Revised_SF1442_with_Pricing_Sheet.pdf
PDF 578 KB Posted
- Attached to
- Multiple Floor Renovations at 26 Federal Plaza
- Solicitation number
- 47PC0318R0007
About this file
Revised SF1442 with Pricing Sheet
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
47PC0318R0007
Acquisition Management Division Operation Branch C One World Trade Center New York, NY 10007
See attached pricing sheet.
Acquisition Management Division Operation Branch C One World Trade Center New York, NY 10007
TBD TBD
06/25/2018
2:00pm
1 4
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Quentin Hamm
CONTRACT PRICE FORM FOR:
The Multiple Floor Renovation Project for Floors 23, 24, 27 and 29, located at the Jacob
Javits Federal Building 26 Federal Plaza, New York, NY 10278
SOLICITATION NUMBER:
Instructions to Offerors: The provided pricing sheet includes the following:
1) – Lump Sum Base Bid price to complete all work on the 27th and 29th floors.
2) – Alternate No. 01A – 01E: Rehabilitation of existing perimeter induction units
3) – Alternate No. 02A – 02E: Replacement of perimeter induction units
4) – Add Option No. 01: 23rd Floor – Area A.
5) – Add Option No. 02: 23rd Floor – Area B.
6) – Add Option No. 03: Entire 23rd Floor.
7) – Add Option No. 04: 24th Floor.
Refer to GSA Division One Specification Section 01 23 00 - Alternates for additional information regarding Alternates 01A - 01E & Alternates 02A - 02E. REFER TO NOTE 1
BELOW.
Refer to GSA Division One Specification Section 01 24 00 – Options for additional information regarding Options 1-4.
The Multiple Floor Renovation Project for the 23rd, 24th, 27th and 29th Floors
ITEM DESCRIPTION SUBTOTAL COST
Total Lump Sum Base Bid for all work on the 27th and 29th Floors, excluding Alternates 1A & 2A (substantial completion within 300 calendar days of NTP) REFER TO NOTE 2 BELOW.
Alternate No. 1A: Rehabilitation of existing perimeter induction units on the 27th and 29th floors.
Alternate No. 2A: Replacement of perimeter induction units on the 27th and 29th floors.
Add Option No. 1: 23rd Floor – Area A, excluding Alternates 1B & 2B
(substantial completion within 120 calendar days of NTP) with an estimated NTP issuance 30 calendar days after completion of the 27th floor
Alternate No. 1B: Rehabilitation of existing perimeter induction units on the 23rd floor - Area A
Alternate No. 2B: Replacement of perimeter induction units on the 23rd floor - Area A.
Add Option No. 2: 23rd Floor – Area B, excluding Alternates 1C & 2C
(substantial completion within 120 calendar days of NTP) with an estimated NTP issuance 90 calendar days after issuance of the NTP.
Alternate No. 1C: Rehabilitation of existing perimeter induction units on the 23rd floor - Area B
Alternate No. 2C: Replacement of perimeter induction units on the 23rd floor - Area B.
Add Option No. 3: entire 23rd Floor, excluding Alternates 1D & 2D (substantial completion within 180 calendar days of NTP) with an estimated NTP issuance 30 calendar days after the completion of the 27th floor.
Alternate No. 1D: Rehabilitation of existing perimeter induction units on the entire 23rd floor
Alternate No. 2D: Replacement of perimeter induction units on the entire 23rd floor.
Add Option No. 4: 24th Floor, excluding Alternates 1E & 2E (substantial completion within 180 calendar days of NTP) with the expectation work would commence on or about February 2019.
Alternate No. 1E: Rehabilitation of existing perimeter induction units on the 24th floor
Alternate No. 2E: Replacement of perimeter induction units on the 24th floor.
Total Evaluated Offer –Sum of Lump Sum Base Bid Plus all Alternates
& Options
Note 1: Bidders are reminded that in their base bid or option price the cost for cleaning of the induction units is included. The alternate price is the added costs associated with the increased scope.
Note 2: Work on the 29th floor will commence upon receipt of Notice to Proceed (“NTP”), and work on the 27th floor will commence 30 calendar days after substantial completion of the 29th floor.
| SF1442 - 26 Fed Multifloor Project |
| P.Sheet |
File details come from the government source that posted it.