptions.
4There are existing EST Genesis series (somewhat modern) speaker strobe notification appliances and strobe only notification appliances currently installed throughout the facility. There are also existing Seimens addressable fire alarm devices [relatively new (two years old)] installed throughout the facility. Will all fire alarm contractors that are bidding the project need to replace all existing fire alarm system equipment including control panels, power supplies, voice amplifier equipment, notification appliances, peripheral fire alarm devices, and cabling? If the existing Seimens fire alarm system equipment is allowed to remain then the Seimens fire alarm contractor will have a major competitive advantage. Also, if the existing EST Genesis series notification appliance fire alarm system equipment is allowed to remain then the EST fire alarm contractor will have a major competitive advantage.All devises will be replaced. GSA FPE
5During the site visit facility walk-through we noticed that there are currently some fire alarm system devices that are mounted on surface-mounted EMT conduit in various corridors and other areas. Are there any areas other than mechanical rooms, parking garage, etc. where new devices can be mounted on surface-mounted EMT conduit and / or surface-mounted metallic wiremold raceway?No. Surface mounted conduit is strongly discouraged and only allowed in specific, pre-approved locations. The Historical architect must also review any visible conduit locations. GSA FPE
62Clarification by GSA.As a general note, the design drawings accidently show fire fighters handsets and jacks. GSA apologies for this confusion as the fire department prefers the use of handheld radios and GSA will utilizes a BDA to improve use of handheld radios. Do disregard the fire phones shown on the drawings as the project will utilize the BDA system as listed in the solicitation and as provided in the BDA Spec. GSA FPE
1
2
3Paragraph 9.1.19

&P of 4

File details come from the government source that posted it. Updated .