Amendment No. AM0002 with responses to RFIs and slides of the Pre-Proposal Conference presentation
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
1 24
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
AM0002
Omar Reveron
CONTRACTING OFFICER
The purpose of this modification is:
- To post Questions & Answers received from Pre-Proposal Conference held on Wednesday, May 2, 2018;
- Post slides of Pre-Proposal conference.
ALL TERMS AND CONDITIONS OF THE SOLICITION REMAIN UNCHAGED
OPERATIONS BRANCH C
One World Trade Center New York, NY 10007
OPERATIONS BRANCH C
One World Trade Center New York, NY 10007
47PC0318R0003
3. EFFECTIVE DATE
05/09/2018
04/13/2018
OMAR REVERON Digitally signed by OMAR REVERON Date: 2018.05.09 16:36:14 -04'00'
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
REPAIR & ALTERATIONS, INDEFINITE DELIVERY INDEFINITE QUANTITY, PUERTO RICO & US VIRGIN
ISLANDS REQUIREMENT
Dated: 05/09/18
Pre-proposal Conference Questions:
01. Could you elaborate about how the key employees are related to the firm?
Answer: Please show how the key personnel are structured in your organization. Examples can be a flow chart or a detailed breakdown of the personnel in your organization. ** Please remember we are looking for the Key Personnel, as indicated on the solicitation, section IID factor 2, number 1 (Pages 10 -
11).
02. Are the proposals accepted via mail?
Answer: (a) No, only e-mail. In order to be considered for award, electronic offers conforming to the requirements of the Solicitation must be received on, or before, the following date/time at the following email addresses no later than:
Date: May 23, 2018
Time: 4:00 P.M. EST
Email: sung.yoo@gsa.gov and brittney.pulley@gsa.gov
(b) All Offers shall be submitted via electronically. Any offers received after 4:00 PM EST will not be accepted.
03. Will a copy of the presentation be posted in FBO?
Answer: Yes
04. For past performance references, please indicate what size of building/structure is considered comparable?
Answer: Any of these federally owned buildings, located in either USVI or PR are considered comparable in size:
Federal Center, 651 Federal Drive, Guaynabo, PR 00965 -Federico Degetau Federal Building and
Clemente Ruiz Nazario U.S. Courthouse 150 Carlos Chardon Avenue, Hato Rey, PR 00918 -Jose V. Toledo
U.S. Post Office and Courthouse, 300 Recinto Sur Street, San Juan, PR 00901 -Ron de Lugo Federal
Building and U.S. Courthouse, 5500 Veterans Drive, St. Thomas, USVI 00801 -Almeric L. Christian Federal
Building and Courthouse, 3013 Estate Golden Rock, St. Croix, USVI 00820
05. For past performance references, must work have been completed within the Caribbean?
Answer: No.
06. Will the government take into consideration the experience of if the teaming partners?
Answer: Teaming partners will be considered. However, this is a 100% HUBzone set aside.
mailto:sung.yoo@gsa.gov mailto:brittney.pulley@gsa.gov
07. Will the similarly situated entities apply to the subcontracting limitations?
Answer: This is set-aside to strictly Small Business, HUBZones (prime must be a HUBZone). No subcontracting plan is required.
08. Will local companies receive a preference?
Answer: No preference will be given to local companies.
09. Will a list of attendees to today’s meeting be posted to FBO?
Answer: A list of the attendees of the pre-proposal conference will not be posted.
10. Is the Final Proposal accepted via FedEx or mail or is in-person submission required?
Answer: Not accepted via FedEx, mail or in-person. Please see answer to question 2.
11. Proposal requires bid bond for the amount $250,000.00, however, the task order limit is $15 million.
Does this mean the contractor has to be able to provide $15 million bond on a given task of the similar amount?
Answer: No - the Contractor does not have to be able to provide a $15 million dollar bond on a given task order. Individual task orders will be limited to projects between the micro-purchase threshold and
$250,000.00. $15 million is the aggregate Maximum Order Limitation (MOL) for all task orders under the
IDIQ contract not to exceed $15,000,000.00 for the total five-year term.
12. Are you going to publish the permits and taxes required by the Government of Puerto Rico?
Answer: No. The Contractor is responsible to look up and include all applicable taxes for Puerto Rico and the United States Virgin Islands.
13. Page 10 of 27 experience for project states "comparably sized structure" as a requirement. We understand the requirement, but what SIZE of the structure is considered acceptable for past performance references?
Answer: Any of these federally owned buildings, located in either USVI or PR are considered “a comparably sized structure”:
Federal Center, 651 Federal Drive, Guaynabo, PR 00965 -Federico Degetau Federal Building and
Clemente Ruiz Nazario U.S. Courthouse 150 Carlos Chardon Avenue, Hato Rey, PR 00918 -Jose V. Toledo
U.S. Post Office and Courthouse, 300 Recinto Sur Street, San Juan, PR 00901 -Ron de Lugo Federal
Building and U.S. Courthouse, 5500 Veterans Drive, St. Thomas, USVI 00801 -Almeric L. Christian Federal
Building and Courthouse, 3013 Estate Golden Rock, St. Croix, USVI 00820
14. How is the Stafford Act associated with the process?
Answer: The Stafford Act applies to FEMA, not GSA. The Stafford Act does not apply to this procurement.
