Amendment_01-USMS_Security_Barrier_Replacement-GC-1.pdf

PDF 2 MB Posted

Attached to
USMS Security Barrier Replacement Federal contract opportunity
Solicitation number
47PF0019R0010
Issued by
General Services Administration Public Buildings Service Region 5

About this file

Amendment 01-USMS Security Barrier Replacement-GC

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

5P1QCC

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RFP 47PF00-19R-0010-"USMS Security Barrier Replacement" project at the Melvin Price Federal Building and US Courthouse, East St.

Louis, IL. This amendment hereby incorporates:

1- Answers to requests for information received 2-This amendments removes and replaces drawing sheets CD101 & CS101 to correct the scale shown on the top right (attachment 1) 3-Drawings and specifications for the snow melt system provided by the AE (attachment 2 and 3) 4-The attendance list from the pre-proposal conference held on February 13th is included 5- A second site visit is scheduled for Thursday, March 7th at 11:00am(CT) at the Melvin Price Federal Building and US Courthouse, 750 Missouri Ave. East St. Louis, IL. Please RSVP to jordan.waldschmidt@gsa.gov. Proposals are still due by March 20, 2019, 2:00pm (EST).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

General Services Administration Acquisition Management Division 230 South Dearborn, Room 3500 Chicago, IL 60604

Same as Box 6

EQ5PSS2P2-19-0004

47PF00-19R-0010

3. EFFECTIVE DATE

03/04/2019

02/05/2019

X 1X 1

RFP-47PF00-19R-0010

USMS Security Barrier Replacement

Melvin Price Federal Building and US Courthouse 750 Missouri Ave.

East St. Louis, IL 62201 Requests for Information

Question 1- For Factor 1: Experience providing General Construction (GC) Services on Similar Projects – may we submit past projects performed by key subcontractors to satisfy this factor?

Answer 1- Yes, past projects performed by key subcontractors is acceptable. Please note the subs that performed the project and any role the GC played in the project.

Question 2- The scale shown at the top of Sheets CD101 & CS101 do not match the Dimensions shown the Site Plans. Which is correct?

Answer 2- See attached updated drawings.

Question 3-What are the specifications for the Snow Melting System called on II.

Contract Price Form CLIN 2 ? Is this a glycol system under the new driveway?

Answer 3-See attachments 2 and 3

Question 4- I.C. Period of Performance Substantial Completion is required in 90 Calendar Days from NTP. The GSA has 90 days to decide on the Snow Melting system. The 14 CD extension is not sufficient to add this to the barrier system or under the new driveway.

Answer 4- See answer to question 5

Question 5- The 90 Calendar Days duration is insufficient to achieve substantial completion plus another 60 Calendar Days for completion of the project. We request a contract duration to substantial completion of a minimum of 190 Calendar Days.

After consulting with three barrier subcontractors the shop drawings require 2- 4 weeks and the fabrication and delivery to the site require 12-16 weeks after shop drawing approval. That is over the 90 Calendar Day duration specified in the RFP. A preliminary schedule is attached that addresses the duration question.

Answer 5- Once awarded, an interim Notice to Proceed is issued to allow time for security clearances, and submittals. The clock does not actually start for the performance period until ON-SITE NTP is issued. Therefore the 2-4 plus 12-16 weeks for shop drawings, fabrication and delivery would not be included in the performance period time frame to reach substantial completion. See "Agreement-Supplementary Conditions" on page 77 of the solicitation.

GSA Security Barrier Upgrade Rev. 1 Construction Documents - Plans.pdf
Sheets and Views
GI001 COVER SHEET
GI002 GENERAL NOTES
GI003 PHASING PLAN
CD101 DEMOLITION PLAN
CS101 SITE PLAN - NEW WORK
CS102 LOOP DETECTOR LAYOUT PLAN - NEW WORK
CS501 SITE DETAILS
CS502 RAM-PROOF BARRIER GATE DETAILS - NEW WORK
CG101 GRADING PLAN - NEW WORK
Final ESL Snow Melt Dwg 2.27.18.pdf
EP104
Sheets and Views
EP104
M101
Sheets and Views
M101
M102
Sheets and Views
M102
P101
Sheets and Views
P101