Amendment_01-USMS_Security_Barrier_Replacement-GC-1.pdf
PDF 2 MB Posted
- Attached to
- USMS Security Barrier Replacement Federal contract opportunity
- Solicitation number
- 47PF0019R0010
About this file
Amendment 01-USMS Security Barrier Replacement-GC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3-Updated_SF1442-14b.pdf | ||
| Amendment_03-Updated_Snow_Melt_Dwgs_and_Cost_Breakdown.pdf | ||
| Attachment_1-ESL_Snow_Melt_Dwg_Add._2_Final_3.14.19_(1).pdf | ||
| Attachment_2-Revise_Contract_Price_Form.docx | DOCX document | |
| Amendment_02-ESL_USMS_Security_Barrier.pdf | ||
| Attachment_2-GSA_Security_Barrier_Replacement_Div_22_&_23_Specs.pdf | ||
| Attachment_1-GSA_Security_Barrier_Upgrade_Rev._1_Construction_Documents_-_Plans.pdf | ||
| Attachment_3-Final_ESL_Snow_Melt_Dwg_2.27.18.pdf | ||
| RFP_47PF00-19R-0010.pdf | ||
| H2-Final_Construction_Documents_-_Specifications_USMS_Sec_Barrier.pdf | ||
| H1-Final_Construction_Documents_-_Plans_USMS_Sec_Barrier.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
5P1QCC
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
RFP 47PF00-19R-0010-"USMS Security Barrier Replacement" project at the Melvin Price Federal Building and US Courthouse, East St.
Louis, IL. This amendment hereby incorporates:
1- Answers to requests for information received 2-This amendments removes and replaces drawing sheets CD101 & CS101 to correct the scale shown on the top right (attachment 1) 3-Drawings and specifications for the snow melt system provided by the AE (attachment 2 and 3) 4-The attendance list from the pre-proposal conference held on February 13th is included 5- A second site visit is scheduled for Thursday, March 7th at 11:00am(CT) at the Melvin Price Federal Building and US Courthouse, 750 Missouri Ave. East St. Louis, IL. Please RSVP to jordan.waldschmidt@gsa.gov. Proposals are still due by March 20, 2019, 2:00pm (EST).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
General Services Administration Acquisition Management Division 230 South Dearborn, Room 3500 Chicago, IL 60604
Same as Box 6
EQ5PSS2P2-19-0004
47PF00-19R-0010
3. EFFECTIVE DATE
03/04/2019
02/05/2019
X 1X 1
RFP-47PF00-19R-0010
USMS Security Barrier Replacement
Melvin Price Federal Building and US Courthouse 750 Missouri Ave.
East St. Louis, IL 62201 Requests for Information
Question 1- For Factor 1: Experience providing General Construction (GC) Services on Similar Projects – may we submit past projects performed by key subcontractors to satisfy this factor?
Answer 1- Yes, past projects performed by key subcontractors is acceptable. Please note the subs that performed the project and any role the GC played in the project.
Question 2- The scale shown at the top of Sheets CD101 & CS101 do not match the Dimensions shown the Site Plans. Which is correct?
Answer 2- See attached updated drawings.
Question 3-What are the specifications for the Snow Melting System called on II.
Contract Price Form CLIN 2 ? Is this a glycol system under the new driveway?
Answer 3-See attachments 2 and 3
Question 4- I.C. Period of Performance Substantial Completion is required in 90 Calendar Days from NTP. The GSA has 90 days to decide on the Snow Melting system. The 14 CD extension is not sufficient to add this to the barrier system or under the new driveway.
Answer 4- See answer to question 5
Question 5- The 90 Calendar Days duration is insufficient to achieve substantial completion plus another 60 Calendar Days for completion of the project. We request a contract duration to substantial completion of a minimum of 190 Calendar Days.
After consulting with three barrier subcontractors the shop drawings require 2- 4 weeks and the fabrication and delivery to the site require 12-16 weeks after shop drawing approval. That is over the 90 Calendar Day duration specified in the RFP. A preliminary schedule is attached that addresses the duration question.
Answer 5- Once awarded, an interim Notice to Proceed is issued to allow time for security clearances, and submittals. The clock does not actually start for the performance period until ON-SITE NTP is issued. Therefore the 2-4 plus 12-16 weeks for shop drawings, fabrication and delivery would not be included in the performance period time frame to reach substantial completion. See "Agreement-Supplementary Conditions" on page 77 of the solicitation.
| GSA Security Barrier Upgrade Rev. 1 Construction Documents - Plans.pdf |
| Sheets and Views |
| GI001 COVER SHEET |
| GI002 GENERAL NOTES |
| GI003 PHASING PLAN |
| CD101 DEMOLITION PLAN |
| CS101 SITE PLAN - NEW WORK |
| CS102 LOOP DETECTOR LAYOUT PLAN - NEW WORK |
| CS501 SITE DETAILS |
| CS502 RAM-PROOF BARRIER GATE DETAILS - NEW WORK |
| CG101 GRADING PLAN - NEW WORK |
| Final ESL Snow Melt Dwg 2.27.18.pdf |
| EP104 |
| Sheets and Views |
| EP104 |
| M101 |
| Sheets and Views |
| M101 |
| M102 |
| Sheets and Views |
| M102 |
| P101 |
| Sheets and Views |
| P101 |