15. Similarly situated entities means that you can sub-contract to another HUBZone (in this case) and will not affect the subcontracting limitations.
Answer: This is set-aside to strictly Small Business, HUBZones (prime must be a HUBZone). No subcontracting plan is required.
16. Can you outline any special taxes or fees associated with the USVI?
Answer: The Contractor is responsible to look up and include all applicable taxes for Puerto Rico and the
United States Virgin Islands.
17. Will a site visit be available?
Answer: Site Visits will be held on a task order level.
18. Question: Where to submit line item pricing as there are no line items to bid on?
Answer: We are requesting an all inclusive coefficient, as described on page 8-9 of 27, under II.C "Price
Proposal." We are using the RS Means methodology, and utilizing the RS Means book for all line items.
19. Please clarify the page limitation for Section II.D. Technical Proposal Factor 1: Experience on Similar
Projects narrative.
Answer: Page limitation has not been included in the solicitation. Your submission needs to address factor 1 in its entirety.
20. For “experience project submission requirements”, the first bulleted requirement states “project involved the repair and alterations of a comparably sized structure”. Please clarify the size of structure deemed acceptable and comparable in order for bidders to meet this requirement.
Answer: Please see answer to question 13 above.
21. For the bid bond, please clarify if an actual bid bond for $250,000 is required or if a letter from our surety firm indicating our capacity to provide the bond upon award is acceptable. If the bond is due at time of proposal, please indicate to whom it needs to be addressed.
Answer: Either one is acceptable. Please make Bid bond out to the General Services Administration.
A Line of credit from your bank or surety - ** This is not a requirement, but highly recommended to be submitted to assist the gov't in assessing your financial capabilities and move the process along.
22. Section II.A. Proposal Contents – states to include the coefficient into block 17 of SF1442, “Amounts”. Are offerors to include the coefficient stated as a percentage? If the coefficient is to remain stable / unchanged for the base year and option periods, please confirm that only one entry or number is required to be placed into block 17.
Answer: We are looking for a coefficient in decimal form, and only one (1) coefficient. This is for the base year and all option years. (example: 1.5 or 1.00).
23. Requirements for Joint Venture Offerors states, “(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture”. Are offerors (both parties of a JV) required to submit both the Form SF527 and their financial statements, to include profit/loss and balance sheets? Please confirm the precise requirement for financial information required for submission.
Answer: If a Joint Venture (JV) is being created, each member of the JV must submit their own 527 along with all financial information.
Financial Information:
- Your latest, yearly certified financial statements and balance sheets are to be submitted.
- A Line of credit from your bank or surety. ** This is not a requirement, but highly recommended to be submitted to assist the gov't in assessing your financial capabilities and move the process along.**
24. Our firm has completed multiple IDIQs and previous projects renovating and rehabilitating occupied building spaces. These projects have involved all disciplines including but not limited to civil, structural, HVAC, plumbing, electrical, telecommunications, utilities, and hazmat abatement. However, it has been rare for an individual project to fall below the $250,000 price maximum stated in the submission requirements. I fear that our proposal will not be considered based on the potentially over-qualified status of our past performances.
Could you verify the level of stringency for the past performance requirements and the related price ranges?
Will projects over $250,000 be disqualified?
Answer: Projects over $250,000 will be disqualified.
Pre-Proposal Conference Wednesday May 2, 2018
Repair and Alteration IDIQ Under Simplified Acquisition Threshold (SAT)
The Caribbean - Puerto Rico and the U.S. Virgin Islands
Agenda
• Opening Remarks
• General Information
• Solicitation Information
• Project Overview Presentation
Opening Remarks
• Pre-Proposal Conference Goals:
– Provide general information about the Solicitation
– Promote awareness of the project
– Encourage maximum participation
Disclaimer
• The information contained in this presentation is for informational purposes only.
• Questions/Answers will be posted, via an amendment, on FBO per the dates reflected in Amendment AM0001 of the solicitation.
• In the event of a discrepancy between the information contained herein and the solicitation documents, the solicitation documents will take precedence and is strongly encouraged for prospective vendors to bring discrepancies to the Government’s attention as soon as possible.
Introducing the Project Team GSA Contracting Team:
• Omar Reveron, Contracting Officer
• Jason Rios, Contracting Specialist
• Sung Yoo, Contract Specialist
• Brittney Pulley, Contract Specialist
GSA Technical Team:
• Gonzalo Vargas, Building Manager
• Kiomy Lamb-Mercado, Construction Control Representative
• Leandro Rivera, Lease Management Specialist
Government Point of Entry All requirements information, amendments and request for informations (RFI) concerning the solicitation will be electronically posted at the Federal Business Opportunity, also known as FedBizOpps, website via http://www.fbo.gov.
INTERESTED PARTIES ARE STRONGLY ENCOURAGED TO
REGISTER TO THE SOLICITATION NOTICE TO RECEIVE
NOTIFICATION OF ACTIONS, INCLUDING POSTING OF
AMENDMENTS.
http://www.fbo.gov
● Project Name: Repair and Alteration, R&A IDIQ, The Caribbean - Puerto Rico and the U.S.
Virgin Islands
● Solicitation Number: 47PC0318R0003
● Performance Period: Base Period with Four (One Year) Options Periods
● Maximum Order Limitation: $15 Million
● Set-Aside: Maximum of five (5) HUBZones vendors
Solicitation Information
System for Award Management Interested firms must be registered in the System for Award Management (SAM), in order to receive procurement documents and, ultimately, a contract award.
Firms can register via the Internet site at https://www.sam.gov or by contacting SAM Service Desk at http://www.fsd.gov.
https://www.sam.gov
Socioeconomic Considerations This requirement is 100% set aside for HUBZones in accordance with Federal Acquisition Regulation (FAR) Subpart 19.
Vendors may confirm they are recognized as a HUBZone entity by the Small Business Administration (SBA) via:
http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
The North American Industry Classification System (NAICS) code associated with this procurement is 236220, Commercial and Institutional Building Construction; with a size standard of thirty-six million, five hundred thousand dollars ($36,500,000) average annual receipts. All responsible small business firms may submit a proposal.
http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
Selection Process This will be a competitively negotiated acquisition governed by procedures in the Federal Acquisition Regulation (FAR) Part 15.
Source selection procedures will utilize the Lowest Price Technically Acceptable (LPTA) process.
Upon receipt of proposals, the Source Selection Evaluation Board’s (SSEB’s) members will evaluate each technical submission individually. Price proposals will be evaluated independently from the technical proposals.
A firm fixed price contract is contemplated.
Factor 1 - Experience on Similar Projects
(Acceptable/Unacceptable)
Evaluation Factors
Factor 2 - Key Personnel and Organizational Structure
(Acceptable/Unacceptable)
Factor 3 - Past Performance of Offeror
(Acceptable/Neutral/Unacceptable)
In the case of an offeror without a record of relevant past performance or for whom information or past performance is not available; the offeror may not be evaluated favorably or unfavorably on past performance. The rating shall be characterized as NEUTRAL in such circumstances.
Discussions
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a).
Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint.
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Proposal Contents
(1) Price Proposal
(a) Standard Form (SF) 1442; Please place All Inclusive Coefficient into block 17 of SF 1442, “Amounts.” Pages 6 of 27 GSA Solicitation No. 47PC0318R0003
(b) Representations and Certifications (C301) or as listed in firm’s sam.gov profile (Attachment)
(c) Standard Form 527 - Contractor’s Qualification and Financial Information (Attachment)
(d) Standard Form 24 Bid Bond in the amount of $250,000.00 (Attachment); or an Irrevocable Letter of Credit from your bank or surety. - Latest certified financial statements and balance sheets are to be submitted. - **A Line of credit from your bank or surety will assist the government in assessing your financial capabilities.**
(2) Technical Proposal (Refer to previously mentioned factors 1-3)
Requests for Information (RFIs)
REQUESTS FOR CLARIFICATION OR INTERPRETATION:
RFI’s (Round One) are due not later than Wednesday, May 9, 2018 at 3:00 PM EST.
RFI’s (Round One) ANSWERS will be posted by Friday, May 11, 2018 at 5:00 PM EST.
RFI’s (Round Two) are due not later than Wednesday, May 16, 2018 at 3:00 PM EST.
RFI’s (Round Two) ANSWERS will be posted by Friday, May 18, 2018 at 5:00 PM EST.
Proposal Submissions are due Wednesday, May 23, 2018 at 4:00 PM EST.
Submit via writing to the following:
Contracting Specialist: Sung Yoo, sung.yoo@gsa.gov Contracting Specialist: Brittney Puley, brittney.pulley@gsa.gov mailto:andreea.surdu@gsa.gov
Thank You for Participating
Submit inquiries in writing to the following:
Contracting Specialist:
Sung Yoo, sung.yoo@gsa.gov
Contracting Specialist:
Brittney Puley, brittney.pulley@gsa.gov
Pre-Proposal Conference May 2, 2018
Repair and Alteration IDIQ Under Simplified Acquisition Threshold (SAT) mailto:andreea.surdu@gsa.gov
| 2018 0509 AM0002 47PC0318R0003 (OR Signed) |
| 2018 0502 Pre-Proposal Conference and RFI Q&A's.docx (1) |
| R&A IDIQ PRE PROPOSAL CONFERENCE working doc.pptx |
File details come from the government source that posted it.